Cities Index.
Agenda packet

Santa Ana City Council
May 5, 2026

Document
Agenda packet
Meeting
May 5, 2026
Body
Santa Ana City Council
Pages
39
Original file
608.4 MB
Text extracted from the city's file for reading and search. Open the original on santa-ana.primegov.com. That file is the official record.

Construction staging areas for the proposed project would potentially be located on the following properties: APNs 398-093-13, 398-092-12, and 398-207-01. The disposal site for the proposed project, if needed, will be selected by the contractor. Any environmental clearances related to the EXHIBIT 2
City Council 22 – 454 5/5/2026
Chapter 2. Project Description
Noise Study Report
Santa Ana Boulevard Grade Separation Project
2-2
disposal site will be obtained by the contractor prior to construction. The proposed project is included in the 2008 Regional Transportation Plan (RTP) and 2011 cost-constrained Federal Transportation Improvement Program (FTIP) (federal approval date of December 14, 2010) as project ID ORA082610. The project as proposed is consistent with the 2011 FTIP description.

EXHIBIT 2
City Council 22 – 455 5/5/2026
§¨¦5
§¨¦405
§¨¦5
§¨¦5
§¨¦405
UV55
UV91
UV261
UV73
UV57
UV72
UV22
UV133
UV90
UV133
UV90
UV261
UV UV72 91
UV261
UV57
UV22
Anaheim
Santa Ana
Irvine
Orange
Costa Mesa
Garden Grove
Fullerton
Tustin
Fountain Valley
Newport Beach
Westminster
Tustin Foothills
Placentia
Villa Park Villa Park
Figure 1
Regional Vicinity Map
Santa Ana Boulevard Grade Separation Project
±
Source: ESRI StreetMap
North America (2008)
0 0.5 1 2
Miles
San Bernardino
Riverside
Imperial San Diego
Orange
Los Angeles
Kern
P a c i f i c
O c e a n
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig01_Regional_Vicinity.mxd SM, NB (09-19-11) Project Site
District: 12
County: Orange
Route: Santa Ana Boulevard
Federal Project No.: STPL 5063(136)
EXHIBIT 2
City Council 22 – 456 5/5/2026
EXHIBIT 2
City Council 22 – 457 5/5/2026
Project Location
French
Park
Logan
Park
Mabury
Park
Prentice
Park
P E Railroad
BNSF RR and Amtrak
15Th
Mcclay
Standard
Spurgeon
Elk
Oakmont
Santiago
Main
Parrie
Hardly
Grace
Breeden
Trinidad
Kilson
Obarr
8Th
6Th
Brown
Dresser
Myrtle
Mortimer
Martha
Greenwood
5Th
Penn
Eastside
Porter
11Th
Stafford
12Th
Terminal
Eastwood
Patricia
2Nd
Camile
Court
Hathaway
Dorman
9Th
10Th
Valencia
Palm
Vance
Minnie
18Th
Warren
Cedar
Concord
Custer
Wellington
Fuller
Fruit
Fairmont
19Th
Bush
20Th
21St
Catalina
Logan
16Th
3Rd
Santa Fe
Minter
Garfield Hickory
Civic Center
Bishop
Pine
Lacy
Washington
Chestnut
Walnut
Wright
French
Linwood
Poinsettia
Lyon
Orange
Cypress
Halladay
Oak
14Th
Maple
4Th
Lincoln
Mabury
Santa Ana
17Th
Grand
Mortimer
5Th
4Th
Main
1St
§¨¦5
Figure 2
Project Location Map
Santa Ana Boulevard Grade Separation Project
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig02_Project_Location.mxd SM, NB (09-19-11)) ±
Source: ESRI StreetMap
North America (2008)
0 250 500 1,000
Feet
District: 12
County: Orange
Route: Santa Ana Boulevard
Federal Project No.: STPL 5063(136)
EXHIBIT 2
City Council 22 – 458 5/5/2026
EXHIBIT 2
City Council 22 – 459 5/5/2026

SANTIAGO ST

POINSETTIA ST

METROLINK

SANTA ANA

STATION

STAFFORD ST

CUSTER ST

LOGAN ST

WASHINGTON AVE

LINCOLN AVE

FULLER ST

TERMINAL ST
E 4TH STBREEDEN
I-5 NB
I-5 SB
I-5 SB OFF
I-5 SB ON

PHOENIX HOUSE

REHAB CENTER

FRUIT ST

EASTWOOD AVE

SANTA ANA
BLVD

GRAND AVE
APN
398-093-01 APN 398-194-21
APN
398-194-22
APN
398-194-20
APN
398-194-19
APN
398-194-18
APN
398-092-09
APN
398-092-08
APN
398-092-10
APN
398-092-11
APN
398-092-14
APN
398-092-13
APN
398-092-02
APN
398-093-08
APN
398-093-07
APN
398-093-05
398-093-06
APN
398-093-04
APN
398-194-15
APN
398-194-16
APN
398-194-17
APN
398-194-23
APN
398-194-14
APN
398-093-13
398-205
-07
APN
398-202-01
APN
398-201-11
APN
398-352-10
APN
398-204-04
APN
398-352-07
APN
398-207-01
APN
398-361-07
APN
398-208-01
APN
398-101-16
APN
398-101-15
APN
398-101-14 APN
398-101-13
APN
398-101-02
APN
398-361-01
APN
398-352-06
APN
398-342-12
APN
398-381-01
APN
398-381-04
APN
398-381-02
05 03
04 02
APN
398-381-12
APN
398-461-07
APN
398-461-19
APN
398-461-18
APN
398-361-03
APN
398-361-12
APN
398-093-03
APN
398-202-07
APN
398-202-08
APN
398-202-09
APN
398-202
-10
APN
398-205-01
APN
398-205-02
APN
398-205-03
APN
398-205-04
APN
398-205
-05
APN
398-205-09
APN
398-205-08
APN
398-381-03
APN
398-381-=13
APN
398-362
-01
APN
398-092-15
APN
398-092-12
APN
398-093-02
APN
398-342-18
Figure 3
Proposed Project Area
Santa Ana Boulevard Grade Separation Project
±
Source: ESRI World Imagery
(2010)
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig03_Project_Area.mxd Date: 5/8/2012 26629 Legend
Parcels
Limits of Disturbance
Proposed Full Aquisition
Proposed Partial Aquisition
Temporary Construction Easement
Proposed Improvements
Detour Road
Proposed Temporary Shoofly
District: 12
County: Orange
Route Santa Ana Blvd
Federal Project No: STPL 5063 (136)
0 100 200 50
Feet
EXHIBIT 2
City Council 22 – 460 5/5/2026

EXHIBIT
2 City Council 22 – 461 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-1
Chapter 3 Fundamentals of Traffic Noise
The following is a brief discussion of fundamental traffic noise concepts. For a detailed discussion, please refer to Caltrans’ Technical Noise Supplement (TeNS) (Caltrans 2009), a technical supplement to the Protocol, which is available on the Caltrans web site (<http://www.dot.ca.gov/hq/env/noise/pub/tens_complete.pdf>).

3.1 Sound, Noise, and Acoustics
Sound can be described as the mechanical energy of a vibrating object transmitted by pressure waves through a liquid or gaseous medium (e.g., air) to a hearing organ, such as a human ear.

Noise is defined as loud, unexpected, or annoying sound.

In the science of acoustics, the fundamental model consists of a sound (or noise) source, a receiver, and the propagation path between the two. The loudness of the noise source and obstructions or atmospheric factors affecting the propagation path to the receiver determines the sound level and characteristics of the noise perceived by the receiver. The field of acoustics deals primarily with the propagation and control of sound.

3.2 Frequency
Continuous sound can be described by frequency (pitch) and amplitude (loudness). A lowfrequency sound is perceived as low in pitch. Frequency is expressed in terms of cycles per second, or hertz (Hz) (e.g., a frequency of 250 cycles per second is referred to as 250 Hz). High frequencies are sometimes more conveniently expressed in kilohertz (kHz), or thousands of Hertz. The audible frequency range for humans is generally between 20 Hz and 20,000 Hz.

3.3 Sound Pressure Levels and Decibels
The amplitude of pressure waves generated by a sound source determines the loudness of that source. Sound pressure amplitude is measured in micro-Pascals (mPa). One mPa is approximately one hundred billionth (0.00000000001) of normal atmospheric pressure. Sound pressure amplitudes for different kinds of noise environments can range from less than 100 to 100,000,000 mPa. Because of this huge range of values, sound is rarely expressed in terms of mPa. Instead, a logarithmic scale is used to describe sound pressure level (SPL) in terms of decibels (dB). The threshold of hearing for young people is about 0 dB, which corresponds to 20 mPa.

3.4 Addition of Decibels
Because decibels are logarithmic units, SPLs cannot be added or subtracted through ordinary arithmetic. Under the decibel scale, a doubling of sound energy corresponds to a 3 dB increase.

In other words, when two identical sources are each producing sound of the same loudness, the EXHIBIT 2
City Council 22 – 462 5/5/2026
Chapter 3. Fundamentals of Traffic Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-2
resulting sound level at a given distance would be 3 dB higher than one source under the same conditions. For example, if one automobile produces an SPL of 70 dB when it passes an observer, two cars passing simultaneously would not produce 140 dB—rather, they would combine to produce 73 dB. Under the decibel scale, three sources of equal loudness together produce a sound level 5 dB louder than one source.

3.5 A-Weighted Decibels
The decibel scale alone does not adequately characterize how humans perceive noise. The dominant frequencies of a sound have a substantial effect on the human response to that sound.

Although the intensity (energy per unit area) of the sound is a purely physical quantity, the loudness or human response is determined by the characteristics of the human ear.

Human hearing is limited in the range of audible frequencies as well as in the way it perceives the SPL in that range. In general, people are most sensitive to the frequency range of 1,000– 8,000 Hz and perceive sounds within that range better than sounds of the same amplitude in higher or lower frequencies. To approximate the response of the human ear, sound levels of individual frequency bands are weighted, depending on human sensitivity to those frequencies.

Then, an A-weighted sound level (expressed in units of dBA) can be computed based on this information.

The A-weighting network approximates the frequency response of the average young ear when listening to most ordinary sounds. When people make judgments regarding the relative loudness or annoyance of a sound, their judgments correlate well with the A-scale sound levels of those sounds. Other weighting networks have been devised to address high noise levels or other special problems (e.g., B, C, and D scales), but these scales are rarely used in conjunction with highway traffic noise. Noise levels for traffic noise reports are typically reported in terms of dBA.

Table 3-1 describes typical A-weighted noise levels for various noise sources.

3.6 Human Response to Changes in Noise Levels
As discussed above, doubling sound energy results in a 3 dB increase in sound. However, given a sound level change measured with precise instrumentation, the subjective human perception of a doubling of loudness will usually be different from what is measured.

Under controlled conditions in an acoustical laboratory, the trained healthy human ear is able to discern 1 dB changes in sound levels when exposed to steady single-frequency (pure-tone) signals in the midfrequency (1,000 Hz–8,000 Hz) range. In typical noisy environments, changes in noise of 1 to 2 dB are generally not perceptible. However, it is widely accepted that people are able to begin to detect sound level increases of 3 dB in typical noisy environments. Further, a 5 dB increase is generally perceived as a distinctly noticeable increase, and a 10 dB increase is generally perceived as a doubling of loudness. Therefore, a doubling of sound energy (e.g., doubling the volume of traffic on a highway), which would result in a 3 dB increase in sound, would generally be perceived as barely detectable.

EXHIBIT 2
City Council 22 – 463 5/5/2026
Chapter 3. Fundamentals of Traffic Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-3
Table 3-1. Typical A-Weighted Noise Levels
Common Outdoor Activities Noise Level
(dBA) Common Indoor Activities
— 110 — Rock band
Jet fly-over at 1,000 feet
— 100 —
Gas lawnmower at 3 feet
— 90 —
Diesel truck at 50 feet at 50 mph Food blender at 3 feet — 80 — Garbage disposal at 3 feet
Noisy urban area, daytime
Gas lawnmower, 100 feet — 70 — Vacuum cleaner at 10 feet Commercial area Normal speech at 3 feet
Heavy traffic at 300 feet — 60 —
Large business office
Quiet urban daytime — 50 — Dishwasher (next room)
Quiet urban nighttime — 40 — Theater, large conference room (background) Quiet suburban nighttime
— 30 — Library
Quiet rural nighttime Bedroom at night, concert
— 20 —
Broadcast/recording studio
— 10 —
Lowest threshold of human hearing — 0 — Lowest threshold of human hearing Source: Caltrans 2009.

3.7 Noise Descriptors
Noise in our daily environment fluctuates over time. Various noise descriptors have been developed to describe time-varying noise levels. The noise descriptors most commonly used in traffic noise analysis are listed below.
• Equivalent Sound Level (Leq): Leq represents an average of the sound energy occurring over a specified period. In effect, Leq is the steady-state sound level containing the same acoustical energy as the time-varying sound that actually occurs during the same period. The 1-hour A-weighted equivalent sound level (Leq[h]) is the energy average of A-weighted sound levels occurring during a 1-hour period, and it is the basis for noise abatement criteria (NAC) used by Caltrans and the FHWA. • Percentile-Exceeded Sound Level (Lxx): Lxx represents the sound level exceeded for a given percentage of a specified period (e.g., L10 is the sound level exceeded 10 percent of the time, and L90 is the sound level exceeded 90 percent of the time).
• Maximum Sound Level (Lmax): Lmax is the highest instantaneous sound level measured during a specified period.

EXHIBIT 2
City Council 22 – 464 5/5/2026
Chapter 3. Fundamentals of Traffic Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-4
• Day-Night Level (Ldn): Ldn is the energy average of A-weighted sound levels occurring over a 24- hour period, with a 10 dB penalty applied to A-weighted sound levels occurring during nighttime hours between 10 p.m. and 7 a.m.
• Community Noise Equivalent Level (CNEL): Similar to Ldn, CNEL is the energy average of the Aweighted sound levels occurring over a 24-hour period, with a 10 dB penalty applied to A-weighted sound levels occurring during the nighttime hours between 10 p.m. and 7 a.m. and a 5 dB penalty applied to the A-weighted sound levels occurring during evening hours between 7 p.m. and 10 p.m.

3.8 Sound Propagation
When sound propagates over a distance, it changes in level and frequency content. The manner in which noise reduces with distance depends on the factors listed below.

3.8.1 Geometric Spreading
Sound from a localized source (i.e., a point source) propagates uniformly outward in a spherical pattern. The sound level attenuates (or decreases) at a rate of 6 dB for each doubling of distance from a point source. Highways consist of several localized noise sources on a defined path and, hence, can be treated as a line source, which approximates the effect of several point sources.

Noise from a line source propagates outward in a cylindrical pattern, often referred to as cylindrical spreading. Sound levels attenuate at a rate of 3 dB for each doubling of distance from a line source.

3.8.2 Ground Absorption
The propagation path of noise from a highway to a receiver is usually very close to the ground.

Noise attenuation from ground absorption and reflective-wave canceling adds to the attenuation associated with geometric spreading. Traditionally, the excess attenuation has also been expressed in terms of attenuation per doubling of distance. This approximation is usually sufficiently accurate for distances of less than 200 feet. For acoustically hard sites (i.e., sites with a reflective surface between the source and the receiver, such as a parking lot or body of water), no excess ground attenuation is assumed. For acoustically absorptive or soft sites (i.e., soft dirt, grass, or scattered bushes and trees), an excess ground-attenuation value of 1.5 dB per doubling of distance is normally assumed. When added to the cylindrical spreading, the excess ground attenuation results in an overall drop-off rate of 4.5 dB per doubling of distance.

3.8.3 Atmospheric Effects
Receptors located downwind from a source can be exposed to increased noise levels relative to calm conditions, whereas locations upwind can experience lowered noise levels. Sound levels can be increased at large distances from the highway (e.g., more than 500 feet) due to atmospheric temperature inversion (i.e., increasing temperature with elevation). Other factors such as air temperature, humidity, and turbulence can also have significant effects.

EXHIBIT 2
City Council 22 – 465 5/5/2026
Chapter 3. Fundamentals of Traffic Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-5

3.8.4 Shielding by Natural or Human-Made Features
A large object or barrier in the path between a noise source and a receiver can substantially attenuate noise levels at the receiver. The amount of attenuation provided by shielding depends on the size of the object and the frequency content of the noise source. Natural terrain features (e.g., hills and dense woods) and human-made features (e.g., buildings and walls) can substantially reduce noise levels. Walls are often constructed between a source and a receiver for the specific purpose of noise reduction. A barrier that breaks the line of sight between a source and a receiver will typically result in at least 5 dB of noise reduction. Taller barriers provide increased noise reduction. Vegetation between the highway and receiver is rarely effective in reducing noise because it does not create a solid barrier.

EXHIBIT 2
City Council 22 – 466 5/5/2026
Chapter 3. Fundamentals of Traffic Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
3-6
This page intentionally left blank
EXHIBIT 2
City Council 22 – 467 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
4-1
Chapter 4 Federal Regulations and State
Policies
This section focuses on the requirements of 23 CFR 772.

4.1 Federal Regulations

4.1.1 23 CFR 772
Provided in 23 CFR 772 are procedures for preparing operational and construction noise studies and evaluating noise abatement considered for federal and federal-aid highway projects. Under 23 CFR 772.7, projects are categorized as Type I, Type II or Type III projects. FHWA defines a Type I project as a proposed federal or federal-aid highway project for the construction of a highway at a new location, the physical alteration of an existing highway that significantly changes either the horizontal or vertical alignment, or an increase in the number of through traffic lanes. A Type II project is a noise barrier retrofit project that involves no changes to highway capacity or alignment. Type III projects are projects that do not meet the classifications of either a Type I or Type II project. Type III projects do not require a noise analysis.

Type I projects include those that create a completely new noise source as well as those that increase the volume or speed of traffic or move the traffic closer to a receiver. Type I projects include those that add an interchange, ramp, auxiliary lane, or truck-climbing lane to an existing highway or widen an existing ramp by a full lane width for its entire length. Projects that are unrelated to increased noise levels, such as striping, lighting, signing, and landscaping projects, are not considered Type I projects.

Under 23 CFR 772.11, noise abatement must be considered for Type I projects if the project is predicted to result in a traffic noise impact. In such cases, 23 CFR 772 requires the project sponsor to consider noise abatement before adoption of the final National Environmental Policy Act (NEPA) document. This process involves identification of noise abatement measures that are reasonable, feasible, and likely to be incorporated into the project as well as noise impacts for which no apparent solution is available.

Traffic noise impacts, as defined in 23 CFR 772.5, occur when the predicted noise level in the design year approaches or exceeds the NAC specified in 23 CFR 772, or a predicted noise level substantially exceeds the existing noise level (a substantial noise increase). However, 23 CFR 772 does not specifically define the terms approach or substantial increase; these criteria are defined in the Protocol, as described below.

Table 4-1 summarizes the NAC corresponding to various land use activity categories. Activity categories and related traffic noise impacts are determined according to actual land uses in a given area.

EXHIBIT 2
City Council 22 – 468 5/5/2026
Chapter 4. Federal Regulations and State Policies
Noise Study Report
Santa Ana Boulevard Grade Separation Project
4-2
Table 4-1. Activity Categories and Noise Abatement Criteria Activity
Category
NAC, Hourly A-Weighted
Noise Level (dBA Leq[h])1
(Evaluation Location)
Description of Activities
A 57 (Exterior) Lands on which serenity and quiet are of extraordinary significance and serve an important public need and where the preservation of those qualities is essential if the area is to continue to serve its intended purpose.

B2 67 (Exterior) Residential.

C2 Exterior 67 (Exterior) Active sport areas, amphitheaters, auditoriums, campgrounds, cemeteries, day care centers, hospitals, libraries, medical facilities, parks, picnic areas, places of worship, playgrounds, public meeting rooms, public or nonprofit institutional structures, radio studios, recording studios, recreation areas, Section 4(f) sites, schools, television studios, trails, and trail crossings.

D 52 (Interior) Auditoriums, day care centers, hospitals, libraries, medical facilities, places of worship, public meeting rooms, public or nonprofit institutional structures, radio studios, recording studios, schools, and television studios.

E 72 (Exterior) Exterior Hotels, motels, offices, restaurants/bars, and other developed lands, properties, or activities not included in A–D or F.

F n/a Agriculture, airports, bus yards, emergency services, industrial, logging, maintenance facilities, manufacturing, mining, rail yards, retail facilities, shipyards, utilities (water resources, water treatment, electrical), and warehousing.

G n/a Undeveloped lands that are not permitted.
1 The Leq(h) activity criteria values are for impact determination only and are not design standards for noise abatement measures.

All values are A-weighted decibels (dBA). 2 Includes undeveloped lands permitted for this activity category. n/a – Not applicable. There is no NAC for this activity category.

In identifying noise impacts, primary consideration is given to exterior areas with frequent human use. In situations where there are no exterior activities or where the exterior activities are far from the roadway or physically shielded in a manner that prevents an impact on exterior activities, the interior criterion (Activity Category D) is used as the basis for determining a noise impact.

4.2 State Regulations and Policies

4.2.1 Traffic Noise Analysis Protocol for New Highway Construction and Reconstruction Projects
The Protocol specifies the policies, procedures, and practices to be used by agencies that sponsor new construction or reconstruction of federal or federal-aid highway projects. The NAC specified in the Protocol are the same as those specified in 23 CFR 772. The Protocol defines a noise increase as substantial when the predicted noise levels with project implementation exceed EXHIBIT 2
City Council 22 – 469 5/5/2026
Chapter 4. Federal Regulations and State Policies
Noise Study Report
Santa Ana Boulevard Grade Separation Project
4-3
existing noise levels by 12 dBA. The Protocol also states that a sound level is considered to approach an NAC level when the sound level is within 1 dB of the NAC identified in 23 CFR 772 (e.g., 66 dBA is considered to approach the NAC of 67 dBA but 65 dBA is not).

The TeNS of the Protocol provides detailed technical guidance for the evaluation of highway traffic noise. This includes field measurement methods, noise modeling methods, and report preparation guidance.

4.2.2 Section 216 of the California Streets and Highways Code Section 216 of the California Streets and Highways Code relates to the noise effects of a proposed freeway project on public and private elementary and secondary schools. Under this code, a noise impact occurs if, as a result of a proposed freeway project, noise levels exceed 52 dBA Leq(h) in the interior of public or private elementary or secondary classrooms, libraries, multipurpose rooms, or spaces. This requirement does not replace the “approach” or “exceed” NAC criterion for FHWA Activity Category D for classroom interiors, but it is a requirement that must be addressed in addition to the requirements of 23 CFR 772.

If a project results in a noise impact under this code, noise abatement must be provided to reduce classroom noise to a level that is at or below 52 dBA Leq(h). If the noise levels generated from freeway and non-freeway sources exceed 52 dBA Leq(h) prior to the construction of the proposed freeway project, then noise abatement must be provided to reduce the noise to the level that existed prior to construction of the project.

4.2.3 City of Santa Ana
The City of Santa Ana Noise Control Section 18-314 requires that noise sources associated with construction, repair, remodeling, or grading of any real property, provided said activities do not take place between the hours of 8:00 p.m. and 7:00 a.m. on weekdays, including Saturday, or any time on Sunday or a federal holiday.

EXHIBIT 2
City Council 22 – 470 5/5/2026
Chapter 4. Federal Regulations and State Policies
Noise Study Report
Santa Ana Boulevard Grade Separation Project
4-4
This page intentionally left blank
EXHIBIT 2
City Council 22 – 471 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
5-1
Chapter 5 Study Methods and Procedures

5.1 Methods for Identifying Land Uses and Selecting Noise Measurement and Modeling Receiver Locations
A field investigation was conducted to identify land uses that could be subject to traffic and construction noise impacts from the proposed project. Land uses in the project area were categorized by land use type; Activity Category, as defined in Table 4-1; and the extent of frequent human use. Although all developed land uses are evaluated in this analysis, as stated in the Protocol, the focus of this impact analysis was on locations of frequent human use that would benefit from a lowered noise level—specifically, locations with defined outdoor activity areas.

For this project, the potentially affected noise-sensitive uses with defined outdoor activity areas consist of residential and institutional land uses.

The geometry of the project relative to nearby existing land uses was also identified, and the possibility of planned, programmed, and designed uses occurring on undeveloped land was investigated. According to City of Santa Ana planning documents, there are no planned, programmed, and designed land uses in the vicinity of the project.

Short-term measurement locations were selected to represent the noise-sensitive land uses within the project area. Additionally, one long-term measurement site was selected to capture the diurnal traffic noise level patterns in the project area. Short-term and long-term measurement locations were selected to serve as representative modeling locations. Additional nonmeasurement locations were selected as modeling locations to gain a more complete understanding of the noise environment in the project area.

5.2 Field Measurement Procedures
A field noise study was conducted in accordance with recommended procedures in TeNS. The following is a summary of the procedures that were used to collect short-term and long-term sound level data.

5.2.1 Short-Term Measurements
Short-term monitoring was conducted at four locations on January 11, 2012 using a Larson Davis Type 1 (precision grade) sound-level meter. The measurements were conducted at Activity Category B, C, and F land uses. The short-term measurement locations are identified in Figure 5-

1. During the short-term measurements, the field staff was present. The Leq values collected during each measurement period (10 minutes in duration) were automatically recorded with digital integrating sound-level meters and subsequently logged manually on field data sheets for each EXHIBIT 2
City Council 22 – 472 5/5/2026
Chapter 5. Study Methods and Procedures
Noise Study Report
Santa Ana Boulevard Grade Separation Project
5-2
measurement location. Dominant noise sources observed and other relevant measurement conditions were also identified and logged manually on the field data sheets. The calibration of the meter was checked before and after the measurement using a Larson-Davis Model CAL 200 calibrator.

Temperature, wind speed, and humidity were recorded manually during the short-term monitoring sessions using a Kestrel 3000 portable weather station. During the short-term measurements, wind speeds typically ranged from 0 to 1 mph. Temperatures ranged from 65°F to 68°F, with relative humidity ranging from 34 to 45 percent.

5.2.2 Long-Term Measurements
Long-term monitoring was conducted at one location (LT1) using a Rion Model NL-21 soundlevel meter. The purpose of the measurement was to identify the diurnal traffic noise pattern throughout the typical day/night cycle. The long-term sound level data was collected over a time period of 24 hours, beginning January 11, 2012, and ending January 12, 2012.

Long-term noise monitoring location LT1 is shown in Figure 5-1. LT1 was located in the sports and recreation area of a drug and alcohol rehabilitation center (Phoenix House) at 1207 East Fruit Street, on the southeastern end of the project area. The sound-level meter was located in the sports and recreation area of the facility, approximately 80 feet from the fence line separating the property from Santa Ana Boulevard. The site was selected in order to document the daily traffic noise pattern, with minimal influence from the rail alignment, which was located more than 800 feet away with buildings intervening. This portion of the project area was influenced by traffic noise from the nearby I-5 freeway (which is not part of this project) as well as traffic noise from Santa Ana Boulevard.

5.3 Traffic Noise Levels Prediction Methods
Traffic noise levels were predicted using FHWA Traffic Noise Model (TNM), version 2.5. TNM is a computer model based on two FHWA reports: FHWA-PD-96-009 and FHWA-PD-96-010 (FHWA 1998a; FHWA 1998b). Key inputs to the traffic noise model were the locations of roadways, shielding features (e.g., topography and buildings), noise barriers, and receivers as well as ground type. Three-dimensional representations of these inputs were developed using CAD drawings, aerials, and topographic contours provided by the project engineer.

Traffic volume data for the project was provided in December 2011 (AECOM 2011). Traffic noise was evaluated under existing conditions, Design Year (2035) No Build conditions, and Design Year (2035) Build conditions. AM traffic volumes were utilized because these were generally slightly higher than PM traffic volumes. Tables A-1 and A-2 in Appendix A summarize the traffic volumes and assumptions used for modeling the existing and design-year conditions with and without the project.

EXHIBIT 2
City Council 22 – 473 5/5/2026
!> !>!>
!>
!> !>
!>
!>
!>
!>
!>
!>
!>
!>
!>
!>
!>
Area A
Area D
Area C
Area B NB-2
NB-1
Santa Ana Blvd
Santiago St
Logan St
Lincoln Ave
Fuller St
Grand Ave
E Fruit St
§¨¦5
Santa Ana Regional
Transportation Center
ST1
ST2
ST4
ST3
LT1
M11
M10
M12 M9
M4
M5
M1 M8
M3
M2
M7
M6
BNSF RR and Amtrak
Figure 5-1
Analysis Areas, Noise Monitoring and Modeling Locations, and Locations of Evaluated Noise Barriers Santa Ana Boulevard Grade Separation Project
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Noise\Fig05-1_noise_measurement_locs.mxd Date: 10/2/2012 26629 Legend
!> Short Term Location
!> Long Term Location
!> Modeled Location
Noise Barrier (NB)
Noise Analysis Area
Project Site
Railroad
SOURCE: Bing Maps Aerial
(2010)
±
0 50 100 200
Feet
EXHIBIT 2
City Council 22 – 474 5/5/2026

EXHIBIT
2 City Council 22 – 475 5/5/2026
Chapter 5. Study Methods and Procedures
Noise Study Report
Santa Ana Boulevard Grade Separation Project
5-3

5.4 Methods for Identifying Traffic Noise Impacts and Consideration of Abatement
Traffic noise impacts occur at receiver locations where predicted design-year noise levels approach or exceed the NAC for the applicable Activity Category, or where substantial noise increases above existing noise levels would occur. Where traffic noise impacts are identified, noise abatement must be considered for reasonableness and feasibility, as required by 23 CFR 772 and the Protocol.

According to the Protocol, abatement measures are considered acoustically feasible if a minimum noise reduction of 5 dB at affected receiver locations is predicted with implementation of the abatement measures. In addition, barriers should be designed to intercept the line of sight from the exhaust stack of a truck to the first tier of receivers, as required by the Caltrans Highway Design Manual, Chapter 1100 (Caltrans 2006). Other factors that affect feasibility include topography, access requirements for driveways and ramps, the presence of local cross streets, utility conflicts, other noise sources in the area, and safety considerations. The overall reasonableness of noise abatement is determined by considering factors such as cost, and the opinions of affected property owners and residents. Additionally, the barrier must provide at least 7 dB of noise reduction at one or more benefited receptors. This design goal applies to any receptor and is not limited to impacted receptors.

The Protocol defines the procedure for assessing reasonableness of noise barriers from a cost perspective. A cost-per-residence allowance is calculated for each benefited residence (i.e., residences that receive at least 5 dB of noise reduction from a noise barrier). The allowance currently is $55,000 per benefited residence. Total allowances are calculated by multiplying the cost per residence by the number of benefited residences.

EXHIBIT 2
City Council 22 – 476 5/5/2026
Chapter 5. Study Methods and Procedures
Noise Study Report
Santa Ana Boulevard Grade Separation Project
5-4
This page intentionally left blank
EXHIBIT 2
City Council 22 – 477 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-1
Chapter 6 Existing Noise Environment

6.1 Existing Land Uses
A field investigation was conducted to identify land uses that could be subject to traffic and construction noise impacts from the proposed project. Single-family residences and a drug and alcohol rehabilitation center were identified as Activity Category B and C land uses in the project area.

Although all developed land uses are evaluated in this analysis, as required by the Protocol, noise abatement was considered only for areas of frequent human use that would benefit from a lowered noise level. Accordingly, this impact analysis focuses on locations with defined outdoor activity areas, such as residential backyards and recreation areas.

6.2 Noise Measurement Results
The existing noise environment in the project area is characterized below based on the short- and long-term noise monitoring conducted.

6.2.1 Short-Term Monitoring
Table 6-1 summarizes the results of the short-term noise monitoring conducted in the project area. Table 6-1 lists the receptor name, address, land use/Activity Category, measurement start time date and duration, measured Leq, and estimated peak noise hour (using the corresponding long-term noise monitoring data).

6.2.2 Long-Term Monitoring
Long-term monitoring was conducted at one location (LT1). The purpose of the long-term noise measurement was to determine the changes in noise levels within the project area throughout a typical day. Using the difference, or offset, in the simultaneous noise levels between the shortterm and long-term data, the long-term measurement at LT1 was used to estimate existing peaknoise-hour levels at the representative short-term receivers. The long-term sound level data were collected from Wednesday, January 11, 2012, to Thursday, January 12, 2012. The long-term monitoring location is shown in Figure 5-1.
• LT1: Long-term monitoring site LT1 is located at Phoenix House Rehabilitation Center, 1207 East Fruit Street (same location as ST-1) in the southeastern portion of the project area.

The loudest-hour noise level measured was 69.2 dBA Leq(h) during the 8 p.m. – 9 p.m. hour.

Table 6-2 and Figure 6-1 summarize the results of the LT-1 data.

EXHIBIT 2
City Council 22 – 478 5/5/2026
Chapter 6. Existing Noise Environment
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-2
Table 6-1. Summary of Short-Term Measurements
Receptor Address
Land Uses/
Activity
Category
Start
Date/
Time
Duration
(minutes) Leq Lmax Lmin L90 L50 L10
PeakNoiseHour
Leq1
ST1 1207 East Fruit
Street
Phoenix
House
Rehabilitation
Center / C
1/11/12
10:04 a.m.
10:00 65.9 72.4 61.5 63.3 65.3 68 68.4
1/11/12
10:15 a.m.
10:00 67.2 74.4 63.7 65.4 66.8 68.5 69.7
ST2 926 Lincoln
Street
Residential /
B
1/11/12
11:50 a.m.
10:00 64.5 79.2 49.5 54.3 62 68 65.5
1/11/12
12:10
10:00 63.1 72.6 49.6 52.5 59.6 67.4 63.8
ST3 SE corner,
Santa Ana
Boulevard /
Santiago Street
Train
Station
Parking
Area / F
1/11/12
1:40 p.m.
10:00 70.8 83.9 57.3 62.8 67.9 74.1 73.2
1/11/12
1:50 p.m.
10:00 69.6 81.9 54.3 59.9 67 72.3 72
ST4 Adjacent to 917
Logan Street2 Residential / B
1/11/12
2:25 p.m.
10:00 66.6 75.2 48.5 56.6 63.5 70.9 69
1/11/12
2:35 p.m.
10:00 66.1 76.1 46.5 55.1 63 70.5 68.5
Note: Refer to Figure 5-1 for measurement locations. 1 Measured existing noise level, adjusted to the peak-noise-hour level using diurnal noise data from LT-1. 2 Acoustically equivalent to the rear and side yard areas.

Table 6-2. Summary of Long-Term Monitoring at Location LT-1 Date Time
(hour beginning) 1-Hour Leq (dBA) Difference from Loudest Hour (dB) January 11, 2012 11:00:00 68.2 -1.0
12:00:00 68.6 -0.6
13:00:00 66.8 -2.4
14:00:00 66.9 -2.3
15:00:00 65.9 -3.3
16:00:00 66.8 -2.4
17:00:00 65.1 -4.1
18:00:00 64.2 -5.0
19:00:00 66.0 -3.2
20:00:00 69.2 0.0
21:00:00 67.7 -1.5
22:00:00 65.8 -3.4
23:00:00 64.7 -4.5
January 12, 2012 0:00:00 63.0 -6.2
EXHIBIT 2
City Council 22 – 479 5/5/2026
Chapter 6. Existing Noise Environment
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-3
Date Time
(hour beginning) 1-Hour Leq (dBA) Difference from Loudest Hour (dB) January 12, 2012 1:00:00 62.1 -7.1
2:00:00 61.6 -7.6
3:00:00 60.4 -8.8
4:00:00 62.6 -6.6
5:00:00 66.9 -2.3
6:00:00 68.8 -0.4
7:00:00 68.7 -0.5
8:00:00 67.3 -1.9
9:00:00 66.3 -2.9
10:00:00 66.7 -2.5
Maximum 69.2
Minimum 60.4
Note: Worst-case noise hours are bolded.

Figure 6-1. Long-Term Monitoring at Location LT1, January 11-12, 2012 EXHIBIT 2
City Council 22 – 480 5/5/2026
Chapter 6. Existing Noise Environment
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-4

6.2.3 Traffic Noise Model Calibration
TNM 2.5 was used to compare measured traffic noise levels to modeled noise levels at field measurement locations using traffic count data collected at the time of the noise measurements.

Four sets of traffic counts and four measurements (ST1, ST2, ST3, and ST4) were gathered on January 11, 2012 to calibrate the TNM model.

TNM Version 2.5 was used to compare measured traffic noise levels to modeled noise levels at field measurement locations using traffic count data collected at the time of the noise measurements. Table 6-3 compares measured and modeled noise levels at each measurement location. Appropriate agreement (less than four decibels) was achieved between the measured and modeled results.

Calibration results that did not agree to the tenth of a decibel with measured noise levels were adjusted by the use of K-factors for the subsequent modeling of existing and future peak-noisehour traffic noise. Table 6-3 shows which adjustment factors were applied to each modeling receiver.

Receivers ST1, ST-2, ST3, and ST4 were found to have differences in measured versus modeled existing sound levels of -3.3, 1.6, 3.5, and 3.1 decibels, respectively. These K-factors were applied to the modeled results for ST1, ST2, ST3, and ST4, as shown in Table 6-3. Modeled existing peak-hour traffic noise levels at all modeling receivers are listed in Table 7-1.

Table 6-3. Comparison of Measured with Modeled Peak-Noise-Hour Sound Levels Measurement
Location
Measured Existing
Sound Level (dBA)
Modeled Existing
Sound Level (dBA)
Measured minus
Modeled (dBA)
ST1 65.9 69.2 -3.3
ST2 64.5 62.9 1.6
ST3 70.8 67.3 3.5
ST4 66.6 63.5 3.1

6.2.4 Existing Modeled Noise Levels
To more accurately model Santa Ana Boulevard and the surrounding area, the existing and future alignments were divided into four areas, as shown on Figure 5-1:
• Area A, north of Santa Ana Boulevard, east of Santiago Street and west of the rail alignment. • Area B, north of Santa Ana Boulevard and east of the rail alignment. • Area C, south of Santa Ana Boulevard, east of Santiago Street and west of the rail alignment. • Area D, south of Santa Ana Boulevard and east of the rail alignment.

EXHIBIT 2
City Council 22 – 481 5/5/2026
Chapter 6. Existing Noise Environment
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-5
Table 6-4 presents additional information for the measured and modeled receivers including area designation, land use/activity category, number of dwelling units or dwelling unit equivalents, address, and the K-factor used for the subsequent TNM modeling analysis.

Table 7-1 presents the existing modeled noise levels at each receiver (ST1 through ST4 and modeled-only receivers M1 through M12). As shown in Table 7-1, existing peak-noise-hour traffic noise levels range from 54.2 to 74.1 dBA Leq(h). FHWA/Caltrans NAC are currently approached or exceeded at six of the modeled receptors (ST2, M3, ST4, M4, M11, and M12), which are representative of six residential or otherwise noise-sensitive uses.

Table 6-4. Measured and Modeled Receiver Information
Receiver
I.D. Area
Land Use / Activity
Category
Number of
Dwelling
Units or
Equivalent Address
K-Factor Used
for TNM
Modeling (dBA)
M1 A Commercial Industrial / F 0 953 E. Santa Ana Blvd. 3.5 M2 A Residential / B 1 922 N. Logan St. 3.1
M3 A Residential / B 1 920 N. Logan St. 3.1
ST4 A Residential / B 1 917 N. Logan St. 3.1
M4 A Residential / B 1 917 N. Logan St. 3.1
M5 A Residential / B 1 925 N. Logan St. 3.1
ST2 A Residential / B 1 926 Lincoln St. 1.6
M9 B Commercial Industrial / F 0 1006 Fuller St. 1.6
ST3 C Transportation (Rail Station)
/ F
0 SE corner, Santa Ana
Boulevard / Santiago St.

3.5 M6 C Transportation (Rail Station)
/ F
0 1000 E. Santa Ana
Blvd.

1.6 M7 C Transportation (Rail Station)
/ F
0 1000 E. Santa Ana
Blvd.

1.6 M8 D Commercial Industrial / F 0 973 Fuller St. 1.6 M10 D Recreation / C 1 1207 East Fruit St. -3.3
M11 D Recreation / C 1 1207 East Fruit St. -3.3
ST1 D Recreation / C 1 1207 East Fruit St. -3.3
M12 D Recreation / C 1 1207 East Fruit St. -3.3
EXHIBIT 2
City Council 22 – 482 5/5/2026
Chapter 6. Existing Noise Environment
Noise Study Report
Santa Ana Boulevard Grade Separation Project
6-6
This page intentionally left blank
EXHIBIT 2
City Council 22 – 483 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-1
Chapter 7 Future Noise Environment, Impacts,
and Considered Abatement

7.1 Future Noise Environment and Impacts
Table 7-1 summarizes the traffic noise modeling results for existing conditions and Design Year (2035) Build and No Build conditions.

The results in Table 7-1 indicate that predicted traffic noise levels for the Design Year Build conditions would approach or exceed the NAC of 67 dBA Leq(h) for Activity Category B (residential) land uses at three receivers (M3, ST4 and M4). Additionally, traffic noise levels for the Design Year Build conditions would approach or exceed the NAC of 67 dBA Leq(h) for Activity Category C land uses at three receivers (M11, ST1 and M12). Modeled Design Year Build noise levels range from 55.5 dBA Leq(h) at receiver M7 to 77.5 dBA Leq(h) at receiver ST3.

Ten receivers (M1, M2, M3, ST4, M4, M5, ST2, M9, M6 and M8) would experience decreases in project noise (compared with Design Year No Build) due to the change in roadway/receptor geometry; construction of the proposed project would result in a decrease in roadway elevation relative to the adjacent receivers. The height of the retaining wall structure would provide structural shielding to receivers from future traffic noise. Nonetheless, traffic noise impacts are predicted to occur at Activity Category B and C land uses within the project area, and noise abatement must be considered.

7.2 Preliminary Noise Abatement Analysis
In accordance with 23 CFR 772, noise abatement is considered where noise impacts are predicted in areas of frequent human use that would benefit from a lowered noise level. Potential noise abatement measures identified in the Protocol include the following:
 Avoiding the impact by using design alternatives, such as altering the horizontal and vertical alignment of the project;
 Constructing noise barriers;
 Acquiring property to serve as a buffer zone;
 Using traffic management measures to regulate types of vehicles and speeds; and  Acoustically insulating public-use or nonprofit institutional structures.

EXHIBIT 2
City Council 22 – 484 5/5/2026
Chapter 7. Future Noise Environment, Impacts, and Considered Abatement Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-2
Table 7-1. Noise Levels and Noise Barrier Modeling
Noise
Barrier
No. Area
Receptor
No. Existing
Future
No
Build
Future
Build
Activity Category (NAC)Future Build Impact Type (None, or A/E) With Barrier With Barrier With Barrier With Barrier With Barrier H = 8 ft H = 10 ft H = 12 ft H = 14 ft H = 16 ft
Leq I.L.1 Leq I.L. Leq I.L. Leq I.L. Leq I.L.
n/a A M1 70.5 74.5 74.4 F (n/a) None --2 -- -- -- -- -- -- -- -- -- NB-1 M2 63.2 66.1 65.1 B (67) None 63.8 1.3 63.4 1.7 63.0* 2.1 63.2 1.9 63.2 1.9 NB-1 M3 66.7 69.3 67.6 B (67) A/E 64.1 3.5 63.3 4.3 63.0* 4.6 62.8 4.8 62.6 5.0 NB-1 ST4 70.0 71.6 67.2 B (67) A/E 64.0* 3.2 63.9 3.3 63.7 3.5 63.4 3.8 63.2 4.0 NB-1 M4 72.4 73.4 66.9 B (67) A/E 61.0* 5.9 59.9 7.0 59.2 7.7 58.6 8.3 58.0 8.9 NB-1 M5 63.8 64.5 58.1 B (67) None 57.8* 0.3 57.7 0.4 57.5 0.6 57.4 0.7 56.6 1.5 NB-1 ST2 67.2 67.9 59.7 B (67) None 57.4* 2.3 56.8 2.9 56.6 3.1 56.5 3.2 55.8 3.9 n/a B M9 67.8 68.6 65.9 F (n/a) None -- -- -- -- -- -- -- -- -- -- n/a C ST3 74.1 77.4 77.5 F (n/a) None -- -- -- -- -- -- -- -- -- -- n/a M6 58.6 61.5 61.1 F (n/a) None -- -- -- -- -- -- -- -- -- -- n/a M7 54.2 54.4 55.5 F (n/a) None -- -- -- -- -- -- -- -- -- -- n/a D M8 63.9 64.4 62.6 F (n/a) None -- -- -- -- -- -- -- -- -- -- NB-2 M10 64.8 65.2 65.3 C (67) None 62.4 2.9 61.5 3.8 61.0* 4.3 59.3 6.0 58.5 6.8 NB-2 M11 67.9 68.7 68.7 C (67) A/E 63.5 5.2 61.8 6.9 60.0* 8.7 59.1 9.6 58.3 10.4 NB-2 ST1 67.4 68.0 68.1 C (67) A/E 63.9 4.2 62.4 5.7 61.0* 7.1 59.7 8.4 58.9 9.2 NB-2 M12 68.3 69.0 69.1 C (67) A/E 63.7 5.4 61.7 7.4 60.2 8.9 60.0* 9.1 58.3 10.8 1 I.L.: Insertion Loss.
2 Either no barrier was analyzed at this location because the modeled receptor would not approach or exceed the NAC or this receptor would be removed as part of the project. 3 Numbers in bold represent noise levels that approach or exceed the NAC. 4 Underlined noise levels have been attenuated by at least 5 dBA (i.e., feasible barrier height). * Minimum height needed to break the line of sight between 11.5 foot truck stack and first row receivers. dBA Leq = equivalent continuous sound level measured in A-weighted decibels ft = feet
H = height
NAC = Noise Abatement Criteria
n/a = not applicable
EXHIBIT 2
City Council 22 – 485 5/5/2026
Chapter 7. Future Noise Environment, Impacts, and Considered Abatement Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-3
All of these abatement options have been considered. However, because of the configuration and location of the project, abatement in the form of noise barriers is the only abatement that is considered to be practical.

Each noise barrier evaluated has been evaluated for feasibility based on achievable noise reduction. For each noise barrier found to be acoustically feasible, reasonable cost allowances were calculated. Worksheets provided in Appendix B summarize the reasonable cost allowance calculations at the critical design receiver based on the allowance calculation procedure identified in the Protocol. Table 7-1 summarizes results at receiver locations for the two noise barriers (Barrier NB-1 and Barrier NB-2) that have been evaluated in detail for this project.

For any noise barrier to be considered reasonable from a cost perspective, the estimated cost of the noise barrier should be equal to or less than the total cost allowance calculated for the barrier.

The cost calculations of the acoustically feasible noise barriers were prepared by AECOM Technical Services (January 2012) and include all items appropriate and necessary for construction of the barrier, such as traffic control, drainage modification, and retaining walls.

The design of noise barriers presented in this report is preliminary and has been conducted at a level appropriate for environmental review and not for final design of the project. Preliminary information on the physical location, length, and height of noise barriers is provided in this report. If pertinent parameters change substantially during the final project design, preliminary noise barrier designs may be modified or eliminated from the final project. A final decision on the construction of the noise abatement will be made upon completion of the project design.

The following is a discussion of noise abatement considered for each evaluation area where traffic noise impacts are predicted.

7.2.1 Area A
The traffic noise modeling results in Table 7-1 indicate that traffic noise levels at residences in Area A are predicted to be in the range of 58.1 to 67.6 dBA Leq (h) in the design year. The results also indicate that the change in traffic noise between existing conditions and the Design Year Build conditions is predicted to range from -7.5 dB at receiver ST-2 to 1.9 dB at receiver M2.1 Because the predicted noise level in the design year is predicted to approach or exceed the noise abatement criterion (67 dBA Leq[h]), traffic noise impacts are predicted at residences in this area, and noise abatement must be considered. Receivers M2, M3, ST4, M4, M5 and ST2 represent a total of 6 residences in Area A. Detailed modeling analysis was conducted for a barrier located at the top of the retaining wall. The barrier evaluated is identified as Barrier NB-1 in Figure 5-1.

Barrier heights in the range of 8 to 16 feet were evaluated in 2-foot increments. Table C-1 in Appendix C summarizes the results of the barrier analysis for each receiver location in Area A.

Reasonable allowance calculation sheets for this barrier are provided in Worksheets B-1 through B-5 in Appendix B.

1 A 3.9 dB increase would occur at receiver M1, but this location is classified as Activity Category F, and therefore is not an affected noise-sensitive land use.

EXHIBIT 2
City Council 22 – 486 5/5/2026
Chapter 7. Future Noise Environment, Impacts, and Considered Abatement Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-4
Table 7-2 summarizes the calculated noise reductions and reasonable allowances for each feasible barrier height (in this case, barriers ranging from 8 feet to 16 feet in height were determined to be feasible). Table 7-3 summarizes the estimated cost to construct Barrier NB-1, by wall height. As shown in Table 7-3, the cost of NB-1 would exceed the reasonable allowance for all of the feasible barrier heights. Barrier NB-1 was estimated to cost between $77,400 and $206,400 vs. a reasonable allowance of $55,000 to $110,000. Therefore, NB-1 was found to be not reasonable to construct.

Table 7-2. Summary of Reasonableness Determination Data—Area A – Barrier NB-1 Barrier I.D. & Location: NB-1 - Top of Retaining Wall WB Lanes Predicted Sound Level without Barrier
Critical Design Receiver: M4
Design Year Noise Level, dBA Leq(h): 66.9 dBA*
Design Year Noise Level Minus Existing
Noise Level:
-5.5 dBA*
Design Year with Barrier
8-Foot
Barrier
10-Foot
Barrier
12-Foot
Barrier
14-Foot
Barrier
16-Foot
Barrier
Barrier Noise Reduction 5.9 dBA * 7.0 dBA * 7.7 dBA * 8.3 dBA * 8.9 dBA * Number of Benefited Residences 1 1 1 1 2
Reasonable Allowance Per Benefited
Residence
$55,000 $55,000 $55,000 $55,000 $55,000
Total Reasonable Allowance $55,000 $55,000 $55,000 $55,000 $110,000 * at Critical Design Receiver
Table 7-3. Noise Barrier NB-1 Cost Estimate
Noise Barrier No. NB-1
Height (feet) 6 8 10 12 14 16
Length (feet) 430 430 430 430 430 430
Area (square feet) 2,580 3,440 4,300 5,160 6,020 6,880
Unit Cost* ($/square foot) $30 $30 $30 $30 $30 $30
Cost* $ $77,400 $103,200 $129,000 $154,800 $180,600 $206,400 *Total Cost: Averages about $30 per square foot.

Type of Wall: Masonry Block
Footings: Trench, spread or pile footings are used as appropriate.

Typical Height: 6 to 16 feet, depending on specific design needs.

Aesthetic Treatment: Decorative concrete block, e.g., color split face, slumpstone, fluted is used (consistent with City’s Planning Department Requirements.)
Engineering of Plans: Typically one month.

Construction Project: Typically two months.

7.2.2 Area D
The traffic noise modeling results in Table 7-1 indicate that traffic noise levels at noise-sensitive receivers (the recreational and classroom land uses at the rehabilitation center) in Area D are predicted to be in the range of 65.3 to 69.1 dBA Leq(h) in the design year. The results also EXHIBIT 2
City Council 22 – 487 5/5/2026
Chapter 7. Future Noise Environment, Impacts, and Considered Abatement Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-5
indicate that the increase in traffic noise between existing conditions and the design year is predicted to range from 0.5 dB at receiver M10 to 0.8 dB at receivers M11 and M12.2 Because the predicted noise level in the design year is predicted to approach or exceed the noise abatement criterion (67 dBA Leq[h]), traffic noise impacts are predicted at noise-sensitive uses in this area, and noise abatement must be considered. Receivers ST1, M10, M11 and M12 represent a total of four noise-sensitive uses in Area D3. Detailed modeling analysis was conducted for a barrier located at the right-of-way. The barrier evaluated is identified as Barrier NB-2 in Figure 5-1. Barrier heights in the range of 8 to 16 feet were evaluated in 2-foot increments. Table C-2 in Appendix C summarizes the results of the barrier analysis for each receiver location in Area D.

Reasonable allowance calculation sheets for this barrier are provided in Worksheets B-6 through B-8 in Appendix B. Table 7-4 summarizes the calculated noise reductions and reasonable allowances for each feasible barrier height (in this case, barriers ranging from 12 feet to 16 feet in height were determined to be feasible4) and the estimated cost to construct Barrier NB-2, by wall height. Barrier NB-2 was estimated to cost between $147,600 and $196,800 vs. a reasonable allowance of $$220,000. As shown in Table 7-4, NB-2 would not exceed the reasonable allowance for all of the feasible barrier heights. Therefore, Barrier NB-2 was found to be reasonable to construct at heights of 12 to 16 feet.

Table 7-4. Summary of Reasonableness Determination Data and Cost Estimate—Area D – Barrier NB-2
Barrier I.D. & Location: NB-2 – Right-of-Way Wall EB Lanes Predicted Sound Level without Barrier
Critical Design Receiver: M11
Design Year Noise Level, dBA Leq(h): 67.9 dBA*
Design Year Noise Level Minus Existing
Noise Level:

0.8 dBA*
Design Year with Barrier 12-Foot Barrier 14-Foot Barrier 16-Foot Barrier Barrier Noise Reduction 8.7 dBA * 9.6 dBA * 10.4 dBA *
Number of Benefited Residences 4 4 4
Reasonable Allowance Per Benefited
Residence
$55,000 $55,000 $55,000
Total Reasonable Allowance $220,000 $220,000 $220,000
Height (feet) 12 14 16
Length (feet) 410 410 410
Area (square feet) 4,920 5,740 6,560
Unit Cost** ($/square foot) $30 $30 $30
Cost* $ $147,600 $172,200 $196,800
Reasonable Yes/No Yes Yes Yes
Note: * at Critical Design Receiver
**Total Cost: Averages about $30 per square foot.

Type of Wall: Masonry Block
Footings: Trench, spread or pile footings are used as appropriate.

Typical Height: 6 to 16 feet, depending on specific design needs.

Aesthetic Treatment: Decorative concrete block, e.g., color split face, slumpstone, fluted is used (consistent with City’s Planning

2 A 1 dB decrease would occur at receiver M8, but this location is classified as Activity Category F, and therefore is not affected.
3 The number of sensitive receivers was determined based on the frontage length of 400 feet along Santa Ana Boulevard.
4 Barrier heights of less than 12 feet would not be feasible because they would not break the line-of-sight between the modeled receiver and an 11.5 foot high truck exhaust stack.

EXHIBIT 2
City Council 22 – 488 5/5/2026
Chapter 7. Future Noise Environment, Impacts, and Considered Abatement Noise Study Report
Santa Ana Boulevard Grade Separation Project
7-6
Department Requirements.)
Engineering of Plans: Typically one month.

Construction Project: Typically two months.

7.2.3 Nonacoustical Factors Relating to Feasibility
Factors not relating to acoustics that must be considered during the construction of noise barriers include: Safety, Maintenance, Security, and Utility Relocations. Additional factors to consider include opinions of affected residents, and input from the public and public agencies. Social, economic, legal, and technological factors also must be taken into consideration. • Geometric Standards. The presence of Barrier NB-2 would introduce potential sight distance issues for eastbound traffic traveling on Santa Ana Boulevard. The minimum horizontal stopping sight distance for 45 miles per hour (mph) is 360 feet, which cannot be provided due to the 652 feet radius curve of the centerline of Santa Ana Boulevard. • Safety. The considered noise barriers would constitute a rigid fixed object behind the sidewalk for both Barriers NB-1 and NB-2, as the leading edge for both walls would be exposed to oncoming traffic in both directions along Santa Ana Boulevard. The vehicles could jump over the curb and impact the wall head on.
• Maintenance. Both noise barriers would have a high probability of vandalism, which would then require more maintenance. Access to private property would not be required for future maintenance because the proposed sound wall is located along the right-of-way of Santa Ana Boulevard.
• Security. The proposed noise barrier does propose a potential security risk if there is a space between the wall and the existing chain link fence.
• Utility Relocations. The noise barriers would require no special utility relocation and would not cross or interfere with any existing or planned utilities.

7.2.4 Preliminary Recommendation and Decision
As shown in Sections 7.2.1 and 7.2.2, NB-1 was found to be not reasonable to construct and NB-2 was found to be reasonable to construct at heights of 12 to 16 feet.. This is the preliminary noise abatement decision.

The preliminary noise abatement decision presented in this report is based on preliminary project alignments and profiles, which may be subject to change. As such, the physical characteristics of noise abatement described herein also may be subject to change. If pertinent parameters change substantially during the final project design, the preliminary noise abatement decision may be changed or eliminated from the final project design. A final decision to construct noise abatement will be made upon completion of the project design. The preliminary noise abatement decision presented here will be included in the draft environmental document, which will be circulated for public review.

EXHIBIT 2
City Council 22 – 489 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
8-1
Chapter 8 Construction Noise
Two types of short-term noise impacts would occur during project construction. The first type would be from construction crew commutes and the transport of construction equipment and materials to the project site and would incrementally raise noise levels on access roads leading to the site. The pieces of heavy equipment for grading and construction activities would be moved on site, would remain for the duration of each construction phase, and would not add to the daily traffic volume in the project vicinity. A high single-event noise exposure potential at a maximum level of 87 dBA Lmax from trucks passing at 50 feet would exist. However, the projected construction traffic would be minimal when compared to existing traffic volumes on Santa Ana Blvd. and other affected streets, and its associated long-term noise level change would not be perceptible. Therefore, construction-related worker commutes and equipment transport noise impacts would be short-term and would not be adverse.

The second type of short-term noise impact would be from construction activities. Construction is performed in discrete steps, each of which has its own mix of equipment and consequently its own noise characteristics. These various, sequential phases would change the character of the noise generated and the noise levels as well along the project alignment as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction-related noise ranges to be categorized by work phase. Table 8-1 lists typical construction equipment noise levels (Lmax) recommended for noise impact assessments, based on a distance of 50 feet between the equipment and a noise receptor.

Typical noise levels at 50 feet from an active construction area range up to 91 dBA Lmax during the noisiest construction phases. The site preparation phase, which includes grading and paving, tends to generate the highest noise levels because the noisiest construction equipment is earthmoving equipment. Earthmoving equipment includes excavating machinery such as backfillers, bulldozers, and front loaders. Earthmoving and compacting equipment includes compactors, scrapers, and graders. Typical operating cycles for these types of construction equipment may involve one or two minutes of full power operation followed by three or four minutes at lower power settings.

Construction of the proposed project is expected to require the use of earthmovers, bulldozers, water trucks, and pickup trucks. Noise associated with the use of construction equipment is estimated between 79 and 89 dBA Lmax at a distance of 50 feet from the active construction area for the grading phase. As seen in Table 8-1, the maximum noise level generated by each earthmover is assumed to be approximately 86 dBA Lmax at 50 feet from the earthmover in operation. Each bulldozer would generate approximately 85 dBA Lmax at 50 feet. The maximum noise level generated by water trucks and pickup trucks is approximately 86 dBA Lmax at 50 feet from these vehicles. Each doubling of the sound source with equal strength increases the noise level by 3 dBA. Each piece of construction equipment operates as an individual point source. The worst-case composite noise level at the nearest residence during this phase of construction would be 91 dBA Lmax (at a distance of 50 feet from an active construction area).

EXHIBIT 2
City Council 22 – 490 5/5/2026
Chapter 8. Construction Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
8-2
Table 8-1. Typical Construction Equipment Noise Levels
Type of Equipment
Range of Maximum Sound
Levels
(dBA Lmax at 50 feet)
Suggested Maximum Sound
Levels for Analysis
(dBA Lmax at 50 feet)
Pile Drivers 81 to 96 93
Rock Drills 83 to 99 96
Jackhammers 75 to 85 82
Pneumatic Tools 78 to 88 85
Pumps 74 to 84 80
Scrapers 83 to 91 87
Haul Trucks 83 to 94 88
Cranes 79 to 86 82
Portable Generators 71 to 87 80
Rollers 75 to 82 80
Dozers 77 to 90 85
Tractors 77 to 82 80
Front-End Loaders 77 to 90 86
Hydraulic Backhoe 81 to 90 86
Hydraulic Excavators 81 to 90 86
Graders 79 to 89 86
Air Compressors 76 to 89 86
Trucks 81 to 87 86
Source: Noise Control for Buildings and Manufacturing Plants, Bolt, Beranek & Newman, 1987. dBA = A-weighted decibels
Lmax = maximum instantaneous noise level
In addition to the standard construction equipment, the project may require the use of pile drivers. As shown in Table 8-1, pile driving generates noise levels of up to 96 dBA Lmax at 50 feet.

The closest sensitive receiver locations are located 50 feet from the project construction areas.

Therefore, these receptor locations may be subject to short-term noise reaching 95 dBA Lmax or higher generated by construction activities along the project alignment. Compliance with the construction hours specified in the City of Santa Ana Municipal Code, Noise Control Section 18- 314, would be required. See Section 4.2.3 on page 4-3 of this report. To minimize construction noise impacts on sensitive land uses adjacent to the project site, construction noise is regulated by the Caltrans Standard Specifications in Section 14-8.02, “Noise Control,” and also by Standard Special Provision S5-310, “Noise Control.” Noise control will conform to the provisions in Section 14-8.02 and Standard Special Provision S5-310. The noise level from the contractor’s operations between the hours of 9:00 p.m. and 6:00 a.m. will not exceed 86 dBA Leq(h) at a distance of 50 feet. This requirement in no way relieves the contractor from responsibility for complying with local ordinances regulating noise levels. The contractor should use an alternative warning method instead of a sound signal unless required by safety laws. In EXHIBIT 2
City Council 22 – 491 5/5/2026
Chapter 8. Construction Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
8-3
addition, the contractor will equip all internal combustion engines with the manufacturerrecommended mufflers and will not operate any internal combustion engine on the job site without the appropriate muffler.

Noise from construction activities are exempt from the City of Santa Ana Municipal Code noise ordinance, provided that construction work takes place between the hours of 7:00 a.m. and 8:00 p.m. on weekdays and Saturdays.

Construction noise would be short-term, intermittent, and overshadowed by local traffic noise.

Further, implementing the following measure would further minimize the temporary noise impacts from construction:
• The contractor will implement appropriate additional noise mitigation measures, including changing the location of stationary construction equipment, turning off idling equipment, rescheduling construction activity, notifying adjacent residents in advance of construction work, and installing acoustic barriers around stationary construction noise sources.

EXHIBIT 2
City Council 22 – 492 5/5/2026
Chapter 8. Construction Noise
Noise Study Report
Santa Ana Boulevard Grade Separation Project
8-4
This page intentionally left blank
EXHIBIT 2
City Council 22 – 493 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
9-1
Chapter 9 References
AECOM. 2011. Traffic Data. December. Orange, CA.

Bolt, Beranek & Newman. 1987. Noise Control for Buildings and Manufacturing Plants.

California Department of Transportation. 2009. Technical Noise Supplement. November.

Sacramento, CA: Division of Environmental Analysis. Available:
<http://www.dot.ca.gov/hq/env/noise/pub/tens_complete.pdf>. ———. 2006. Highway Design Manual. Publications Unit.
———. 2010. 2010 Standard Specifications and Special Provisions. ———. 2011. Traffic Noise Analysis Protocol for New Highway Construction, Reconstruction, and Retrofit Barrier Projects. Division of Environmental Analysis. May. Available:
<http://www.dot.ca.gov/hq/env/noise/pub/ca_tnap_may2011.pdf>.

Federal Highway Administration (Anderson, Grant S., Cynthia S. Y. Lee, Gregg G. Fleming). 1998a. FHWA Traffic Noise Model, Version 1.0: User's Guide. Report No. FHWA-PD96-009 and DOT-VNTSC-FHWA-98-1. Cambridge, MA: John A. Volpe National Transportation Systems Center, Acoustics Facility, January. ——— (Menge, Christopher W., Christopher J. Rossano, Grant S. Anderson, Christopher J.

Bajdek). 1998b. FHWA Traffic Noise Model, Version 1.0: Technical Manual. Report No.

FHWA-PD-96-010 and DOT-VNTSC-FHWA-98-2. Cambridge, MA: John A. Volpe National Transportation Systems Center, Acoustics Facility, February. ———. 2004. FHWA Traffic Noise Model, Version 2.5. Office of Environment and Planning.

Washington, D.C. February.

Santa Ana, City of. Municipal Code. November 28, 2011 (Supp. No. 7) Santa Ana, CA.

Available: < http://library.municode.com/index.aspx?clientId=14452> EXHIBIT 2
City Council 22 – 494 5/5/2026
Chapter 9 References
Noise Study Report
Santa Ana Boulevard Grade Separation Project
9-2
This page intentionally left blank
EXHIBIT 2
City Council 22 – 495 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
A-1
Appendix A Traffic Data
This appendix contains tables that present traffic data for the existing conditions, Design Year No Build, and Design Year Build.

EXHIBIT 2
City Council 22 – 496 5/5/2026
EXHIBIT 2
City Council 22 – 497 5/5/2026
Table A1: Santa Ana Boulevard Grade Separation Weekday AM Peak Hour Traffic Volumes

NB EB SB WB

ID INTERSECT SCENARIO L T R L T R L T R L T R
2 Santiago St/Santa Ana Blvd Existing 21 43 62 29 326 19 220 122 83 114 836 241 2016 Baseline 22 44 64 41 373 19 239 125 94 117 917 2692016 Baseline1 22 44 64 41 373 19 248 125 98 108 909 2732035 Baseline2 69 291 106 177 701 44 352 306 332 148 1086 6062035 + Project 69 291 106 177 701 44 361 306 336 139 1078 610 3 Logan St/Santa Ana Blvd Existing 0 0 0 0 616 0 0 0 21 0 1197 8 2016 Baseline1 0 0 0 0 683 0 0 0 22 0 1309 82016 + Project 0 0 0 0 683 0 0 0 0 0 1317 02035 Baseline3 0 0 0 0 742 0 0 0 24 0 1423 92035 + Project 0 0 0 0 742 0 0 0 0 0 1432 0 4 SARTC Dwy/Santa Ana Blvd Existing 0 0 35 0 581 39 0000 1201 0 2016 Baseline1 0 0 35 0 1323 39 0000 2633 0
2016 + Project 0 0 35 0 1384 39 0000 2702 0
2035 Baseline3 0 0 39 0 703 44 0000 1427 0
2035 + Project 0 0 39 0 712 44 0000 1414 0
5 Fuller St‐Fruit St/Santa Ana Blvd Existing 22 0 23 4 583 25 1 0 1 32 1148 6 2016 Baseline1 23 0 24 4 650 26 1 0 1 33 1259 6
2016 + Project 23 0 24 4 659 26 1 0 1 33 1259 6
2035 Baseline3 25 0 26 4 705 28 1 0 1 36 1368 7
2035 + Project 25 0 26 4 714 28 1 0 1 36 1368 7
6I‐5 SB Ramps/SanAna Blvd Existing 0 0 0 230 393 0 378 0 84 0 1114 264 2016 Baseline1 0 0 0 251 440 0 387 0 103 0 1207 2712016 + Project 0 0 0 251 449 0 387 0 103 0 1207 2712035 Baseline2 0 0 0 340 841 0 508 0 122 0 1203 2192035 + Project 0 0 0 340 850 0 508 0 122 0 1203 219 Source: AECOM. 2011 `
1 2016 Baseline traffic volumes developed by adding cumulative projects trip assignmentand application of 2 2035 Baseline traffic volumes referenced from Santa Ana Renaissanc Specific Plan Traffic Study (KOA 3 2035 Baseline traffic volumes developed by adding cumulative projects trip assignmentand application of

EXHIBIT
2 City Council 22 – 498 5/5/2026
Table A2: Santa Ana Boulevard Grade Separation Weekday PM Peak Hour Traffic Volumes

ID INTERSECT SCENARIO L T R L T R L T R L T R
Santiago St/Santa Ana Blvd Existing 42 77 104 240 128 61 43 750 16 103 439 142 2016 Baseline1 43 79 107 281 131 75 61 861 16 106 495 1572016 + Project 43 79 107 286 131 78 61 861 16 101 489 1622035 Baseline2 55 291 115 461 369 308 295 1018 126 148 907 5062035 + Project 55 291 115 466 369 311 295 1018 126 143 901 511 Logan St/Santa Ana Blvd Existing 0 0 0 0 0 14 0 1166 0 0 660 8 2016 Baseline1 0 0 0 0 0 14 0 1322 0 0 732 8
2016 + Project 0000000 1327 0 0 740 0
2035 Baseline3 0 0 0 0 0 16 0 1433 0 0 794 9
2035 + Project 0000000 1438 0 0 803 0
SARTC Dwy/Santa Ana Blvd Existing 0 0 97 0000 1076 33 0 680 0 2016 Baseline1 0 0 99 0000 1230 34 0 752 02016 + Project 0 0 99 0000 1235 34 0 760 02035 Baseline3 0 0 109 0000 1332 37 0 817 02035 + Project 0 0 109 0000 1337 37 0 826 0 Fuller St‐Fruit St/Santa Ana Blvd Existing 24 0 82 16 1 6 7 1149 15 14 648 3 2016 Baseline1 25 0 84 16 1 6 7 1305 15 14 719 32016 + Project 25 0 84 16 1 6 7 1310 15 14 719 32035 Baseline3 27 0 92 18 1 7 8 1414 17 16 781 32035 + Project 27 0 92 18 1 7 8 1419 17 16 781 3 I‐5 SB Ramps/SanAna Blvd Existing 0 0 0 296 0 83 663 608 0 0 571 193 2016 Baseline1 0 0 0 304 0 95 719 711 0 0 630 1992016 + Project 0 0 0 304 0 95 719 716 0 0 630 1992035 Baseline2 0 0 0 351 0 305 527 943 0 0 1324 2732035 + Project 0 0 0 351 0 305 527 948 0 0 1324 273 Source: AECOM. 2011
1 2016 Baseline traffic volumes developed by adding cumulative projects trip assignmentand application of 0.50% annual 2 2035 Baseline traffic volumes referenced from Santa Ana Renaissanc Specific Plan Traffic Study (KOA Corporatio 2010) 3 2035 Baseline traffic volumes developed by adding cumulative projects trip assignmentand application of 0.50% annual

EXHIBIT
2 City Council 22 – 499 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
B-1
Appendix B Noise Barrier Reasonableness
Analysis Worksheet
WORKSHEET B-1

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-1, AREA A, TOP OF RETAINING WALL, 8 FEET Critical Receiver: M4
Base Allowance (2011 Dollars): $55,000
1) Absolute Noise Levels 66.9 dBA*
2) "Build" VS Existing Noise Levels -5.5 dBA*
3) Achievable Noise Reduction 5.9 dBA *
Number of Benefited Residences 1
Total Unmodified Reasonableness Allowance $55,000
* at Critical Design Receiver
WORKSHEET B-2

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-1, AREA A, TOP OF RETAINING WALL, 10 FEET Critical Receiver: M4
Base Allowance (2011 Dollars): $55,000
1) Absolute Noise Levels 66.9 dBA*
2) "Build" VS Existing Noise Levels -5.5 dBA*
3) Achievable Noise Reduction 7.0 dBA *
Number of Benefited Residences 1
Total Unmodified Reasonableness Allowance $55,000
* at Critical Design Receiver
EXHIBIT 2
City Council 22 – 500 5/5/2026
Appendix B. Noise Barrier Reasonableness Analysis Worksheet Noise Study Report
Santa Ana Boulevard Grade Separation Project
B-2
WORKSHEET B-3

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-1, AREA A, TOP OF RETAINING WALL, 12 FEET Critical Receiver: M4
Base Allowance (2011 Dollars): $55,000
1) Absolute Noise Levels 66.9 dBA*
2) "Build" VS Existing Noise Levels -5.5 dBA*
3) Achievable Noise Reduction 7.7 dBA *
Number of Benefited Residences 1
Total Unmodified Reasonableness Allowance $55,000
* at Critical Design Receiver
WORKSHEET B-4

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-1, AREA A, TOP OF RETAINING WALL, 14 FEET Critical Receiver: M4
Base Allowance (2011 Dollars): $55,000
1) Absolute Noise Levels 66.9 dBA*
2) "Build" VS Existing Noise Levels -5.5 dBA*
3) Achievable Noise Reduction 8.3 dBA *
Number of Benefited Residences 1
Total Unmodified Reasonableness Allowance $55,000
* at Critical Design Receiver
EXHIBIT 2
City Council 22 – 501 5/5/2026
Appendix B. Noise Barrier Reasonableness Analysis Worksheet Noise Study Report
Santa Ana Boulevard Grade Separation Project
B-3
WORKSHEET B-5

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-1, AREA A, TOP OF RETAINING WALL, 16 FEET Critical Receiver: M4
Base Allowance (2011 Dollars): $55,000
1) Absolute Noise Levels 66.9 dBA*
2) "Build" VS Existing Noise Levels -5.5 dBA*
3) Achievable Noise Reduction 8.9 dBA *
Number of Benefited Residences 2
Total Unmodified Reasonableness Allowance $110,000
* at Critical Design Receiver
WORKSHEET B–6

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-2, AREA D, RIGHT-OF-WAY, 12 FEET Critical Receiver: M11
Base Allowance (2009 Dollars): $55,000
1) Absolute Noise Levels 67.9 dBA*
2) "Build" VS Existing Noise Levels 0.8 dBA*
3) Achievable Noise Reduction 8.7 dBA *
Unmodified Reasonableness Allowance Per Residence $55,000 Number of Benefited Residences 4
Total Unmodified Reasonableness Allowance $220,000
* at Critical Design Receiver
EXHIBIT 2
City Council 22 – 502 5/5/2026
Appendix B. Noise Barrier Reasonableness Analysis Worksheet Noise Study Report
Santa Ana Boulevard Grade Separation Project
B-4
WORKSHEET B-7

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-2, AREA D, RIGHT-OF-WAY, 14 FEET Critical Receiver: M11
Base Allowance (2009 Dollars): $55,000
1) Absolute Noise Levels 67.9 dBA*
2) "Build" VS Existing Noise Levels 0.8 dBA*
3) Achievable Noise Reduction 9.6 dBA *
Unmodified Reasonableness Allowance Per Residence $55,000 Number of Benefited Residences 4
Total Unmodified Reasonableness Allowance $220,000
* at Critical Design Receiver
WORKSHEET B-8

CALCULATION OF REASONABLE ALLOWANCE
PROJECT: SANTA ANA BOULEVARD GRADE

SEPERATION PROJECT
PROJECT LOCATION: SANTA ANA,

ORANGE COUNTY
Date:
9/2012
NOISE BARRIER I.D. & LOCATION: NB-2, AREA D, RIGHT-OF-WAY, 16 FEET Critical Receiver: M11
Base Allowance (2009 Dollars): $55,000
1) Absolute Noise Levels 67.9 dBA*
2) "Build" VS Existing Noise Levels 0.8 dBA*
3) Achievable Noise Reduction 10.4 dBA *
Unmodified Reasonableness Allowance Per Residence $55,000 Number of Benefited Residences 4
Total Unmodified Reasonableness Allowance $220,000
* at Critical Design Receiver
EXHIBIT 2
City Council 22 – 503 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
C-1
Appendix C Noise Barrier Analysis
Table C-1. Analysis of Barrier NB-1
Position
Total
Number of
Benefited
M2 M3 ST4 M4 M5 ST2 Receivers
Number of Units Represented 1 1 1 1 1 1 --
Existing Traffic Noise Level (dBA Leq[h]) 63.2 66.7 70.0 72.4 63.8 67.2 -- Future with Project Traffic Noise Level (dBA Leq[h]) 65.1 67.6 67.2 66.9 58.1 59.7 -- Future with Project - Existing Traffic Noise Level (dBA Leq[h]) 1.9 0.9 -2.8 -5.5 -5.7 -7.5 -- 8-Foot Barrierb
Future with Project Traffic Noise Level (dBA Leq[h]) 63.8 64.1 64.0 61.0 57.8 57.4 -- Predicted Noise Reduction (dB) 1.3 3.5 3.2 5.9 0.3 2.3 -- Number of Benefited Receivers 0 0 0 1 0 0 1
10-Foot Barrierb
Future with Project Traffic Noise Level (dBA Leq[h]) 63.4 63.3 63.9 59.9 57.7 56.8 -- Predicted Noise Reduction (dB) 1.7 4.3 3.3 7.0 0.4 2.9 -- Number of Benefited Receivers 0 0 0 1 0 0 1
12-Foot Barrierb
Future with Project Traffic Noise Level (dBA Leq[h]) 63.0 63.0 63.7 59.2 57.5 56.6 -- Predicted Noise Reduction (dB) 2.1 4.6 3.5 7.7 0.6 3.1 -- Number of Benefited Receivers 0 0 0 1 0 0 1
14-Foot Barrierb
Future with Project Traffic Noise Level (dBA Leq[h]) 63.2 62.8 63.4 58.6 57.4 56.5 -- Predicted Noise Reduction (dB) 1.9 4.8 3.8 8.3 0.7 3.2 -- Number of Benefited Receivers 0 0 0 1 0 0 1
EXHIBIT 2
City Council 22 – 504 5/5/2026
Appendix C. Noise Barrier Analysis
Noise Study Report
Santa Ana Boulevard Grade Separation Project
C-2
Table C-1. Analysis of Barrier NB-1
Position
Total
Number of
Benefited
M2 M3 ST4 M4 M5 ST2 Receivers
16-Foot Barrierb
Future with Project Traffic Noise Level (dBA Leq[h]) 63.2 62.6 63.2 58.0 56.6 55.8 -- Predicted Noise Reduction (dB) 1.9 5.0 4.0 8.9 1.5 3.9 -- Number of Benefited Receivers 0 1 0 1 0 0 2
a Traffic noise levels that approach or exceed 67 dBA Leq(h) are shown in bold. b Noise barriers that block the line-of-sight from the receptor to truck exhaust stacks are shaded in yellow for receptors exceeding NAC and in pink for receptors not exceeding NAC. c Based upon an allowance of $55,000 per benefitted residence. Note that "benefitted" residence is one that achieves a minimum of 5 dB insertion loss.

EXHIBIT 2
City Council 22 – 505 5/5/2026
Appendix C. Noise Barrier Analysis
Noise Study Report
Santa Ana Boulevard Grade Separation Project
C-3
Table C-2. Analysis of Barrier NB-2
Position
Total Number
of Benefited
Receivers
M10 M11 ST1 M12
Number of Units Represented 1 1 1 1 --
Existing Traffic Noise Level (dBA Leq[h]) 64.8 67.9 67.4 68.3 -- Future build Traffic Noise Level (dBA Leq[h]) 65.3 68.7 68.1 69.1 -- Future build - Existing Traffic Noise Level (dBA Leq[h]) 0.5 0.8 0.7 0.8 -- 8-Foot Barrierb
Future build Traffic Noise Level (dBA Leq[h]) 62.4 63.5 63.9 63.7 -- Predicted Noise Reduction (dB) 2.9 5.2 4.2 5.4 --
Number of Benefited Receivers 0 1 0 1 2
10-Foot Barrierb
Future build Traffic Noise Level (dBA Leq[h]) 61.5 61.8 62.4 61.7 -- Predicted Noise Reduction (dB) 3.8 6.9 5.7 7.4 --
Number of Benefited Receivers 0 1 1 1 3
12-Foot Barrierb
Future build Traffic Noise Level (dBA Leq[h]) 61.0 60.0 61.0 60.2 -- Predicted Noise Reduction (dB) 4.3 8.7 7.1 8.9 --
Number of Benefited Receivers 1 1 1 1 4
14-Foot Barrierb
Future build Traffic Noise Level (dBA Leq[h]) 59.3 59.1 59.7 60.0 -- Predicted Noise Reduction (dB) 6.0 9.6 8.4 9.1 --
Number of Benefited Receivers 1 1 1 1 4
16-Foot Barrierb
Future build Traffic Noise Level (dBA Leq[h]) 58.5 58.3 58.9 58.3 -- EXHIBIT 2
City Council 22 – 506 5/5/2026
Appendix C. Noise Barrier Analysis
Noise Study Report
Santa Ana Boulevard Grade Separation Project
C-4
Table C-2. Analysis of Barrier NB-2
Position
Total Number
of Benefited
Receivers
M10 M11 ST1 M12
Predicted Noise Reduction (dB) 6.8 10.4 9.2 10.8 --
Number of Benefited Receivers 1 1 1 1 4
a Traffic noise levels that approach or exceed 67 dBA Leq(h) are shown in bold. b Noise barriers that block the line-of-sight from the receptor to truck exhaust stacks are shaded in yellow for receptors exceeding NAC and in pink for receptors not exceeding NAC.

EXHIBIT 2
City Council 22 – 507 5/5/2026
Noise Study Report
Santa Ana Boulevard Grade Separation Project
D-1
Appendix D Supplemental Data
D-1 List of Field Instrumentation and Calibration Records D-2 Field Data Sheets
D-3 Field Photos
D-4 TNM® Files: Input/Output Sheets and Model Files
(files included on CD; printouts to be included in final noise study) EXHIBIT 2
City Council 22 – 508 5/5/2026
Appendix D. Supplemental Data
Noise Study Report
Santa Ana Boulevard Grade Separation Project
D-2
This page intentionally left blank
EXHIBIT 2
City Council 22 – 509 5/5/2026
Appendix D-1
List of Field Instrumentation and Calibration
Records
List of Field Instrumentation
 Sound Level Meter (for short-term noise measurements)  Larson Davis Model 812 Type 1 Integrating Sound Level Meter, Serial Number 0432
 Rion NL-21Type 2 Integrating Sound Level Meter, Serial Number 0776887
 Acoustical Calibrators
 Larson Davis Model Cal 200 (114 dB SPL @ 1000 Hz), Serial Number 6644
 Meteorology Instrumentation
 Kestrel Model K3000 Digital Hygrometer/Thermometer/Anemometer, Serial Number 475332
Figures (following pages)
 Larson Davis 812 (S/N 0432) Calibration Certificate
 Larson Davis 828 Preamplifier (S/N 1368) Calibration Certificate  Rion NL-21 (S/N 0776887) Calibration Certificate
 Larson Davis Cal 200 (S/N 6644) Calibration Certificate EXHIBIT 2
City Council 22 – 510 5/5/2026
EXHIBIT 2
City Council 22 – 511 5/5/2026
EXHIBIT 2
City Council 22 – 512 5/5/2026
EXHIBIT 2
City Council 22 – 513 5/5/2026
EXHIBIT 2
City Council 22 – 514 5/5/2026
EXHIBIT 2
City Council 22 – 515 5/5/2026
Appendix D-2
Field Data Sheets
EXHIBIT 2
City Council 22 – 516 5/5/2026
EXHIBIT 2
City Council 22 – 517 5/5/2026
EXHIBIT 2
City Council 22 – 518 5/5/2026
EXHIBIT 2
City Council 22 – 519 5/5/2026
EXHIBIT 2
City Council 22 – 520 5/5/2026
EXHIBIT 2
City Council 22 – 521 5/5/2026
EXHIBIT 2
City Council 22 – 522 5/5/2026
EXHIBIT 2
City Council 22 – 523 5/5/2026
Appendix D-3
Field Measurement Photographs
EXHIBIT 2
City Council 22 – 524 5/5/2026
EXHIBIT 2
City Council 22 – 525 5/5/2026
LT1 and ST1, looking west
EXHIBIT 2
City Council 22 – 526 5/5/2026
ST1 and LT, looking south
EXHIBIT 2
City Council 22 – 527 5/5/2026
ST2, looking southeast
EXHIBIT 2
City Council 22 – 528 5/5/2026
ST2, looking west
EXHIBIT 2
City Council 22 – 529 5/5/2026
ST3, looking north
EXHIBIT 2
City Council 22 – 530 5/5/2026
ST4, looking north
EXHIBIT 2
City Council 22 – 531 5/5/2026
ST4, looking south
EXHIBIT 2
City Council 22 – 532 5/5/2026
EXHIBIT 2
City Council 22 – 533 5/5/2026
Appendix D-4
TNM® Files: Input/Output Sheets and Model
Files (files included on CD; printouts to be
included in final noise study)
EXHIBIT 2
City Council 22 – 534 5/5/2026
EXHIBIT 2
City Council 22 – 535 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - Existing Case of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1 February 20

EXHIBIT
2 City Council 22 – 536 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago St 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago St 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago St 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 WB Santa Ana Blvd - e of I-5 Ramps 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 WB Santa Ana Blvd - w of Santiago St 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago St 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average
C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 2 1 February 20

EXHIBIT
2 City Council 22 – 537 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St S of Santa Ana Blvd- 2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average
point130 130 6,567,368.0 2,177,335.8 135.00 Average
point131 131 6,567,533.5 2,177,225.5 140.00 Average
point132 132 6,567,603.0 2,177,157.0 142.00 Average
point133 133 6,567,651.0 2,177,091.0 144.00 Average
point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 3 1 February 20

EXHIBIT
2 City Council 22 – 538 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Fuller St -2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Fuller St 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 EB Santa Ana Blvd - e of I-5 Ramps-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of I-5 Ramps 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 EB Santa Ana Blvd - e of Logan St 40.0 point155 155 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 WB Santa Ana Blvd - e of Santiago St 40.0 point156 156 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 WB Santa Ana Blvd - e of Logan St 40.0 point157 157 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 4 1 February 20

EXHIBIT
2 City Council 22 – 539 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point52 52 6,566,837.5 2,176,223.8 139.00
EB Santa Ana Blvd - e of Fuller St 40.0 point158 158 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 5 1 February 20

EXHIBIT
2 City Council 22 – 540 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing Case Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 11 25 1 25 0 0 0 0 0 0 point2 2
NB Logan St point75 75 7 25 1 25 0 0 0 0 0 0
point74 74 7 25 1 25 0 0 0 0 0 0 point73 73 7 25 1 25 0 0 0 0 0 0 point72 72 7 25 1 25 0 0 0 0 0 0 point71 71 7 25 1 25 0 0 0 0 0 0 point70 70 7 25 1 25 0 0 0 0 0 0 point69 69 SB Logan St point80 80 19 25 1 25 1 20 0 0 0 0
point79 79 19 25 1 25 1 20 0 0 0 0 point78 78 19 25 1 25 1 20 0 0 0 0 point77 77 19 25 1 25 1 20 0 0 0 0 point76 76 I-5 SB point89 89 13020 65 520 65 460 60 0 0 0 0
point90 90 13020 65 520 65 460 60 0 0 0 0 point92 92 13020 65 520 65 460 60 0 0 0 0 point93 93 13020 65 520 65 460 60 0 0 0 0 point94 94 13020 65 520 65 460 60 0 0 0 0 point95 95 13020 65 520 65 460 60 0 0 0 0 point96 96 13020 65 520 65 460 60 0 0 0 0 point97 97 13020 65 520 65 460 60 0 0 0 0 point98 98 13020 65 520 65 460 60 0 0 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1

EXHIBIT
2 City Council 22 – 541 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 13020 65 520 65 460 60 0 0 0 0 point100 100 13020 65 520 65 460 60 0 0 0 0 point101 101 I-5 NB point102 102 13020 65 520 65 460 60 0 0 0 0
point104 104 13020 65 520 65 460 60 0 0 0 0 point105 105 13020 65 520 65 460 60 0 0 0 0 point106 106 13020 65 520 65 460 60 0 0 0 0 point107 107 13020 65 520 65 460 60 0 0 0 0 point108 108 13020 65 520 65 460 60 0 0 0 0 point109 109 13020 65 520 65 460 60 0 0 0 0 point110 110 13020 65 520 65 460 60 0 0 0 0 point111 111 13020 65 520 65 460 60 0 0 0 0 point112 112 13020 65 520 65 460 60 0 0 0 0 point113 113 EB Santa Ana Blvd - w of Santiago St point45 45 339 35 12 35 11 30 10 35 2 35 point44 44 339 35 12 35 11 30 10 35 2 35 point43 43 339 35 12 35 11 30 10 35 2 35 point42 42 EB Santa Ana Blvd - e of Santiago St point114 114 552 35 19 35 17 30 16 35 3 35 point126 126 552 35 19 35 17 30 16 35 3 35 point84 84 552 35 19 35 17 30 16 35 3 35 point41 41 552 35 19 35 17 30 16 35 3 35 point40 40 EB Santa Ana Blvd - e of Santiago St point115 115 552 35 19 35 17 30 16 35 3 35 point39 39 552 35 19 35 17 30 16 35 3 35 point38 38
WB Santa Ana Blvd - e of I-5 Ramps point68 68 1251 35 44 35 39 30 36 35 8 35 point67 67 1251 35 44 35 39 30 36 35 8 35 point66 66 1251 35 44 35 39 30 36 35 8 35 point65 65 1251 35 44 35 39 30 36 35 8 35 point64 64 WB Santa Ana Blvd - w of Santiago St point117 117 853 35 30 35 27 30 25 35 5 35 point86 86 853 35 30 35 27 30 25 35 5 35 point125 125 853 35 30 35 27 30 25 35 5 35 point48 48 853 35 30 35 27 30 25 35 5 35 point116 116 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 2 1

EXHIBIT
2 City Council 22 – 542 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago St point118 118 853 35 30 35 27 30 25 35 5 35 point47 47 853 35 30 35 27 30 25 35 5 35 point46 46
NB Santiago S of Santa Ana Blvd point12 12 104 35 12 35 8 30 3 35 0 0 point11 11 104 35 12 35 8 30 3 35 0 0 point10 10 104 35 12 35 8 30 3 35 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 257 35 30 35 19 30 7 35 0 0 point8 8 257 35 30 35 19 30 7 35 0 0 point7 7 257 35 30 35 19 30 7 35 0 0 point6 6 257 35 30 35 19 30 7 35 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 257 35 30 35 19 30 7 35 0 0 point5 5 257 35 30 35 19 30 7 35 0 0 point4 4 257 35 30 35 19 30 7 35 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 349 35 30 35 19 30 7 35 0 0 point20 20 349 35 30 35 19 30 7 35 0 0 point19 19 349 35 30 35 19 30 7 35 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 210 35 24 35 15 30 6 35 0 0 point15 15 210 35 24 35 15 30 6 35 0 0 point14 14 210 35 24 35 15 30 6 35 0 0 point13 13 SB Santiago St S of Santa Ana Blvd- 2 point124 124 210 35 24 35 15 30 6 35 0 0 point17 17 210 35 24 35 15 30 6 35 0 0 point16 16 210 35 24 35 15 30 6 35 0 0 point122 122 SB I-5 Offramp point127 127 427 65 18 65 16 60 1 65 1 65 point129 129 427 60 18 60 16 60 1 60 1 60 point130 130 427 60 18 60 16 60 1 60 1 60 point131 131 427 45 18 45 16 45 1 45 1 45 point132 132 427 45 18 45 16 45 1 45 1 45 point133 133 427 30 18 30 16 30 1 30 1 30 point134 134 427 30 18 30 16 30 1 30 1 30 point135 135 427 15 18 15 16 15 1 15 1 15 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 3 1

EXHIBIT
2 City Council 22 – 543 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point136 136
SB I-5 Onramp point137 137 457 65 19 65 17 60 1 65 1 65 point139 139 457 65 19 65 17 60 1 65 1 65 point140 140 457 65 19 65 17 60 1 65 1 65 point141 141 457 65 19 65 17 60 1 65 1 65 point142 142 457 65 19 65 17 60 1 65 1 65 point143 143 457 65 19 65 17 60 1 65 1 65 point144 144 457 65 19 65 17 60 1 65 1 65 point145 145 457 65 19 65 17 60 1 65 1 65 point146 146 457 65 19 65 17 60 1 65 1 65 point147 147 457 65 19 65 17 60 1 65 1 65 point148 148 457 65 19 65 17 60 1 65 1 65 point149 149 457 65 19 65 17 60 1 65 1 65 point150 150 457 65 19 65 17 60 1 65 1 65 point138 138 WB Santa Ana Blvd - e of Fuller St -2 point151 151 1076 35 38 35 34 30 31 35 7 35 point63 63 1076 35 38 35 34 30 31 35 7 35 point62 62 1076 35 38 35 34 30 31 35 7 35 point61 61 WB Santa Ana Blvd - e of Fuller St point152 152 1076 35 38 35 34 30 31 35 7 35 point60 60 1076 35 38 35 34 30 31 35 7 35 point59 59 1076 35 38 35 34 30 31 35 7 35 point58 58 1076 35 38 35 34 30 31 35 7 35 point57 57 EB Santa Ana Blvd - e of I-5 Ramps-2 point153 153 700 35 25 35 22 30 20 35 4 35 point27 27 700 35 25 35 22 30 20 35 4 35 point26 26 700 35 25 35 22 30 20 35 4 35 point25 25 EB Santa Ana Blvd - e of I-5 Ramps point154 154 700 35 25 35 22 30 20 35 4 35 point24 24 700 35 25 35 22 30 20 35 4 35 point23 23 700 35 25 35 22 30 20 35 4 35 point22 22 EB Santa Ana Blvd - e of Logan St point155 155 559 35 20 35 17 30 16 35 4 35 point37 37 559 35 20 35 17 30 16 35 4 35 point36 36 559 35 20 35 17 30 16 35 4 35 point35 35 559 35 20 35 17 30 16 35 4 35 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 4 1

EXHIBIT
2 City Council 22 – 544 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point34 34 559 35 20 35 17 30 16 35 4 35 point33 33
WB Santa Ana Blvd - e of Santiago St point156 156 1081 35 38 35 34 30 31 35 7 35 point51 51 1081 35 38 35 34 30 31 35 7 35 point50 50 1081 35 38 35 34 30 31 35 7 35 point49 49 WB Santa Ana Blvd - e of Logan St point157 157 1094 35 39 35 34 30 32 35 7 35 point56 56 1094 35 39 35 34 30 32 35 7 35 point55 55 1094 35 39 35 34 30 32 35 7 35 point54 54 1094 35 39 35 34 30 32 35 7 35 point53 53 1094 35 39 35 34 30 32 35 7 35 point52 52 EB Santa Ana Blvd - e of Fuller St point158 158 551 35 19 35 17 30 16 35 3 35 point32 32 551 35 19 35 17 30 16 35 3 35 point31 31 551 35 19 35 17 30 16 35 3 35 point30 30 551 35 19 35 17 30 16 35 3 35 point29 29 551 35 19 35 17 30 16 35 3 35 point28 28 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 5 1

EXHIBIT
2 City Council 22 – 545 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing Case ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 0.00 66 10.0 8.0 Y ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 0.00 66 10.0 8.0 Y ST3 5 0 6,566,626.0 2,176,014.2 137.00 5.00 0.00 66 10.0 8.0 Y ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 Y M1 12 0 6,566,544.0 2,176,187.5 138.00 5.00 0.00 66 10.0 8.0 Y M2 14 1 6,566,648.0 2,176,315.5 139.00 5.00 0.00 66 10.0 8.0 Y M3 15 1 6,566,678.0 2,176,262.0 139.00 5.00 0.00 66 10.0 8.0 Y M4 16 1 6,566,899.0 2,176,290.2 139.50 5.00 0.00 66 10.0 8.0 Y M5 17 1 6,566,930.5 2,176,378.8 139.50 5.00 0.00 66 10.0 8.0 Y M6 18 0 6,566,933.5 2,175,803.8 140.00 5.00 0.00 66 10.0 8.0 Y M7 19 0 6,567,071.5 2,175,736.2 140.00 5.00 0.00 66 10.0 8.0 Y M8 20 0 6,567,207.5 2,176,200.0 141.00 5.00 0.00 66 10.0 8.0 Y M9 21 0 6,567,422.0 2,176,583.8 144.00 5.00 0.00 66 10.0 8.0 Y M10 22 1 6,567,834.0 2,176,465.8 145.30 5.00 0.00 66 10.0 8.0 Y M11 24 1 6,567,864.5 2,176,578.2 145.50 5.00 0.00 66 10.0 8.0 Y M12 25 1 6,567,944.5 2,176,607.8 146.30 5.00 0.00 66 10.0 8.0 Y C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1

EXHIBIT
2 City Council 22 – 546 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing Case Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1 February 2012

EXHIBIT
2 City Council 22 – 547 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 point85 85 6,566,964.5 2,176,389.8 140.00 12.00 Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 2 1 February 2012

EXHIBIT
2 City Council 22 – 548 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 Barrier38 W 0.00 99.99 0.00 0.00 point198 198 6,567,843.5 2,176,442.0 145.50 12.00 0.00 0 0 point199 199 6,567,843.5 2,176,466.2 145.50 12.00 0.00 0 0 point200 200 6,567,904.5 2,176,465.0 145.50 12.00 ROW SE of Fuller St W 0.00 99.99 0.00 0.00 point201 201 6,567,810.5 2,176,610.5 145.20 0.00 0.00 0 0 point202 202 6,567,912.0 2,176,638.0 146.00 0.00 0.00 0 0 point203 203 6,568,012.0 2,176,662.2 147.00 0.00 0.00 0 0 point204 204 6,568,113.0 2,176,668.8 147.00 0.00 Barrier40 W 0.00 99.99 0.00 0.00 point205 205 6,568,135.0 2,176,664.8 147.50 18.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 3 1 February 2012

EXHIBIT
2 City Council 22 – 549 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point206 206 6,568,083.0 2,176,665.5 147.50 18.00 0.00 0 0 point207 207 6,568,082.0 2,176,583.0 147.50 18.00 0.00 0 0 point208 208 6,568,134.0 2,176,582.0 147.00 18.00 Barrier41 W 0.00 99.99 0.00 0.00 point210 210 6,568,086.5 2,176,567.8 147.00 18.00 0.00 0 0 point211 211 6,568,086.5 2,176,446.5 147.00 18.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 4 1 February 2012

EXHIBIT
2 City Council 22 – 550 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing CaseBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1

EXHIBIT
2 City Council 22 – 551 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 2 1

EXHIBIT
2 City Council 22 – 552 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing Case Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1

EXHIBIT
2 City Council 22 – 553 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Existing Case BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 0.0 70.7 66 70.7 10 Snd Lvl 70.7 0.0 8 -8.0 ST2 3 1 0.0 65.6 66 65.6 10 ---- 65.6 0.0 8 -8.0 ST3 5 0 0.0 70.6 66 70.6 10 Snd Lvl 70.6 0.0 8 -8.0 ST4 6 1 0.0 66.9 66 66.9 10 Snd Lvl 66.9 0.0 8 -8.0 M1 12 0 0.0 67.0 66 67.0 10 Snd Lvl 67.0 0.0 8 -8.0 M2 14 1 0.0 60.1 66 60.1 10 ---- 60.1 0.0 8 -8.0
M3 15 1 0.0 63.6 66 63.6 10 ---- 63.6 0.0 8 -8.0 M4 16 1 0.0 69.3 66 69.3 10 Snd Lvl 69.3 0.0 8 -8.0 M5 17 1 0.0 60.7 66 60.7 10 ---- 60.7 0.0 8 -8.0
M6 18 0 0.0 57.0 66 57.0 10 ---- 57.0 0.0 8 -8.0 M7 19 0 0.0 52.6 66 52.6 10 ---- 52.6 0.0 8 -8.0 M8 20 0 0.0 62.3 66 62.3 10 ---- 62.3 0.0 8 -8.0 M9 21 0 0.0 66.2 66 66.2 10 Snd Lvl 66.2 0.0 8 -8.0 M10 22 1 0.0 68.1 66 68.1 10 Snd Lvl 68.1 0.0 8 -8.0 M11 24 1 0.0 71.2 66 71.2 10 Snd Lvl 71.2 0.0 8 -8.0 M12 25 1 0.0 71.6 66 71.6 10 Snd Lvl 71.6 0.0 8 -8.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 10 0.0 0.0 0.0 All Impacted 6 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaEx2 1 1 February 2012

EXHIBIT
2 City Council 22 – 554 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - Calibration Case 1 of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1 February 20

EXHIBIT
2 City Council 22 – 555 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago St 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago St 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago St-2 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 WB Santa Ana Blvd - e of Santiago St 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 2 1 February 20

EXHIBIT
2 City Council 22 – 556 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago St 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago St 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St N of Santa Ana Blvd-2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 I-5 SB Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average
point130 130 6,567,368.0 2,177,335.8 135.00 Average
point131 131 6,567,533.5 2,177,225.5 140.00 Average
point132 132 6,567,603.0 2,177,157.0 142.00 Average
point133 133 6,567,651.0 2,177,091.0 144.00 Average
C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 3 1 February 20

EXHIBIT
2 City Council 22 – 557 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
I-5 SB Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Santiago -2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Santiago St-2 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average point52 52 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 EB Santa Ana Blvd - e of Santiago S 2-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of Santiago -2-2 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 4 1 February 20

EXHIBIT
2 City Council 22 – 558 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 5 1 February 20

EXHIBIT
2 City Council 22 – 559 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 1 Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 44 25 2 25 1 25 0 0 0 0 point2 2
NB Logan St point75 75 0 0 0 0 0 0 0 0 0 0
point74 74 0 0 0 0 0 0 0 0 0 0 point73 73 0 0 0 0 0 0 0 0 0 0 point72 72 0 0 0 0 0 0 0 0 0 0 point71 71 0 0 0 0 0 0 0 0 0 0 point70 70 0 0 0 0 0 0 0 0 0 0 point69 69 SB Logan St point80 80 0 0 0 0 0 0 0 0 0 0
point79 79 0 0 0 0 0 0 0 0 0 0 point78 78 0 0 0 0 0 0 0 0 0 0 point77 77 0 0 0 0 0 0 0 0 0 0 point76 76 I-5 SB point89 89 7326 65 312 65 222 60 18 65 30 65
point90 90 7326 65 312 65 222 60 18 65 30 65 point92 92 7326 65 312 65 222 60 18 65 30 65 point93 93 7326 65 312 65 222 60 18 65 30 65 point94 94 7326 65 312 65 222 60 18 65 30 65 point95 95 7326 65 312 65 222 60 18 65 30 65 point96 96 7326 65 312 65 222 60 18 65 30 65 point97 97 7326 65 312 65 222 60 18 65 30 65 point98 98 7326 65 312 65 222 60 18 65 30 65 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1

EXHIBIT
2 City Council 22 – 560 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 7326 65 312 65 222 60 18 65 30 65 point100 100 7326 65 312 65 222 60 18 65 30 65 point101 101 I-5 NB point102 102 8364 65 354 65 282 60 12 65 12 65
point104 104 8364 65 354 65 282 60 12 65 12 65 point105 105 8364 65 354 65 282 60 12 65 12 65 point106 106 8364 65 354 65 282 60 12 65 12 65 point107 107 8364 65 354 65 282 60 12 65 12 65 point108 108 8364 65 354 65 282 60 12 65 12 65 point109 109 8364 65 354 65 282 60 12 65 12 65 point110 110 8364 65 354 65 282 60 12 65 12 65 point111 111 8364 65 354 65 282 60 12 65 12 65 point112 112 8364 65 354 65 282 60 12 65 12 65 point113 113 EB Santa Ana Blvd - w of Santiago St point45 45 0 0 0 0 0 0 0 0 0 0 point44 44 0 0 0 0 0 0 0 0 0 0 point43 43 0 0 0 0 0 0 0 0 0 0 point42 42 EB Santa Ana Blvd - e of Santiago St point114 114 0 0 0 0 0 0 0 0 0 0 point126 126 0 0 0 0 0 0 0 1 0 0 point84 84 0 0 0 0 0 0 0 0 0 0 point41 41 0 0 0 0 0 0 0 0 0 0 point40 40 EB Santa Ana Blvd - e of Santiago St-2 point115 115 666 35 42 35 42 30 0 0 6 35 point39 39 666 35 42 35 42 30 0 0 6 35 point38 38 666 35 42 35 42 30 0 0 6 35 point37 37 666 35 42 35 42 30 0 0 6 35 point36 36 666 35 42 35 42 30 0 0 6 35 point35 35 666 35 42 35 42 30 0 0 6 35 point34 34 666 35 42 35 42 30 0 0 6 35 point33 33 666 35 42 35 42 30 0 0 6 35 point32 32 666 35 42 35 42 30 0 0 6 35 point31 31 666 35 42 35 42 30 0 0 6 35 point30 30 666 35 42 35 42 30 0 0 6 35 point29 29 666 35 42 35 42 30 0 0 6 35 point28 28 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 2 1

EXHIBIT
2 City Council 22 – 561 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - e of Santiago St point68 68 690 35 24 35 12 30 18 35 12 35 point67 67 690 35 24 35 12 30 18 35 12 35 point66 66 690 35 24 35 12 30 18 35 12 35 point65 65 690 35 24 35 12 30 18 35 12 35 point64 64 WB Santa Ana Blvd - w of Santiago St point117 117 0 0 0 0 0 0 0 0 0 0 point86 86 0 0 0 0 0 0 0 0 0 0 point125 125 0 0 0 0 0 0 0 0 0 0 point48 48 0 0 0 0 0 0 0 0 0 0 point116 116 WB Santa Ana Blvd - w of Santiago St point118 118 0 0 0 0 0 0 0 0 0 0 point47 47 0 0 0 0 0 0 0 0 0 0 point46 46
NB Santiago S of Santa Ana Blvd point12 12 0 0 0 0 0 0 0 0 0 0 point11 11 0 0 0 0 0 0 0 0 0 0 point10 10 0 0 0 0 0 0 0 0 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 0 0 0 0 0 0 0 0 0 0 point8 8 0 0 0 0 0 0 0 0 0 0 point7 7 0 0 0 0 0 0 0 0 0 0 point6 6 0 0 0 0 0 0 0 0 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 0 0 0 0 0 0 0 0 0 0 point5 5 0 0 0 0 0 0 0 0 0 0 point4 4 0 0 0 0 0 0 0 0 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 0 0 0 0 0 0 0 0 0 0 point20 20 0 0 0 0 0 0 0 0 0 0 point19 19 0 0 0 0 0 0 0 0 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 0 0 0 0 0 0 0 0 0 0 point15 15 0 0 0 0 0 0 0 0 0 0 point14 14 0 0 0 0 0 0 0 0 0 0 point13 13 SB Santiago St N of Santa Ana Blvd-2 point124 124 0 0 0 0 0 0 0 0 0 0 point17 17 0 0 0 0 0 0 0 0 0 0
C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 3 1

EXHIBIT
2 City Council 22 – 562 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point16 16 0 0 0 0 0 0 0 0 0 0 point122 122
I-5 SB Offramp point127 127 428 65 18 65 13 60 1 65 2 65 point129 129 428 60 18 60 13 60 1 60 2 60 point130 130 428 60 18 60 13 60 1 60 2 60 point131 131 428 45 18 45 13 45 1 45 2 45 point132 132 428 45 18 45 13 45 1 45 2 45 point133 133 428 30 18 30 13 30 1 30 2 30 point134 134 428 30 18 30 13 30 1 30 2 30 point135 135 428 15 18 15 13 15 1 15 2 15 point136 136 I-5 SB Onramp point137 137 458 65 19 65 14 60 1 65 2 65 point139 139 458 65 19 65 14 60 1 65 2 65 point140 140 458 65 19 65 14 60 1 65 2 65 point141 141 458 65 19 65 14 60 1 65 2 65 point142 142 458 65 19 65 14 60 1 65 2 65 point143 143 458 65 19 65 14 60 1 65 2 65 point144 144 458 65 19 65 14 60 1 65 2 65 point145 145 458 65 19 65 14 60 1 65 2 65 point146 146 458 65 19 65 14 60 1 65 2 65 point147 147 458 65 19 65 14 60 1 65 2 65 point148 148 458 65 19 65 14 60 1 65 2 65 point149 149 458 65 19 65 14 60 1 65 2 65 point150 150 458 65 19 65 14 60 1 65 2 65 point138 138 WB Santa Ana Blvd - e of Santiago -2 point151 151 690 35 24 35 12 30 18 35 12 35 point63 63 690 35 24 35 12 30 18 35 12 35 point62 62 690 35 24 35 12 30 18 35 12 35 point61 61 WB Santa Ana Blvd - e of Santiago St-2 point152 152 690 35 24 35 12 30 18 35 12 35 point60 60 690 35 24 35 12 30 18 35 12 35 point59 59 690 35 24 35 12 30 18 35 12 35 point58 58 690 35 24 35 12 30 18 35 12 35 point57 57 690 35 24 35 12 30 18 35 12 35 point56 56 690 35 24 35 12 30 18 35 12 35 point55 55 690 35 24 35 12 30 18 35 12 35 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 4 1

EXHIBIT
2 City Council 22 – 563 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point54 54 690 35 24 35 12 30 18 35 12 35 point53 53 690 35 24 35 12 30 18 35 12 35 point52 52 690 35 24 35 12 30 18 35 12 35 point51 51 690 35 24 35 12 30 18 35 12 35 point50 50 690 35 24 35 12 30 18 35 12 35 point49 49 EB Santa Ana Blvd - e of Santiago S 2-2 point153 153 666 35 42 35 42 30 0 0 6 35 point27 27 666 35 42 35 42 30 0 0 6 35 point26 26 666 35 42 35 42 30 0 0 6 35 point25 25 EB Santa Ana Blvd - e of Santiago -2-2 point154 154 666 35 42 35 42 30 0 0 6 35 point24 24 666 35 42 35 42 30 0 0 6 35 point23 23 666 35 42 35 42 30 0 0 6 35 point22 22 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 5 1

EXHIBIT
2 City Council 22 – 564 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 1 ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 65.90 66 10.0 8.0 Y ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 0.00 66 10.0 8.0 ST3 5 1 6,566,626.0 2,176,014.2 137.00 5.00 0.00 66 10.0 8.0 ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1

EXHIBIT
2 City Council 22 – 565 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 1 Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,566,183.0 2,175,983.8 135.00 30.00 0.00 0 0 point2 2 6,566,193.5 2,175,961.5 135.00 30.00 0.00 0 0 point3 3 6,566,212.5 2,175,970.5 135.00 30.00 0.00 0 0 point4 4 6,566,215.0 2,175,965.0 135.00 30.00 0.00 0 0 point5 5 6,566,276.0 2,175,994.2 135.00 30.00 Barrier2 W 0.00 99.99 0.00 0.00 point6 6 6,566,282.5 2,176,004.0 136.00 30.00 0.00 0 0 point7 7 6,566,300.5 2,176,012.5 136.00 30.00 0.00 0 0 point8 8 6,566,303.0 2,176,006.8 136.00 30.00 0.00 0 0 point9 9 6,566,364.5 2,176,036.2 136.00 30.00 Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,566,410.5 2,176,132.5 136.50 30.00 0.00 0 0 point11 11 6,566,434.5 2,176,144.0 136.50 30.00 0.00 0 0 point12 12 6,566,453.0 2,176,105.0 136.50 30.00 0.00 0 0 point13 13 6,566,426.5 2,176,092.2 136.50 30.00 0.00 0 0 point14 14 6,566,436.5 2,176,071.0 136.50 30.00 0.00 0 0 point15 15 6,566,398.5 2,176,052.8 136.50 30.00 0.00 0 0 point16 16 6,566,396.0 2,176,058.0 136.50 30.00 0.00 0 0 point17 17 6,566,366.0 2,176,043.5 136.50 30.00 Barrier4 W 0.00 99.99 0.00 0.00 point18 18 6,566,342.5 2,176,219.5 137.00 30.00 0.00 0 0 point19 19 6,566,390.5 2,176,239.0 137.00 30.00 0.00 0 0 point20 20 6,566,428.5 2,176,145.8 137.00 30.00 0.00 0 0 point21 21 6,566,380.0 2,176,126.2 137.00 30.00 Barrier5 W 0.00 99.99 0.00 0.00 point22 22 6,566,265.0 2,176,266.8 137.00 30.00 0.00 0 0 point23 23 6,566,361.5 2,176,311.5 137.00 30.00 0.00 0 0 point24 24 6,566,377.5 2,176,279.2 137.00 30.00 0.00 0 0 point25 25 6,566,282.0 2,176,233.2 137.00 30.00 Barrier6 W 0.00 99.99 0.00 0.00 point26 26 6,566,238.0 2,176,397.2 137.00 30.00 0.00 0 0 point27 27 6,566,275.0 2,176,415.0 137.00 30.00 0.00 0 0 point28 28 6,566,287.5 2,176,389.0 137.00 30.00 0.00 0 0 point29 29 6,566,308.5 2,176,399.0 137.00 30.00 0.00 0 0 point30 30 6,566,317.0 2,176,380.5 137.00 30.00 0.00 0 0 point31 31 6,566,322.5 2,176,383.0 137.00 30.00 0.00 0 0 point32 32 6,566,351.5 2,176,322.0 137.00 30.00 0.00 0 0 point33 33 6,566,305.0 2,176,300.0 137.00 30.00 Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1 February 2012

EXHIBIT
2 City Council 22 – 566 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 2 1 February 2012

EXHIBIT
2 City Council 22 – 567 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point85 85 6,566,964.5 2,176,389.8 140.00 12.00
Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 3 1 February 2012

EXHIBIT
2 City Council 22 – 568 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier26 W 0.00 99.99 0.00 0.00 point136 136 6,566,669.5 2,175,590.8 135.00 30.00 0.00 0 0 point137 137 6,566,648.5 2,175,635.0 135.00 30.00 0.00 0 0 point138 138 6,566,652.5 2,175,637.2 135.00 30.00 0.00 0 0 point139 139 6,566,634.5 2,175,674.8 135.00 30.00 0.00 0 0 point140 140 6,566,640.5 2,175,677.8 135.00 30.00 0.00 0 0 point141 141 6,566,622.5 2,175,715.2 135.00 30.00 0.00 0 0 point142 142 6,566,600.5 2,175,712.8 135.00 30.00 0.00 0 0 point143 143 6,566,595.5 2,175,722.8 135.00 30.00 0.00 0 0 point144 144 6,566,523.0 2,175,687.2 135.00 30.00 0.00 0 0 point145 145 6,566,518.5 2,175,696.2 135.00 30.00 0.00 0 0 point146 146 6,566,457.5 2,175,666.5 135.00 30.00 Barrier27 W 0.00 99.99 0.00 0.00 point147 147 6,566,489.0 2,175,897.5 136.00 30.00 0.00 0 0 point148 148 6,566,534.5 2,175,919.8 136.00 30.00 0.00 0 0 point149 149 6,566,563.0 2,175,859.2 136.00 30.00 0.00 0 0 point150 150 6,566,557.0 2,175,856.2 136.00 30.00 0.00 0 0 point151 151 6,566,565.5 2,175,838.2 136.00 30.00 0.00 0 0 point152 152 6,566,525.5 2,175,819.5 136.00 30.00 Barrier28 W 0.00 99.99 0.00 0.00 point153 153 6,566,456.0 2,175,820.2 136.00 30.00 0.00 0 0 point154 154 6,566,486.0 2,175,834.5 136.00 30.00 0.00 0 0 point155 155 6,566,464.0 2,175,880.8 136.00 30.00 0.00 0 0 point156 156 6,566,434.0 2,175,865.0 136.00 30.00 Barrier29 W 0.00 99.99 0.00 0.00 point157 157 6,566,395.5 2,175,938.8 136.50 30.00 0.00 0 0 point158 158 6,566,456.0 2,175,966.8 136.50 30.00 0.00 0 0 point159 159 6,566,458.0 2,175,962.2 136.50 30.00 0.00 0 0 point160 160 6,566,477.0 2,175,971.0 136.50 30.00 0.00 0 0 point161 161 6,566,487.5 2,175,950.0 136.50 30.00 0.00 0 0 point162 162 6,566,514.0 2,175,962.5 136.50 30.00 0.00 0 0 point163 163 6,566,531.5 2,175,924.2 136.50 30.00 0.00 0 0 point164 164 6,566,508.5 2,175,913.8 136.50 30.00 Barrier30 W 0.00 99.99 0.00 0.00 point165 165 6,566,335.5 2,175,860.5 136.00 30.00 0.00 0 0 point166 166 6,566,316.0 2,175,901.2 136.00 30.00 0.00 0 0 point167 167 6,566,390.0 2,175,936.8 136.00 30.00 Barrier31 W 0.00 99.99 0.00 0.00 point168 168 6,566,246.5 2,175,848.5 135.00 30.00 0.00 0 0 point169 169 6,566,236.5 2,175,870.2 135.00 30.00 0.00 0 0 point170 170 6,566,274.5 2,175,887.8 135.00 30.00 0.00 0 0 point171 171 6,566,276.5 2,175,883.0 135.00 30.00 0.00 0 0 point172 172 6,566,306.5 2,175,896.8 135.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 4 1 February 2012

EXHIBIT
2 City Council 22 – 569 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 Barrier38 W 0.00 99.99 0.00 0.00 point198 198 6,568,135.0 2,176,664.8 147.50 18.00 0.00 0 0 point199 199 6,568,083.0 2,176,665.5 147.50 18.00 0.00 0 0 point200 200 6,568,082.0 2,176,583.0 147.50 18.00 0.00 0 0 point201 201 6,568,134.0 2,176,582.0 147.00 18.00 Barrier39 W 0.00 99.99 0.00 0.00 point203 203 6,568,086.5 2,176,567.8 147.00 18.00 0.00 0 0 point204 204 6,568,086.5 2,176,446.5 147.00 18.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 5 1 February 2012

EXHIBIT
2 City Council 22 – 570 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration CaBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1

EXHIBIT
2 City Council 22 – 571 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 2 1

EXHIBIT
2 City Council 22 – 572 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 1 Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1

EXHIBIT
2 City Council 22 – 573 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 1 BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 65.9 69.2 66 3.3 10 Snd Lvl 69.2 0.0 8 -8.0
ST2 3 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST3 5 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST4 6 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 4 0.0 0.0 0.0 All Impacted 1 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\Projects\Santa Ana Blvd\SantAnaCal1 1 1 February 2012

EXHIBIT
2 City Council 22 – 574 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - Calibration Case 2 of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1 1 Fe

EXHIBIT
2 City Council 22 – 575 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago Blvd 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago Blvd 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 WB Santa Ana Blvd - e of Santiago Blvd 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 2 1 Fe

EXHIBIT
2 City Council 22 – 576 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago Blvd-2 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago Blvd-2-2 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St N of Santa Ana Blvd-2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average point130 130 6,567,368.0 2,177,335.8 135.00 Average point131 131 6,567,533.5 2,177,225.5 140.00 Average point132 132 6,567,603.0 2,177,157.0 142.00 Average point133 133 6,567,651.0 2,177,091.0 144.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 3 1 Fe

EXHIBIT
2 City Council 22 – 577 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average point52 52 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 EB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of Santiago Blvd-2-2-2 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 4 1 Fe

EXHIBIT
2 City Council 22 – 578 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 5 1 Fe

EXHIBIT
2 City Council 22 – 579 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 2 Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 44 25 2 25 1 25 0 0 0 0 point2 2
NB Logan St point75 75 8 25 0 0 0 0 0 0 0 0
point74 74 8 25 0 0 0 0 0 0 0 0 point73 73 8 25 0 0 0 0 0 0 0 0 point72 72 8 25 0 0 0 0 0 0 0 0 point71 71 8 25 0 0 0 0 0 0 0 0 point70 70 8 25 0 0 0 0 0 0 0 0 point69 69 SB Logan St point80 80 21 25 0 0 0 0 0 0 0 0
point79 79 21 25 0 0 0 0 0 0 0 0 point78 78 21 25 0 0 0 0 0 0 0 0 point77 77 21 25 0 0 0 0 0 0 0 0 point76 76 I-5 SB point89 89 7326 65 312 65 222 60 18 65 30 65
point90 90 7326 65 312 65 222 60 18 65 30 65 point92 92 7326 65 312 65 222 60 18 65 30 65 point93 93 7326 65 312 65 222 60 18 65 30 65 point94 94 7326 65 312 65 222 60 18 65 30 65 point95 95 7326 65 312 65 222 60 18 65 30 65 point96 96 7326 65 312 65 222 60 18 65 30 65 point97 97 7326 65 312 65 222 60 18 65 30 65 point98 98 7326 65 312 65 222 60 18 65 30 65 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1

EXHIBIT
2 City Council 22 – 580 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 7326 65 312 65 222 60 18 65 30 65 point100 100 7326 65 312 65 222 60 18 65 30 65 point101 101 I-5 NB point102 102 8364 65 354 65 282 60 12 65 12 65
point104 104 8364 65 354 65 282 60 12 65 12 65 point105 105 8364 65 354 65 282 60 12 65 12 65 point106 106 8364 65 354 65 282 60 12 65 12 65 point107 107 8364 65 354 65 282 60 12 65 12 65 point108 108 8364 65 354 65 282 60 12 65 12 65 point109 109 8364 65 354 65 282 60 12 65 12 65 point110 110 8364 65 354 65 282 60 12 65 12 65 point111 111 8364 65 354 65 282 60 12 65 12 65 point112 112 8364 65 354 65 282 60 12 65 12 65 point113 113 EB Santa Ana Blvd - w of Santiago Blvd point45 45 492 35 18 35 0 0 12 35 0 0 point44 44 492 35 18 35 0 0 12 35 0 0 point43 43 492 35 18 35 0 0 12 35 0 0 point42 42 EB Santa Ana Blvd - e of Santiago Blvd point114 114 492 35 18 35 0 0 12 35 0 0 point126 126 492 35 18 35 0 0 12 35 0 0 point84 84 492 35 18 35 0 0 12 35 0 0 point41 41 492 35 18 35 0 0 12 35 0 0 point40 40 EB Santa Ana Blvd - e of Santiago Blvd-2 point115 115 492 35 18 35 0 0 12 35 0 0 point39 39 492 35 18 35 0 0 12 35 0 0 point38 38 492 35 18 35 0 0 12 35 0 0 point37 37 492 35 18 35 1 0 12 35 0 0 point36 36 492 35 18 35 0 0 12 35 0 0 point35 35 492 35 18 35 0 0 12 35 0 0 point34 34 492 35 18 35 0 0 12 35 0 0 point33 33 492 35 18 35 0 0 12 35 0 0 point32 32 492 35 18 35 0 0 12 35 0 0 point31 31 492 35 18 35 0 0 12 35 0 0 point30 30 492 35 18 35 0 0 12 35 0 0 point29 29 492 35 18 35 0 0 12 35 0 0 point28 28 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 2

EXHIBIT
2 City Council 22 – 581 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - e of Santiago Blvd point68 68 510 35 18 35 24 30 12 35 0 0 point67 67 510 35 18 35 24 30 12 35 0 0 point66 66 510 35 18 35 24 30 12 35 0 0 point65 65 510 35 18 35 24 30 12 35 0 0 point64 64 WB Santa Ana Blvd - w of Santiago Blvd-2 point117 117 510 35 18 35 24 30 12 35 0 0 point86 86 510 35 18 35 24 30 12 35 0 0 point125 125 510 35 18 35 24 30 12 35 0 0 point48 48 510 35 18 35 24 30 12 35 0 0 point116 116 WB Santa Ana Blvd - w of Santiago Blvd-2- point118 118 510 35 18 35 24 30 12 35 0 0 point47 47 510 35 18 35 24 30 12 35 0 0 point46 46
NB Santiago S of Santa Ana Blvd point12 12 0 0 0 0 0 0 0 0 0 0 point11 11 0 0 0 0 0 0 0 0 0 0 point10 10 0 0 0 0 0 0 0 0 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 0 0 0 0 0 0 0 0 0 0 point8 8 0 0 0 0 0 0 0 0 0 0 point7 7 0 0 0 0 0 0 0 0 0 0 point6 6 0 0 0 0 0 0 0 0 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 0 0 0 0 0 0 0 0 0 0 point5 5 0 0 0 0 0 0 0 0 0 0 point4 4 0 0 0 0 0 0 0 0 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 0 0 0 0 0 0 0 0 0 0 point20 20 0 0 0 0 0 0 0 0 0 0 point19 19 0 0 0 0 0 0 0 0 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 0 0 0 0 0 0 0 0 0 0 point15 15 0 0 0 0 0 0 0 0 0 0 point14 14 0 0 0 0 0 0 0 0 0 0 point13 13 SB Santiago St N of Santa Ana Blvd-2 point124 124 0 0 0 0 0 0 0 0 0 0 point17 17 0 0 0 0 0 0 0 0 0 0
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 3

EXHIBIT
2 City Council 22 – 582 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point16 16 0 0 0 0 0 0 0 0 0 0 point122 122
SB I-5 Offramp point127 127 428 65 18 65 13 60 1 65 2 65 point129 129 428 60 18 60 13 60 1 60 2 60 point130 130 428 60 18 60 13 60 1 60 2 60 point131 131 428 45 18 45 13 45 1 45 2 45 point132 132 428 45 18 45 13 45 1 45 2 45 point133 133 428 30 18 30 13 30 1 30 2 30 point134 134 428 30 18 30 13 30 1 30 2 30 point135 135 428 15 18 15 13 15 1 15 2 15 point136 136 SB I-5 Onramp point137 137 458 65 19 65 14 60 1 65 2 65 point139 139 458 65 19 65 14 60 1 65 2 65 point140 140 458 65 19 65 14 60 1 65 2 65 point141 141 458 65 19 65 14 60 1 65 2 65 point142 142 458 65 19 65 14 60 1 65 2 65 point143 143 458 65 19 65 14 60 1 65 2 65 point144 144 458 65 19 65 14 60 1 65 2 65 point145 145 458 65 19 65 14 60 1 65 2 65 point146 146 458 65 19 65 14 60 1 65 2 65 point147 147 458 65 19 65 14 60 1 65 2 65 point148 148 458 65 19 65 14 60 1 65 2 65 point149 149 458 65 19 65 14 60 1 65 2 65 point150 150 458 65 19 65 14 60 1 65 2 65 point138 138 WB Santa Ana Blvd - e of Santiago Blvd-2 point151 151 510 35 18 35 24 30 12 35 0 0 point63 63 510 35 18 35 24 30 12 35 0 0 point62 62 510 35 18 35 24 30 12 35 0 0 point61 61 WB Santa Ana Blvd - e of Santiago Blvd-2-2 point152 152 510 35 18 35 24 30 12 35 0 0 point60 60 510 35 18 35 24 30 12 35 0 0 point59 59 510 35 18 35 24 30 12 35 0 0 point58 58 510 35 18 35 24 30 12 35 0 0 point57 57 510 35 18 35 24 30 12 35 0 0 point56 56 510 35 18 35 24 30 12 35 0 1 point55 55 510 35 18 35 24 30 12 35 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 4

EXHIBIT
2 City Council 22 – 583 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point54 54 510 35 18 35 24 30 12 35 0 0 point53 53 510 35 18 35 24 30 12 35 0 0 point52 52 510 35 18 35 24 30 12 35 0 0 point51 51 510 35 18 35 24 30 12 35 0 0 point50 50 510 35 18 35 24 30 12 35 0 0 point49 49 EB Santa Ana Blvd - e of Santiago Blvd-2-2 point153 153 492 35 18 35 0 0 12 35 0 0 point27 27 492 35 18 35 0 0 12 35 0 0 point26 26 492 35 18 35 0 0 12 35 0 0 point25 25 EB Santa Ana Blvd - e of Santiago Blvd-2-2- point154 154 492 35 18 35 0 0 12 35 0 0 point24 24 492 35 18 35 0 0 12 35 0 0 point23 23 492 35 18 35 0 0 12 35 0 0 point22 22 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 5

EXHIBIT
2 City Council 22 – 584 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 2 ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 65.90 66 10.0 8.0 ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 64.50 66 10.0 8.0 Y ST3 5 1 6,566,626.0 2,176,014.2 137.00 5.00 0.00 66 10.0 8.0 ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1

EXHIBIT
2 City Council 22 – 585 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 2 Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,566,183.0 2,175,983.8 135.00 30.00 0.00 0 0 point2 2 6,566,193.5 2,175,961.5 135.00 30.00 0.00 0 0 point3 3 6,566,212.5 2,175,970.5 135.00 30.00 0.00 0 0 point4 4 6,566,215.0 2,175,965.0 135.00 30.00 0.00 0 0 point5 5 6,566,276.0 2,175,994.2 135.00 30.00 Barrier2 W 0.00 99.99 0.00 0.00 point6 6 6,566,282.5 2,176,004.0 136.00 30.00 0.00 0 0 point7 7 6,566,300.5 2,176,012.5 136.00 30.00 0.00 0 0 point8 8 6,566,303.0 2,176,006.8 136.00 30.00 0.00 0 0 point9 9 6,566,364.5 2,176,036.2 136.00 30.00 Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,566,410.5 2,176,132.5 136.50 30.00 0.00 0 0 point11 11 6,566,434.5 2,176,144.0 136.50 30.00 0.00 0 0 point12 12 6,566,453.0 2,176,105.0 136.50 30.00 0.00 0 0 point13 13 6,566,426.5 2,176,092.2 136.50 30.00 0.00 0 0 point14 14 6,566,436.5 2,176,071.0 136.50 30.00 0.00 0 0 point15 15 6,566,398.5 2,176,052.8 136.50 30.00 0.00 0 0 point16 16 6,566,396.0 2,176,058.0 136.50 30.00 0.00 0 0 point17 17 6,566,366.0 2,176,043.5 136.50 30.00 Barrier4 W 0.00 99.99 0.00 0.00 point18 18 6,566,342.5 2,176,219.5 137.00 30.00 0.00 0 0 point19 19 6,566,390.5 2,176,239.0 137.00 30.00 0.00 0 0 point20 20 6,566,428.5 2,176,145.8 137.00 30.00 0.00 0 0 point21 21 6,566,380.0 2,176,126.2 137.00 30.00 Barrier5 W 0.00 99.99 0.00 0.00 point22 22 6,566,265.0 2,176,266.8 137.00 30.00 0.00 0 0 point23 23 6,566,361.5 2,176,311.5 137.00 30.00 0.00 0 0 point24 24 6,566,377.5 2,176,279.2 137.00 30.00 0.00 0 0 point25 25 6,566,282.0 2,176,233.2 137.00 30.00 Barrier6 W 0.00 99.99 0.00 0.00 point26 26 6,566,238.0 2,176,397.2 137.00 30.00 0.00 0 0 point27 27 6,566,275.0 2,176,415.0 137.00 30.00 0.00 0 0 point28 28 6,566,287.5 2,176,389.0 137.00 30.00 0.00 0 0 point29 29 6,566,308.5 2,176,399.0 137.00 30.00 0.00 0 0 point30 30 6,566,317.0 2,176,380.5 137.00 30.00 0.00 0 0 point31 31 6,566,322.5 2,176,383.0 137.00 30.00 0.00 0 0 point32 32 6,566,351.5 2,176,322.0 137.00 30.00 0.00 0 0 point33 33 6,566,305.0 2,176,300.0 137.00 30.00 Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1 1 February 2012

EXHIBIT
2 City Council 22 – 586 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 2 1 February 2012

EXHIBIT
2 City Council 22 – 587 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point85 85 6,566,964.5 2,176,389.8 140.00 12.00
Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 3 1 February 2012

EXHIBIT
2 City Council 22 – 588 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier26 W 0.00 99.99 0.00 0.00 point136 136 6,566,669.5 2,175,590.8 135.00 30.00 0.00 0 0 point137 137 6,566,648.5 2,175,635.0 135.00 30.00 0.00 0 0 point138 138 6,566,652.5 2,175,637.2 135.00 30.00 0.00 0 0 point139 139 6,566,634.5 2,175,674.8 135.00 30.00 0.00 0 0 point140 140 6,566,640.5 2,175,677.8 135.00 30.00 0.00 0 0 point141 141 6,566,622.5 2,175,715.2 135.00 30.00 0.00 0 0 point142 142 6,566,600.5 2,175,712.8 135.00 30.00 0.00 0 0 point143 143 6,566,595.5 2,175,722.8 135.00 30.00 0.00 0 0 point144 144 6,566,523.0 2,175,687.2 135.00 30.00 0.00 0 0 point145 145 6,566,518.5 2,175,696.2 135.00 30.00 0.00 0 0 point146 146 6,566,457.5 2,175,666.5 135.00 30.00 Barrier27 W 0.00 99.99 0.00 0.00 point147 147 6,566,489.0 2,175,897.5 136.00 30.00 0.00 0 0 point148 148 6,566,534.5 2,175,919.8 136.00 30.00 0.00 0 0 point149 149 6,566,563.0 2,175,859.2 136.00 30.00 0.00 0 0 point150 150 6,566,557.0 2,175,856.2 136.00 30.00 0.00 0 0 point151 151 6,566,565.5 2,175,838.2 136.00 30.00 0.00 0 0 point152 152 6,566,525.5 2,175,819.5 136.00 30.00 Barrier28 W 0.00 99.99 0.00 0.00 point153 153 6,566,456.0 2,175,820.2 136.00 30.00 0.00 0 0 point154 154 6,566,486.0 2,175,834.5 136.00 30.00 0.00 0 0 point155 155 6,566,464.0 2,175,880.8 136.00 30.00 0.00 0 0 point156 156 6,566,434.0 2,175,865.0 136.00 30.00 Barrier29 W 0.00 99.99 0.00 0.00 point157 157 6,566,395.5 2,175,938.8 136.50 30.00 0.00 0 0 point158 158 6,566,456.0 2,175,966.8 136.50 30.00 0.00 0 0 point159 159 6,566,458.0 2,175,962.2 136.50 30.00 0.00 0 0 point160 160 6,566,477.0 2,175,971.0 136.50 30.00 0.00 0 0 point161 161 6,566,487.5 2,175,950.0 136.50 30.00 0.00 0 0 point162 162 6,566,514.0 2,175,962.5 136.50 30.00 0.00 0 0 point163 163 6,566,531.5 2,175,924.2 136.50 30.00 0.00 0 0 point164 164 6,566,508.5 2,175,913.8 136.50 30.00 Barrier30 W 0.00 99.99 0.00 0.00 point165 165 6,566,335.5 2,175,860.5 136.00 30.00 0.00 0 0 point166 166 6,566,316.0 2,175,901.2 136.00 30.00 0.00 0 0 point167 167 6,566,390.0 2,175,936.8 136.00 30.00 Barrier31 W 0.00 99.99 0.00 0.00 point168 168 6,566,246.5 2,175,848.5 135.00 30.00 0.00 0 0 point169 169 6,566,236.5 2,175,870.2 135.00 30.00 0.00 0 0 point170 170 6,566,274.5 2,175,887.8 135.00 30.00 0.00 0 0 point171 171 6,566,276.5 2,175,883.0 135.00 30.00 0.00 0 0 point172 172 6,566,306.5 2,175,896.8 135.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 4 1 February 2012

EXHIBIT
2 City Council 22 – 589 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 5 1 February 2012

EXHIBIT
2 City Council 22 – 590 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration CaBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1

EXHIBIT
2 City Council 22 – 591 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 2

EXHIBIT
2 City Council 22 – 592 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 2 Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1

EXHIBIT
2 City Council 22 – 593 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 2 BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 65.9 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0
ST2 3 1 64.5 62.9 66 -1.6 10 ---- 62.9 0.0 8 -8.0 ST3 5 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST4 6 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 4 0.0 0.0 0.0 All Impacted 0 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal2 1 1 February 20

EXHIBIT
2 City Council 22 – 594 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - Calibration Case 3 of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1 1 Fe

EXHIBIT
2 City Council 22 – 595 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago Blvd 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago Blvd 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 WB Santa Ana Blvd - e of Santiago Blvd 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 2 1 Fe

EXHIBIT
2 City Council 22 – 596 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago Blvd-2 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago Blvd-2-2 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St N of Santa Ana Blvd-2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average point130 130 6,567,368.0 2,177,335.8 135.00 Average point131 131 6,567,533.5 2,177,225.5 140.00 Average point132 132 6,567,603.0 2,177,157.0 142.00 Average point133 133 6,567,651.0 2,177,091.0 144.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 3 1 Fe

EXHIBIT
2 City Council 22 – 597 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average point52 52 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 EB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of Santiago Blvd-2-2-2 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 4 1 Fe

EXHIBIT
2 City Council 22 – 598 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 5 1 Fe

EXHIBIT
2 City Council 22 – 599 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 3 Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 0 0 0 0 0 0 0 0 0 0 point2 2
NB Logan St point75 75 8 25 0 0 0 0 0 0 0 0
point74 74 8 25 0 0 0 0 0 0 0 0 point73 73 8 25 0 0 0 0 0 0 0 0 point72 72 8 25 0 0 0 0 0 0 0 0 point71 71 8 25 0 0 0 0 0 0 0 0 point70 70 8 25 0 0 0 0 0 0 0 0 point69 69 SB Logan St point80 80 21 25 0 0 0 0 0 0 0 0
point79 79 21 25 0 0 0 0 0 0 0 0 point78 78 21 25 0 0 0 0 0 0 0 0 point77 77 21 25 0 0 0 0 0 0 0 0 point76 76 I-5 SB point89 89 7326 65 312 65 222 60 18 65 30 65
point90 90 7326 65 312 65 222 60 18 65 30 65 point92 92 7326 65 312 65 222 60 18 65 30 65 point93 93 7326 65 312 65 222 60 18 65 30 65 point94 94 7326 65 312 65 222 60 18 65 30 65 point95 95 7326 65 312 65 222 60 18 65 30 65 point96 96 7326 65 312 65 222 60 18 65 30 65 point97 97 7326 65 312 65 222 60 18 65 30 65 point98 98 7326 65 312 65 222 60 18 65 30 65 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1

EXHIBIT
2 City Council 22 – 600 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 7326 65 312 65 222 60 18 65 30 65 point100 100 7326 65 312 65 222 60 18 65 30 65 point101 101 I-5 NB point102 102 8364 65 354 65 282 60 12 65 12 65
point104 104 8364 65 354 65 282 60 12 65 12 65 point105 105 8364 65 354 65 282 60 12 65 12 65 point106 106 8364 65 354 65 282 60 12 65 12 65 point107 107 8364 65 354 65 282 60 12 65 12 65 point108 108 8364 65 354 65 282 60 12 65 12 65 point109 109 8364 65 354 65 282 60 12 65 12 65 point110 110 8364 65 354 65 282 60 12 65 12 65 point111 111 8364 65 354 65 282 60 12 65 12 65 point112 112 8364 65 354 65 282 60 12 65 12 65 point113 113 EB Santa Ana Blvd - w of Santiago Blvd point45 45 102 35 12 35 6 30 12 35 0 0 point44 44 102 35 12 35 6 30 12 35 0 0 point43 43 102 35 12 35 6 30 12 35 0 0 point42 42 EB Santa Ana Blvd - e of Santiago Blvd point114 114 102 35 12 35 6 30 12 35 0 0 point126 126 102 35 12 35 6 30 12 35 0 0 point84 84 102 35 12 35 6 30 12 35 0 0 point41 41 102 35 12 35 6 30 12 35 0 0 point40 40 EB Santa Ana Blvd - e of Santiago Blvd-2 point115 115 102 35 12 35 6 30 12 35 0 0 point39 39 102 35 12 35 6 30 12 35 0 0 point38 38 102 35 12 35 6 30 12 35 0 0 point37 37 102 35 12 35 6 30 12 35 0 0 point36 36 102 35 12 35 6 30 12 35 0 0 point35 35 102 35 12 35 6 30 12 35 0 0 point34 34 102 35 12 35 6 30 12 35 0 0 point33 33 102 35 12 35 6 30 12 35 0 0 point32 32 102 35 12 35 6 30 12 35 0 0 point31 31 102 35 12 35 6 30 12 35 0 0 point30 30 102 35 12 35 6 30 12 35 0 0 point29 29 102 35 12 35 6 30 12 35 0 0 point28 28 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 2

EXHIBIT
2 City Council 22 – 601 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - e of Santiago Blvd point68 68 342 35 12 35 0 0 0 0 6 35 point67 67 342 35 12 35 0 0 0 0 6 35 point66 66 342 35 12 35 0 0 0 0 6 35 point65 65 342 35 12 35 0 0 0 0 6 35 point64 64 WB Santa Ana Blvd - w of Santiago Blvd-2 point117 117 342 35 12 35 0 0 0 0 6 35 point86 86 342 35 12 35 0 0 0 0 6 35 point125 125 342 35 12 35 0 0 0 0 6 35 point48 48 342 35 12 35 0 0 0 0 6 35 point116 116 WB Santa Ana Blvd - w of Santiago Blvd-2- point118 118 342 35 12 35 0 0 0 0 6 35 point47 47 342 35 12 35 0 0 0 0 6 35 point46 46
NB Santiago S of Santa Ana Blvd point12 12 228 35 12 35 12 30 18 35 0 0 point11 11 228 35 12 35 12 30 18 35 0 0 point10 10 228 35 12 35 12 30 18 35 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 228 35 12 35 12 30 18 35 0 0 point8 8 228 35 12 35 12 30 18 35 0 0 point7 7 228 35 12 35 12 30 18 35 0 0 point6 6 228 35 12 35 12 30 18 35 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 228 35 12 35 12 30 18 35 0 0 point5 5 228 35 12 35 12 30 18 35 0 0 point4 4 228 35 12 35 12 30 18 35 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 192 35 0 0 12 30 0 0 0 0 point20 20 192 35 0 0 12 30 0 0 0 0 point19 19 192 35 0 0 12 30 0 0 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 192 35 0 0 12 30 0 0 0 0 point15 15 192 35 0 0 12 30 0 0 0 0 point14 14 192 35 0 0 12 30 0 0 0 0 point13 13 SB Santiago St N of Santa Ana Blvd-2 point124 124 192 35 0 0 12 30 0 0 0 0 point17 17 192 35 0 0 12 30 0 0 0 0
C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 3

EXHIBIT
2 City Council 22 – 602 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point16 16 192 35 0 0 12 30 0 0 0 0 point122 122
SB I-5 Offramp point127 127 428 65 18 65 13 60 1 65 2 65 point129 129 428 60 18 60 13 60 1 60 2 60 point130 130 428 60 18 60 13 60 1 60 2 60 point131 131 428 45 18 45 13 45 1 45 2 45 point132 132 428 45 18 45 13 45 1 45 2 45 point133 133 428 30 18 30 13 30 1 30 2 30 point134 134 428 30 18 30 13 30 1 30 2 30 point135 135 428 15 18 15 13 15 1 15 2 15 point136 136 SB I-5 Onramp point137 137 458 65 19 65 14 60 1 65 2 65 point139 139 458 65 19 65 14 60 1 65 2 65 point140 140 458 65 19 65 14 60 1 65 2 65 point141 141 458 65 19 65 14 60 1 65 2 65 point142 142 458 65 19 65 14 60 1 65 2 65 point143 143 458 65 19 65 14 60 1 65 2 65 point144 144 458 65 19 65 14 60 1 65 2 65 point145 145 458 65 19 65 14 60 1 65 2 65 point146 146 458 65 19 65 14 60 1 65 2 65 point147 147 458 65 19 65 14 60 1 65 2 65 point148 148 458 65 19 65 14 60 1 65 2 65 point149 149 458 65 19 65 14 60 1 65 2 65 point150 150 458 65 19 65 14 60 1 65 2 65 point138 138 WB Santa Ana Blvd - e of Santiago Blvd-2 point151 151 342 35 12 35 0 0 0 0 6 35 point63 63 342 35 12 35 0 0 0 0 6 35 point62 62 342 35 12 35 0 0 0 0 6 35 point61 61 WB Santa Ana Blvd - e of Santiago Blvd-2-2 point152 152 342 35 12 35 0 0 0 0 6 35 point60 60 342 35 12 35 0 0 0 0 6 35 point59 59 342 35 12 35 0 0 0 0 6 35 point58 58 342 35 12 35 0 0 0 0 6 35 point57 57 342 35 12 35 0 0 0 0 6 35 point56 56 342 35 12 35 0 0 0 0 6 35 point55 55 342 35 12 35 0 0 0 0 6 35 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 4

EXHIBIT
2 City Council 22 – 603 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point54 54 342 35 12 35 0 0 0 0 6 35 point53 53 342 35 12 35 0 0 0 0 6 35 point52 52 342 35 12 35 0 0 0 0 6 35 point51 51 342 35 12 35 0 0 0 0 6 35 point50 50 342 35 12 35 0 0 0 0 6 35 point49 49 EB Santa Ana Blvd - e of Santiago Blvd-2-2 point153 153 102 35 12 35 6 30 12 35 0 0 point27 27 102 35 12 35 6 30 12 35 0 0 point26 26 102 35 12 35 6 30 12 35 0 0 point25 25 EB Santa Ana Blvd - e of Santiago Blvd-2-2- point154 154 102 35 12 35 6 30 12 35 0 0 point24 24 102 35 12 35 6 30 12 35 0 0 point23 23 102 35 12 35 6 30 12 35 0 0 point22 22 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 5

EXHIBIT
2 City Council 22 – 604 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 3 ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 65.90 66 10.0 8.0 ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 64.50 66 10.0 8.0 ST3 5 1 6,566,626.0 2,176,014.2 137.00 5.00 70.80 66 10.0 8.0 Y ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1

EXHIBIT
2 City Council 22 – 605 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 3 Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,566,183.0 2,175,983.8 135.00 30.00 0.00 0 0 point2 2 6,566,193.5 2,175,961.5 135.00 30.00 0.00 0 0 point3 3 6,566,212.5 2,175,970.5 135.00 30.00 0.00 0 0 point4 4 6,566,215.0 2,175,965.0 135.00 30.00 0.00 0 0 point5 5 6,566,276.0 2,175,994.2 135.00 30.00 Barrier2 W 0.00 99.99 0.00 0.00 point6 6 6,566,282.5 2,176,004.0 136.00 30.00 0.00 0 0 point7 7 6,566,300.5 2,176,012.5 136.00 30.00 0.00 0 0 point8 8 6,566,303.0 2,176,006.8 136.00 30.00 0.00 0 0 point9 9 6,566,364.5 2,176,036.2 136.00 30.00 Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,566,410.5 2,176,132.5 136.50 30.00 0.00 0 0 point11 11 6,566,434.5 2,176,144.0 136.50 30.00 0.00 0 0 point12 12 6,566,453.0 2,176,105.0 136.50 30.00 0.00 0 0 point13 13 6,566,426.5 2,176,092.2 136.50 30.00 0.00 0 0 point14 14 6,566,436.5 2,176,071.0 136.50 30.00 0.00 0 0 point15 15 6,566,398.5 2,176,052.8 136.50 30.00 0.00 0 0 point16 16 6,566,396.0 2,176,058.0 136.50 30.00 0.00 0 0 point17 17 6,566,366.0 2,176,043.5 136.50 30.00 Barrier4 W 0.00 99.99 0.00 0.00 point18 18 6,566,342.5 2,176,219.5 137.00 30.00 0.00 0 0 point19 19 6,566,390.5 2,176,239.0 137.00 30.00 0.00 0 0 point20 20 6,566,428.5 2,176,145.8 137.00 30.00 0.00 0 0 point21 21 6,566,380.0 2,176,126.2 137.00 30.00 Barrier5 W 0.00 99.99 0.00 0.00 point22 22 6,566,265.0 2,176,266.8 137.00 30.00 0.00 0 0 point23 23 6,566,361.5 2,176,311.5 137.00 30.00 0.00 0 0 point24 24 6,566,377.5 2,176,279.2 137.00 30.00 0.00 0 0 point25 25 6,566,282.0 2,176,233.2 137.00 30.00 Barrier6 W 0.00 99.99 0.00 0.00 point26 26 6,566,238.0 2,176,397.2 137.00 30.00 0.00 0 0 point27 27 6,566,275.0 2,176,415.0 137.00 30.00 0.00 0 0 point28 28 6,566,287.5 2,176,389.0 137.00 30.00 0.00 0 0 point29 29 6,566,308.5 2,176,399.0 137.00 30.00 0.00 0 0 point30 30 6,566,317.0 2,176,380.5 137.00 30.00 0.00 0 0 point31 31 6,566,322.5 2,176,383.0 137.00 30.00 0.00 0 0 point32 32 6,566,351.5 2,176,322.0 137.00 30.00 0.00 0 0 point33 33 6,566,305.0 2,176,300.0 137.00 30.00 Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1 1 February 2012

EXHIBIT
2 City Council 22 – 606 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 2 1 February 2012

EXHIBIT
2 City Council 22 – 607 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point85 85 6,566,964.5 2,176,389.8 140.00 12.00
Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 96 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 3 1 February 2012

EXHIBIT
2 City Council 22 – 608 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier26 W 0.00 99.99 0.00 0.00 point136 136 6,566,669.5 2,175,590.8 135.00 30.00 0.00 0 0 point137 137 6,566,648.5 2,175,635.0 135.00 30.00 0.00 0 0 point138 138 6,566,652.5 2,175,637.2 135.00 30.00 0.00 0 0 point139 139 6,566,634.5 2,175,674.8 135.00 30.00 0.00 0 0 point140 140 6,566,640.5 2,175,677.8 135.00 30.00 0.00 0 0 point141 141 6,566,622.5 2,175,715.2 135.00 30.00 0.00 0 0 point142 142 6,566,600.5 2,175,712.8 135.00 30.00 0.00 0 0 point143 143 6,566,595.5 2,175,722.8 135.00 30.00 0.00 0 0 point144 144 6,566,523.0 2,175,687.2 135.00 30.00 0.00 0 0 point145 145 6,566,518.5 2,175,696.2 135.00 30.00 0.00 0 0 point146 146 6,566,457.5 2,175,666.5 135.00 30.00 Barrier27 W 0.00 99.99 0.00 0.00 point147 147 6,566,489.0 2,175,897.5 136.00 30.00 0.00 0 0 point148 148 6,566,534.5 2,175,919.8 136.00 30.00 0.00 0 0 point149 149 6,566,563.0 2,175,859.2 136.00 30.00 0.00 0 0 point150 150 6,566,557.0 2,175,856.2 136.00 30.00 0.00 0 0 point151 151 6,566,565.5 2,175,838.2 136.00 30.00 0.00 0 0 point152 152 6,566,525.5 2,175,819.5 136.00 30.00 Barrier28 W 0.00 99.99 0.00 0.00 point153 153 6,566,456.0 2,175,820.2 136.00 30.00 0.00 0 0 point154 154 6,566,486.0 2,175,834.5 136.00 30.00 0.00 0 0 point155 155 6,566,464.0 2,175,880.8 136.00 30.00 0.00 0 0 point156 156 6,566,434.0 2,175,865.0 136.00 30.00 Barrier29 W 0.00 99.99 0.00 0.00 point157 157 6,566,395.5 2,175,938.8 136.50 30.00 0.00 0 0 point158 158 6,566,456.0 2,175,966.8 136.50 30.00 0.00 0 0 point159 159 6,566,458.0 2,175,962.2 136.50 30.00 0.00 0 0 point160 160 6,566,477.0 2,175,971.0 136.50 30.00 0.00 0 0 point161 161 6,566,487.5 2,175,950.0 136.50 30.00 0.00 0 0 point162 162 6,566,514.0 2,175,962.5 136.50 30.00 0.00 0 0 point163 163 6,566,531.5 2,175,924.2 136.50 30.00 0.00 0 0 point164 164 6,566,508.5 2,175,913.8 136.50 30.00 Barrier30 W 0.00 99.99 0.00 0.00 point165 165 6,566,335.5 2,175,860.5 136.00 30.00 0.00 0 0 point166 166 6,566,316.0 2,175,901.2 136.00 30.00 0.00 0 0 point167 167 6,566,390.0 2,175,936.8 136.00 30.00 Barrier31 W 0.00 99.99 0.00 0.00 point168 168 6,566,246.5 2,175,848.5 135.00 30.00 0.00 0 0 point169 169 6,566,236.5 2,175,870.2 135.00 30.00 0.00 0 0 point170 170 6,566,274.5 2,175,887.8 135.00 30.00 0.00 0 0 point171 171 6,566,276.5 2,175,883.0 135.00 30.00 0.00 0 0 point172 172 6,566,306.5 2,175,896.8 135.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 4 1 February 2012

EXHIBIT
2 City Council 22 – 609 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 5 1 February 2012

EXHIBIT
2 City Council 22 – 610 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration CaBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1

EXHIBIT
2 City Council 22 – 611 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 2

EXHIBIT
2 City Council 22 – 612 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 3 Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1

EXHIBIT
2 City Council 22 – 613 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 3 BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 65.9 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0
ST2 3 1 64.5 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST3 5 1 70.8 67.3 66 -3.5 10 Snd Lvl 67.3 0.0 8 -8.0 ST4 6 1 0.0 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 4 0.0 0.0 0.0 All Impacted 1 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SANTANACAL3 1 1 February 20

EXHIBIT
2 City Council 22 – 614 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - Calibration Case 4 of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1 1 Fe

EXHIBIT
2 City Council 22 – 615 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago Blvd 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago Blvd 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 WB Santa Ana Blvd - e of Santiago Blvd 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 2 1 Fe

EXHIBIT
2 City Council 22 – 616 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago Blvd-2 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago Blvd-2-2 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St N of Santa Ana Blvd-2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average point130 130 6,567,368.0 2,177,335.8 135.00 Average point131 131 6,567,533.5 2,177,225.5 140.00 Average point132 132 6,567,603.0 2,177,157.0 142.00 Average point133 133 6,567,651.0 2,177,091.0 144.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 3 1 Fe

EXHIBIT
2 City Council 22 – 617 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Santiago Blvd-2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average point52 52 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 EB Santa Ana Blvd - e of Santiago Blvd-2-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of Santiago Blvd-2-2-2 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 4 1 Fe

EXHIBIT
2 City Council 22 – 618 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 5 1 Fe

EXHIBIT
2 City Council 22 – 619 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 4 Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 44 25 2 25 1 25 0 0 0 0 point2 2
NB Logan St point75 75 8 25 0 0 0 0 0 0 0 0
point74 74 8 25 0 0 0 0 0 0 0 0 point73 73 8 25 0 0 0 0 0 0 0 0 point72 72 8 25 0 0 0 0 0 0 0 0 point71 71 8 25 0 0 0 0 0 0 0 0 point70 70 8 25 0 0 0 0 0 0 0 0 point69 69 SB Logan St point80 80 21 25 0 0 0 0 0 0 0 0
point79 79 21 25 0 0 0 0 0 0 0 0 point78 78 21 25 0 0 0 0 0 0 0 0 point77 77 21 25 0 0 0 0 0 0 0 0 point76 76 I-5 SB point89 89 7326 65 312 65 222 60 18 65 30 65
point90 90 7326 65 312 65 222 60 18 65 30 65 point92 92 7326 65 312 65 222 60 18 65 30 65 point93 93 7326 65 312 65 222 60 18 65 30 65 point94 94 7326 65 312 65 222 60 18 65 30 65 point95 95 7326 65 312 65 222 60 18 65 30 65 point96 96 7326 65 312 65 222 60 18 65 30 65 point97 97 7326 65 312 65 222 60 18 65 30 65 point98 98 7326 65 312 65 222 60 18 65 30 65 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1

EXHIBIT
2 City Council 22 – 620 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 7326 65 312 65 222 60 18 65 30 65 point100 100 7326 65 312 65 222 60 18 65 30 65 point101 101 I-5 NB point102 102 8364 65 354 65 282 60 12 65 12 65
point104 104 8364 65 354 65 282 60 12 65 12 65 point105 105 8364 65 354 65 282 60 12 65 12 65 point106 106 8364 65 354 65 282 60 12 65 12 65 point107 107 8364 65 354 65 282 60 12 65 12 65 point108 108 8364 65 354 65 282 60 12 65 12 65 point109 109 8364 65 354 65 282 60 12 65 12 65 point110 110 8364 65 354 65 282 60 12 65 12 65 point111 111 8364 65 354 65 282 60 12 65 12 65 point112 112 8364 65 354 65 282 60 12 65 12 65 point113 113 EB Santa Ana Blvd - w of Santiago Blvd point45 45 438 35 0 0 6 30 30 35 0 0 point44 44 438 35 0 0 6 30 30 35 0 0 point43 43 438 35 0 0 6 30 30 35 0 0 point42 42 EB Santa Ana Blvd - e of Santiago Blvd point114 114 438 35 0 0 6 30 30 35 0 0 point126 126 438 35 0 0 6 30 30 35 0 0 point84 84 438 35 0 0 6 30 30 35 0 0 point41 41 438 35 0 0 6 30 30 35 0 0 point40 40 EB Santa Ana Blvd - e of Santiago Blvd-2 point115 115 438 35 0 0 6 30 30 35 0 0 point39 39 438 35 0 0 6 30 30 35 0 0 point38 38 438 35 0 0 6 30 30 35 0 0 point37 37 438 35 0 0 6 30 30 35 0 0 point36 36 438 35 0 0 6 30 30 35 0 0 point35 35 438 35 0 0 6 30 30 35 0 0 point34 34 438 35 0 0 6 30 30 35 0 0 point33 33 438 35 0 0 6 30 30 35 0 0 point32 32 438 35 0 0 6 30 30 35 0 0 point31 31 438 35 0 0 6 30 30 35 0 0 point30 30 438 35 0 0 6 30 30 35 0 0 point29 29 438 35 0 0 6 30 30 35 0 0 point28 28 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 2

EXHIBIT
2 City Council 22 – 621 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - e of Santiago Blvd point68 68 564 35 12 35 0 0 18 35 0 0 point67 67 564 35 12 35 0 0 18 35 0 0 point66 66 564 35 12 35 0 0 18 35 0 0 point65 65 564 35 12 35 0 0 18 35 0 0 point64 64 WB Santa Ana Blvd - w of Santiago Blvd-2 point117 117 564 35 12 35 0 0 18 35 0 0 point86 86 564 35 12 35 0 0 18 35 0 0 point125 125 564 35 12 35 0 0 18 35 0 0 point48 48 564 35 12 35 0 0 18 35 0 0 point116 116 WB Santa Ana Blvd - w of Santiago Blvd-2- point118 118 564 35 12 35 0 0 18 35 0 0 point47 47 564 35 12 35 0 0 18 35 0 0 point46 46
NB Santiago S of Santa Ana Blvd point12 12 228 35 12 35 12 30 18 35 0 0 point11 11 228 35 12 35 12 30 18 35 0 0 point10 10 228 35 12 35 12 30 18 35 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 228 35 12 35 12 30 18 35 0 0 point8 8 228 35 12 35 12 30 18 35 0 0 point7 7 228 35 12 35 12 30 18 35 0 0 point6 6 228 35 12 35 12 30 18 35 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 228 35 12 35 12 30 18 35 0 0 point5 5 228 35 12 35 12 30 18 35 0 0 point4 4 228 35 12 35 12 30 18 35 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 192 35 0 0 12 30 0 0 0 0 point20 20 192 35 0 0 12 30 0 0 0 0 point19 19 192 35 0 0 12 30 0 0 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 192 35 0 0 12 30 0 0 0 0 point15 15 192 35 0 0 12 30 0 0 0 0 point14 14 192 35 0 0 12 30 0 0 0 0 point13 13 SB Santiago St N of Santa Ana Blvd-2 point124 124 192 35 0 0 12 30 0 0 0 0 point17 17 192 35 0 0 12 30 0 0 0 0
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 3

EXHIBIT
2 City Council 22 – 622 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point16 16 192 35 0 0 12 30 0 0 0 0 point122 122
SB I-5 Offramp point127 127 428 65 18 65 13 60 1 65 2 65 point129 129 428 60 18 60 13 60 1 60 2 60 point130 130 428 60 18 60 13 60 1 60 2 60 point131 131 428 45 18 45 13 45 1 45 2 45 point132 132 428 45 18 45 13 45 1 45 2 45 point133 133 428 30 18 30 13 30 1 30 2 30 point134 134 428 30 18 30 13 30 1 30 2 30 point135 135 428 15 18 15 13 15 1 15 2 15 point136 136 SB I-5 Onramp point137 137 458 65 19 65 14 60 1 65 2 65 point139 139 458 65 19 65 14 60 1 65 2 65 point140 140 458 65 19 65 14 60 1 65 2 65 point141 141 458 65 19 65 14 60 1 65 2 65 point142 142 458 65 19 65 14 60 1 65 2 65 point143 143 458 65 19 65 14 60 1 65 2 65 point144 144 458 65 19 65 14 60 1 65 2 65 point145 145 458 65 19 65 14 60 1 65 2 65 point146 146 458 65 19 65 14 60 1 65 2 65 point147 147 458 65 19 65 14 60 1 65 2 65 point148 148 458 65 19 65 14 60 1 65 2 65 point149 149 458 65 19 65 14 60 1 65 2 65 point150 150 458 65 19 65 14 60 1 65 2 65 point138 138 WB Santa Ana Blvd - e of Santiago Blvd-2 point151 151 564 35 12 35 0 0 18 35 0 0 point63 63 564 35 12 35 0 0 18 35 0 0 point62 62 564 35 12 35 0 0 18 35 0 0 point61 61 WB Santa Ana Blvd - e of Santiago Blvd-2-2 point152 152 564 35 12 35 0 0 18 35 0 0 point60 60 564 35 12 35 0 0 18 35 0 0 point59 59 564 35 12 35 0 0 18 35 0 0 point58 58 564 35 12 35 0 0 18 35 0 0 point57 57 564 35 12 35 0 0 18 35 0 0 point56 56 564 35 12 35 0 0 18 35 0 0 point55 55 564 35 12 35 0 0 18 35 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 4

EXHIBIT
2 City Council 22 – 623 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point54 54 564 35 12 35 0 0 18 35 0 0 point53 53 564 35 12 35 0 0 18 35 0 0 point52 52 564 35 12 35 0 0 18 35 0 0 point51 51 564 35 12 35 0 0 18 35 0 0 point50 50 564 35 12 35 0 0 18 35 0 0 point49 49 EB Santa Ana Blvd - e of Santiago Blvd-2-2 point153 153 438 35 0 0 6 30 30 35 0 0 point27 27 438 35 0 0 6 30 30 35 0 0 point26 26 438 35 0 0 6 30 30 35 0 0 point25 25 EB Santa Ana Blvd - e of Santiago Blvd-2-2- point154 154 438 35 0 0 6 30 30 35 0 0 point24 24 438 35 0 0 6 30 30 35 0 0 point23 23 438 35 0 0 6 30 30 35 0 0 point22 22 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 5

EXHIBIT
2 City Council 22 – 624 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 4 ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 65.90 66 10.0 8.0 ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 64.50 66 10.0 8.0 ST3 5 1 6,566,626.0 2,176,014.2 137.00 5.00 70.80 66 10.0 8.0 ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 66.60 66 10.0 8.0 Y C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1

EXHIBIT
2 City Council 22 – 625 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 4 Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier1 W 0.00 99.99 0.00 0.00 point1 1 6,566,183.0 2,175,983.8 135.00 30.00 0.00 0 0 point2 2 6,566,193.5 2,175,961.5 135.00 30.00 0.00 0 0 point3 3 6,566,212.5 2,175,970.5 135.00 30.00 0.00 0 0 point4 4 6,566,215.0 2,175,965.0 135.00 30.00 0.00 0 0 point5 5 6,566,276.0 2,175,994.2 135.00 30.00 Barrier2 W 0.00 99.99 0.00 0.00 point6 6 6,566,282.5 2,176,004.0 136.00 30.00 0.00 0 0 point7 7 6,566,300.5 2,176,012.5 136.00 30.00 0.00 0 0 point8 8 6,566,303.0 2,176,006.8 136.00 30.00 0.00 0 0 point9 9 6,566,364.5 2,176,036.2 136.00 30.00 Barrier3 W 0.00 99.99 0.00 0.00 point10 10 6,566,410.5 2,176,132.5 136.50 30.00 0.00 0 0 point11 11 6,566,434.5 2,176,144.0 136.50 30.00 0.00 0 0 point12 12 6,566,453.0 2,176,105.0 136.50 30.00 0.00 0 0 point13 13 6,566,426.5 2,176,092.2 136.50 30.00 0.00 0 0 point14 14 6,566,436.5 2,176,071.0 136.50 30.00 0.00 0 0 point15 15 6,566,398.5 2,176,052.8 136.50 30.00 0.00 0 0 point16 16 6,566,396.0 2,176,058.0 136.50 30.00 0.00 0 0 point17 17 6,566,366.0 2,176,043.5 136.50 30.00 Barrier4 W 0.00 99.99 0.00 0.00 point18 18 6,566,342.5 2,176,219.5 137.00 30.00 0.00 0 0 point19 19 6,566,390.5 2,176,239.0 137.00 30.00 0.00 0 0 point20 20 6,566,428.5 2,176,145.8 137.00 30.00 0.00 0 0 point21 21 6,566,380.0 2,176,126.2 137.00 30.00 Barrier5 W 0.00 99.99 0.00 0.00 point22 22 6,566,265.0 2,176,266.8 137.00 30.00 0.00 0 0 point23 23 6,566,361.5 2,176,311.5 137.00 30.00 0.00 0 0 point24 24 6,566,377.5 2,176,279.2 137.00 30.00 0.00 0 0 point25 25 6,566,282.0 2,176,233.2 137.00 30.00 Barrier6 W 0.00 99.99 0.00 0.00 point26 26 6,566,238.0 2,176,397.2 137.00 30.00 0.00 0 0 point27 27 6,566,275.0 2,176,415.0 137.00 30.00 0.00 0 0 point28 28 6,566,287.5 2,176,389.0 137.00 30.00 0.00 0 0 point29 29 6,566,308.5 2,176,399.0 137.00 30.00 0.00 0 0 point30 30 6,566,317.0 2,176,380.5 137.00 30.00 0.00 0 0 point31 31 6,566,322.5 2,176,383.0 137.00 30.00 0.00 0 0 point32 32 6,566,351.5 2,176,322.0 137.00 30.00 0.00 0 0 point33 33 6,566,305.0 2,176,300.0 137.00 30.00 Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1 1 February 2012

EXHIBIT
2 City Council 22 – 626 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 2 1 February 2012

EXHIBIT
2 City Council 22 – 627 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point85 85 6,566,964.5 2,176,389.8 140.00 12.00
Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 96 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 3 1 February 2012

EXHIBIT
2 City Council 22 – 628 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier26 W 0.00 99.99 0.00 0.00 point136 136 6,566,669.5 2,175,590.8 135.00 30.00 0.00 0 0 point137 137 6,566,648.5 2,175,635.0 135.00 30.00 0.00 0 0 point138 138 6,566,652.5 2,175,637.2 135.00 30.00 0.00 0 0 point139 139 6,566,634.5 2,175,674.8 135.00 30.00 0.00 0 0 point140 140 6,566,640.5 2,175,677.8 135.00 30.00 0.00 0 0 point141 141 6,566,622.5 2,175,715.2 135.00 30.00 0.00 0 0 point142 142 6,566,600.5 2,175,712.8 135.00 30.00 0.00 0 0 point143 143 6,566,595.5 2,175,722.8 135.00 30.00 0.00 0 0 point144 144 6,566,523.0 2,175,687.2 135.00 30.00 0.00 0 0 point145 145 6,566,518.5 2,175,696.2 135.00 30.00 0.00 0 0 point146 146 6,566,457.5 2,175,666.5 135.00 30.00 Barrier27 W 0.00 99.99 0.00 0.00 point147 147 6,566,489.0 2,175,897.5 136.00 30.00 0.00 0 0 point148 148 6,566,534.5 2,175,919.8 136.00 30.00 0.00 0 0 point149 149 6,566,563.0 2,175,859.2 136.00 30.00 0.00 0 0 point150 150 6,566,557.0 2,175,856.2 136.00 30.00 0.00 0 0 point151 151 6,566,565.5 2,175,838.2 136.00 30.00 0.00 0 0 point152 152 6,566,525.5 2,175,819.5 136.00 30.00 Barrier28 W 0.00 99.99 0.00 0.00 point153 153 6,566,456.0 2,175,820.2 136.00 30.00 0.00 0 0 point154 154 6,566,486.0 2,175,834.5 136.00 30.00 0.00 0 0 point155 155 6,566,464.0 2,175,880.8 136.00 30.00 0.00 0 0 point156 156 6,566,434.0 2,175,865.0 136.00 30.00 Barrier29 W 0.00 99.99 0.00 0.00 point157 157 6,566,395.5 2,175,938.8 136.50 30.00 0.00 0 0 point158 158 6,566,456.0 2,175,966.8 136.50 30.00 0.00 0 0 point159 159 6,566,458.0 2,175,962.2 136.50 30.00 0.00 0 0 point160 160 6,566,477.0 2,175,971.0 136.50 30.00 0.00 0 0 point161 161 6,566,487.5 2,175,950.0 136.50 30.00 0.00 0 0 point162 162 6,566,514.0 2,175,962.5 136.50 30.00 0.00 0 0 point163 163 6,566,531.5 2,175,924.2 136.50 30.00 0.00 0 0 point164 164 6,566,508.5 2,175,913.8 136.50 30.00 Barrier30 W 0.00 99.99 0.00 0.00 point165 165 6,566,335.5 2,175,860.5 136.00 30.00 0.00 0 0 point166 166 6,566,316.0 2,175,901.2 136.00 30.00 0.00 0 0 point167 167 6,566,390.0 2,175,936.8 136.00 30.00 Barrier31 W 0.00 99.99 0.00 0.00 point168 168 6,566,246.5 2,175,848.5 135.00 30.00 0.00 0 0 point169 169 6,566,236.5 2,175,870.2 135.00 30.00 0.00 0 0 point170 170 6,566,274.5 2,175,887.8 135.00 30.00 0.00 0 0 point171 171 6,566,276.5 2,175,883.0 135.00 30.00 0.00 0 0 point172 172 6,566,306.5 2,175,896.8 135.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 4 1 February 2012

EXHIBIT
2 City Council 22 – 629 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 5 1 February 2012

EXHIBIT
2 City Council 22 – 630 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration CaBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1

EXHIBIT
2 City Council 22 – 631 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 2

EXHIBIT
2 City Council 22 – 632 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 4 Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1

EXHIBIT
2 City Council 22 – 633 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - Calibration Case 4 BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 65.9 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0
ST2 3 1 64.5 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST3 5 1 70.8 0.0 66 0.0 10 inactive 0.0 0.0 8 0.0 ST4 6 1 66.6 63.5 66 -3.1 10 ---- 63.5 0.0 8 -8.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 4 0.0 0.0 0.0 All Impacted 0 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaCal4 1 1 February 20

EXHIBIT
2 City Council 22 – 634 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - 2035 Baseline Case of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
NB Logan St 20.0 point75 75 6,566,858.0 2,176,244.8 138.90 Average point74 74 6,566,839.5 2,176,244.2 138.70 Average point73 73 6,566,819.0 2,176,252.0 138.80 Average point72 72 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 Average point77 77 6,566,789.5 2,176,225.8 138.70 Average point76 76 6,566,789.5 2,176,209.2 138.50 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1 1 Fe

EXHIBIT
2 City Council 22 – 635 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average point105 105 6,568,114.5 2,177,192.0 160.00 Average point106 106 6,567,968.0 2,177,267.2 155.00 Average point107 107 6,567,826.0 2,177,341.8 150.00 Average point108 108 6,567,689.5 2,177,413.2 145.00 Average point109 109 6,567,547.0 2,177,487.0 140.00 Average point110 110 6,567,412.0 2,177,559.0 135.00 Average point111 111 6,567,230.0 2,177,656.0 130.00 Average point112 112 6,566,832.0 2,177,876.5 130.00 Average point113 113 6,566,641.5 2,177,985.2 135.00 EB Santa Ana Blvd - w of Santiago St 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 EB Santa Ana Blvd - e of Santiago St 40.0 point114 114 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point126 126 6,566,520.0 2,176,021.0 136.90 Average point84 84 6,566,552.5 2,176,035.2 137.30 Average point41 41 6,566,590.5 2,176,052.5 137.50 Average point40 40 6,566,681.5 2,176,094.5 137.80 EB Santa Ana Blvd - e of Santiago St 40.0 point115 115 6,566,681.5 2,176,094.5 137.80 Average point39 39 6,566,772.5 2,176,136.0 138.50 Average point38 38 6,566,862.5 2,176,180.0 138.80 WB Santa Ana Blvd - e of I-5 Ramps 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 WB Santa Ana Blvd - w of Santiago St 40.0 point117 117 6,566,567.0 2,176,094.5 137.60 Signal 0.00 50 Average point86 86 6,566,535.5 2,176,079.5 137.50 Average point125 125 6,566,508.5 2,176,066.2 137.10 Average point48 48 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 WB Santa Ana Blvd - w of Santiago St 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 2 1 Fe

EXHIBIT
2 City Council 22 – 636 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St S of Santa Ana Blvd- 2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average
point130 130 6,567,368.0 2,177,335.8 135.00 Average
point131 131 6,567,533.5 2,177,225.5 140.00 Average
point132 132 6,567,603.0 2,177,157.0 142.00 Average
point133 133 6,567,651.0 2,177,091.0 144.00 Average
point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 3 1 Fe

EXHIBIT
2 City Council 22 – 637 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
WB Santa Ana Blvd - e of Fuller St -2 40.0 point151 151 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point63 63 6,567,827.0 2,176,702.8 146.10 Average point62 62 6,567,736.0 2,176,661.2 145.60 Average point61 61 6,567,645.5 2,176,618.8 145.00 WB Santa Ana Blvd - e of Fuller St 40.0 point152 152 6,567,645.5 2,176,618.8 145.00 Average point60 60 6,567,557.5 2,176,571.0 144.40 Average point59 59 6,567,472.5 2,176,519.0 143.50 Average point58 58 6,567,381.5 2,176,476.8 142.80 Average point57 57 6,567,290.5 2,176,435.8 143.00 EB Santa Ana Blvd - e of I-5 Ramps-2 40.0 point153 153 6,567,761.0 2,176,616.5 145.50 Signal 0.00 30 Average point27 27 6,567,852.0 2,176,658.0 146.20 Average point26 26 6,567,937.5 2,176,681.5 146.60 Average point25 25 6,568,018.5 2,176,697.2 146.90 EB Santa Ana Blvd - e of I-5 Ramps 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 EB Santa Ana Blvd - e of Logan St 40.0 point155 155 6,566,862.5 2,176,180.0 138.80 Average point37 37 6,566,947.5 2,176,220.2 139.60 Average point36 36 6,567,033.5 2,176,259.8 140.80 Average point35 35 6,567,121.5 2,176,301.5 142.20 Average point34 34 6,567,217.5 2,176,346.2 142.40 Average point33 33 6,567,315.0 2,176,392.0 142.60 WB Santa Ana Blvd - e of Santiago St 40.0 point156 156 6,566,837.5 2,176,223.8 139.00 Average point51 51 6,566,747.5 2,176,180.8 138.30 Average point50 50 6,566,657.0 2,176,137.8 137.80 Average point49 49 6,566,567.0 2,176,094.5 137.60 WB Santa Ana Blvd - e of Logan St 40.0 point157 157 6,567,290.5 2,176,435.8 143.00 Average point56 56 6,567,200.0 2,176,392.8 142.70 Average point55 55 6,567,109.5 2,176,350.5 143.00 Average point54 54 6,567,019.0 2,176,308.2 141.30 Average point53 53 6,566,928.0 2,176,266.0 139.60 Average C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 4 1 Fe

EXHIBIT
2 City Council 22 – 638 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point52 52 6,566,837.5 2,176,223.8 139.00
EB Santa Ana Blvd - e of Fuller St 40.0 point158 158 6,567,315.0 2,176,392.0 142.60 Average point32 32 6,567,405.5 2,176,434.5 142.90 Average point31 31 6,567,496.0 2,176,477.0 143.50 Average point30 30 6,567,582.5 2,176,526.5 144.20 Average point29 29 6,567,670.5 2,176,574.0 145.00 Average point28 28 6,567,761.0 2,176,616.5 145.50 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 5 1 Fe

EXHIBIT
2 City Council 22 – 639 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 Baseline Case Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 11 25 1 25 0 0 0 0 0 0 point2 2
NB Logan St point75 75 8 25 1 25 0 0 0 0 0 0
point74 74 8 25 1 25 0 0 0 0 0 0 point73 73 8 25 1 25 0 0 0 0 0 0 point72 72 8 25 1 25 0 0 0 0 0 0 point71 71 8 25 1 25 0 0 0 0 0 0 point70 70 8 25 1 25 0 0 0 0 0 0 point69 69 SB Logan St point80 80 22 25 1 25 1 20 0 0 0 0
point79 79 22 25 1 25 1 20 0 0 0 0 point78 78 22 25 1 25 1 20 0 0 0 0 point77 77 22 25 1 25 1 20 0 0 0 0 point76 76 I-5 SB point89 89 13020 65 520 65 460 60 0 0 0 0
point90 90 13020 65 520 65 460 60 0 0 0 0 point92 92 13020 65 520 65 460 60 0 0 0 0 point93 93 13020 65 520 65 460 60 0 0 0 0 point94 94 13020 65 520 65 460 60 0 0 0 0 point95 95 13020 65 520 65 460 60 0 0 0 0 point96 96 13020 65 520 65 460 60 0 0 0 0 point97 97 13020 65 520 65 460 60 0 0 0 0 point98 98 13020 65 520 65 460 60 0 0 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1

EXHIBIT
2 City Council 22 – 640 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point99 99 13020 65 520 65 460 60 0 0 0 0 point100 100 13020 65 520 65 460 60 0 0 0 0 point101 101 I-5 NB point102 102 13020 65 520 65 460 60 0 0 0 0
point104 104 13020 65 520 65 460 60 0 0 0 0 point105 105 13020 65 520 65 460 60 0 0 0 0 point106 106 13020 65 520 65 460 60 0 0 0 0 point107 107 13020 65 520 65 460 60 0 0 0 0 point108 108 13020 65 520 65 460 60 0 0 0 0 point109 109 13020 65 520 65 460 60 0 0 0 0 point110 110 13020 65 520 65 460 60 0 0 0 0 point111 111 13020 65 520 65 460 60 0 0 0 0 point112 112 13020 65 520 65 460 60 0 0 0 0 point113 113 EB Santa Ana Blvd - w of Santiago St point45 45 837 35 30 35 26 30 24 35 5 35 point44 44 837 35 30 35 26 30 24 35 5 35 point43 43 837 35 30 35 26 30 24 35 5 35 point42 42 EB Santa Ana Blvd - e of Santiago St point114 114 1052 35 37 35 33 30 31 35 7 35 point126 126 1052 35 37 35 33 30 31 35 7 35 point84 84 1052 35 37 35 33 30 31 35 7 35 point41 41 1052 35 37 35 33 30 31 35 7 35 point40 40 EB Santa Ana Blvd - e of Santiago St point115 115 1052 35 37 35 33 30 31 35 7 35 point39 39 1052 35 37 35 33 30 31 35 7 35 point38 38
WB Santa Ana Blvd - e of I-5 Ramps point68 68 1291 35 46 35 40 30 37 35 8 35 point67 67 1291 35 46 35 40 30 37 35 8 35 point66 66 1291 35 46 35 40 30 37 35 8 35 point65 65 1291 35 46 35 40 30 37 35 8 35 point64 64 WB Santa Ana Blvd - w of Santiago St point117 117 1350 35 48 35 42 30 39 35 9 35 point86 86 1350 35 48 35 42 30 39 35 9 35 point125 125 1350 35 48 35 42 30 39 35 9 35 point48 48 1350 35 48 35 42 30 39 35 9 35 point116 116 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 2

EXHIBIT
2 City Council 22 – 641 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project WB Santa Ana Blvd - w of Santiago St point118 118 1350 35 48 35 42 30 39 35 9 35 point47 47 1350 35 48 35 42 30 39 35 9 35 point46 46
NB Santiago S of Santa Ana Blvd point12 12 383 35 45 35 28 30 10 35 0 0 point11 11 383 35 45 35 28 30 10 35 0 0 point10 10 383 35 45 35 28 30 10 35 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 883 35 103 35 65 30 23 35 0 0 point8 8 883 35 103 35 65 30 23 35 0 0 point7 7 883 35 103 35 65 30 23 35 0 0 point6 6 883 35 103 35 65 30 23 35 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 883 35 103 35 65 30 23 35 0 0 point5 5 883 35 103 35 65 30 23 35 0 0 point4 4 883 35 103 35 65 30 23 35 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 814 35 103 35 65 30 23 35 0 0 point20 20 814 35 103 35 65 30 23 35 0 0 point19 19 814 35 103 35 65 30 23 35 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 409 35 48 35 30 30 11 35 0 0 point15 15 409 35 48 35 30 30 11 35 0 0 point14 14 409 35 48 35 30 30 11 35 0 0 point13 13 SB Santiago St S of Santa Ana Blvd- 2 point124 124 409 35 48 35 30 30 11 35 0 0 point17 17 409 35 48 35 30 30 11 35 0 0 point16 16 409 35 48 35 30 30 11 35 0 0 point122 122 SB I-5 Offramp point127 127 583 65 24 65 21 60 1 65 1 65 point129 129 583 60 24 60 21 60 1 60 1 60 point130 130 583 60 24 60 21 60 1 60 1 60 point131 131 583 45 24 45 21 45 1 45 1 45 point132 132 583 45 24 45 21 45 1 45 1 45 point133 133 583 30 24 30 21 30 1 30 1 30 point134 134 583 30 24 30 21 30 1 30 1 30 point135 135 583 15 24 15 21 15 1 15 1 15 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 3

EXHIBIT
2 City Council 22 – 642 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point136 136
SB I-5 Onramp point137 137 517 65 21 65 19 60 1 65 1 65 point139 139 517 65 21 65 19 60 1 65 1 65 point140 140 517 65 21 65 19 60 1 65 1 65 point141 141 517 65 21 65 19 60 1 65 1 65 point142 142 517 65 21 65 19 60 1 65 1 65 point143 143 517 65 21 65 19 60 1 65 1 65 point144 144 517 65 21 65 19 60 1 65 1 65 point145 145 517 65 21 65 19 60 1 65 1 65 point146 146 517 65 21 65 19 60 1 65 1 65 point147 147 517 65 21 65 19 60 1 65 1 65 point148 148 517 65 21 65 19 60 1 65 1 65 point149 149 517 65 21 65 19 60 1 65 1 65 point150 150 517 65 21 65 19 60 1 65 1 65 point138 138 WB Santa Ana Blvd - e of Fuller St -2 point151 151 1281 35 45 35 40 30 37 35 8 35 point63 63 1281 35 45 35 40 30 37 35 8 35 point62 62 1281 35 45 35 40 30 37 35 8 35 point61 61 WB Santa Ana Blvd - e of Fuller St point152 152 1281 35 45 35 40 30 37 35 8 35 point60 60 1281 35 45 35 40 30 37 35 8 35 point59 59 1281 35 45 35 40 30 37 35 8 35 point58 58 1281 35 45 35 40 30 37 35 8 35 point57 57 EB Santa Ana Blvd - e of I-5 Ramps-2 point153 153 1224 35 43 35 38 30 36 35 8 35 point27 27 1224 35 43 35 38 30 36 35 8 35 point26 26 1224 35 43 35 38 30 36 35 8 35 point25 25 EB Santa Ana Blvd - e of I-5 Ramps point154 154 1224 35 43 35 38 30 36 35 8 35 point24 24 1224 35 43 35 38 30 36 35 8 35 point23 23 1224 35 43 35 38 30 36 35 8 35 point22 22 EB Santa Ana Blvd - e of Logan St point155 155 673 35 24 35 21 30 20 35 4 35 point37 37 673 35 24 35 21 30 20 35 4 35 point36 36 673 35 24 35 21 30 20 35 4 35 point35 35 673 35 24 35 21 30 20 35 4 35 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 4

EXHIBIT
2 City Council 22 – 643 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point34 34 673 35 24 35 21 30 20 35 4 35 point33 33
WB Santa Ana Blvd - e of Santiago St point156 156 1670 35 59 35 52 30 48 35 11 35 point51 51 1670 35 59 35 52 30 48 35 11 35 point50 50 1670 35 59 35 52 30 48 35 11 35 point49 49 WB Santa Ana Blvd - e of Logan St point157 157 1300 35 46 35 41 30 38 35 8 35 point56 56 1300 35 46 35 41 30 38 35 8 35 point55 55 1300 35 46 35 41 30 38 35 8 35 point54 54 1300 35 46 35 41 30 38 35 8 35 point53 53 1300 35 46 35 41 30 38 35 8 35 point52 52 EB Santa Ana Blvd - e of Fuller St point158 158 664 35 23 35 21 30 19 35 4 35 point32 32 664 35 23 35 21 30 19 35 4 35 point31 31 664 35 23 35 21 30 19 35 4 35 point30 30 664 35 23 35 21 30 19 35 4 35 point29 29 664 35 23 35 21 30 19 35 4 35 point28 28 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 5

EXHIBIT
2 City Council 22 – 644 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 Baseline Case ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 0.00 66 10.0 8.0 Y ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 0.00 66 10.0 8.0 Y ST3 5 0 6,566,626.0 2,176,014.2 137.00 5.00 0.00 66 10.0 8.0 Y ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 Y M1 12 0 6,566,544.0 2,176,187.5 138.00 5.00 0.00 66 10.0 8.0 Y M2 14 1 6,566,648.0 2,176,315.5 139.00 5.00 0.00 66 10.0 8.0 Y M3 15 1 6,566,678.0 2,176,262.0 139.00 5.00 0.00 66 10.0 8.0 Y M4 16 1 6,566,899.0 2,176,290.2 139.50 5.00 0.00 66 10.0 8.0 Y M5 17 1 6,566,930.5 2,176,378.8 139.50 5.00 0.00 66 10.0 8.0 Y M6 18 0 6,566,933.5 2,175,803.8 140.00 5.00 0.00 66 10.0 8.0 Y M7 19 0 6,567,071.5 2,175,736.2 140.00 5.00 0.00 66 10.0 8.0 Y M8 20 0 6,567,207.5 2,176,200.0 141.00 5.00 0.00 66 10.0 8.0 Y M9 21 0 6,567,422.0 2,176,583.8 144.00 5.00 0.00 66 10.0 8.0 Y M10 22 1 6,567,834.0 2,176,465.8 145.30 5.00 0.00 66 10.0 8.0 Y M11 24 1 6,567,864.5 2,176,578.2 145.50 5.00 0.00 66 10.0 8.0 Y M12 25 1 6,567,944.5 2,176,607.8 146.30 5.00 0.00 66 10.0 8.0 Y C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1

EXHIBIT
2 City Council 22 – 645 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 Baseline Case Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1 1 February 2012

EXHIBIT
2 City Council 22 – 646 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 point85 85 6,566,964.5 2,176,389.8 140.00 12.00 Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 2 1 February 2012

EXHIBIT
2 City Council 22 – 647 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project Barrier22 W 0.00 99.99 0.00 0.00 point118 118 6,567,467.5 2,176,109.8 143.00 12.00 0.00 0 0 point119 119 6,567,469.5 2,176,428.0 143.00 12.00 0.00 0 0 point120 120 6,567,553.5 2,176,427.5 143.00 12.00 0.00 0 0 point121 121 6,567,551.0 2,176,111.0 143.00 12.00 Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 Barrier38 W 0.00 99.99 0.00 0.00 point198 198 6,567,843.5 2,176,442.0 145.50 12.00 0.00 0 0 point199 199 6,567,843.5 2,176,466.2 145.50 12.00 0.00 0 0 point200 200 6,567,904.5 2,176,465.0 145.50 12.00 Barrier39 W 0.00 99.99 0.00 0.00 point201 201 6,568,135.0 2,176,664.8 147.50 18.00 0.00 0 0 point202 202 6,568,083.0 2,176,665.5 147.50 18.00 0.00 0 0 point203 203 6,568,082.0 2,176,583.0 147.50 18.00 0.00 0 0 point204 204 6,568,134.0 2,176,582.0 147.00 18.00 Barrier41 W 0.00 99.99 0.00 0.00 point209 209 6,568,086.5 2,176,567.8 147.00 18.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 3 1 February 2012

EXHIBIT
2 City Council 22 – 648 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point210 210 6,568,086.5 2,176,446.5 147.00 18.00
ROW SE of Fuller St W 0.00 99.99 0.00 0.00 point211 211 6,567,810.5 2,176,610.5 145.20 0.00 0.00 0 0 point212 212 6,567,912.0 2,176,638.0 146.00 0.00 0.00 0 0 point213 213 6,568,012.0 2,176,662.2 147.00 0.00 0.00 0 0 point214 214 6,568,113.0 2,176,668.8 147.00 0.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 4 1 February 2012

EXHIBIT
2 City Council 22 – 649 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 BaselineBuilding Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1

EXHIBIT
2 City Council 22 – 650 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 2

EXHIBIT
2 City Council 22 – 651 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 Baseline Case Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1

EXHIBIT
2 City Council 22 – 652 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - 2035 Baseline Case BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 0.0 71.3 66 71.3 10 Snd Lvl 71.3 0.0 8 -8.0 ST2 3 1 0.0 66.3 66 66.3 10 Snd Lvl 66.3 0.0 8 -8.0 ST3 5 0 0.0 73.9 66 73.9 10 Snd Lvl 73.9 0.0 8 -8.0 ST4 6 1 0.0 68.5 66 68.5 10 Snd Lvl 68.5 0.0 8 -8.0 M1 12 0 0.0 71.0 66 71.0 10 Snd Lvl 71.0 0.0 8 -8.0 M2 14 1 0.0 63.0 66 63.0 10 ---- 63.0 0.0 8 -8.0
M3 15 1 0.0 66.2 66 66.2 10 Snd Lvl 66.2 0.0 8 -8.0
M4 16 1 0.0 70.3 66 70.3 10 Snd Lvl 70.3 0.0 8 -8.0 M5 17 1 0.0 61.4 66 61.4 10 ---- 61.4 0.0 8 -8.0 M6 18 0 0.0 59.9 66 59.9 10 ---- 59.9 0.0 8 -8.0 M7 19 0 0.0 52.8 66 52.8 10 ---- 52.8 0.0 8 -8.0 M8 20 0 0.0 62.8 66 62.8 10 ---- 62.8 0.0 8 -8.0 M9 21 0 0.0 67.0 66 67.0 10 Snd Lvl 67.0 0.0 8 -8.0 M10 22 1 0.0 68.5 66 68.5 10 Snd Lvl 68.5 0.0 8 -8.0 M11 24 1 0.0 72.0 66 72.0 10 Snd Lvl 72.0 0.0 8 -8.0 M12 25 1 0.0 72.3 66 72.3 10 Snd Lvl 72.3 0.0 8 -8.0 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 10 0.0 0.0 0.0 All Impacted 8 0.0 0.0 0.0 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFNP2035 1 1 February 20

EXHIBIT
2 City Council 22 – 653 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: ROADWAYS Average pavement type shall be used unlessPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project a State highway agency substantiates the useRUN: Santa Ana Blvd - FWP Year 2035 of a different type with the approval of FHWARoadway PointsName Width Name No. Coordinates (pavement) Flow Control Segment X Y Z Control Speed Percent Pvmt On
Device Constraint Vehicles Type Struct?
Affected
ft ft ft ft mph %
Fuller St N of Santa Ana Blvd 36.0 point1 1 6,567,308.5 2,177,216.5 147.00 Average point2 2 6,567,303.5 2,176,468.0 143.00
SB Logan St 20.0 point80 80 6,566,791.5 2,176,543.2 140.10 Average point79 79 6,566,791.5 2,176,446.2 139.50 Average point78 78 6,566,791.5 2,176,269.5 138.80 I-5 SB 125.0 point89 89 6,566,575.5 2,177,854.8 135.00 Average point90 90 6,566,768.5 2,177,744.2 130.00 Average point92 92 6,567,171.0 2,177,515.5 130.00 Average point93 93 6,567,354.0 2,177,415.0 135.00 Average point94 94 6,567,500.0 2,177,334.8 140.00 Average point95 95 6,567,650.0 2,177,256.8 145.00 Average point96 96 6,567,797.0 2,177,180.5 150.00 Average point97 97 6,567,943.5 2,177,099.5 155.00 Average point98 98 6,568,097.0 2,177,015.0 160.00 Average point99 99 6,568,248.5 2,176,929.8 165.00 Average point100 100 6,568,441.0 2,176,818.2 167.00 Average point101 101 6,568,563.5 2,176,747.2 169.00
I-5 NB 125.0 point102 102 6,568,544.5 2,176,965.0 170.00 Average point104 104 6,568,271.0 2,177,109.5 165.00 Average
point105 105 6,568,114.5 2,177,192.0 160.00 Average
point106 106 6,567,968.0 2,177,267.2 155.00 Average
point107 107 6,567,826.0 2,177,341.8 150.00 Average
point108 108 6,567,689.5 2,177,413.2 145.00 Average
point109 109 6,567,547.0 2,177,487.0 140.00 Average
point110 110 6,567,412.0 2,177,559.0 135.00 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1 1 Fe

EXHIBIT
2 City Council 22 – 654 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point111 111 6,567,230.0 2,177,656.0 130.00 Average
point112 112 6,566,832.0 2,177,876.5 130.00 Average
point113 113 6,566,641.5 2,177,985.2 135.00
WB Santa Ana Blvd - e of I-5 Ramps 40.0 point68 68 6,568,320.0 2,176,761.5 148.00 Average point67 67 6,568,220.0 2,176,761.5 147.70 Average point66 66 6,568,120.0 2,176,761.5 147.40 Average point65 65 6,568,020.0 2,176,753.8 147.20 Average point64 64 6,567,922.5 2,176,733.2 146.70 WB Santa Ana Blvd - w of Santiago St 40.0 point118 118 6,566,360.5 2,175,992.5 135.90 Average point47 47 6,566,244.5 2,175,933.8 135.00 Average point46 46 6,566,158.0 2,175,892.8 134.00 NB Santiago S of Santa Ana Blvd 36.0 point12 12 6,566,911.0 2,175,298.5 134.80 Average point11 11 6,566,715.5 2,175,708.5 135.80 Average point10 10 6,566,634.0 2,175,876.5 136.50 Average point9 9 6,566,570.0 2,175,999.8 136.90 NB Santiago St N of Santa Ana Blvd-2 36.0 point119 119 6,566,570.0 2,175,999.8 136.90 Signal 0.00 50 Average point8 8 6,566,552.5 2,176,035.2 137.30 Average point7 7 6,566,535.5 2,176,079.5 137.50 Average point6 6 6,566,510.0 2,176,130.8 137.80 Average point120 120 6,566,468.0 2,176,220.5 137.75 NB Santiago St N of Santa Ana Blvd 36.0 point121 121 6,566,468.0 2,176,220.5 137.75 Average point5 5 6,566,425.5 2,176,310.5 137.70 Average point4 4 6,566,355.0 2,176,460.8 137.90 Average point3 3 6,566,272.0 2,176,637.5 139.20 SB Santiago St N of Santa Ana Blvd 40.0 point21 21 6,566,237.0 2,176,612.8 139.00 Average point20 20 6,566,292.0 2,176,510.8 138.00 Average point19 19 6,566,353.0 2,176,388.0 137.70 Average point18 18 6,566,495.5 2,176,094.0 137.00 SB Santiago St S of Santa Ana Blvd-2 40.0 point123 123 6,566,566.0 2,175,929.0 136.45 Average point15 15 6,566,611.5 2,175,839.8 136.00 Average point14 14 6,566,686.5 2,175,692.5 135.60 Average point13 13 6,566,875.0 2,175,285.5 134.60 SB Santiago St S of Santa Ana Blvd- 2 40.0 point124 124 6,566,495.5 2,176,094.0 137.00 Signal 0.00 50 Average point17 17 6,566,508.5 2,176,066.2 137.10 Average point16 16 6,566,520.0 2,176,021.0 136.90 Average point122 122 6,566,566.0 2,175,929.0 136.45 SB I-5 Offramp 36.0 point127 127 6,567,020.0 2,177,551.0 127.00 Average point129 129 6,567,183.0 2,177,459.0 129.80 Average
point130 130 6,567,368.0 2,177,335.8 135.00 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 2 1 Fe

EXHIBIT
2 City Council 22 – 655 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point131 131 6,567,533.5 2,177,225.5 140.00 Average
point132 132 6,567,603.0 2,177,157.0 142.00 Average
point133 133 6,567,651.0 2,177,091.0 144.00 Average
point134 134 6,567,673.0 2,177,052.5 145.00 Average
point135 135 6,567,727.5 2,176,916.2 147.00 Average
point136 136 6,567,797.0 2,176,730.5 146.80
SB I-5 Onramp 24.0 point137 137 6,567,842.0 2,176,745.0 146.00 Signal 0.00 50 Average point139 139 6,567,814.5 2,176,814.2 147.00 Average
point140 140 6,567,808.0 2,176,846.0 147.50 Average
point141 141 6,567,812.0 2,176,885.8 148.00 Average
point142 142 6,567,823.0 2,176,915.5 149.00 Average
point143 143 6,567,845.0 2,176,949.0 150.00 Average
point144 144 6,567,881.0 2,176,977.2 151.00 Average
point145 145 6,567,932.5 2,176,992.5 153.00 Average
point146 146 6,567,983.0 2,176,988.5 155.00 Average
point147 147 6,568,037.5 2,176,971.0 157.30 Average
point148 148 6,568,109.0 2,176,941.5 160.20 Average
point149 149 6,568,253.0 2,176,870.5 164.80 Average
point150 150 6,568,519.5 2,176,727.5 166.50 Average
point138 138 6,568,557.0 2,176,707.0 166.80
EB Santa Ana Blvd - e of I-5 Ramps 40.0 point154 154 6,568,018.5 2,176,697.2 146.90 Average point24 24 6,568,123.5 2,176,710.0 147.30 Average point23 23 6,568,220.5 2,176,716.8 147.50 Average point22 22 6,568,321.0 2,176,716.8 147.80 EB Santa Ana Blvd - e of Santiago St 40.0 point244 244 6,566,678.5 2,176,086.8 135.50 Average point204 204 6,566,725.5 2,176,104.0 134.50 Average
point205 205 6,566,821.5 2,176,133.2 131.00 Average
point259 259 6,566,868.0 2,176,151.2 128.75
WB Santa Ana Blvd - e of Logan St 40.0 point248 248 6,567,299.0 2,176,409.0 127.25 Average point172 172 6,567,255.5 2,176,384.8 125.00 Average
point173 173 6,567,164.5 2,176,341.5 121.80 Average
point174 174 6,567,074.0 2,176,299.2 121.00 Average
point175 175 6,566,983.5 2,176,256.5 122.50 Average
point176 176 6,566,894.0 2,176,214.5 126.50 Average
point257 257 6,566,847.0 2,176,196.8 128.75
EB Santa Ana Blvd - e of Fuller St 40.0 point250 250 6,567,320.0 2,176,365.8 127.25 Average point211 211 6,567,365.0 2,176,387.5 129.50 Average
point212 212 6,567,452.5 2,176,435.5 135.50 Average
point213 213 6,567,542.0 2,176,480.8 140.50 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 3 1 Fe

EXHIBIT
2 City Council 22 – 656 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point214 214 6,567,627.5 2,176,533.0 144.00 Average
point215 215 6,567,711.5 2,176,587.5 145.30 Average
point253 253 6,567,756.0 2,176,610.5 145.65
WB Santa Ana Blvd - e of Fuller St 40.0 point252 252 6,567,647.0 2,176,605.8 144.65 Average point168 168 6,567,605.0 2,176,579.0 144.00 Average
point169 169 6,567,516.5 2,176,523.0 140.50 Average
point170 170 6,567,429.5 2,176,473.5 135.50 Average
point171 171 6,567,343.0 2,176,433.0 129.50 Average
point247 247 6,567,299.0 2,176,409.0 127.25
EB Santa Ana Blvd - e of I-5 Ramps -2 40.0 point254 254 6,567,756.0 2,176,610.5 145.65 Signal 0.00 30 Average point216 216 6,567,800.5 2,176,633.8 146.00 Average
point217 217 6,567,852.0 2,176,658.0 146.20 Average
point218 218 6,567,937.5 2,176,681.5 146.60 Average
point219 219 6,568,018.5 2,176,697.2 146.90
WB Santa Ana Blvd - e of Fuller St - 2 40.0 point255 255 6,567,922.5 2,176,733.2 146.70 Signal 0.00 30 Average point165 165 6,567,827.0 2,176,702.8 146.10 Average
point166 166 6,567,778.0 2,176,679.5 146.00 Average
point167 167 6,567,689.5 2,176,632.5 145.30 Average
point251 251 6,567,647.0 2,176,605.8 144.65
EB Santa Ana Blvd - e of Logan St 40.0 point260 260 6,566,868.0 2,176,151.2 128.75 Average point206 206 6,566,915.0 2,176,169.2 126.50 Average
point207 207 6,567,006.0 2,176,211.2 122.50 Average
point208 208 6,567,096.5 2,176,254.0 121.00 Average
point209 209 6,567,186.5 2,176,297.0 121.80 Average
point210 210 6,567,275.0 2,176,344.0 125.00 Average
point249 249 6,567,320.0 2,176,365.8 127.25
EB Santa Ana Blvd - w of Santiago St 40.0 point45 45 6,566,176.5 2,175,866.2 133.80 Average point44 44 6,566,292.0 2,175,921.0 135.00 Average point43 43 6,566,369.5 2,175,955.2 136.00 Average point42 42 6,566,499.5 2,176,011.8 136.90 WB Santa Ana Blvd - e of Santiago St 40.0 point258 258 6,566,847.0 2,176,196.8 128.75 Average point177 177 6,566,800.0 2,176,179.0 131.00 Average
point178 178 6,566,705.0 2,176,147.5 134.50 Average
point179 179 6,566,612.0 2,176,112.0 136.50 Average
point245 245 6,566,564.5 2,176,093.5 136.80
EB Santa Ana Blvd - e of Santiago St-2 40.0 point266 266 6,566,499.5 2,176,011.8 136.90 Signal 0.00 50 Average point261 261 6,566,520.0 2,176,021.0 136.90 Average
point264 264 6,566,552.5 2,176,035.2 137.30 Average
point203 203 6,566,631.5 2,176,069.5 136.50 Average
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 4 1 Fe

EXHIBIT
2 City Council 22 – 657 5/5/2026
INPUT: ROADWAYS Santa Ana Blvd Grade Separation Project point243 243 6,566,678.5 2,176,086.8 135.50
WB Santa Ana Blvd- w of Santiago St 40.0 point267 267 6,566,564.5 2,176,093.5 136.80 Signal 0.00 50 Average point268 268 6,566,535.5 2,176,079.5 137.50 Average point269 269 6,566,508.5 2,176,066.2 137.10 Average point265 265 6,566,476.5 2,176,051.5 136.80 Average point116 116 6,566,360.5 2,175,992.5 135.90 NB Logan St -2 20.0 point270 270 6,566,806.0 2,176,267.5 138.80 Average point71 71 6,566,803.0 2,176,292.0 138.90 Average point70 70 6,566,803.0 2,176,383.5 139.30 Average point69 69 6,566,803.0 2,176,543.2 140.20 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 5 1 Fe

EXHIBIT
2 City Council 22 – 658 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: TRAFFIC FOR LAeq1h VolumesPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 2035 Roadway PointsName Name No. Segment Autos MTrucks HTrucks Buses Motorcycles V SV SV SV SV Sveh/hr mph veh/hr mph veh/hr mph veh/hr mph veh/hr mph Fuller St N of Santa Ana Blvd point1 1 12 25 1 25 0 0 0 0 0 0 point2 2
SB Logan St point80 80 0 0 0 0 0 0 0 0 0 0
point79 79 0 0 0 0 0 0 0 0 0 0 point78 78
I-5 SB point89 89 13020 65 520 65 460 60 0 0 0 0
point90 90 13020 65 520 65 460 60 0 0 0 0 point92 92 13020 65 520 65 460 60 0 0 0 0 point93 93 13020 65 520 65 460 60 0 0 0 0 point94 94 13020 65 520 65 460 60 0 0 0 0 point95 95 13020 65 520 65 460 60 0 0 0 0 point96 96 13020 65 520 65 460 60 0 0 0 0 point97 97 13020 65 520 65 460 60 0 0 0 0 point98 98 13020 65 520 65 460 60 0 0 0 0 point99 99 13020 65 520 65 460 60 0 0 0 0 point100 100 13020 65 520 65 460 60 0 0 0 0 point101 101 I-5 NB point102 102 13020 65 520 65 460 60 0 0 0 0
point104 104 13020 65 520 65 460 60 0 0 0 0 point105 105 13020 65 520 65 460 60 0 0 0 0 point106 106 13020 65 520 65 460 60 0 0 0 0 point107 107 13020 65 520 65 460 60 0 0 0 0 point108 108 13020 65 520 65 460 60 0 0 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1

EXHIBIT
2 City Council 22 – 659 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point109 109 13020 65 520 65 460 60 0 0 0 0 point110 110 13020 65 520 65 460 60 0 0 0 0 point111 111 13020 65 520 65 460 60 0 0 0 0 point112 112 13020 65 520 65 460 60 0 0 0 0 point113 113 WB Santa Ana Blvd - e of I-5 Ramps point68 68 1291 35 46 35 40 30 37 35 8 35 point67 67 1291 35 46 35 40 30 37 35 8 35 point66 66 1291 35 46 35 40 30 37 35 8 35 point65 65 1291 35 46 35 40 30 37 35 8 35 point64 64 WB Santa Ana Blvd - w of Santiago St point118 118 1346 35 47 35 42 30 39 35 8 35 point47 47 1346 35 47 35 42 30 39 35 8 35 point46 46
NB Santiago S of Santa Ana Blvd point12 12 383 35 45 35 28 30 10 35 0 0 point11 11 383 35 45 35 28 30 10 35 0 0 point10 10 383 35 45 35 28 30 10 35 0 0 point9 9 NB Santiago St N of Santa Ana Blvd-2 point119 119 886 35 103 35 65 30 23 35 0 0 point8 8 886 35 103 35 65 30 23 35 0 0 point7 7 886 35 103 35 65 30 23 35 0 0 point6 3 886 35 103 35 65 30 23 35 0 0 point120 120 NB Santiago St N of Santa Ana Blvd point121 121 886 35 103 35 65 30 23 35 0 0 point5 5 886 35 103 35 65 30 23 35 0 0 point4 4 886 35 103 35 65 30 23 35 0 0 point3 3 SB Santiago St N of Santa Ana Blvd point21 21 824 35 103 35 65 30 23 35 0 0 point20 20 824 35 103 35 65 30 23 35 0 0 point19 19 824 35 103 35 65 30 23 35 0 0 point18 18 SB Santiago St S of Santa Ana Blvd-2 point123 123 402 35 47 35 30 30 11 35 0 0 point15 15 402 35 47 35 30 30 11 35 0 0 point14 14 402 35 47 35 30 30 11 35 0 0 point13 13 SB Santiago St S of Santa Ana Blvd- 2 point124 124 402 35 47 35 30 30 11 35 0 0 point17 17 402 35 47 35 30 30 11 35 0 0
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 2

EXHIBIT
2 City Council 22 – 660 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point16 16 402 35 47 35 30 30 11 35 0 0 point122 122
SB I-5 Offramp point127 127 583 65 24 65 21 60 1 65 1 65 point129 129 583 60 24 60 21 60 1 60 1 60 point130 130 583 60 24 60 21 60 1 60 1 60 point131 131 583 45 24 45 21 45 1 45 1 45 point132 132 583 45 24 45 21 45 1 45 1 45 point133 133 583 30 24 30 21 30 1 30 1 30 point134 134 583 30 24 30 21 30 1 30 1 30 point135 135 583 15 24 15 21 15 1 15 1 15 point136 136 SB I-5 Onramp point137 137 517 65 21 65 19 60 1 65 1 65 point139 139 517 65 21 65 19 60 1 65 1 65 point140 140 517 65 21 65 19 60 1 65 1 65 point141 141 517 65 21 65 19 60 1 65 1 65 point142 142 517 65 21 65 19 60 1 65 1 65 point143 143 517 65 21 65 19 60 1 65 1 65 point144 144 517 65 21 65 19 60 1 65 1 65 point145 145 517 65 21 65 19 60 1 65 1 65 point146 146 517 65 21 65 19 60 1 65 1 65 point147 147 517 65 21 65 19 60 1 65 1 65 point148 148 517 65 21 65 19 60 1 65 1 65 point149 149 517 65 21 65 19 60 1 65 1 65 point150 150 517 65 21 65 19 60 1 65 1 65 point138 138 EB Santa Ana Blvd - e of I-5 Ramps point154 154 1233 35 43 35 38 30 36 35 8 35 point24 24 1233 35 43 35 38 30 36 35 8 35 point23 23 1233 35 43 35 38 30 36 35 8 35 point22 22 EB Santa Ana Blvd - e of Santiago St point244 244 1060 35 37 35 33 30 31 35 7 35 point204 204 1060 35 37 35 33 30 31 35 7 35 point205 205 1060 35 37 35 33 30 31 35 7 35 point259 259 WB Santa Ana Blvd - e of Logan St point248 248 1300 35 46 35 41 30 38 35 8 35 point172 172 1300 35 46 35 41 30 38 35 8 35 point173 173 1300 35 46 35 41 30 38 35 8 35 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 3

EXHIBIT
2 City Council 22 – 661 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point174 174 1300 35 46 35 41 30 38 35 8 35 point175 175 1300 35 46 35 41 30 38 35 8 35 point176 176 1300 35 46 35 41 30 38 35 8 35 point257 257 EB Santa Ana Blvd - e of Fuller St point250 250 673 35 24 35 21 30 20 35 4 35 point211 211 673 35 24 35 21 30 20 35 4 35 point212 212 673 35 24 35 21 30 20 35 4 35 point213 213 673 35 24 35 21 30 20 35 4 35 point214 214 673 35 24 35 21 30 20 35 4 35 point215 215 673 35 24 35 21 30 20 35 4 35 point253 253 WB Santa Ana Blvd - e of Fuller St point252 252 1281 35 45 35 40 30 37 35 8 35 point168 168 1281 35 45 35 40 30 37 35 8 35 point169 169 1281 35 45 35 40 30 37 35 8 35 point170 170 1281 35 45 35 40 30 37 35 8 35 point171 171 1281 35 45 35 40 30 37 35 8 35 point247 247 EB Santa Ana Blvd - e of I-5 Ramps -2 point254 254 1233 35 43 35 38 30 36 35 8 35 point216 216 1233 35 43 35 38 30 36 35 8 35 point217 217 1233 35 43 35 38 30 36 35 8 35 point218 218 1233 35 43 35 38 30 36 35 8 35 point219 219 WB Santa Ana Blvd - e of Fuller St - 2 point255 255 1281 35 45 35 40 30 37 35 8 35 point165 165 1281 35 45 35 40 30 37 35 8 35 point166 166 1281 35 45 35 40 30 37 35 8 35 point167 167 1281 35 45 35 40 30 37 35 8 35 point251 251 EB Santa Ana Blvd - e of Logan St point260 260 673 35 24 35 21 30 20 35 4 35 point206 206 673 35 24 35 21 30 20 35 4 35 point207 207 673 35 24 35 21 30 20 35 4 35 point208 208 673 35 24 35 21 30 20 35 4 35 point209 209 673 35 24 35 21 30 20 35 4 35 point210 210 673 35 24 35 21 30 20 35 4 35 point249 249 EB Santa Ana Blvd - w of Santiago St point45 45 837 35 30 35 26 30 24 35 5 35 point44 44 837 35 30 35 26 30 24 35 5 35
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 4

EXHIBIT
2 City Council 22 – 662 5/5/2026
INPUT: TRAFFIC FOR LAeq1h Volumes Santa Ana Blvd Grade Separation Project point43 43 837 35 30 35 26 30 24 35 5 35 point42 42
WB Santa Ana Blvd - e of Santiago St point258 258 1658 35 58 35 52 30 48 35 10 35 point177 177 1658 35 58 35 52 30 48 35 10 35 point178 178 1658 35 58 35 52 30 48 35 10 35 point179 179 1658 35 58 35 52 30 48 35 10 35 point245 245 EB Santa Ana Blvd - e of Santiago St-2 point266 266 1060 35 37 35 33 30 31 35 7 35 point261 261 1060 35 37 35 33 30 31 35 7 35 point264 264 1060 35 37 35 33 30 31 35 7 35 point203 203 1060 35 37 35 33 30 31 35 7 35 point243 243 WB Santa Ana Blvd- w of Santiago St point267 267 1346 35 47 35 42 30 39 35 8 35 point268 268 1346 35 47 35 42 30 39 35 8 35 point269 269 1346 35 47 35 42 30 39 35 8 35 point265 265 1346 35 47 35 42 30 39 35 8 35 point116 116 NB Logan St -2 point270 270 0 0 0 0 0 0 0 0 0 0
point71 71 0 0 0 0 0 0 0 0 0 0 point70 70 0 0 0 0 0 0 0 0 0 0 point69 69 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 5

EXHIBIT
2 City Council 22 – 663 5/5/2026
INPUT: RECEIVERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: RECEIVERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 2035 ReceiverName No. #DUs Coordinates (ground) Height Input Sound Levels and Criteria Active X Y Z above Existing Impact Criteria NR in
Ground LAeq1h LAeq1h Sub'l Goal Calc.
ft ft ft ft dBA dBA dB dB
ST1 1 1 6,567,920.0 2,176,569.2 146.50 5.00 0.00 66 10.0 8.0 Y ST2 3 1 6,567,064.5 2,176,399.5 141.00 5.00 0.00 66 10.0 8.0 Y ST3 5 0 6,566,626.0 2,176,014.2 137.00 5.00 0.00 66 10.0 8.0 Y ST4 6 1 6,566,816.0 2,176,280.0 139.00 5.00 0.00 66 10.0 8.0 Y M1 12 0 6,566,544.0 2,176,187.5 138.00 5.00 0.00 66 10.0 8.0 Y M2 14 1 6,566,648.0 2,176,315.5 139.00 5.00 0.00 66 10.0 8.0 Y M3 15 1 6,566,678.0 2,176,262.0 139.00 5.00 0.00 66 10.0 8.0 Y M4 16 1 6,566,899.0 2,176,290.2 139.50 5.00 0.00 66 10.0 8.0 Y M5 17 1 6,566,930.5 2,176,378.8 139.50 5.00 0.00 66 10.0 8.0 Y M6 18 0 6,566,933.5 2,175,803.8 140.00 5.00 0.00 66 10.0 8.0 Y M7 19 0 6,567,071.5 2,175,736.2 140.00 5.00 0.00 66 10.0 8.0 Y M8 20 0 6,567,207.5 2,176,200.0 141.00 5.00 0.00 66 10.0 8.0 Y M9 21 0 6,567,422.0 2,176,583.8 144.00 5.00 0.00 66 10.0 8.0 Y M10 22 1 6,567,834.0 2,176,465.8 145.30 5.00 0.00 66 10.0 8.0 Y M11 24 1 6,567,864.5 2,176,578.2 145.50 5.00 0.00 66 10.0 8.0 Y M12 25 1 6,567,944.5 2,176,607.8 146.30 5.00 0.00 66 10.0 8.0 Y C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1

EXHIBIT
2 City Council 22 – 664 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BARRIERSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 2035 Barrier PointsName Type Height If Wall If Berm Add'tnl Name No. Coordinates (bottom) Height Segment Min Max $ per $ per Top Run:Rise $ per X Y Z at Seg Ht Perturbs On Important Unit Unit Width Unit Point Incre- #Up #Dn Struct? ReflecArea Vol. Length ment tions? ft ft $/sq ft $/cu yd ft ft:ft $/ft ft ft ft ft ft
Barrier7 W 0.00 99.99 0.00 0.00 point34 34 6,566,594.5 2,176,168.0 138.00 10.00 0.00 0 0 point35 35 6,566,609.0 2,176,175.2 138.00 10.00 0.00 0 0 point36 36 6,566,618.0 2,176,157.5 138.00 10.00 0.00 0 0 point37 37 6,566,595.5 2,176,146.5 138.00 10.00 0.00 0 0 point38 38 6,566,595.0 2,176,148.0 138.00 10.00 0.00 0 0 point39 39 6,566,559.0 2,176,128.8 138.00 10.00 0.00 0 0 point40 40 6,566,539.5 2,176,163.2 138.00 10.00 Barrier8 W 0.00 99.99 0.00 0.00 point41 41 6,566,756.0 2,176,295.2 139.00 12.00 0.00 0 0 point42 42 6,566,755.5 2,176,272.2 139.00 12.00 0.00 0 0 point43 43 6,566,748.5 2,176,272.2 139.00 12.00 0.00 0 0 point44 44 6,566,748.5 2,176,264.8 139.00 12.00 0.00 0 0 point45 45 6,566,744.5 2,176,265.0 139.00 12.00 0.00 0 0 point46 46 6,566,744.0 2,176,253.8 139.00 12.00 0.00 0 0 point47 47 6,566,701.5 2,176,253.8 139.00 12.00 0.00 0 0 point48 48 6,566,701.5 2,176,274.5 139.00 12.00 0.00 0 0 point49 49 6,566,693.5 2,176,274.5 139.00 12.00 0.00 0 0 point50 50 6,566,693.5 2,176,295.8 139.00 12.00 Barrier9 W 0.00 99.99 0.00 0.00 point51 51 6,566,750.5 2,176,344.2 139.50 12.00 0.00 0 0 point52 52 6,566,750.5 2,176,320.5 139.50 12.00 0.00 0 0 point53 53 6,566,737.0 2,176,320.8 139.50 12.00 0.00 0 0 point54 54 6,566,736.5 2,176,304.5 139.50 12.00 0.00 0 0 point55 55 6,566,672.5 2,176,304.5 139.50 12.00 0.00 0 0 point56 56 6,566,672.5 2,176,333.0 139.50 12.00 Barrier10 W 0.00 99.99 0.00 0.00 point57 57 6,566,831.0 2,176,302.2 139.50 12.00 0.00 0 0 point58 58 6,566,846.0 2,176,302.0 139.50 12.00 0.00 0 0 point59 59 6,566,846.0 2,176,303.8 139.50 12.00 0.00 0 0 point60 60 6,566,880.0 2,176,303.8 139.50 12.00 0.00 0 0 point61 61 6,566,880.0 2,176,282.5 139.50 12.00 0.00 0 0 point62 62 6,566,836.5 2,176,282.5 139.50 12.00 0.00 0 0 point63 63 6,566,836.5 2,176,284.5 139.50 12.00 0.00 0 0 point64 64 6,566,831.0 2,176,284.5 139.50 12.00 Barrier11 W 0.00 99.99 0.00 0.00 point65 65 6,566,935.0 2,176,370.8 139.50 12.00 0.00 0 0 point66 66 6,566,935.0 2,176,354.5 139.50 12.00 0.00 0 0 point67 67 6,566,908.0 2,176,354.8 139.50 12.00 0.00 0 0 point68 68 6,566,908.0 2,176,322.2 139.50 12.00 0.00 0 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1 1 February 2012

EXHIBIT
2 City Council 22 – 665 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point69 69 6,566,873.5 2,176,322.5 139.50 12.00 0.00 0 0 point70 70 6,566,873.5 2,176,315.2 139.50 12.00 0.00 0 0 point71 71 6,566,860.5 2,176,315.5 139.50 12.00 0.00 0 0 point72 72 6,566,860.5 2,176,306.2 139.50 12.00 0.00 0 0 point73 73 6,566,831.0 2,176,307.0 139.50 12.00 0.00 0 0 point74 74 6,566,831.0 2,176,323.2 139.50 12.00 Barrier12 W 0.00 99.99 0.00 0.00 point75 75 6,566,942.0 2,176,321.2 139.50 12.00 0.00 0 0 point76 76 6,566,942.5 2,176,300.5 139.50 12.00 0.00 0 0 point77 77 6,566,906.5 2,176,300.2 139.50 12.00 0.00 0 0 point78 78 6,566,906.5 2,176,320.0 139.50 12.00 Barrier13 W 0.00 99.99 0.00 0.00 point79 79 6,566,984.5 2,176,387.8 140.00 12.00 0.00 0 0 point80 80 6,566,983.5 2,176,372.8 140.00 12.00 0.00 0 0 point81 81 6,566,967.0 2,176,373.5 140.00 12.00 0.00 0 0 point82 82 6,566,967.5 2,176,385.8 140.00 12.00 Barrier14 W 0.00 99.99 0.00 0.00 point83 83 6,566,987.5 2,176,402.5 140.00 12.00 0.00 0 0 point84 84 6,566,987.5 2,176,388.5 140.00 12.00 0.00 0 0 point85 85 6,566,964.5 2,176,389.8 140.00 12.00 Barrier15 W 0.00 99.99 0.00 0.00 point86 86 6,567,028.0 2,176,409.5 141.00 12.00 0.00 0 0 point87 87 6,567,028.0 2,176,381.2 141.00 12.00 0.00 0 0 point88 88 6,567,039.0 2,176,381.2 141.00 12.00 0.00 0 0 point89 89 6,567,039.0 2,176,372.5 141.00 12.00 0.00 0 0 point90 90 6,567,059.0 2,176,372.5 141.00 12.00 0.00 0 0 point91 91 6,567,059.0 2,176,381.2 141.00 12.00 Barrier16 W 0.00 99.99 0.00 0.00 point92 92 6,567,057.5 2,176,417.8 141.00 12.00 0.00 0 0 point93 93 6,567,058.0 2,176,407.0 141.00 12.00 0.00 0 0 point94 94 6,567,061.0 2,176,407.0 141.00 12.00 0.00 0 0 point95 95 6,567,061.5 2,176,393.0 141.00 12.00 0.00 0 0 point96 96 6,567,059.0 2,176,393.0 141.00 12.00 0.00 0 0 point97 97 6,567,059.0 2,176,381.2 141.00 12.00 Barrier17 W 0.00 99.99 0.00 0.00 point98 98 6,567,084.5 2,176,430.5 141.00 12.00 0.00 0 0 point99 99 6,567,084.5 2,176,420.5 141.00 12.00 0.00 0 0 point100 100 6,567,056.5 2,176,420.5 141.00 12.00 0.00 0 0 point101 101 6,567,056.5 2,176,430.5 141.00 12.00 Barrier18 W 0.00 99.99 0.00 0.00 point102 102 6,567,276.5 2,176,778.8 144.00 14.00 0.00 0 0 point103 103 6,567,276.5 2,176,528.0 144.00 14.00 0.00 0 0 point104 104 6,567,179.0 2,176,528.0 144.00 14.00 0.00 0 0 point105 105 6,567,179.0 2,176,783.8 144.00 14.00 Barrier19 W 0.00 99.99 0.00 0.00 point106 106 6,567,464.5 2,176,599.5 144.00 14.00 0.00 0 0 point107 107 6,567,421.5 2,176,600.0 144.00 14.00 0.00 0 0 point108 108 6,567,422.0 2,176,623.8 144.00 14.00 0.00 0 0 point109 109 6,567,331.5 2,176,625.0 144.00 14.00 0.00 0 0 point110 110 6,567,331.5 2,176,665.5 144.00 14.00 Barrier20 W 0.00 99.99 0.00 0.00 point111 111 6,567,799.5 2,176,279.0 144.50 12.00 0.00 0 0 point112 112 6,567,799.5 2,176,308.8 144.50 12.00 0.00 0 0 point113 113 6,567,699.0 2,176,308.8 144.50 12.00 Barrier21 W 0.00 99.99 0.00 0.00 point114 114 6,567,589.0 2,176,110.2 144.00 12.00 0.00 0 0 point115 115 6,567,595.5 2,176,325.8 144.00 12.00 0.00 0 0 point116 116 6,567,666.5 2,176,325.8 144.00 12.00 0.00 0 0 point117 117 6,567,666.5 2,176,109.2 144.00 12.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 2 1 February 2012

EXHIBIT
2 City Council 22 – 666 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project Barrier23 W 0.00 99.99 0.00 0.00 point122 122 6,567,323.0 2,176,093.8 142.00 12.00 0.00 0 0 point123 123 6,567,322.5 2,176,165.0 142.00 12.00 0.00 0 0 point124 124 6,567,291.0 2,176,166.2 142.00 12.00 Barrier24 W 0.00 99.99 0.00 0.00 point125 125 6,567,185.0 2,176,131.8 141.00 12.00 0.00 0 0 point126 126 6,567,185.0 2,176,219.8 141.00 12.00 0.00 0 0 point127 127 6,567,152.5 2,176,219.8 141.00 12.00 Barrier25 W 0.00 99.99 0.00 0.00 point128 128 6,567,085.5 2,175,584.2 140.00 30.00 0.00 0 0 point129 129 6,567,083.0 2,175,688.2 140.00 30.00 0.00 0 0 point130 130 6,567,058.5 2,175,673.2 140.00 30.00 0.00 0 0 point131 131 6,567,025.5 2,175,741.5 140.00 30.00 0.00 0 0 point132 132 6,567,085.5 2,175,768.5 140.00 30.00 0.00 0 0 point133 133 6,567,085.0 2,175,889.8 140.00 30.00 0.00 0 0 point134 134 6,567,069.0 2,175,882.5 140.00 30.00 0.00 0 0 point135 135 6,566,937.5 2,175,820.8 140.00 30.00 Barrier32 W 0.00 99.99 0.00 0.00 point173 173 6,566,828.0 2,176,372.2 139.50 12.00 0.00 0 0 point174 174 6,566,828.0 2,176,323.2 139.50 12.00 0.00 0 0 point175 175 6,566,831.0 2,176,323.2 139.50 12.00 Barrier33 W 0.00 99.99 0.00 0.00 point176 176 6,567,377.5 2,177,134.0 146.00 14.00 0.00 0 0 point177 177 6,567,469.5 2,177,132.0 146.00 14.00 0.00 0 0 point178 178 6,567,470.0 2,176,977.5 146.00 14.00 0.00 0 0 point179 179 6,567,366.5 2,176,977.0 146.00 14.00 Barrier34 W 0.00 99.99 0.00 0.00 point182 182 6,567,376.0 2,176,893.0 145.00 14.00 0.00 0 0 point183 183 6,567,467.5 2,176,892.0 145.00 14.00 0.00 0 0 point184 184 6,567,466.0 2,176,728.2 145.00 14.00 0.00 0 0 point185 185 6,567,374.5 2,176,729.2 145.00 14.00 0.00 0 0 point186 186 6,567,374.5 2,176,735.5 145.00 14.00 0.00 0 0 point187 187 6,567,343.0 2,176,735.8 145.00 14.00 Barrier35 W 0.00 99.99 0.00 0.00 point188 188 6,567,178.5 2,176,811.0 145.00 14.00 0.00 0 0 point189 189 6,567,178.5 2,177,208.0 145.00 14.00 0.00 0 0 point190 190 6,567,285.0 2,177,208.0 145.00 14.00 0.00 0 0 point191 191 6,567,285.0 2,176,809.2 145.00 14.00 Barrier36 W 0.00 99.99 0.00 0.00 point192 192 6,566,563.5 2,176,281.0 138.00 12.00 0.00 0 0 point193 193 6,566,514.5 2,176,256.5 138.00 12.00 0.00 0 0 point194 194 6,566,493.0 2,176,299.5 138.00 12.00 0.00 0 0 point195 195 6,566,464.0 2,176,286.0 138.00 12.00 0.00 0 0 point196 196 6,566,377.0 2,176,467.0 138.00 12.00 0.00 0 0 point197 197 6,566,423.5 2,176,487.8 138.00 12.00 Barrier38 W 0.00 99.99 0.00 0.00 point198 198 6,567,843.5 2,176,442.0 145.50 12.00 0.00 0 0 point199 199 6,567,843.5 2,176,466.2 145.50 12.00 0.00 0 0 point200 200 6,567,904.5 2,176,465.0 145.50 12.00 Retaining Wall NE of Santiago St W 0.00 99.99 0.00 0.00 point201 201 6,566,566.0 2,176,126.2 138.00 6.00 2.00 5 0 point203 203 6,566,599.0 2,176,140.0 138.00 6.00 2.00 5 0 point304 304 6,566,649.0 2,176,159.0 138.00 6.00 2.00 5 0 point204 204 6,566,699.0 2,176,177.8 138.00 6.00 2.00 5 0 point303 303 6,566,747.0 2,176,192.5 138.25 6.00 2.00 5 0 point205 205 6,566,794.5 2,176,207.2 138.50 6.00 2.00 5 0 point302 302 6,566,841.0 2,176,225.2 139.00 6.00 2.00 5 1 point206 206 6,566,888.0 2,176,243.2 139.50 6.00 2.00 5 0 point301 301 6,566,933.5 2,176,264.5 139.90 6.00 2.00 5 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 3 1 February 2012

EXHIBIT
2 City Council 22 – 667 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point207 207 6,566,979.0 2,176,285.8 140.30 6.00 2.00 5 0 point300 300 6,567,024.0 2,176,307.0 141.40 6.00 2.00 5 0 point208 208 6,567,069.5 2,176,328.0 142.50 6.00 2.00 5 0 point299 299 6,567,082.5 2,176,333.8 142.50 6.00 2.00 5 0 point209 209 6,567,160.0 2,176,370.8 143.00 6.00 2.00 5 0 point210 210 6,567,250.5 2,176,413.5 143.50 6.00 2.00 5 0 point211 211 6,567,259.0 2,176,417.5 143.50 6.00 2.00 5 0 point212 212 6,567,278.0 2,176,439.5 143.50 6.00 2.00 5 0 point213 213 6,567,279.0 2,176,691.5 144.50 6.00 Barrier41 W 0.00 99.99 0.00 0.00 point223 223 6,567,327.5 2,176,691.2 143.50 0.00 0.00 0 0 point225 225 6,567,327.5 2,176,556.8 143.00 0.00 0.00 0 0 point226 226 6,567,333.5 2,176,504.8 144.00 0.00 0.00 0 0 point227 227 6,567,373.0 2,176,484.5 143.50 0.00 0.00 0 0 point228 228 6,567,486.0 2,176,539.5 143.50 0.00 0.00 0 0 point229 229 6,567,572.0 2,176,591.0 144.50 0.00 0.00 0 0 point230 230 6,567,656.0 2,176,646.0 145.00 0.00 0.00 0 0 point231 231 6,567,744.0 2,176,694.0 145.90 0.00 0.00 0 0 point232 232 6,567,767.0 2,176,705.2 146.00 0.00 Retaining Wall SE of Santiago St W 0.00 99.99 0.00 0.00 point267 267 6,566,613.5 2,176,033.0 137.50 0.00 0.00 0 0 point269 269 6,566,713.5 2,176,073.0 138.20 0.00 0.00 0 0 point270 270 6,566,807.5 2,176,103.2 138.00 0.00 0.00 0 0 point271 271 6,566,902.0 2,176,136.5 138.50 0.00 0.00 0 0 point272 272 6,566,993.5 2,176,177.8 139.00 0.00 0.00 0 0 point273 273 6,567,084.0 2,176,220.2 141.20 0.00 0.00 0 0 point274 274 6,567,174.5 2,176,262.5 142.00 0.00 0.00 0 0 point275 275 6,567,258.5 2,176,302.0 142.50 0.00 0.00 0 0 point276 276 6,567,326.5 2,176,334.2 142.60 0.00 0.00 0 0 point277 277 6,567,365.0 2,176,322.5 142.70 0.00 0.00 0 0 point278 278 6,567,395.0 2,176,257.0 142.70 0.00 0.00 0 0 point279 279 6,567,403.0 2,176,231.5 142.70 0.00 0.00 0 0 point280 280 6,567,406.5 2,176,196.5 142.80 0.00 0.00 0 0 point281 281 6,567,406.0 2,176,136.8 142.80 0.00 Retaining Wall SE of Fuller St W 0.00 99.99 0.00 0.00 point245 245 6,567,460.5 2,176,136.8 143.00 6.00 2.00 5 0 point247 247 6,567,461.0 2,176,204.0 143.00 6.00 2.00 5 0 point248 248 6,567,457.0 2,176,236.2 143.00 6.00 2.00 5 0 point249 249 6,567,447.5 2,176,272.2 143.00 6.00 2.00 5 0 point250 250 6,567,409.0 2,176,356.2 143.20 6.00 2.00 5 0 point251 251 6,567,424.5 2,176,394.0 143.50 6.00 2.00 5 0 point305 305 6,567,488.0 2,176,425.5 143.65 6.00 2.00 5 0 point252 252 6,567,551.5 2,176,456.8 143.80 6.00 2.00 5 0 point306 306 6,567,595.0 2,176,483.0 144.15 6.00 2.00 5 0 point253 253 6,567,638.0 2,176,509.5 144.50 6.00 2.00 5 0 point307 307 6,567,680.0 2,176,536.5 144.70 6.00 2.00 5 0 point254 254 6,567,722.0 2,176,563.5 144.90 6.00 2.00 5 0 point308 308 6,567,766.0 2,176,587.0 145.05 6.00 2.00 5 0 point255 255 6,567,810.5 2,176,610.5 145.20 6.00 ROW SE of Fuller St W 0.00 99.99 0.00 0.00 point292 292 6,567,810.5 2,176,610.5 145.20 6.00 2.00 5 0 point309 309 6,567,861.0 2,176,624.2 145.60 6.00 2.00 5 0 point289 289 6,567,912.0 2,176,638.0 146.00 6.00 2.00 5 0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 4 1 February 2012

EXHIBIT
2 City Council 22 – 668 5/5/2026
INPUT: BARRIERS Santa Ana Blvd Grade Separation Project point310 310 6,567,962.0 2,176,650.0 146.50 6.00 2.00 5 0 point290 290 6,568,012.0 2,176,662.2 147.00 6.00 2.00 5 0 point311 311 6,568,062.5 2,176,665.5 147.00 6.00 2.00 5 0 point291 291 6,568,113.0 2,176,668.8 147.00 6.00 Barrier50 W 0.00 99.99 0.00 0.00 point293 293 6,568,135.0 2,176,664.8 147.50 18.00 0.00 0 0 point294 294 6,568,083.0 2,176,665.5 147.50 18.00 0.00 0 0 point295 295 6,568,082.0 2,176,583.0 147.50 18.00 0.00 0 0 point296 296 6,568,134.0 2,176,582.0 147.00 18.00 Barrier51 W 0.00 99.99 0.00 0.00 point297 297 6,568,086.5 2,176,567.8 147.00 18.00 0.00 0 0 point298 298 6,568,086.5 2,176,446.5 147.00 18.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 5 1 February 2012

EXHIBIT
2 City Council 22 – 669 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5 INPUT: BUILDING ROWSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 203Building Row PointsName Average Building No. Coordinates (ground) Height Percent X Y Z
ft % ft ft ft
Building1 12.00 80 1 6,566,726.5 2,176,353.0 140.00
2 6,566,736.0 2,176,517.5 140.00
Building2 12.00 80 3 6,566,885.0 2,176,376.5 140.50
4 6,566,885.0 2,176,504.0 140.50
Building3 12.00 80 5 6,567,037.5 2,177,406.0 150.00
6 6,566,840.5 2,177,412.0 150.00
Building4 12.00 80 7 6,567,038.0 2,177,340.5 150.00
8 6,566,825.0 2,177,340.5 150.00
Building5 12.00 80 9 6,567,070.0 2,177,168.2 148.00
10 6,566,825.5 2,177,168.2 148.00
Building6 12.00 80 11 6,567,074.5 2,176,980.0 145.00
12 6,566,822.5 2,176,980.0 145.00
Building7 12.00 80 13 6,566,756.5 2,177,500.0 148.00
14 6,566,569.0 2,177,500.0 148.00
Building8 12.00 80 15 6,566,754.0 2,177,441.8 148.00
16 6,566,557.0 2,177,441.8 148.00
Building9 12.00 80 17 6,566,729.0 2,177,352.5 146.00
18 6,566,574.5 2,177,352.5 146.00
Building10 12.00 80 19 6,566,760.5 2,177,158.8 147.00
20 6,566,564.0 2,177,158.8 147.00
Building11 12.00 80 21 6,566,755.5 2,176,984.8 145.00
22 6,566,550.0 2,176,984.8 145.00
Building12 12.00 80 23 6,567,103.5 2,176,638.8 143.00
24 6,566,829.5 2,176,642.5 143.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1

EXHIBIT
2 City Council 22 – 670 5/5/2026
INPUT: BUILDING ROWS Santa Ana Blvd Grade Separation Project Building13 12.00 80 25 6,566,752.0 2,176,638.8 142.00
26 6,566,526.5 2,176,638.8 142.00
C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 2

EXHIBIT
2 City Council 22 – 671 5/5/2026
INPUT: TERRAIN LINES Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5INPUT: TERRAIN LINESPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 2035 Terrain Line PointsName No. Coordinates (ground) X Y Zft ft ft
Toe of Slope at I-5 1 6,568,314.5 2,176,815.5 149.00
3 6,568,314.5 2,176,811.0 149.004 6,568,294.5 2,176,790.0 149.005 6,568,193.0 2,176,796.2 149.006 6,568,140.0 2,176,836.0 149.007 6,568,057.5 2,176,879.2 149.008 6,567,934.0 2,176,934.8 149.009 6,567,886.5 2,176,946.0 149.00 Toe of Slope at I-5-2-2 24 6,567,669.5 2,176,856.0 150.00 12 6,567,588.0 2,177,084.0 150.0013 6,567,529.0 2,177,186.0 145.0014 6,567,496.0 2,177,216.0 142.0015 6,567,408.0 2,177,251.5 142.0016 6,567,166.5 2,177,402.2 142.0017 6,567,159.5 2,177,417.5 142.0018 6,567,099.0 2,177,457.0 142.0019 6,567,065.0 2,177,474.2 143.0020 6,567,058.0 2,177,463.5 144.0021 6,566,868.0 2,177,573.0 144.0022 6,566,510.0 2,177,798.5 144.00 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1

EXHIBIT
2 City Council 22 – 672 5/5/2026
RESULTS: SOUND LEVELS Santa Ana Blvd Grade Separation Project ICF International 1 February 2012 M Greene TNM 2.5
Calculated with TNM 2.5
RESULTS: SOUND LEVELSPROJECT/CONTRACT: Santa Ana Blvd Grade Separation Project RUN: Santa Ana Blvd - FWP Year 2035 BARRIER DESIGN: INPUT HEIGHTS Average pavement type shall be used unless a State highway agency substantiates the use
ATMOSPHERICS: 68 deg F, 50% RH of a different type with approval of FHWA.ReceiverName No. #DUs Existing No Barrier With Barrier LAeq1h LAeq1h Increase over existing Type Calculated Noise Reduction Calculated Crit'n Calculated Crit'n Impact LAeq1h Calculated Goal Calculated Sub'l Inc minus
Goal
dBA dBA dBA dB dB dBA dB dB dB
ST1 1 1 0.0 71.4 66 71.4 10 Snd Lvl 68.6 2.8 8 -5.2 ST2 3 1 0.0 58.1 66 58.1 10 ---- 56.5 1.6 8 -6.4 ST3 5 0 0.0 74.0 66 74.0 10 Snd Lvl 74.0 0.0 8 -8.0 ST4 6 1 0.0 64.1 66 64.1 10 ---- 61.3 2.8 8 -5.2 M1 12 0 0.0 70.9 66 70.9 10 Snd Lvl 70.9 0.0 8 -8.0 M2 14 1 0.0 62.0 66 62.0 10 ---- 61.0 1.0 8 -7.0
M3 15 1 0.0 64.5 66 64.5 10 ---- 61.8 2.7 8 -5.3 M4 16 1 0.0 63.8 66 63.8 10 ---- 59.2 4.6 8 -3.4 M5 17 1 0.0 55.0 66 55.0 10 ---- 54.8 0.2 8 -7.8 M6 18 0 0.0 59.5 66 59.5 10 ---- 59.5 0.0 8 -8.0 M7 19 0 0.0 53.9 66 53.9 10 ---- 53.8 0.1 8 -7.9 M8 20 0 0.0 61.0 66 61.0 10 ---- 60.6 0.4 8 -7.6 M9 21 0 0.0 64.3 66 64.3 10 ---- 64.2 0.1 8 -7.9 M10 22 1 0.0 68.6 66 68.6 10 Snd Lvl 66.5 2.1 8 -5.9 M11 24 1 0.0 72.0 66 72.0 10 Snd Lvl 68.5 3.5 8 -4.5 M12 25 1 0.0 72.4 66 72.4 10 Snd Lvl 69.0 3.4 8 -4.6 Dwelling Units # DUs Noise Reduction
Min Avg Max dB dB dB
All Selected 10 0.0 1.6 4.6 All Impacted 4 0.0 2.0 3.5 All that meet NR Goal 0 0.0 0.0 0.0 C:\TNM25\PROJECTS\SANTA ANA BLVD\SantAnaFWP2035 1 1 February 20

EXHIBIT
2 City Council 22 – 673 5/5/2026

CITY OF SANTA ANA
ATTACHMENT N4

AIR QUALITY ASSESSMENT REPORT
EXHIBIT 2
City Council 22 – 674 5/5/2026
Air Quality Assessment Report
Santa Ana Boulevard Grade Separation Project
City of Santa Ana, Orange County, California
Federal Project Number: STPL 5063 (136)
June 2012
Prepared By:

ICF International
Keith Cooper
811 West 7th Street, Suite 800
Los Angeles, CA 90017
(213) 627-5376
Submitted To:

California Department of Transportation

EXHIBIT 2
City Council 22 – 675 5/5/2026
.

EXHIBIT 2
City Council 22 – 676 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
i
Table of Contents
Page
Table of Contents ............................................................................................................. i List of Tables .................................................................................................................. iv List of Figures ................................................................................................................ iv Acronyms and Abbreviations ........................................................................................ v Executive Summary ........................................................................................................ 1 Chapter 1 Introduction .............................................................................................. 1

1.1 Project Description ......................................................................... 1

1.2 Purpose and Need ......................................................................... 2 Chapter 2 Environmental Setting ............................................................................. 9

2.1 Meteorology ................................................................................... 9

2.1.1 Topography and Climate .................................................... 9

2.1.2 Temperature Inversion ....................................................... 9

2.1.3 Air Quality Management ................................................... 10

2.1.4 Transportation Conformity Rule ....................................... 12 Chapter 3 Regulatory Framework .......................................................................... 13

3.1 Federal Clean Air Act ................................................................... 13

3.1.1 Mobile Source Air Toxics ................................................. 13

3.2 California Clean Air Act ................................................................ 14

3.3 South Coast Air Quality Management District .............................. 14 Chapter 4 Monitored Air Quality ............................................................................ 15

4.1 Carbon Monoxide ......................................................................... 15

4.2 Ozone .......................................................................................... 15

4.3 Nitrogen Dioxide .......................................................................... 16

4.4 Sulfur Oxides ............................................................................... 16

4.5 Inhalable Particulate Matter ......................................................... 16

4.6 Lead ............................................................................................. 17

4.7 Toxic Air Contaminants ................................................................ 17

4.8 Naturally Occurring Asbestos ...................................................... 18 Chapter 5 Potential Air Quality Impacts ................................................................ 19

5.1 Assessment Methodology ............................................................ 19 EXHIBIT 2
City Council 22 – 677 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
ii

5.1.1 Construction-Period Impact Assessment
Methodology ................................................................................ 19

5.1.2 Operational-Period Impact Assessment
Methodolog .................................................................................. 19

5.2 Project Avoidance and Minimization Measures ........................... 20

5.2.1 Construction-Period Effects ............................................. 20

5.2.2 Operations-Period Effects ................................................ 21 Chapter 6 Conclusions ........................................................................................... 25 Chapter 7 References ............................................................................................. 27 Chapter 8 Preparers ................................................................................................ 29 EXHIBIT 2
City Council 22 – 678 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
iii
Appendices
Appendix A - SCAG Adopted 2011 FTIP
Appendix B - Local Climate and Ambient Air Monitoring Data Appendix C - SCAQMD Rule 403
Appendix D - Caltrans CO Protocol Excerpts (Table 1, Table 2, and CO Analysis Flow Charts)
Appendix E - Prototype Language for Compliance with 40 CFR 1502.22 EXHIBIT 2
City Council 22 – 679 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
iv
List of Tables
Table Page
Table 1. California and National Ambient Air Quality Standards ................................................ 10 Table 2. Ambient Air Quality Monitoring Data Collected from the Anaheim-Pampas (ARB Station No. 30178) Monitoring Station ............................................................................................ 11 Table 3. Attainment Status for Orange County Portion of South Coast Air Basin ...................... 12 List of Figures
Figure Page
Figure 1. Regional Vicinity ............................................................................................................ 3 Figure 2. Project Location ............................................................................................................. 5 Figure 3. Project Layout ................................................................................................................ 7 EXHIBIT 2
City Council 22 – 680 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
v
Acronyms and Abbreviations
µg/m3 micrograms per cubic meter
AAQS ambient air quality standards
AB Assembly Bill
AQMP Air Quality Management Plan
ARB California Air Resources Board
BACM Best Available Control Measures
Basin South Coast Air Basin
CAA Clean Air Act
CAAQS California ambient air quality standards
Caltrans California Department of Transportation
CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CO carbon monoxide
County County of Orange
EPA U.S. Environmental Protection Agency
FHWA Federal Highway Administration
FR Federal Register
FTIP Federal Transportation Improvement Program
HAP hazardous air pollutants
LOS level of service
mph Miles per hour
MSAT mobile-source air toxics
NAAQS national ambient air quality standards
NEPA National Environmental Policy Act
NO2 nitrogen dioxide
NOA naturally occurring asbestos
NOx oxides of nitrogen
O3 ozone
OCTA Orange County Transportation Authority
Pb lead
PM post mile
PM10 particulate matter 10 microns or less in diameter
EXHIBIT 2
City Council 22 – 681 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
vi
PM2.5 particulate matter 2.5 microns or less in diameter ppm parts per million
project proposed Santa Ana Boulevard Grade Separation Project ROG reactive organic gases
RTP Regional Transportation Plan
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SIP state implementation plan
SO2 sulfur dioxide
SRA Source Receptor Area
TACs toxic air contaminants
TCWG Transportation Conformity Working Group
U.S.C. United States Code
V/C volume to capacity
VMT vehicle miles traveled
EXHIBIT 2
City Council 22 – 682 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
ES-1
Executive Summary
The City of Santa Ana, in coordination with the California Department of Transportation (Caltrans), is proposing to grade separate the existing Santa Ana Boulevard/Orange County Transportation Authority (OCTA) Metrolink at-grade railroad crossing in the City of Santa Ana in Orange County, California.

Project improvements would include the construction of an underpass bridge (i.e., roadway going under the railroad tracks) and retaining walls, installation of paving, curbs, gutters, medians, sidewalks, streetlights, landscape and irrigation features, drainage facilities, and the relocation of utilities (see Figures 1 and 2).

The proposed project is included in the 2008 Regional Transportation Plan (RTP) and 2011 costconstrained Federal Transportation Improvement Program (FTIP) (federal approval date of December 14, 2010) as project ID ORA082610. As such, the project’s operational emissions, which include the ozone (O3) precursors reactive organic gases (ROG) and nitrogen oxides (NOX), meet regional transportation conformity determination requirements imposed by the U.S. Environmental Protection Agency (EPA).

This project type, “railroad/highway crossing,” qualifies for an exemption from the requirement to determine conformity per 40 CFR 93.126. As such, the proposed project does not require a project-level conformity analysis. In addition, this project qualifies for a statutory exemption under the California Environmental Quality Act (CEQA) per Section 15282(g).1 The proposed project would have no adverse impacts under NEPA. This air quality evaluation is the basis for the determination that the proposed project would not result in any substantial air quality impact. This determination is based on the following:
 during project construction, the implementation of exhaust and fugitive dust emission control measures would avoid and/or minimize impacts to air quality;  the project is included in the SCAG 2008 RTP and SCAG 2011 FTIP (Project ID ORA082610), which implies that project’s operational emissions (which include the ozone precursors ROG and NOX) meet the transportation conformity requirements imposed by EPA and the SCAQMD. As such, the project would not exceed the motor vehicle emissions budget for the region;  Caltrans’ CO protocol screening procedure demonstrated that the project would not have a material effect on localized CO concentrations;
 the proposed project is not considered a project of air quality concern, as defined by 40 CFR

93.123(b)(1), and as such, a qualitative PM2.5/PM10 hot-spot evaluation is not required. It is unlikely that the proposed project would generate new air quality violations, worsen existing violations, or delay attainment of NAAQS for PM2.5 or PM10; and
 the proposed project was found to have no potential for significant MSAT emissions (using FHWA guidance) and is not linked with any special MSAT concern.

1 CEQA Section 15282. Other Statutory Exemptions. (g) Any railroad grade separation project which eliminates an existing grade crossing or which reconstructs an existing grade separation as set forth in Section 21080.13 of the Public Resources Code.

EXHIBIT 2
City Council 22 – 683 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
ES-2
This page intentionally left blank.

EXHIBIT 2
City Council 22 – 684 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
1 Chapter 1 Introduction
This report evaluates the potential air quality impacts associated with proposed construction and operation of the OCTA Metrolink railroad/Santa Ana Boulevard grade separation in the City of Santa Ana.

1.1 Project Description
The City of Santa Ana, in coordination with the California Department of Transportation (Caltrans), is proposing to grade separate the existing Santa Ana Boulevard/Orange County Transportation Authority (OCTA) Metrolink at-grade railroad crossing in the City of Santa Ana, Orange County, California (see Figures 1 and 2).

Currently, 66 trains cross Santa Ana Boulevard at this location on weekdays. The purpose of the proposed project is to eliminate the at-grade crossing of Santa Ana Boulevard and the Orange County Transportation Authority (OCTA) Metrolink tracks by creating a grade separation, including depressing the profile of Santa Ana Boulevard under the adjacent Metrolink tracks to: enhance traffic operations; improve pedestrian and bicycle user safety; improve emergency response times; and reduce existing traffic congestion along Santa Ana Boulevard.

The proposed project improvements extend along Santa Ana Boulevard from approximately Santiago Street at the west end to the west side of the Interstate 5 (I-5) southbound off-ramp intersection with Santa Ana Boulevard. As part of the grade separation the proposed project includes: minor improvements to the Santa Ana Boulevard/Santiago Street intersection; terminating Logan Street north of Santa Ana Boulevard by constructing a cul-de-sac; and improvements to Fuller Street, both north and south of Santa Ana Boulevard (see Figure 3).

The project proposes to relocate Santa Ana Boulevard approximately 30 feet south of its existing alignment, to construct a utility corridor on the north side of the roadway, and to maintain the existing lane configuration of three (3) lanes in each direction for the entire length of the project.

The proposed project will include the construction of an underpass bridge (i.e., roadway going under the railroad tracks) and retaining walls, installation of paving, curbs, gutters, medians, sidewalks, streetlights, landscape and irrigation features, drainage facilities, and the relocation of utilities.

During construction the project proposes to construct a temporary two track shoofly railroad alignment for the purpose of constructing the underpass structure while maintaining railroad service, which is to be constructed beginning just south of the existing Metrolink crossing of I-5 and terminating south of the Santa Ana Transportation Center near 4th Street. This shoofly alignment would be located east of the existing railroad alignment. The project also proposes to construct a two-lane detour road south of Santa Ana Boulevard, which would be used by traffic during the construction of the underpass bridge and its approaches. The project also proposes to use Fruit Street as a detour route during the final phase of construction. New right-of-way, including both permanent acquisition and temporary easements, will be needed for the construction of the shoofly and detour road.

Construction staging areas for the proposed project would potentially be located on the following properties: APNs 398-093-13, 398-092-12, and 398-207-01. The disposal site for the proposed project, if needed, will be selected by the contractor. Any environmental clearances related to the disposal site will be obtained by the contractor prior to construction.

EXHIBIT 2
City Council 22 – 685 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
2 The proposed project is included in the 2008 Regional Transportation Plan (RTP) and 2011 costconstrained Federal Transportation Improvement Program (FTIP) (federal approval date of December 14, 2010) as project ID ORA082610. The project as proposed is consistent with the 2011 FTIP description.

1.2 Purpose and Need
The purpose of the proposed project is to reduce the congestion and inconvenience caused by this existing at-grade railroad crossing facility. The proposed project is also anticipated to improve safety because it would remove the existing at-grade conflict between pedestrians, vehicular traffic and rail traffic.

Currently, 66 trains cross Santa Ana Boulevard at this location on weekdays.

EXHIBIT 2
City Council 22 – 686 5/5/2026
§¨¦5
§¨¦405
§¨¦5
§¨¦5
§¨¦405
UV55
UV91
UV261
UV73
UV57
UV72
UV22
UV133
UV90
UV133
UV90
UV261
UV UV72 91
UV261
UV57
UV22
Anaheim
Santa Ana
Irvine
Orange
Costa Mesa
Garden Grove
Fullerton
Tustin
Fountain Valley
Newport Beach
Westminster
Tustin Foothills
Placentia
Villa Park Villa Park
Figure 1
Regional Vicinity Map
Santa Ana Boulevard Grade Separation Project
±
Source: ESRI StreetMap
North America (2008)
0 0.5 1 2
Miles
San Bernardino
Riverside
Imperial San Diego
Orange
Los Angeles
Kern
P a c i f i c
O c e a n
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig01_Regional_Vicinity.mxd SM, NB (09-19-11) Project Site
District: 12
County: Orange
Route: Santa Ana Boulevard
Federal Project No.: STPL 5063(136)
EXHIBIT 2
City Council 22 – 687 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
4 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 688 5/5/2026
Project Location
French
Park
Logan
Park
Mabury
Park
Prentice
Park
P E Railroad
BNSF RR and Amtrak
15Th
Mcclay
Standard
Spurgeon
Elk
Oakmont
Santiago
Main
Parrie
Hardly
Grace
Breeden
Trinidad
Kilson
Obarr
8Th
6Th
Brown
Dresser
Myrtle
Mortimer
Martha
Greenwood
5Th
Penn
Eastside
Porter
11Th
Stafford
12Th
Terminal
Eastwood
Patricia
2Nd
Camile
Court
Hathaway
Dorman
9Th
10Th
Valencia
Palm
Vance
Minnie
18Th
Warren
Cedar
Concord
Custer
Wellington
Fuller
Fruit
Fairmont
19Th
Bush
20Th
21St
Catalina
Logan
16Th
3Rd
Santa Fe
Minter
Garfield Hickory
Civic Center
Bishop
Pine
Lacy
Washington
Chestnut
Walnut
Wright
French
Linwood
Poinsettia
Lyon
Orange
Cypress
Halladay
Oak
14Th
Maple
4Th
Lincoln
Mabury
Santa Ana
17Th
Grand
Mortimer
5Th
4Th
Main
1St
§¨¦5
Figure 2
Project Location Map
Santa Ana Boulevard Grade Separation Project
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig02_Project_Location.mxd SM, NB (09-19-11)) ±
Source: ESRI StreetMap
North America (2008)
0 250 500 1,000
Feet
District: 12
County: Orange
Route: Santa Ana Boulevard
Federal Project No.: STPL 5063(136)
EXHIBIT 2
City Council 22 – 689 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
6 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 690 5/5/2026

SANTIAGO ST

POINSETTIA ST

METROLINK

SANTA ANA

STATION

STAFFORD ST

CUSTER ST

LOGAN ST

WASHINGTON AVE

LINCOLN AVE

FULLER ST

TERMINAL ST
E 4TH STBREEDEN
I-5 NB
I-5 SB
I-5 SB OFF
I-5 SB ON

PHOENIX HOUSE

REHAB CENTER

FRUIT ST

EASTWOOD AVE

SANTA ANA
BLVD

GRAND AVE
APN
398-093-01 APN 398-194-21
APN
398-194-22
APN
398-194-20
APN
398-194-19
APN
398-194-18
APN
398-092-09
APN
398-092-08
APN
398-092-10
APN
398-092-11
APN
398-092-14
APN
398-092-13
APN
398-092-02
APN
398-093-08
APN
398-093-07
APN
398-093-05
398-093-06
APN
398-093-04
APN
398-194-15
APN
398-194-16
APN
398-194-17
APN
398-194-23
APN
398-194-14
APN
398-093-13
398-205
-07
APN
398-202-01
APN
398-201-11
APN
398-352-10
APN
398-204-04
APN
398-352-07
APN
398-207-01
APN
398-361-07
APN
398-208-01
APN
398-101-16
APN
398-101-15
APN
398-101-14 APN
398-101-13
APN
398-101-02
APN
398-361-01
APN
398-352-06
APN
398-342-12
APN
398-381-01
APN
398-381-04
APN
398-381-02
05 03
04 02
APN
398-381-12
APN
398-461-07
APN
398-461-19
APN
398-461-18
APN
398-361-03
APN
398-361-12
APN
398-093-03
APN
398-202-07
APN
398-202-08
APN
398-202-09
APN
398-202
-10
APN
398-205-01
APN
398-205-02
APN
398-205-03
APN
398-205-04
APN
398-205
-05
APN
398-205-09
APN
398-205-08
APN
398-381-03
APN
398-381-=13
APN
398-362
-01
APN
398-092-15
APN
398-092-12
APN
398-093-02
APN
398-342-18
Figure 3
Proposed Project Area
Santa Ana Boulevard Grade Separation Project
±
Source: ESRI World Imagery
(2010)
K:\Irvine\GIS\Projects\AECOM\00452_11\mapdoc\Fig03_Project_Area.mxd Date: 5/8/2012 26629 Legend
Parcels
Limits of Disturbance
Proposed Full Aquisition
Proposed Partial Aquisition
Temporary Construction Easement
Proposed Improvements
Detour Road
Proposed Temporary Shoofly
District: 12
County: Orange
Route Santa Ana Blvd
Federal Project No: STPL 5063 (136)
0 100 200 50
Feet
EXHIBIT 2
City Council 22 – 691 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
8 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 692 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
9 Chapter 2 Environmental Setting

2.1 Meteorology
Air quality conditions are dependent upon climatological conditions, topography, and the types and amounts of pollutants emitted. The following discussion describes relevant characteristics of the South Coast Air Basin (SCAB) and offers an overview of conditions affecting pollutant ambient air concentrations in the SCAB.

2.1.1 Topography and Climate
The proposed project site is located within the SCAB, an approximately 6,745-square-mile area bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The SCAB includes all of Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties, in addition to the San Gorgonio Pass area in Riverside County.

The terrain and geographical location determine the distinctive climate of the SCAB, which is a coastal plain with connecting broad valleys and low hills. The topography and climate of Southern California combine to make the SCAB an area of high air pollution potential.

Data from the Western Regional Climate Center’s Santa Ana Fire Station climate monitoring station was used to characterize project vicinity climate conditions because it is nearest to the proposed project site.

The average project area summer (August) high and low temperatures are 84.7°F and 61.6°F, respectively, while the average winter (January) high and low temperatures are 68.0°F and 43°F, respectively. The average annual rainfall is 13.79 inches.

The wind monitoring station located nearest to the proposed project site is in the City of Anaheim; therefore, data from the Anaheim wind monitoring station was used to characterize study area wind conditions. Wind patterns in the project vicinity display a unidirectional flow, with winds arising primarily from the southwest, at an average speed of 4.25 miles per hour. Calm wind conditions are present 0.02 percent of the time.

2.1.2 Temperature Inversion
The vertical temperature profile of the atmosphere determines whether the pollutants are mixed and diluted throughout the atmosphere or whether they are “clamped” under a lid (inversion) and become trapped and thus accumulate in the communities that produce the pollution (NPS 1999). The greatest air pollution impacts throughout the SCAB occur from June through September. This condition is generally attributed to the large amount of pollutant emissions, light winds, and shallow vertical atmospheric mixing. This frequently reduces pollutant dispersion, thus causing elevated air pollution levels. Pollutant concentrations in the SCAB vary with location, season, and time of day. O3 concentrations, for example, tend to be lower along the coast, higher in the near inland valleys, and lower in the far inland areas of the SCAB and adjacent desert.

EXHIBIT 2
City Council 22 – 693 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
10 2.1.3 Air Quality Management
The project site is located in the Orange County portion of the South Coast Air Basin. The monitoring station located closest to the project site is the Anaheim-Pampas station (ARB Station No. 30178) located approximately seven miles northwest of the project site at 163 Pampas Lane, Anaheim. The AnaheimPampas station monitors major criteria pollutants including PM10 and PM2.5, CO, NO2 and O3.

Existing air quality conditions in the project area can be characterized in terms of the AAQS that the State of California and the federal government have established for several different pollutants. For some pollutants, separate standards have been set for different measurement periods. Most standards have been set to protect public health. For some pollutants, standards have been based on other values (such as protection of crops, protection of materials, or avoidance of nuisance conditions). Table 1 shows the state and federal standards for a variety of pollutants.

Table 1. California and National Ambient Air Quality Standards Pollutant Averaging Time CAAQSa NAAQSb
Ozone (O3)
c 1 hour 0.09 ppmd
--
8 hour 0.070 ppm 0.075 ppm
Carbon Monoxide (CO) 1 hour 20 ppm 35 ppm
8 hour 9.0 ppm 9 ppm
Nitrogen Dioxide (NO2)
e 1 hour 0.18 ppm 100 ppb
Annual 0.030 ppm 53 ppb
Sulfur Dioxide (SO2)
e 1 hour 0.25 ppm 75 ppb
3 hour -- 0.5 ppm
24 hour 0.04 ppm --
Inhalable Particulate Matter (PM10) 24 hour 50 µg/m3c 150 µg/m3 Annual 20 µg/m3 --
Fine Particulate Matter (PM2.5) 24 hour -- 35 µg/m3
Annual 12 µg/m3 15.0 µg/m3
Sulfates 24 hour 25 µg/m3 --
Lead (Pb)e,f 30 day 1.5 µg/m3 --
Calendar quarter -- 1.5 µg/m3
Rolling 3-month average -- 0.15 µg/m3
Hydrogen Sulfide 1 hour 0.03 ppm --
Vinyl Chloride 24 hour 0.01 ppm --
Notes:
a The California ambient air quality standards for O3, CO, SO2 (1-hour and 24-hour), NO2, PM10, and PM2.5 are values not to be exceeded. All other California standards shown are values not to be equaled or exceeded. b The national ambient air quality standards, other than O3 and those based on annual averages, are not to be exceeded more than once a year. The O3 standard is attained when the expected number of days per calendar year with maximum hourly average concentrations above the standard is equal to or less than one. c U.S. EPA promulgated new national O3 standards in July 1997. In April 2004, U.S. EPA made area designations for the new national 8-hour O3 standard. The national 1-hour O3 standard was revoked effective June 15, 2005. d ppm = parts per million by volume; ppb = parts per billion by volume; µg/m3 = micrograms per cubic meter. e NAAQS for NO2, SO2, and Pb were changed in 2008-2010 for the first time since the 1990 Federal CAAA.

Implementation through designation of new nonattainment areas will start in 2010-1011 for Pb and 2012 onward for NO2 and SO2. f
CARB staff submitted recommended area designations for the revised federal Pb standard to U.S. EPA on October 15, 2009. It was recommended that the Los Angeles County portion of the South Coast Air Basin be designated nonattainment.

Source: California Air Resources Board, September 8, 2010.

EXHIBIT 2
City Council 22 – 694 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
11 The existing air quality conditions in the area of proposed project can be characterized by monitoring data collected at this station. Table 2 presents air monitoring data from the Anaheim-Pampas monitoring station.

Table 2. Ambient Air Quality Monitoring Data Collected from the Anaheim-Pampas (ARB Station No. 30178) Monitoring Station
Pollutant Standards 2008 2009 2010
Ozone (O3)
Maximum 1-hour concentration (ppm) 0.105 0.093 0.104
Maximum 8-hour concentration (ppm) 0.086 0.077 0.088
Number of Days Standard Exceeded
CAAQS 1-hour (>0.09 ppm) 2 0 1
NAAQS 8-hour (>0.075 ppm) 5 1 1
Carbon Monoxide (CO)
Maximum 8-hour concentration (ppm) 3.44 2.73 1.98
Number of Days Standard Exceeded
NAAQS/CAAQS 8-hour (>9.0 ppm) 0 0 0
Nitrogen Dioxide (NO2)
Maximum 1-hour concentration (ppm) 0.093 0.068 0.073
Annual average concentration (ppm); CAAQS = 0.030 ppm 0.020 0.018 0.018 Number of Days Standard Exceeded
NAAQS 1-hour (>0.100 ppm) 0 0 0
Particulate Matter (PM10)
National maximum 24-hour concentration (g/m3
) 61 63 43
National second-highest 24-hour concentration (g/m3) 59 49 42 State maximum 24-hour concentration (g/m3
) 61 62 43
State second-highest 24-hour concentration (g/m3) 58 49 42 Nationalc
annual average concentration (g/m3) 28.6 30.9 22.5
Stated
annual average concentration (g/m3) NA NA NA
Number of Days Standard Exceeded
CAAQS 24-hour (>50 g/m3
) 3 1 0
NAAQS 24-hour (>150 g/m3
) 0 0 0
Particulate Matter (PM2.5)
National maximum 24-hour concentration (g/m3
) 67.8 64.5 31.7
National second-highest 24-hour concentration (g/m3
) 39.4 43.0 31.3
National third-highest 24-hour concentration (g/m3
) 39.2 36.7 30.6
National fourth-highest 24-hour concentration (g/m3
) 37.3 36.6 30.3
National annual average concentration (g/m3) NA 12.0 10.5 State annual average concentration (g/m3
) NA NA NA
Number of Days Standard Exceeded
NAAQS 24-hour (>35 g/m3) 5 5 0
Notes:

CAAQS = California ambient air quality standards.

NAAQS = National ambient air quality standards.

NA = Insufficient data available to determine the value/Data not available.

Sources: California Air Resources Board; compiled by ICF International, August 2010.

As shown in Table 3, the 8-hour O3 concentration exceeded the federal standard five times in 2008, with one violation each in years 2009 and 2010. In addition, PM10 and PM2.5 concentrations have exceeded EXHIBIT 2
City Council 22 – 695 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
12 state and federal standards multiple times during the three-year reporting period. CO and NO2 concentrations remained below state and federal standards during the three-year reporting period.

If a pollutant concentration is lower than the state or federal standard, the area is classified as being in attainment for that pollutant. If a pollutant violates the standard, the area is considered a nonattainment area. If data are insufficient to determine whether a pollutant is violating the standard, the area is designated unclassified. The State of California has designated the SCAB as being a nonattainment area for ozone, NO2, PM2.5, and PM10. The federal EPA has designated this area as being a nonattainment area for O3 (8-hour standard), PM10 and PM2.5 (see Table 3).

Table 3. Attainment Status for Orange County Portion of South Coast Air Basin Pollutants Federal Classification State Classification
O3 (1-hour standard) — Extreme Nonattainment
O3 (8-hour standard) Nonattainment, Extreme Nonattainment PM10 Nonattainment, Serious Nonattainment
PM2.5 Nonattainment Nonattainment
CO Attainment/Maintenance Attainment
NO2 Attainment/Maintenance Nonattainment
SO2 Attainment Attainment
Source: California Air Resources Board and EPA; compiled by ICF International, November 2011.

2.1.4 Transportation Conformity Rule
The concept of transportation conformity was introduced in the 1977 federal CAA, which includes a provision to ensure that transportation investments conform to the SIP for meeting the national ambient air quality standards (NAAQS). Conformity requirements were made substantially more rigorous in the federal CAA amendments of 1990, and the transportation conformity regulation that details implementation of the conformity requirements was first issued in November 1993, though the requirements have been amended many times. The most recent complete set of amendments to the Transportation Conformity Rule is found at 40 Code of Federal Regulations (CFR) parts 51 and 93 (August 15, 1997). Additionally, on July 1, 2004, EPA published a set of the Transportation Conformity Rule Amendments, amending the August 1997 regulations, in Federal Register (FR) Volume 69 No. 26.

The new amendments provide regulations for the new 8-hour O3 and PM2.5 NAAQS.

EXHIBIT 2
City Council 22 – 696 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
13 Chapter 3 Regulatory Framework
The proposed project is located in the South Coast Air Basin (SCAB or Basin). The SCAQMD has jurisdiction over air quality issues throughout the air basin. It administers air quality regulations developed at the federal, state, and local levels. Federal, state, and local air quality regulations applicable to the proposed project are described below.

3.1 Federal Clean Air Act
The federal Clean Air Act (CAA), enacted in 1970 and amended twice thereafter (including the 1990 amendments), establishes the framework for modern air pollution control. The act directs the EPA to establish ambient air standards for six pollutants: ozone, carbon monoxide, lead, nitrogen dioxide, particulate matter, and sulfur dioxide. The standards are divided into primary and secondary standards; the former are set to protect human health within an adequate margin of safety and the latter to protect environmental values, such as plant and animal life.

The federal CAA requires states to submit a state implementation plan (SIP) for areas designated as nonattainment for federal air quality standards. The SIP, which is reviewed and approved by EPA, must demonstrate how the federal standards will be achieved. Failing to submit a plan or secure approval could lead to denial of federal funding and permits. In cases where the SIP is submitted by the state but fails to demonstrate achievement of the standards, EPA is directed to prepare a federal implementation plan.

3.1.1 Mobile Source Air Toxics
The federal CAA identified 188 pollutants as being air toxics, which are also known as hazardous air pollutants (HAP). From this list, EPA identified a group of 21 as MSATs in its final rule, Control of Emissions of Hazardous Air Pollutants from Mobile Sources (66 FR 17235) in March 2001. From this list of 21 MSATs, EPA identified six priority MSATs: benzene, formaldehyde, acetaldehyde, diesel particulate matter/diesel exhaust organic gases, acrolein, and 1,3-butadiene. To address emissions of MSATs, EPA has issued a number of regulations that will dramatically decrease MSATs through cleaner fuels and cleaner engines.

The area of air toxics analysis is a new and emerging issue and is a continuing area of research. Although much work has been done to assess the overall health risk of air toxics, many questions remain unanswered. In particular, the tools and techniques available for assessing project-specific health impacts from MSATs are limited. Given the emerging state of the science and of project-level analysis techniques, there are no established criteria for determining when MSAT emissions should be considered a significant issue in the NEPA context. FHWA is currently preparing guidance as to how mobile-source health risks should factor into project-level decision making under NEPA. In addition, EPA has not established regulatory concentration targets for the six relevant MSAT pollutants appropriate for use in the project development process. In light of the recent development regarding MSATs, FHWA has issued interim guidance for the assessment of MSATs in NEPA documents.

EXHIBIT 2
City Council 22 – 697 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
14 3.2 California Clean Air Act
Responsibility for achieving the California ambient air quality standards (CAAQS), which are more stringent than federal standards, is placed on the California Air Resources Board (ARB) and local air pollution control districts. State standards are to be achieved through district-level air quality management plans that are incorporated into the SIP.

The California CAA requires local and regional air pollution control districts that are not attaining one or more of the CAAQS for ozone, CO, SO2, or NO2 to expeditiously adopt plans specifically designed to attain these standards. Each plan must be designed to achieve an annual 5% reduction in district-wide emissions of each nonattainment pollutant or its precursors.

Recently enacted amendments to the California CAA impose additional requirements that are designed to ensure an improvement in air quality within the next 5 years. More specifically, local districts with moderate air pollution that did not achieve “transitional nonattainment” status by December 31, 1997, must implement the more stringent measures applicable to districts with serious air pollution.

3.3 South Coast Air Quality Management District
The air quality management agencies of direct importance to the Basin include EPA, ARB, and the SCAQMD. EPA has established federal AAQS for which ARB and the SCAQMD have primary implementation responsibility. ARB and the SCAQMD are also responsible for ensuring that state AAQS are met. SCAG develops the Regional Transportation Plan (RTP) in consultation with local air management districts. The RTP includes projects that strive to meet the goals and objectives of the NAAQS. The RTP is also in accord with EPA’s Transportation Conformity Rule as it pertains to air quality standards in the County.

With regard to the proposed project, it is exempt from the requirement to determine conformity under the Safety heading in 40 CFR 93.126 (railroad/highway crossing). As such, it can be concluded that the project’s operational emissions (which include the ozone precursors ROG and NOX) meet the transportation conformity requirements imposed by the EPA and SCAQMD. 40 CFR 93.126 also exempts the project from the requirement to undergo project-level conformity analysis.

EXHIBIT 2
City Council 22 – 698 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
15 Chapter 4 Monitored Air Quality

4.1 Carbon Monoxide
CO is a public health concern because it combines readily with hemoglobin and reduces the amount of oxygen transported in the bloodstream. CO can cause health problems such as fatigue, headache, confusion, dizziness, and even death.

Motor vehicles are the dominant source of CO emissions in most areas. High CO levels develop primarily during winter when periods of light winds combine with the formation of ground-level temperature inversions (typically from the evening through early morning). These conditions result in reduced dispersion of vehicle emissions. Motor vehicles also exhibit increased CO emission rates at low air temperatures.

State and federal CO standards have been set for one-hour and eight-hour averaging times. The state onehour standard is 20 ppm by volume, whereas the federal one-hour standard is 35 ppm. Both the state and federal standard for the eight-hour averaging period is nine ppm.

4.2 Ozone
Ozone is a respiratory irritant that increases susceptibility to respiratory infections. It is also an oxidant that can cause substantial damage to vegetation and other materials.

Ozone, which is a regional pollutant, is not emitted directly into the air but is formed by a photochemical reaction in the atmosphere. Ozone precursors, which include ROG and NOX, react in the atmosphere in the presence of sunlight to form ozone. Because photochemical reaction rates depend on the intensity of ultraviolet light and air temperature, ozone is primarily a summer air pollution problem. In addition, photochemical reactions take time to occur, so high ozone levels often occur downwind of the emission source.

The EPA revoked the federal one-hour ozone standard on June 15, 2005; however, the new federal eighthour ozone standard was promulgated effective from that same date. A state standard for ozone has been established for the one-hour and eight-hour averaging times. The state one-hour and eight-hour ozone standards are 0.09 parts per million (ppm) and 0.070 ppm, respectively, not to be exceeded. The federal eight-hour ozone standard is 0.075 ppm and is not to be exceeded more than three times in any three-year period.

On April 15, 2004, EPA released its list of eight-hour ozone nonattainment areas, together with the deadline for each nonattainment area to attain the standard. Areas with the highest eight-hour concentrations and the greatest number of days exceeding the new standard were given the longest time to reach attainment. The SCAB is classified as Nonattainment Severe-17.

EXHIBIT 2
City Council 22 – 699 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
16 4.3 Nitrogen Dioxide
Nitrogen oxides (NOX) are a family of highly reactive gases that are primary precursors to the formation of ground-level ozone, reacting in the atmosphere to form acid rain. Nitrogen oxide is emitted from the use of solvents and combustion processes in which fuel is burned at high temperatures, principally from motor vehicle exhaust and stationary sources such as electric utilities and industrial boilers. A brownish gas, nitrogen dioxide (NO2) is a strong oxidizing agent that reacts in the air to form corrosive nitric acid, as well as toxic organic nitrates.

Nitrogen oxides can irritate the lungs, cause lung damage, and lower resistance to respiratory infections such as influenza. The effects of short-term exposure are still unclear, but continued or frequent exposure to concentrations that are typically much higher than those normally found in the ambient air may cause increased incidence of acute respiratory illness in children. Health effects associated with NOX are an increase in the incidence of chronic bronchitis and lung irritation. Chronic exposure to NO2 may lead to eye and mucus membrane aggravation along with pulmonary dysfunction. Nitrogen oxides can cause fading of textile dyes and additives, deterioration of cotton and nylon, and corrosion of metals due to production of particulate nitrates. Airborne NOX can also impair visibility. Nitrogen dioxide is a major component of acid deposition in California. Nitrogen oxides may affect both terrestrial and aquatic ecosystems. Nitrogen oxides in the air are a potentially significant contributor to a number of environmental effects such as acid rain and eutrophication in coastal waters. Eutrophication occurs when a body of water suffers an increase in nutrients that reduces the amount of oxygen in the water, producing an environment that is destructive to fish and other animal life.

4.4 Sulfur Oxides
Oxides of sulfur (SOX) gases are a family of colorless, pungent gases, which include SO2 and are formed primarily by combustion of sulfur-containing fossil fuels (mainly coal and oil), metal smelting, and other industrial processes. Oxides of sulfur can react to form sulfates, which significantly reduce visibility.

Oxides of sulfur are a precursor to particulate matter formation, which is in nonattainment in the proposed project area.

The major health concerns associated with exposure to high concentrations of SOX include effects related to breathing, respiratory illness, alterations in pulmonary defenses, and aggravation of existing cardiovascular disease. Major subgroups of the population that are most sensitive to SOX include individuals with cardiovascular disease or chronic lung disease (such as bronchitis or emphysema), as well as children and the elderly. Emissions of SOX also can damage the foliage of trees and agricultural crops. Together, SOX and NOX are the major precursors to acid rain, which is associated with the acidification of lakes and streams and accelerated corrosion of buildings and monuments.

4.5 Inhalable Particulate Matter
Particulates can damage human health and retard plant growth. Health concerns associated with suspended particulate matter focus on those particles small enough to reach the lungs when inhaled.

Particulates also reduce visibility and corrode materials.

Particulate emissions are generated by a wide variety of sources, including industrial emissions, dust suspended by vehicle traffic and construction equipment, and secondary aerosols formed by reactions in the atmosphere.

EXHIBIT 2
City Council 22 – 700 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
17 The federal and state AAQS for particulate matter apply to two classes of particulates: PM2.5 and PM10.

The federal PM2.5 standards are 15 micrograms per cubic meter (µg/m3 ) for the annual average and
35 µg/m3
for the 24-hour average. On June 20, 2002, the ARB adopted a new annual PM2.5 standard of 12 µg/m3
. The federal PM10 standard is 150 µg/m3 as a 24-hour average. The state PM10 standards are 50 µg/m3
as a 24-hour average and 20 µg/m3 as an annual geometric mean. EPA released its final nonattainment area designations for PM2.5 on January 5, 2005 (70 FR 943). The first federal conformity determination for PM2.5 (for the 2004 SCAG RTP) was issued on March 30, 2006.

4.6 Lead
Lead is a metal that is a natural constituent of air, water, and the biosphere. Lead is neither created nor destroyed in the environment, so it essentially persists forever. Lead was used several decades ago to increase the octane rating in automotive fuel. Since gasoline-powered automobile engines were a major source of airborne lead through the use of leaded fuels and the use of leaded fuel has been mostly phased out, the ambient concentrations of lead have dropped dramatically.

Short-term exposure to high levels of lead can cause vomiting, diarrhea, convulsions, coma, or even death. However, even small amounts of lead can be harmful, especially to infants, young children, and pregnant women. Symptoms of long-term exposure to lower lead levels may be less noticeable but are still serious. Anemia is common, and damage to the nervous system may cause impaired mental function.

Other symptoms are appetite loss, abdominal pain, constipation, fatigue, sleeplessness, irritability, and headache. Continued excessive exposure, as in an industrial setting, can affect the kidneys.

Lead exposure is most serious for young children because they absorb lead more easily than adults and are more susceptible to its harmful effects. Even low-level exposure may harm the intellectual development, behavior, size, and hearing of infants. During pregnancy, especially in the last trimester, lead can cross the placenta and affect the fetus. Female workers exposed to high levels of lead have more miscarriages and stillbirths.

4.7 Toxic Air Contaminants
Although AAQS exist for criteria pollutants, no ambient standards exist for toxic air contaminants (TACs). Many pollutants are identified as TACs because of their potential to increase the risk of developing cancer or because of their acute or chronic health risks. For TACs that are known or suspected carcinogens, the ARB has consistently found that there are no levels or thresholds below which exposure is risk-free. Individual TACs vary greatly in the risk each presents. At a given level of exposure, one TAC may pose a hazard that is many times greater than another. For certain TACs, a unit risk factor can be developed to evaluate cancer risk. For acute and chronic health risks, a similar factor, called a Hazard Index, is used to evaluate risk.

In the early 1980s, the ARB established a statewide comprehensive air toxics program to reduce exposure to air toxics. The Toxic Air Contaminant Identification and Control Act (Assembly Bill [AB] 1807) created California’s program to reduce exposure to air toxics. The Air Toxics “Hot Spots” Information and Assessment Act (AB 2588) supplements the AB 1807 program by requiring a statewide air toxics inventory, notification of people exposed to a significant health risk, and facility plans to reduce these risks.

EXHIBIT 2
City Council 22 – 701 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
18 4.8 Naturally Occurring Asbestos
Naturally occurring asbestos (NOA) is present in approximately 44 of California’s 58 counties. Asbestos is often found in serpentine rock and ultramafic rock near fault zones. Asbestos is a human health hazard when airborne. Asbestos fibers can be inhaled into lungs, causing inflammation and respiratory ailments and cancers. A General Location Guide for Ultramafic Rock in California (Department of Conservation 2000) indicates that there is no naturally occurring asbestos located near or on the project site.

EXHIBIT 2
City Council 22 – 702 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
19 Chapter 5 Potential Air Quality Impacts

5.1 Assessment Methodology
The proposed project would generate construction-related and operational emissions. The methodology used to evaluate construction and operational effects is described below.

5.1.1 Construction-Period Impact Assessment Methodology Construction is a source of fugitive dust and exhaust emissions that can have substantial temporary impacts on local air quality (i.e., exceed state air quality standards for PM2.5 and PM10). Such emissions would result from earthmoving and use of heavy equipment, as well as land clearing, ground excavation, cut-and-fill operations, and the construction of roadways. Dust emissions can vary substantially from day to day, depending on the level of activity, the specific operations, and the prevailing weather. A major portion of dust emissions for the proposed project would likely be caused by construction traffic on temporary construction roads.

Construction-period emission estimates have not been included in this report because Caltrans’policy is to require implementation of effective and comprehensive control measures rather than detailed quantification of emissions. Experience has shown that several feasible control measures can be reasonably implemented to reduce exhaust and fugitive PM2.5 and PM10 emissions during construction.

5.1.2 Operational-Period Impact Assessment Methodology
With respect project-level, localized emissions, the primary pollutants of concern are CO and particulates (PM2.5 and PM10). The ozone precursor pollutants (ROG and NOX) are a regional concern, and are not evaluated at the localized level. The effects of CO emissions were evaluated using Caltrans’ CO protocol (Garza et al. 1997). The effects of particulate PM2.5 and PM10 emissions were evaluated in accordance with the March 2006 FHWA guidance.

5.1.2.1 Carbon Monoxide Modeling Protocol—Screening Procedure Caltrans, in coordination with the University of California, Davis, Institute of Transportation Studies, has developed a transportation project-level CO protocol (Garza et al. 1997). This CO protocol details a qualitative step-by-step screening procedure to determine if project-related CO concentrations have a potential to generate new air quality violations, worsen existing violations, or delay attainment of NAAQS for CO. If the screening procedure reveals that such a potential may exist, then the CO protocol details a quantitative method to ascertain project-related CO impacts.

5.1.2.2 PM10 and PM2.5 Evaluation Protocol—Screening Procedure During March 2006, EPA issued a guidance document titled Transportation Conformity Guidance for Qualitative Hot-Spot Analyses in PM2.5 and PM10 Nonattainment and Maintenance Areas. This guidance details a qualitative step-by-step screening procedure to determine if project-related particulate emissions EXHIBIT 2
City Council 22 – 703 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
20 have a potential to generate new air quality violations, worsen existing violations, or delay attainment of NAAQS for PM2.5 or PM10.

5.1.2.3 Mobile-Source Air Toxics—Screening Procedure
The FHWA has issued interim guidance on how MSATs should be addressed in NEPA documents for highway projects and has developed a tiered approach for analyzing MSATs in NEPA documents.

Depending on the specific project circumstances, FHWA has identified three levels of analysis:

1. no analysis for exempt projects or projects with no potential for meaningful MSAT effects,

2. qualitative analysis for projects with low-potential MSAT effects, or

3. quantitative analysis to differentiate alternatives for projects with higher potential MSAT effects.

Because the proposed project is exempt per 40 CFR 93.126, no meaningful MSAT effects are anticipated.

5.2 Project Avoidance and Minimization Measures

5.2.1 Construction-Period Effects

5.2.1.1 Criteria Pollutant Emissions during Construction Construction is a source of fugitive dust and exhaust emissions that can have substantial temporary impacts on local air quality (i.e., exceed state air quality standards for PM2.5 and PM10). Such emissions would result from earthmoving and use of heavy equipment, as well as land clearing, ground excavation, cut-and-fill operations, and the construction of roadways. Dust emissions can vary substantially from day to day, depending on the level of activity, the specific operations, and the prevailing weather. A major portion of dust emissions for the proposed project would likely be caused by construction traffic on temporary construction roads.

While construction activities would contribute to an increase of criteria pollutant emissions, such emissions would be temporary and would cease upon completion of construction activities. Constructionperiod emission estimates have not been included in this report because Caltrans’ policy is to require implementation of effective and comprehensive control measures rather than detailed quantification of emissions. Experience has shown that several feasible control measures can be reasonably implemented to reduce exhaust and fugitive PM2.5 and PM10 emissions during construction. Therefore, the proposed project would have no negative short-term, construction impacts to localized or regional air quality.

Exhaust Emissions
The project would conform to Caltrans’ construction requirements, as specified in the Caltrans’ Standard Specifications, Section 7-1.01F (Air Pollution Control): “The Contractor shall comply with all air pollution control ordinances and statutes which apply to any work performed pursuant to the contract, including any air pollution control rules, regulations, ordinances and statutes, specified in Section 11017 of the Government Code.”
Particulate Emissions
SCAQMD Rule 403 (Fugitive Dust) requires that fugitive dust control measures be applied to all construction projects in the SCAB, unless said project is specifically exempted by the rule. Construction EXHIBIT 2
City Council 22 – 704 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
21 projects that are classified as “large operations” (i.e., 20 hectares [50 acres] or larger) are required to submit a fully executed Large Operation Notification Form (Form 403 N) to the Executive Office of the SCAQMD within seven days of qualifying as a large operation and to maintain daily records to document the specific control actions taken. The control measures incorporated in the Rule are available in a Rule 403 Implementation Handbook. The proposed project, although not a large operation under the Rule’s definition would be required to implement measures for each source of PM10 emissions, as specified in the Rule that is included in the Air Quality Appendix.

The implementation of exhaust and fugitive dust emission control measures identified above would avoid and/or minimize any impacts to air quality.

5.2.1.2 Diesel Particulate-Related Health Risk during Construction SCAQMD does not consider diesel-related cancer risks from construction equipment to be an issue due to the short-term nature of construction activities. Construction activities associated with the proposed project would be sporadic, transitory, and short term in nature. The assessment of cancer risk is typically based on a 70-year exposure period. Because exposure to diesel exhaust would be well below the 70-year exposure period, construction of the proposed project is not anticipated to result in an elevated cancer risk to exposed persons due to the short-term nature of construction. Consequently, the estimation of diesel risks associated with construction activities would have no effect on humans.

5.2.2 Operations-Period Effects

5.2.2.1 Regional Conformity Assessment
The federal Clean Air Act Amendments of 1990 require that projects conform to the SIP and that direct and indirect emissions resulting from federal actions or funding do not produce new air quality violations or worsen existing violations. The federal CCA specifically instructs the EPA to develop guidelines for identifying when vehicle-related projects can increase local concentrations of CO, PM10 and PM2.5 by altering traffic patterns. Transportation conformity requirements apply only to emissions after completion of a project; they do not apply to construction impacts.

The federal EPA issued two sets of conformity procedure rules in November 1993. Transportation conformity procedures generally apply to highway and transit development and require that transportation plans, programs, and projects that are funded or approved under Title 23 USC or the Federal Transit Act conform to state or federal air quality plans. General conformity procedures apply to all other types of development. Transportation conformity procedures require more detailed analysis for transportation projects than those required for nontransportation projects receiving federal funds or approval. The SCAQMD adopted the EPA’s conformity rules as its own in its Regulation XX.

In addition to 1) demonstrating that a proposed project has been identified in an approved RTIP and incorporated in an EPA-approved SIP or 2) demonstrating that a proposed project is exempt from conformity requirements, agencies constructing transportation projects must demonstrate that they do not exacerbate an existing violation of an NAAQS or create a new exceedance. The proposed project is exempt from the requirement to determine conformity under the Safety heading in 40 CFR 93.126 (railroad/highway crossing). As such, no adverse effects to regional air quality are anticipated.

EXHIBIT 2
City Council 22 – 705 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
22 5.2.2.2 Localized CO Hot-Spot Evaluation
The proposed project was evaluated using the CO analysis protocol, described in Section 5.1.2 above. The CO protocol includes two flowcharts that illustrate when a detailed CO analysis needs to be prepared. The referenced flowcharts are included in the Air Quality Appendix.

The questions in the first flowchart relevant to the proposed project and the answers to those questions are as follows. The answers presented for both flowcharts would be the same for either build alternative.

Flowchart 1 Question 3.1.1: Is the project exempt from all emissions analyses? Response: Yes, the proposed project qualifies for an exemption. As shown in Table 1 of the CO protocol (provided in the Air Quality Appendix), the proposed project falls under the category of “Safety, Railroad/highway crossing” that is exempt from all emissions analysis.

Per the Caltrans CO protocol analysis methodology and flowchart, no further analysis is needed. Potential localized CO impacts would be less than significant.

5.2.2.3 Localized PM2.5 and PM10 Hot-Spot Evaluation
Although the proposed project is exempt from the requirement to demonstrate conformity per 40 CFR

93.126, the following analysis nonetheless compares proposed project emissions to localized PM conformity evaluation criteria.

While most projects create particulate emissions during construction, construction activities lasting 5 years or less are considered temporary impacts under the EPA transportation conformity rule and are exempt. It is expected that this project would be completed in less than five years. As such, hot-spot review is therefore limited to operational impacts.

With respect to operations-period emissions, the EPA’s transportation conformity rules stipulate that transportation projects considered a Project of Air Quality Concern “POAQC,” or any other project that is identified by the PM2.5 SIP as a localized air quality concern, must undergo hot-spot analysis in PM2.5 nonattainment and maintenance areas. EPA defines a POAQC as certain highway and transit projects that involve significant levels of diesel traffic or any other project that is identified by the PM2.5 SIP as a localized air quality concern. A discussion of the proposed project compared to projects of air quality concern, as defined by 40 CFR 93.123(b)(1), is provided below.

1. New or expanded highway projects that have a significant number of or significant increase in diesel vehicles. Per the traffic impact analysis (AECOM 2011), there would be no meaningful difference in total traffic volumes or truck traffic volumes along Santa Ana Boulevard under the build alternative when compared to no build.

2. Projects affecting intersections that are at level –of –service (LOS) D, E, or F with a significant number of diesel vehicles or those that will change to LOS D, E, or F because of increased traffic volumes from a significant number of diesel vehicles related to the project. The proposed project is anticipated to have no effect on local truck volumes under the build alternative when compared to no build.

3. New bus and rail terminals and transfer points that have a significant number of diesel vehicles congregating at a single location. The proposed project has no bus or rail terminal component, nor would it alter travel patterns to/from any existing bus or rail terminal.

EXHIBIT 2
City Council 22 – 706 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
23 4. Expanded bus and rail terminals and transfer points that significantly increase the number of diesel vehicles congregating at a single location. The proposed project would not expand any bus terminal, rail terminal, or related transfer point that would increase the number of diesel vehicles congregating at any single location.

5. Projects in or affecting locations, areas, or categories of sites that are identified in the PM2.5- or PM10-applicable implementation plan or implementation plan submission, as appropriate, as sites of violation or possible violation. The project site is not in or affecting an area or location identified in any PM10 or PM2.5 implementation plan. The immediate project area is not considered to be a site of violation or possible violation.

The discussion provided above indicates that the proposed project would not be considered a POAQC, as defined by 40 CFR 93.123(b)(1). Therefore, PM2.5 and PM10 hot-spot evaluations are not required. It is unlikely that the proposed project would generate new air quality violations, worsen existing violations, or delay attainment of national AAQS for PM2.5 and PM10. Clean Air Act, 40 CFR Part 93.116, requirements are met without any explicit hot-spot analysis; and as such, the proposed project can be screened from further analysis.

5.2.2.4 Evaluation of Health Effects Related to Mobile-Source Air Toxics (MSAT) With respect to the proposed project, there would be no meaningful change in traffic volumes under build alternative when compared to no build (AECOM 2011). As such, the proposed project would have no MSAT effects relative to proposed project improvements. In addition, projects that are exempt from conformity requirements under the Clean Air Act pursuant to 40 CFR 93.126 require no analysis or discussion of MSAT emissions.

The purpose of this project is to reduce the congestion and inconvenience caused by an existing at-grade railroad crossing facility by constructing a new, grade-separated facility. This project has been determined to generate minimal air quality impacts for CAAA criteria pollutants and has not been linked with any special MSAT concerns. As such, this project will not result in changes in traffic volumes, vehicle mix, basic project location, or any other factor that would cause an increase in MSAT impacts of the project from that of the no-build alternative.

Moreover, EPA regulations for vehicle engines and fuels will cause overall MSAT emissions to decline significantly over the next several decades. Based on regulations now in effect, an analysis of national trends with EPA's MOBILE6.2 model forecasts a combined reduction of 72 percent in the total annual emission rate for the priority MSAT from 1999 to 2050 while vehicle-miles of travel are projected to increase by 145 percent. This will both reduce the background level of MSAT as well as the possibility of even minor MSAT emissions from this project.

EXHIBIT 2
City Council 22 – 707 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
24 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 708 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
25 Chapter 6 Conclusions
As demonstrated in this report, the proposed project would not result in substantial negative impacts to localized or regional air quality. This determination is based on the following:
 during project construction, the implementation of exhaust and fugitive dust emission control measures would avoid and/or minimize impacts to air quality;  the proposed project, it is exempt from the requirement to determine conformity under the Safety heading in 40 CFR 93.126 (railroad/highway crossing). As such, would meet transportation conformity requirements imposed by EPA and the SCAQMD.
 The proposed qualifies for a statutory exemption under the California Environmental Quality Act (CEQA) per Section 15282(g);
 Caltrans’ CO protocol screening procedure demonstrated that the project would not have a material effect on localized CO concentrations;
 the proposed project is not considered a project of air quality concern, as defined by 40 CFR

93.123(b)(1), and as such, a qualitative PM2.5/PM10 hot-spot evaluation is not required. It is unlikely that the proposed project would generate new air quality violations, worsen existing violations, or delay attainment of NAAQS for PM2.5 or PM10; and
 the proposed project was found to have no potential for significant MSAT emissions (using FHWA guidance) and is not linked with any special MSAT concern.

EXHIBIT 2
City Council 22 – 709 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
26 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 710 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
27 Chapter 7 References
AECOM. 2011. Traffic Volume Summary Tables prepared for Santa Ana Boulevard Grade Separation Project. December.

Benson, Paul. 1984 (revised 1989). CALINE4 – A Dispersion Model for Prediction Air Pollutant Concentrations Near Roadways. November.

California Air Resources Board. 2010. Top 4 Measurements and Days above the Standard. Available:
<http://www.arb.ca.gov/adam/cgi-bin/db2www/adamtop4.d2w/start>. Accessed: November 2011.

Department of Conservation, Division of Mining and Geology. 2000. A General Location Guide for Ultramafic Rock in California—Areas More Likely to Contain Naturally Occurring Asbestos. August.

Garza, V. J., P. Graney, and D. Sperling. 1997. Transportation Project-Level Carbon Monoxide Protocol.

December. Davis, CA.

National Park Service, Malm, William C. 1999. Introduction to Visibility. May.

South Coast Air Quality Management District. 1999. Draft Final Report: Multiple Air Toxics Exposure Study in the South Coast Air Basin, (MATES-II). November.

U.S. Environmental Protection Agency. 2006. Transportation Conformity Guidance for Qualitative HotSpot Analyses in PM2.5 and PM10 Nonattainment and Maintenance Areas. March. ———. 2009. Interim Guidance Update on Air Toxic Analysis in NEPA Documents. September.

EXHIBIT 2
City Council 22 – 711 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
28 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 712 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
29 Chapter 8 Preparers
Keith Cooper ICF International, Senior Air Quality and Climate Change Analyst 14 Years Experience
Education: B.S., Business Administration, California State University, Dominguez Hills, 1999; Graduate Study, University of California, Los Angeles.

Nickolas Dreves ICF International, Air Quality and Climate Change Analyst 7 Years Experience
Education: B.A., Economics and Public Policy Analysis, Pomona College, Claremont CA, 2005.

EXHIBIT 2
City Council 22 – 713 5/5/2026
Santa Ana Boulevard Grade Separation Project
Air Quality Assessment Report
30 This page intentionally left blank.

EXHIBIT 2
City Council 22 – 714 5/5/2026
Appendix A SCAG Adopted 2011 FTIP

EXHIBIT 2
City Council 22 – 715 5/5/2026
EXHIBIT 2
City Council 22 – 716 5/5/2026
Print Date: 12/21/2011 9:32:35 AM Page: 12 of 36
CITY FUNDS 18 18 18 18
RECREATIONAL TRAILS 16 116 132 132 132
ORA100603 Total 34 116 150 150 150
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment ORA100603 Orange SCAB REG0704 NCN25 L EXEMPT - 93.126 0 Fund ENG R/W CON Total Prior 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total

SANTA ANA RIVER TRAIL FAIRVIEW TRIANGLE HABITAT RESTORATION PROJECT IMPROVEMENTS FOR AND ALONG THE SANTA ANA RIVER TRAIL Description: PTC 150 Agency SANTA ANA
CITY FUNDS 55 55 55 55
RECREATIONAL TRAILS 103 103 103 103
ORA100501 Total 158 158 158 158
Fund ENG R/W CON Total Prior 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment THORTON PARK RECREATION TRAIL REFURBISHMENT. INCLUDING REGRADING, REPLACE ASPHALT & CONCRETE, INSTALLATION OF EDGING.

Description: PTC 158 Agency SANTA ANA
ORA100501 Orange SCAB ORA100501 NCR25 L EXEMPT - 93.126 0 ORANGE M - TRANSIT 170 170 170 170
STP LOCAL - REGIONAL 1,330 1,330 1,330 1,330
ORA082610 Total 1,500 1,500 1,500 1,500
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment ORA082610 Orange SCAB 2TR0704 CAN61 L EXEMPT - 93.126 0 Fund ENG R/W CON Total Prior 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total Santa Ana Blvd Grade Separation - Near the Expansion of the Santa Ana Regional Transportation Center. (SARTIC) Initial planning and conceptual engineering phase. related to ORA81621 Description: PTC 1,671 Agency SANTA ANA
STP ENHANCE-IIP TEA 38 311 349 349 349
CITY FUNDS 12 103 115 115 115
ORA001120 Total 50 414 464 464 464
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment ORA001120 Orange SCAB 2L224 NCN84 L EXEMPT - 93.126 0
Fund ENG R/W CON Total Prior 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Total ADJACENT TO PATRICIA LANE SCENIC ENHANCEMENTS (6TH ST AND EASTSIDE) AQUIRE ROW FROM CALTRANS AND LANDSCAPE EMPTY LOT TO CREATE PASSIVE PARK. (STATE TEA SHARE)
Description: PTC 464 Agency SANTA ANA
Local Highway, State Highway, Transit
Orange County - 100% Prior
2011 Federal Transportation Improvement Program
(In 000`s)
Including Amendments 1-15_17 and 19
NOTE: These projects may still require state or federal action other than funding & they are included in the previously obligated list of the 2011 FTIP for this purpose EXHIBIT 2 City Council 22 – 717 5/5/2026
EXHIBIT 2
City Council 22 – 718 5/5/2026
Appendix B Local Climate and Ambient Air
Monitoring Data

EXHIBIT 2
City Council 22 – 719 5/5/2026
EXHIBIT 2
City Council 22 – 720 5/5/2026
Back to:

NOTE:

To print data frame (right side), click on right frame
before printing.
1981 - 2010
Daily Temp. & Precip.

Daily Tabular data (~23 KB)
Monthly Tabular data (~1 KB)
NCDC 1981-2010 Normals (~3
KB)
1971 - 2000
Daily Temp. & Precip.

Daily Tabular data (~23 KB)
Monthly Tabular data (~1 KB)
NCDC 1971-2000 Normals (~3
KB)
1961 - 1990
Daily Temp. & Precip.

Daily Tabular data (~23 KB)
Monthly Tabular data (~1 KB)
NCDC 1961-1990 Normals (~3
KB)
Period of Record
Station Metadata
Station Metadata Graphics
General Climate Summary
Tables
Temperature
Precipitation
Heating Degree Days
Cooling Degree Days
Growing Degree Days
Temperature
Daily Extremes and Averages
Spring 'Freeze' Probabilities
Period of Record Monthly Climate Summary
Period of Record : 4/ 1/1906 to 12/31/2010
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De
Average
Max.

Temperature
(F)

68.0 68.9 70.6 73.0 75.2 78.6 83.5 84.7 83.9 79.4 74.2 68.

Average
Min.

Temperature
(F)

43.0 44.9 46.6 49.9 53.9 57.4 60.8 61.6 59.2 54.5 47.4 43.

Average
Total
Precipitation
(in.)

2.76 3.09 2.23 1.04 0.25 0.06 0.01 0.06 0.23 0.48 1.27 2.3 Average
Total
SnowFall
(in.)

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.

Average
Snow Depth
(in.)
00000000000
Percent of possible observations for period of record.

Max. Temp.: 97.9% Min. Temp.: 97.6% Precipitation: 99.6% Snowfall: 99.6% Snow Depth: 99.6%
Check Station Metadata or Metadata graphics for more detail about data completeness.

Western Regional Climate Center, [email protected]
SANTA ANA FIRE STN, CALIFORNIA - Climate Summary http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca7888 1 of 1 11/11/2011 4:51 PM
EXHIBIT 2
City Council 22 – 721 5/5/2026
WRPLOT View - Lakes Environmental Software
WIND ROSE PLOT:

Anaheim-Pampas station
COMMENTS: COMPANY NAME:

MODELER:

DATE:
11/14/2011
PROJECT NO.:

NORTH
SOUTH

WEST EAST
5%
10%
15%
20%
25%

WIND SPEED
(m/s)
>= 11.1

8.8 - 11.1

5.7 - 8.8

3.6 - 5.7

2.1 - 3.6

0.5 - 2.1
Calms: 0.02%
TOTAL COUNT:
52268 hrs.

CALM WINDS:

0.02%
DATA PERIOD:

Start Date: 1/1/2005 - 00:00
End Date: 12/31/2007 - 23:00
AVG. WIND SPEED:

1.90 m/s
DISPLAY:

Wind Speed
Direction (blowing from)
EXHIBIT 2
City Council 22 – 722 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily Maximum Hourly Ozone Measurements
Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date Measurement Date Measurement Date Measurement
First High: Jun 20 0.105 Sep 26 0.093 Sep 26 0.104
Second High: Oct 29 0.095 Apr 21 0.091 Sep 4 0.085
Third High: Jun 18 0.094 Apr 19 0.088 Sep 25 0.077
Fourth High: Jun 19 0.094 Aug 30 0.084 Jul 1 0.076
# Days Above State Standard: 2 0 1
California Designation Value: 0.10 0.10 0.10
Expected Peak Day Conc.: 0.102 0.098 0.095
# Days Above Nat'l Standard: 0 0 0
National Design Value: 0.105 0.095 0.094
Year Coverage: 99 97 83
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All concentrations are expressed in parts per million.

The national 1-hour ozone standard was revoked in June 2005 and is no longer in effect. Statistics related to the revoked standard are shown in italics or italics .

State exceedances are shown in yellow . Exceedances of the revoked national 1-hour standard are shown in orange .

An exceedance is not necessarily a violation.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Switch: 8-Hour
Ozone PM2.5 PM10 CarbonMonoxide
Nitrogen
Dioxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Hourly Ozone Measurements http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 1 11/11/2011 4:40 PM
EXHIBIT 2
City Council 22 – 723 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily Maximum 8-Hour Ozone Averages
Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date 8-Hr Average Date 8-Hr Average Date 8-Hr Average
National:

First High: Jun 20 0.086 Aug 30 0.077 Sep 26 0.088
Second High: Jun 21 0.080 Apr 21 0.073 Oct 10 0.066
Third High: Jun 19 0.077 Aug 29 0.069 Sep 4 0.062
Fourth High: May 17 0.076 Apr 19 0.068 Apr 25 0.060
California:

First High: Jun 20 0.086 Aug 30 0.077 Sep 26 0.088
Second High: Jun 21 0.081 Apr 21 0.074 Oct 10 0.066
Third High: May 17 0.077 Apr 19 0.069 Sep 4 0.062
Fourth High: Jun 18 0.077 Aug 29 0.069 Sep 25 0.061
National:
# Days Above '08 Nat'l Std.: 511
'08 Nat'l Std. Design Value: 0.073 0.072 0.068
National Year Coverage: 99 97 80
California:
# Days Above State Standard: 10 2 1
California Designation Value: 0.083 0.081 0.077
Expected Peak Day Conc.: 0.084 0.083 0.080
California Year Coverage: 99 97 79
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All averages are expressed in parts per million.

National exceedances are shown in orange . State exceedances are shown in yellow .

An exceedance is not necessarily a violation.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Switch: Hourly
Ozone PM2.5 PM10 CarbonMonoxide
Nitrogen
Dioxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Eight-Hour Ozone Averages http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 1 11/11/2011 4:40 PM
EXHIBIT 2
City Council 22 – 724 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily Maximum Hourly Nitrogen Dioxide Measurements Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date Measurement Date Measurement Date Measurement
First High: Nov 16 0.093 Dec 18 0.068 Nov 3 0.073
Second High: Nov 21 0.084 Mar 2 0.067 Sep 27 0.069
Third High: Oct 27 0.083 Oct 16 0.067 Jan 8 0.066
Fourth High: Oct 28 0.083 Oct 1 0.065 Feb 16 0.064
# Days Above State Standard: 0 0 0
Annual Average: 0.020 0.018 0.018
Year Coverage: 99 94 96
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All averages are expressed in parts per million.

National exceedances are shown in orange . State exceedances are shown in yellow .

An exceedance is not necessarily a violation.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Switch: Hourly
Ozone
8-Hour
Ozone PM2.5 PM10 CarbonMonoxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Hourly Nitrogen Dioxide Measurements http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 1 11/11/2011 4:42 PM
EXHIBIT 2
City Council 22 – 725 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily Maximum 8-Hour Carbon Monoxide Averages Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date 8-Hr Average Date 8-Hr Average Date 8-Hr Average
National:

First High: Nov 17 3.44 Dec 18 2.73 Nov 3 1.98
Second High: Nov 17 2.50 Dec 18 2.37 Jan 8 1.91
Third High: Jan 13 2.35 Jan 8 2.23 Dec 8 1.89
Fourth High: Nov 19 2.30 Dec 17 2.17 Dec 2 1.86
California:

First High: Nov 17 3.44 Dec 18 2.73 Nov 3 1.98
Second High: Jan 12 2.35 Jan 8 2.23 Jan 8 1.91
Third High: Nov 19 2.30 Dec 17 2.17 Dec 8 1.89
Fourth High: Dec 6 2.24 Oct 17 1.87 Dec 1 1.86
# Days Above Nat'l Standard: 0 0 0
# Days Above State Standard: 0 0 0
Year Coverage: 97 97 96
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All averages are expressed in parts per million.

National exceedances are shown in orange . State exceedances are shown in yellow .

An exceedance is not necessarily a violation.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Switch: Hourly
Ozone
8-Hour
Ozone PM2.5 PM10 NitrogenDioxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Eight-Hour Carbon Monoxide Averages http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 1 11/11/2011 4:42 PM
EXHIBIT 2
City Council 22 – 726 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily 24-Hour PM10 Averages
Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date 24-Hr Average Date 24-Hr Average Date 24-Hr Average National:

First High: Nov 14 61.0 Jan 1 63.0 Jan 8 43.0
Second High: Oct 27 59.0 Jan 7 49.0 Mar 27 42.0
Third High: Dec 3 51.0 Mar 2 48.0 Dec 4 39.0
Fourth High: Oct 21 47.0 Aug 29 45.0 Aug 24 36.0
California:

First High: Nov 14 61.0 Jan 1 62.0 Jan 8 43.0
Second High: Oct 27 58.0 Jan 7 49.0 Mar 27 42.0
Third High: Dec 3 51.0 Mar 2 48.0 Dec 4 39.0
Fourth High: Oct 15 46.0 Aug 29 45.0 Aug 24 36.0
Measured:
# Days Above Nat'l Standard: 0 0 0
# Days Above State Standard: 31 0
Estimated:
3-Yr Avg # Days Above Nat'l Std: 2.0 2.0 0.0
# Days Above Nat'l Standard: 0.0 0.0 0.0
# Days Above State Standard: * * *
State 3-Yr Maximum Average: 38 38 *
State Annual Average: * * *
National 3-Year Average: 34 33 27
National Annual Average: 28.6 30.9 22.5
Year Coverage: 99 87 97
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All concentrations are expressed in micrograms per cubic meter.

The national annual average PM10 standard was revoked in December 2006 and is no longer in effect.

Statistics related to the revoked standard are shown in italics or italics .

National exceedances are shown in orange . State exceedances are shown in yellow .

An exceedance is not necessarily a violation.

Statistics may include data that are related to an exceptional event.

State and national statistics may differ for the following reasons:

State statistics are based on California approved samplers, whereas national statistics are based on samplers using federal reference or equivalent methods.

State and national statistics may therefore be based on different samplers.

State statistics for 1998 and later are based on local conditions (except for sites in the South Coast Air Basin, where State statistics for 2002 and later are based on local conditions).

National statistics are based on standard conditions.

State criteria for ensuring that data are sufficiently complete for calculating valid annual averages are more stringent than the national criteria.

Measurements are usually collected every six days. Measured days counts the days that a measurement was greater than the level of the standard; Estimated days mathematically estimates how many days concentrations would have been greater than the level of the standard had each day been monitored. 3-Year statistics represent the listed year and the 2 years before the listed year.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Top 4 Daily PM10 Averages http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 2 11/11/2011 4:41 PM
EXHIBIT 2
City Council 22 – 727 5/5/2026
Hourly
Ozone
8-Hour
Ozone PM2.5 CarbonMonoxide
Nitrogen
Dioxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Daily PM10 Averages http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 2 of 2 11/11/2011 4:41 PM
EXHIBIT 2
City Council 22 – 728 5/5/2026
California Home ARB: Home Search Site Map Links Software Contact Us AQD: Home Highest 4 Daily 24-Hour PM2.5 Averages
Anaheim-Pampas Lane FAQs
Year: 2008 2009 2010
Date 24-Hr Average Date 24-Hr Average Date 24-Hr Average National:

First High: Nov 16 67.8 Jan 1 64.5 Dec 4 31.7
Second High: Jan 12 39.4 Jan 8 43.0 Nov 18 31.3
Third High: Jan 11 39.2 Dec 25 36.7 Nov 17 30.6
Fourth High: Dec 31 37.3 Jan 2 36.6 Feb 2 30.3
California:

First High: Nov 16 67.8 Jan 1 64.5 Dec 4 31.7
Second High: Jan 12 55.1 Jan 8 43.0 Nov 18 31.3
Third High: Jul 4 48.7 Jan 2 36.6 Nov 17 30.6
Fourth High: Feb 8 44.8 Nov 8 35.7 Feb 2 30.3
Estimated Days > Nat'l 24-Hr Std: * 5.0 0.0
Measured Days > Nat'l 24-Hr Std: 55 0
Nat'l 24-Hr Std Design Value: 38 37 30
Nat'l 24-Hr Std 98th Percentile: 31.2 32.1 26.9
National Annual Std Design Value: * * *
National Annual Average: * 12.0 10.5
State Ann'l Std Designation Value: * * *
State Annual Average: * * *
Year Coverage: 74 100 100
Go Backward One Year New Top 4 Summary Go Forward One Year Notes: All concentrations are expressed in micrograms per cubic meter.

National exceedances are shown in orange . State exceedances are shown in yellow .

An exceedance is not necessarily a violation.

State and national statistics may differ for the following reasons:

State statistics are based on California approved samplers, whereas national statistics are based on samplers using federal reference or equivalent methods.

State and national statistics may therefore be based on different samplers.

State criteria for ensuring that data are sufficiently complete for calculating valid annual averages are more stringent than the national criteria.

Year Coverage indicates the extent to which available monitoring data represent the time of the year when concentrations are expected to be highest. 0 means that data represent none of the high period; 100 means that data represent the entire high period. A high Year Coverage does not mean that there was sufficient data for annual statistics to be considered valid. * There was insufficient (or no) data available to determine the value.

Switch: Hourly
Ozone
8-Hour
Ozone PM10 CarbonMonoxide
Nitrogen
Dioxide
Sulfur
Dioxide
Hydrogen
Sulfide
Go to: Data Statistics Home Page Top 4 Summaries Start Page Top 4 Daily PM2.5 Averages http://www.arb.ca.gov/adam/topfour/topfourdisplay.php 1 of 1 11/11/2011 4:41 PM
EXHIBIT 2
City Council 22 – 729 5/5/2026
EXHIBIT 2
City Council 22 – 730 5/5/2026
Appendix C SCAQMD Rule 403

EXHIBIT 2
City Council 22 – 731 5/5/2026
EXHIBIT 2
City Council 22 – 732 5/5/2026
403 - 1
(Adopted May 7, 1976) (Amended November 6, 1992)
(Amended July 9, 1993) (Amended February 14, 1997)
(Amended December 11, 1998)(Amended April 2, 2004)
(Amended June 3, 2005)
RULE 403. FUGITIVE DUST
(a) Purpose
The purpose of this Rule is to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (man-made) fugitive dust sources by requiring actions to prevent, reduce or mitigate fugitive dust emissions. (b) Applicability
The provisions of this Rule shall apply to any activity or man-made condition capable of generating fugitive dust.
(c) Definitions
(1) ACTIVE OPERATIONS means any source capable of generating fugitive dust, including, but not limited to, earth-moving activities, construction/demolition activities, disturbed surface area, or heavy- and light-duty vehicular movement.
(2) AGGREGATE-RELATED PLANTS are defined as facilities that produce and / or mix sand and gravel and crushed stone.
(3) AGRICULTURAL HANDBOOK means the region-specific guidance document that has been approved by the Governing Board or hereafter approved by the Executive Officer and the U.S. EPA. For the South Coast Air Basin, the Board-approved region-specific guidance document is the Rule 403 Agricultural Handbook dated December 1998. For the Coachella Valley, the Board-approved region-specific guidance document is the Rule 403 Coachella Valley Agricultural Handbook dated April 2, 2004.
(4) ANEMOMETERS are devices used to measure wind speed and direction in accordance with the performance standards, and maintenance and calibration criteria as contained in the most recent Rule 403 Implementation Handbook.
(5) BEST AVAILABLE CONTROL MEASURES means fugitive dust control actions that are set forth in Table 1 of this Rule.

EXHIBIT 2
City Council 22 – 733 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 2
(6) BULK MATERIAL is sand, gravel, soil, aggregate material less than two inches in length or diameter, and other organic or inorganic particulate matter.
(7) CEMENT MANUFACTURING FACILITY is any facility that has a cement kiln at the facility.
(8) CHEMICAL STABILIZERS are any non-toxic chemical dust suppressant which must not be used if prohibited for use by the Regional Water Quality Control Boards, the California Air Resources Board, the U.S.

Environmental Protection Agency (U.S. EPA), or any applicable law, rule or regulation. The chemical stabilizers shall meet any specifications, criteria, or tests required by any federal, state, or local water agency.

Unless otherwise indicated, the use of a non-toxic chemical stabilizer shall be of sufficient concentration and application frequency to maintain a stabilized surface.
(9) COMMERCIAL POULTRY RANCH means any building, structure, enclosure, or premises where more than 100 fowl are kept or maintained for the primary purpose of producing eggs or meat for sale or other distribution.
(10) CONFINED ANIMAL FACILITY means a source or group of sources of air pollution at an agricultural source for the raising of 3,360 or more fowl or 50 or more animals, including but not limited to, any structure, building, installation, farm, corral, coop, feed storage area, milking parlor, or system for the collection, storage, or distribution of solid and liquid manure; if domesticated animals, including horses, sheep, goats, swine, beef cattle, rabbits, chickens, turkeys, or ducks are corralled, penned, or otherwise caused to remain in restricted areas for commercial agricultural purposes and feeding is by means other than grazing.
(11) CONSTRUCTION/DEMOLITION ACTIVITIES means any on-site mechanical activities conducted in preparation of, or related to, the building, alteration, rehabilitation, demolition or improvement of property, including, but not limited to the following activities: grading, excavation, loading, crushing, cutting, planing, shaping or ground breaking. (12) CONTRACTOR means any person who has a contractual arrangement to conduct an active operation for another person.
(13) DAIRY FARM is an operation on a property, or set of properties that are contiguous or separated only by a public right-of-way, that raises cows or EXHIBIT 2
City Council 22 – 734 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 3
produces milk from cows for the purpose of making a profit or for a livelihood. Heifer and calf farms are dairy farms.
(14) DISTURBED SURFACE AREA means a portion of the earth's surface which has been physically moved, uncovered, destabilized, or otherwise modified from its undisturbed natural soil condition, thereby increasing the potential for emission of fugitive dust. This definition excludes those areas which have:
(A) been restored to a natural state, such that the vegetative ground cover and soil characteristics are similar to adjacent or nearby natural conditions;
(B) been paved or otherwise covered by a permanent structure; or (C) sustained a vegetative ground cover of at least 70 percent of the native cover for a particular area for at least 30 days. (15) DUST SUPPRESSANTS are water, hygroscopic materials, or non-toxic chemical stabilizers used as a treatment material to reduce fugitive dust emissions.
(16) EARTH-MOVING ACTIVITIES means the use of any equipment for any activity where soil is being moved or uncovered, and shall include, but not be limited to the following: grading, earth cutting and filling operations, loading or unloading of dirt or bulk materials, adding to or removing from open storage piles of bulk materials, landfill operations, weed abatement through disking, and soil mulching.
(17) DUST CONTROL SUPERVISOR means a person with the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule 403 requirements at an active operation. (18) FUGITIVE DUST means any solid particulate matter that becomes airborne, other than that emitted from an exhaust stack, directly or indirectly as a result of the activities of any person. (19) HIGH WIND CONDITIONS means that instantaneous wind speeds exceed 25 miles per hour.
(20) INACTIVE DISTURBED SURFACE AREA means any disturbed surface area upon which active operations have not occurred or are not expected to occur for a period of 20 consecutive days.
(21) LARGE OPERATIONS means any active operations on property which contains 50 or more acres of disturbed surface area; or any earth-moving operation with a daily earth-moving or throughput volume of 3,850 cubic EXHIBIT 2
City Council 22 – 735 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 4
meters (5,000 cubic yards) or more three times during the most recent 365-day period.
(22) OPEN STORAGE PILE is any accumulation of bulk material, which is not fully enclosed, covered or chemically stabilized, and which attains a height of three feet or more and a total surface area of 150 or more square feet.
(23) PARTICULATE MATTER means any material, except uncombined water, which exists in a finely divided form as a liquid or solid at standard conditions.
(24) PAVED ROAD means a public or private improved street, highway, alley, public way, or easement that is covered by typical roadway materials, but excluding access roadways that connect a facility with a public paved roadway and are not open to through traffic. Public paved roads are those open to public access and that are owned by any federal, state, county, municipal or any other governmental or quasi-governmental agencies.

Private paved roads are any paved roads not defined as public. (25) PM10 means particulate matter with an aerodynamic diameter smaller than or equal to 10 microns as measured by the applicable State and Federal reference test methods.
(26) PROPERTY LINE means the boundaries of an area in which either a person causing the emission or a person allowing the emission has the legal use or possession of the property. Where such property is divided into one or more sub-tenancies, the property line(s) shall refer to the boundaries dividing the areas of all sub-tenancies.
(27) RULE 403 IMPLEMENTATION HANDBOOK means a guidance
document that has been approved by the Governing Board on April 2, 2004 or hereafter approved by the Executive Officer and the U.S. EPA. (28) SERVICE ROADS are paved or unpaved roads that are used by one or more public agencies for inspection or maintenance of infrastructure and which are not typically used for construction-related activity. (29) SIMULTANEOUS SAMPLING means the operation of two PM10 samplers in such a manner that one sampler is started within five minutes of the other, and each sampler is operated for a consecutive period which must be not less than 290 minutes and not more than 310 minutes. (30) SOUTH COAST AIR BASIN means the non-desert portions of Los Angeles, Riverside, and San Bernardino counties and all of Orange EXHIBIT 2
City Council 22 – 736 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 5
County as defined in California Code of Regulations, Title 17, Section 60104. The area is bounded on the west by the Pacific Ocean, on the north and east by the San Gabriel, San Bernardino, and San Jacinto Mountains, and on the south by the San Diego county line. (31) STABILIZED SURFACE means any previously disturbed surface area or open storage pile which, through the application of dust suppressants, shows visual or other evidence of surface crusting and is resistant to winddriven fugitive dust and is demonstrated to be stabilized. Stabilization can be demonstrated by one or more of the applicable test methods contained in the Rule 403 Implementation Handbook.
(32) TRACK-OUT means any bulk material that adheres to and agglomerates on the exterior surface of motor vehicles, haul trucks, and equipment (including tires) that have been released onto a paved road and can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions.
(33) TYPICAL ROADWAY MATERIALS means concrete, asphaltic concrete, recycled asphalt, asphalt, or any other material of equivalent performance as determined by the Executive Officer, and the U.S. EPA. (34) UNPAVED ROADS means any unsealed or unpaved roads, equipment paths, or travel ways that are not covered by typical roadway materials.

Public unpaved roads are any unpaved roadway owned by federal, state, county, municipal or other governmental or quasi-governmental agencies.

Private unpaved roads are all other unpaved roadways not defined as public.
(35) VISIBLE ROADWAY DUST means any sand, soil, dirt, or other solid particulate matter which is visible upon paved road surfaces and which can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions.
(36) WIND-DRIVEN FUGITIVE DUST means visible emissions from any disturbed surface area which is generated by wind action alone. (37) WIND GUST is the maximum instantaneous wind speed as measured by an anemometer.
(d) Requirements
(1) No person shall cause or allow the emissions of fugitive dust from any active operation, open storage pile, or disturbed surface area such that:

EXHIBIT 2
City Council 22 – 737 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 6
(A) the dust remains visible in the atmosphere beyond the property line of the emission source; or
(B) the dust emission exceeds 20 percent opacity (as determined by the appropriate test method included in the Rule 403 Implementation Handbook), if the dust emission is the result of movement of a motorized vehicle.
(2) No person shall conduct active operations without utilizing the applicable best available control measures included in Table 1 of this Rule to minimize fugitive dust emissions from each fugitive dust source type within the active operation.
(3) No person shall cause or allow PM10 levels to exceed 50 micrograms per cubic meter when determined, by simultaneous sampling, as the difference between upwind and downwind samples collected on high-volume particulate matter samplers or other U.S. EPA-approved equivalent method for PM10 monitoring. If sampling is conducted, samplers shall be:
(A) Operated, maintained, and calibrated in accordance with 40 Code of Federal Regulations (CFR), Part 50, Appendix J, or appropriate U.S. EPA-published documents for U.S. EPA-approved equivalent method(s) for PM10.
(B) Reasonably placed upwind and downwind of key activity areas and as close to the property line as feasible, such that other sources of fugitive dust between the sampler and the property line are minimized.
(4) No person shall allow track-out to extend 25 feet or more in cumulative length from the point of origin from an active operation. Notwithstanding the preceding, all track-out from an active operation shall be removed at the conclusion of each workday or evening shift.
(5) No person shall conduct an active operation with a disturbed surface area of five or more acres, or with a daily import or export of 100 cubic yards or more of bulk material without utilizing at least one of the measures listed in subparagraphs (d)(5)(A) through (d)(5)(E) at each vehicle egress from the site to a paved public road.
(A) Install a pad consisting of washed gravel (minimum-size: one inch) maintained in a clean condition to a depth of at least six inches and extending at least 30 feet wide and at least 50 feet long.

EXHIBIT 2
City Council 22 – 738 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 7
(B) Pave the surface extending at least 100 feet and at least 20 feet wide.
(C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material from tires and vehicle undercarriages before vehicles exit the site.
(D) Install and utilize a wheel washing system to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (E) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the actions specified in
subparagraphs (d)(5)(A) through (d)(5)(D).
(6) Beginning January 1, 2006, any person who operates or authorizes the operation of a confined animal facility subject to this Rule shall implement the applicable conservation management practices specified in Table 4 of this Rule.
(e) Additional Requirements for Large Operations
(1) Any person who conducts or authorizes the conducting of a large operation subject to this Rule shall implement the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards can not be met through use of Table 2 actions; and shall:
(A) submit a fully executed Large Operation Notification (Form 403 N) to the Executive Officer within 7 days of qualifying as a large operation;
(B) include, as part of the notification, the name(s), address(es), and phone number(s) of the person(s) responsible for the submittal, and a description of the operation(s), including a map depicting the location of the site;
(C) maintain daily records to document the specific dust control actions taken, maintain such records for a period of not less than three years; and make such records available to the Executive Officer upon request;
EXHIBIT 2
City Council 22 – 739 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 8
(D) install and maintain project signage with project contact signage that meets the minimum standards of the Rule 403 Implementation Handbook, prior to initiating any earthmoving activities; (E) identify a dust control supervisor that:
(i) is employed by or contracted with the property owner or developer;
(ii) is on the site or available on-site within 30 minutes during working hours;
(iii) has the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule
requirements;
(iv) has completed the AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class; and
(F) notify the Executive Officer in writing within 30 days after the site no longer qualifies as a large operation as defined by paragraph (c)(18).
(2) Any Large Operation Notification submitted to the Executive Officer or AQMD-approved dust control plan shall be valid for a period of one year from the date of written acceptance by the Executive Officer. Any Large Operation Notification accepted pursuant to paragraph (e)(1), excluding those submitted by aggregate-related plants and cement manufacturing facilities must be resubmitted annually by the person who conducts or authorizes the conducting of a large operation, at least 30 days prior to the expiration date, or the submittal shall no longer be valid as of the expiration date. If all fugitive dust sources and corresponding control measures or special circumstances remain identical to those identified in the previously accepted submittal or in an AQMD-approved dust control plan, the resubmittal may be a simple statement of no-change (Form 403NC).
(f) Compliance Schedule
The newly amended provisions of this Rule shall become effective upon adoption.

Pursuant to subdivision (e), any existing site that qualifies as a large operation will have 60 days from the date of Rule adoption to comply with the notification and recordkeeping requirements for large operations. Any Large Operation EXHIBIT 2
City Council 22 – 740 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 9
Notification or AQMD-approved dust control plan which has been accepted prior to the date of adoption of these amendments shall remain in effect and the Large Operation Notification or AQMD-approved dust control plan annual resubmittal date shall be one year from adoption of this Rule amendment. (g) Exemptions
(1) The provisions of this Rule shall not apply to:
(A) Dairy farms.
(B) Confined animal facilities provided that the combined disturbed surface area within one continuous property line is one acre or less. (C) Agricultural vegetative crop operations provided that the combined disturbed surface area within one continuous property line and not separated by a paved public road is 10 acres or less.
(D) Agricultural vegetative crop operations within the South Coast Air Basin, whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations:
(i) voluntarily implements the conservation management
practices contained in the Rule 403 Agricultural Handbook; (ii) completes and maintains the self-monitoring form
documenting sufficient conservation management
practices, as described in the Rule 403 Agricultural
Handbook; and
(iii) makes the completed self-monitoring form available to the Executive Officer upon request.
(E) Agricultural vegetative crop operations outside the South Coast Air Basin whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations:
(i) voluntarily implements the conservation management
practices contained in the Rule 403 Coachella Valley
Agricultural Handbook; and
(ii) completes and maintains the self-monitoring form
documenting sufficient conservation management
practices, as described in the Rule 403 Coachella Valley Agricultural Handbook; and
(iii) makes the completed self-monitoring form available to the Executive Officer upon request.

EXHIBIT 2
City Council 22 – 741 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 10
(F) Active operations conducted during emergency life-threatening situations, or in conjunction with any officially declared disaster or state of emergency.
(G) Active operations conducted by essential service utilities to provide electricity, natural gas, telephone, water and sewer during periods of service outages and emergency disruptions.
(H) Any contractor subsequent to the time the contract ends, provided that such contractor implemented the required control measures during the contractual period.
(I) Any grading contractor, for a phase of active operations, subsequent to the contractual completion of that phase of earthmoving activities, provided that the required control measures have been implemented during the entire phase of earth-moving activities, through and including five days after the final grading inspection.
(J) Weed abatement operations ordered by a county agricultural commissioner or any state, county, or municipal fire department, provided that:
(i) mowing, cutting or other similar process is used which maintains weed stubble at least three inches above the soil; and
(ii) any discing or similar operation which cuts into and disturbs the soil, where watering is used prior to initiation of these activities, and a determination is made by the agency issuing the weed abatement order that, due to fire hazard conditions, rocks, or other physical obstructions, it is not practical to meet the conditions specified in clause (g)(1)(H)(i). The provisions this clause shall not exempt the owner of any property from stabilizing, in accordance with paragraph (d)(2), disturbed surface areas which have been created as a result of the weed abatement actions. (K) sandblasting operations.
(2) The provisions of paragraphs (d)(1) and (d)(3) shall not apply:
(A) When wind gusts exceed 25 miles per hour, provided that:

EXHIBIT 2
City Council 22 – 742 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 11
(i) The required Table 3 contingency measures in this Rule are implemented for each applicable fugitive dust source type, and;
(ii) records are maintained in accordance with subparagraph (e)(1)(C).
(B) To unpaved roads, provided such roads:
(i) are used solely for the maintenance of wind-generating equipment; or
(ii) are unpaved public alleys as defined in Rule 1186; or (iii) are service roads that meet all of the following criteria:
(a) are less than 50 feet in width at all points along the road;
(b) are within 25 feet of the property line; and
(c) have a traffic volume less than 20 vehicle-trips per day.
(C) To any active operation, open storage pile, or disturbed surface area for which necessary fugitive dust preventive or mitigative actions are in conflict with the federal Endangered Species Act, as determined in writing by the State or federal agency responsible for making such determinations.
(3) The provisions of (d)(2) shall not apply to any aggregate-related plant or cement manufacturing facility that implements the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards of paragraphs (d)(1) and (d)(3) can not be met through use of Table 2 actions.
(4) The provisions of paragraphs (d)(1), (d)(2), and (d)(3) shall not apply to:
(A) Blasting operations which have been permitted by the California Division of Industrial Safety; and
(B) Motion picture, television, and video production activities when dust emissions are required for visual effects. In order to obtain this exemption, the Executive Officer must receive notification in writing at least 72 hours in advance of any such activity and no nuisance results from such activity.
(5) The provisions of paragraph (d)(3) shall not apply if the dust control actions, as specified in Table 2, are implemented on a routine basis for EXHIBIT 2
City Council 22 – 743 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 12
each applicable fugitive dust source type. To qualify for this exemption, a person must maintain records in accordance with subparagraph (e)(1)(C). (6) The provisions of paragraph (d)(4) shall not apply to earth coverings of public paved roadways where such coverings are approved by a local government agency for the protection of the roadway, and where such coverings are used as roadway crossings for haul vehicles provided that such roadway is closed to through traffic and visible roadway dust is removed within one day following the cessation of activities. (7) The provisions of subdivision (e) shall not apply to:
(A) officially-designated public parks and recreational areas, including national parks, national monuments, national forests, state parks, state recreational areas, and county regional parks.
(B) any large operation which is required to submit a dust control plan to any city or county government which has adopted a Districtapproved dust control ordinance. (C) any large operation subject to Rule 1158, which has an approved dust control plan pursuant to Rule 1158, provided that all sources of fugitive dust are included in the Rule 1158 plan.
(8) The provisions of subparagraph (e)(1)(A) through (e)(1)(C) shall not apply to any large operation with an AQMD-approved fugitive dust control plan provided that there is no change to the sources and controls as identified in the AQMD-approved fugitive dust control plan.
(h) Fees
Any person conducting active operations for which the Executive Officer conducts upwind/downwind monitoring for PM10 pursuant to paragraph (d)(3) shall be assessed applicable Ambient Air Analysis Fees pursuant to Rule 304.1. Applicable fees shall be waived for any facility which is exempted from paragraph (d)(3) or meets the requirements of paragraph (d)(3).

EXHIBIT 2
City Council 22 – 744 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 13
Source Category Control Measure Guidance Backfilling 01-1 01-2 01-3
Stabilize backfill material when not actively handling; and Stabilize backfill material during handling; and Stabilize soil at completion of activity. 9 Mix backfill soil with water prior to moving 9 Dedicate water truck or high capacity hose to backfilling equipment
9 Empty loader bucket slowly so that no dust
plumes are generated
9 Minimize drop height from loader bucket
Clearing and grubbing
02-1 02-2 02-3
Maintain stability of soil through pre-watering of site prior to clearing and grubbing; and Stabilize soil during clearing and grubbing activities; and Stabilize soil immediately after clearing and grubbing activities. 9 Maintain live perennial vegetation where
possible
9 Apply water in sufficient quantity to prevent
generation of dust plumes
Clearing forms 03-1
03-2 03-3
Use water spray to clear forms; or Use sweeping and water spray to clear forms; or Use vacuum system to clear forms. 9 Use of high pressure air to clear forms may cause
exceedance of Rule requirements
Crushing 04-1
04-2
Stabilize surface soils prior to operation of support equipment; and Stabilize material after crushing. 9 Follow permit conditions for crushing equipment
9 Pre-water material prior to loading into crusher 9 Monitor crusher emissions opacity 9 Apply water to crushed material to prevent dust plumes

EXHIBIT
2 City Council 22 – 745 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 14
Source Category Control Measure Guidance Cut and fill 05-1 05-2
Pre-water soils prior to cut and fill activities; and Stabilize soil during and after cut and fill activities. 9 For large sites, pre-water with sprinklers or
water trucks and allow time for penetration
9 Use water trucks/pulls to water soils to depth
of cut prior to subsequent cuts
Demolition – mechanical/manual
06-1
06-2 06-3 06-4
Stabilize wind erodible surfaces to reduce dust; and Stabilize surface soil where support equipment and vehicles will operate; and Stabilize loose soil and demolition debris; and Comply with AQMD Rule 1403. 9 Apply water in sufficient quantities to
prevent the generation of visible dust plumes
Disturbed soil 07-1
07-2
Stabilize disturbed soil throughout the construction site; and Stabilize disturbed soil between structures 9 Limit vehicular traffic and disturbances on
soils where possible
9 If interior block walls are planned, install as
early as possible
9 Apply water or a stabilizing agent in
sufficient quantities to prevent the generation of visible dust plumes Earth-moving activities
08-1 08-2 08-3
Pre-apply water to depth of proposed cuts; and Re-apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and Stabilize soils once earth-moving activities are complete. 9 Grade each project phase separately, timed
to coincide with construction phase
9 Upwind fencing can prevent material
movement on site
9 Apply water or a stabilizing agent in
sufficient quantities to prevent the generation of visible dust plumes

EXHIBIT
2 City Council 22 – 746 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 15
Source Category Control Measure Guidance Importing/exporting of bulk materials 09-1
09-2 09-3 09-4 09-5
Stabilize material while loading to reduce fugitive dust emissions; and Maintain at least six inches of freeboard on haul vehicles; and Stabilize material while transporting to reduce fugitive dust emissions; and Stabilize material while unloading to reduce fugitive dust emissions; and Comply with Vehicle Code Section 23114. 9 Use tarps or other suitable enclosures on
haul trucks
9 Check belly-dump truck seals regularly and
remove any trapped rocks to prevent spillage
9 Comply with track-out
prevention/mitigation requirements
9 Provide water while loading and unloading
to reduce visible dust plumes
Landscaping 10-1 Stabilize soils, materials, slopes 9 Apply water to materials to stabilize 9 Maintain materials in a crusted condition
9 Maintain effective cover over materials
9 Stabilize sloping surfaces using soil binders
until vegetation or ground cover can effectively stabilize the slopes 9 Hydroseed prior to rain season
Road shoulder maintenance
11-1
11-2
Apply water to unpaved shoulders prior to clearing;
and Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. 9 Installation of curbing and/or paving of road
shoulders can reduce recurring maintenance costs
9 Use of chemical dust suppressants can
inhibit vegetation growth and reduce future road shoulder maintenance costs

EXHIBIT
2 City Council 22 – 747 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 16
Source Category Control Measure Guidance Screening 12-1 12-2 12-3
Pre-water material prior to screening; and Limit fugitive dust emissions to opacity and plume length standards; and Stabilize material immediately after screening. 9 Dedicate water truck or high capacity hose
to screening operation
9 Drop material through the screen slowly and
minimize drop height
9 Install wind barrier with a porosity of no
more than 50% upwind of screen to the height of the drop point Staging areas 13-1
13-2
Stabilize staging areas during use; and Stabilize staging area soils at project completion. 9 Limit size of staging area
9 Limit vehicle speeds to 15 miles per hour 9 Limit number and size of staging area entrances/exists
Stockpiles/ Bulk Material Handling
14-1
14-2
Stabilize stockpiled materials. Stockpiles within 100 yards of off-site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. 9 Add or remove material from the downwind
portion of the storage pile
9 Maintain storage piles to avoid steep sides
or faces

EXHIBIT
2 City Council 22 – 748 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 17
Source Category Control Measure Guidance Traffic areas for construction activities 15-1
15-2 15-3
Stabilize all off-road traffic and parking areas; and Stabilize all haul routes; and Direct construction traffic over established haul routes. 9 Apply gravel/paving to all haul routes as
soon as possible to all future roadway areas
9 Barriers can be used to ensure vehicles are
only used on established parking areas/haul routes
Trenching 16-1
16-2
Stabilize surface soils where trencher or excavator and support equipment will operate; and Stabilize soils at the completion of trenching activities. 9 Pre-watering of soils prior to trenching is an
effective preventive measure. For deep trenching activities, pre-trench to 18 inches soak soils via the pre-trench and resuming trenching 9 Washing mud and soils from equipment at
the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck loading 17-1
17-2
Pre-water material prior to loading; and Ensure that freeboard exceeds six inches (CVC 23114) 9 Empty loader bucket such that no visible
dust plumes are created
9 Ensure that the loader bucket is close to the
truck to minimize drop height while loading
Turf Overseeding 18-1
18-2
Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and Cover haul vehicles prior to exiting the site. 9 Haul waste material immediately off-site

EXHIBIT
2 City Council 22 – 749 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 18
Source Category Control Measure Guidance Unpaved roads/parking lots 19-1 19-2
Stabilize soils to meet the applicable performance standards; and Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. 9 Restricting vehicular access to established
unpaved travel paths and parking lots can reduce stabilization requirements Vacant land 20-1 In instances where vacant lots are 0.10 acre or larger and have a cumulative area of 500 square feet or more that are driven over and/or used by motor vehicles and/or off-road vehicles, prevent motor vehicle and/or off-road vehicle trespassing, parking and/or access by installing barriers, curbs, fences, gates, posts, signs, shrubs, trees or other effective control measures.

EXHIBIT
2 City Council 22 – 750 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403 - 19
Table 2

DUST CONTROL MEASURES FOR LARGE OPERATIONS

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Earth-moving (except
construction cutting and
filling areas, and mining
operations)
(1a) Maintain soil moisture content at a minimum of
12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air
Resources Board, and the U.S. EPA. Two soil
moisture evaluations must be conducted during
the first three hours of active operations during a
calendar day, and two such evaluations each
subsequent four-hour period of active operations;
OR
(1a-1) For any earth-moving which is more than 100
feet from all property lines, conduct watering as
necessary to prevent visible dust emissions from
exceeding 100 feet in length in any direction.

Earth-moving:

Construction fill areas:
(1b) Maintain soil moisture content at a minimum of
12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air
Resources Board, and the U.S. EPA. For areas
which have an optimum moisture content for
compaction of less than 12 percent, as
determined by ASTM Method 1557 or other
equivalent method approved by the Executive
Officer and the California Air Resources Board
and the U.S. EPA, complete the compaction
process as expeditiously as possible after
achieving at least 70 percent of the optimum soil
moisture content. Two soil moisture evaluations
must be conducted during the first three hours of
active operations during a calendar day, and two
such evaluations during each subsequent fourhour period of active operations.

EXHIBIT 2
City Council 22 – 751 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403-20
Table 2 (Continued)

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Earth-moving:

Construction cut areas
and mining operations:
(1c) Conduct watering as necessary to prevent visible
emissions from extending more than 100 feet
beyond the active cut or mining area unless the area
is inaccessible to watering vehicles due to slope
conditions or other safety factors.

Disturbed surface areas
(except completed
grading areas)
(2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any
areas which cannot be stabilized, as evidenced by
wind driven fugitive dust must have an application
of water at least twice per day to at least 80 percent
of the unstabilized area.

Disturbed surface
areas: Completed
grading areas
(2c) Apply chemical stabilizers within five working days of grading completion; OR
(2d) Take actions (3a) or (3c) specified for inactive
disturbed surface areas.

Inactive disturbed
surface areas
(3a) Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is
evidence of wind driven fugitive dust, excluding any
areas which are inaccessible to watering vehicles due
to excessive slope or other safety conditions; OR
(3b) Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR
(3c) Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover
must be of sufficient density to expose less than 30
percent of unstabilized ground within 90 days of
planting, and at all times thereafter; OR
(3d) Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas.

EXHIBIT 2
City Council 22 – 752 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403-21
Table 2 (Continued)

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Unpaved Roads (4a) Water all roads used for any vehicular traffic at least once per every two hours of active
operations [3 times per normal 8 hour work day];
OR
(4b) Water all roads used for any vehicular traffic
once daily and restrict vehicle speeds to 15 miles
per hour; OR
(4c) Apply a chemical stabilizer to all unpaved road
surfaces in sufficient quantity and frequency to
maintain a stabilized surface.

Open storage piles (5a) Apply chemical stabilizers; OR
(5b) Apply water to at least 80 percent of the surface
area of all open storage piles on a daily basis
when there is evidence of wind driven fugitive
dust; OR
(5c) Install temporary coverings; OR
(5d) Install a three-sided enclosure with walls with no more than 50 percent porosity which extend, at a
minimum, to the top of the pile. This option may
only be used at aggregate-related plants or at
cement manufacturing facilities.

All Categories (6a) Any other control measures approved by the Executive Officer and the U.S. EPA as
equivalent to the methods specified in Table 2
may be used.

EXHIBIT 2
City Council 22 – 753 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403-22
TABLE 3

CONTINGENCY CONTROL MEASURES FOR LARGE OPERATIONS

FUGITIVE DUST
SOURCE

CATEGORY

CONTROL MEASURES
Earth-moving (1A) Cease all active operations; OR
(2A) Apply water to soil not more than 15 minutes prior to moving such soil.

Disturbed surface
areas
(0B) On the last day of active operations prior to a
weekend, holiday, or any other period when active
operations will not occur for not more than four
consecutive days: apply water with a mixture of
chemical stabilizer diluted to not less than 1/20 of the concentration required to maintain a stabilized
surface for a period of six months; OR
(1B) Apply chemical stabilizers prior to wind event; OR (2B) Apply water to all unstabilized disturbed areas 3
times per day. If there is any evidence of wind driven
fugitive dust, watering frequency is increased to a
minimum of four times per day; OR
(3B) Take the actions specified in Table 2, Item (3c); OR (4B) Utilize any combination of control actions (1B), (2B), and (3B) such that, in total, these actions apply to all disturbed surface areas.

Unpaved roads (1C) Apply chemical stabilizers prior to wind event; OR (2C) Apply water twice per hour during active operation; OR
(3C) Stop all vehicular traffic.

Open storage piles (1D) Apply water twice per hour; OR
(2D) Install temporary coverings.

Paved road track-out (1E) Cover all haul vehicles; OR
(2E) Comply with the vehicle freeboard requirements of
Section 23114 of the California Vehicle Code for
both public and private roads.

All Categories (1F) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to
the methods specified in Table 3 may be used.

EXHIBIT 2
City Council 22 – 754 5/5/2026
Rule 403 (cont.) (Amended June 3, 2005)
403-23
Table 4
(Conservation Management Practices for Confined Animal Facilities) SOURCE

CATEGORY

CONSERVATION MANAGEMENT PRACTICES
Manure
Handling
(1a)
(1b)
Cover manure prior to removing material off-site; AND
Spread the manure before 11:00 AM and when wind conditions are less than 25 miles per hour; AND
(Only
applicable to
Commercial
Poultry
Ranches)
(1c)
(1d)
Utilize coning and drying manure management by removing manure at laying hen houses at least twice per year and maintain a base of no less than 6 inches of dry manure after clean out; or in lieu of complying with conservation management practice (1c), comply with conservation management practice (1d).

Utilize frequent manure removal by removing the manure from laying hen houses at least every seven days and immediately thin bed dry the material.

Feedstock
Handling
(2a) Utilize a sock or boot on the feed truck auger when filling feed storage bins.

Disturbed
Surfaces
(3a)
(3b)
(3c)
Maintain at least 70 percent vegetative cover on vacant portions of the facility; OR
Utilize conservation tillage practices to manage the amount, orientation and distribution of crop and other plant residues on the soil surface year-round, while growing crops (if applicable) in narrow slots or tilled strips; OR
Apply dust suppressants in sufficient concentrations and frequencies to maintain a stabilized surface.

Unpaved
Roads
(4a)
(4b)
(4c)
Restrict access to private unpaved roads either through signage or physical access restrictions and control vehicular speeds to no more than 15 miles per hour through worker notifications, signage, or any other necessary means; OR
Cover frequently traveled unpaved roads with low silt content material (i.e., asphalt, concrete, recycled road base, or gravel to a minimum depth of four inches); OR
Treat unpaved roads with water, mulch, chemical dust
suppressants or other cover to maintain a stabilized surface.

Equipment
Parking Areas
(5a)
(5b)
Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR
Apply material with low silt content (i.e., asphalt, concrete, recycled road base, or gravel to a depth of four inches).

EXHIBIT 2
City Council 22 – 755 5/5/2026
EXHIBIT 2
City Council 22 – 756 5/5/2026
Appendix D Caltrans CO Protocol Excerpts
Table 1
Table 2
CO Analysis Flow Charts

EXHIBIT 2
City Council 22 – 757 5/5/2026
EXHIBIT 2
City Council 22 – 758 5/5/2026
EXHIBIT 2
City Council 22 – 759 5/5/2026
EXHIBIT 2
City Council 22 – 760 5/5/2026
3-2

3.1.1. Is this project exempt from all
emissions analyses? (see Table 1)

3.1.8. Project-level
air quality analysis
not required
Yes

3.1.4. Is project in a federal attainment
area?

3.1.3. Is project locally defined as
regionally significant?

3.1.2. Is project exempt from regional
emissions analyses? (see Table 2) 3.1.9. Examine
local impacts
No
No
No
Yes
Proceed to
Section 4

3.1.4a. Is project in a California
attainment area?

3.1.4b. Is project included in a current
RTP for which a CEQA review has
been conducted?

3.1.4c. Project requires an examination of the
regional air quality impacts of the project, as
related to the California standards, within the
project's CEQA review.*

3.1.4d. Is a favorable CEQA finding for
regional air quality impacts, related to
the California standards, able to be
made for the project?**

3.1.10. Project
fails air quality
review
No
Yes
No
No
No
Yes
Continue on to next page
Box 3.1.5
Yes
Yes
Yes
Figure 1. Requirements for New Projects

EXHIBIT
2 City Council 22 – 761 5/5/2026
3-3

3.1.6. Is the project included in the
regional emissions analysis supporting
the currently conforming RTP and TIP?

3.1.5. Is there a currently conforming
RTP and TIP?

3.1.10. Project
fails air quality
review

3.1.7. Has project design concept and/or
scope changed significantly from that in
regional analysis?

3.1.10. Project
fails air quality
review

3.1.12. Is an affirmative regional
conformity determination, and a favorable
CEQA finding for regional air quality
impacts related to the California standards,
able to be made for the project?**

3.1.11. Project requires: 1) a project specific
regional conformity determination; and 2) if the
project is in a California nonattainment area, a
CEQA examination of the regional air quality
impacts, as they relate to the California
standards.*
*In consultation w/MPO and Caltrans **In consultation w/MPO, local air district, CARB and Caltrans

3.1.9. Examine
local impacts
Proceed to
Section 4
From Box 3.1.4 on
previous page
Yes
Yes
No
Yes
Yes
No
No
No
Figure 1 (cont.). Requirements for New Projects

EXHIBIT
2 City Council 22 – 762 5/5/2026

EXHIBIT
2 City Council 22 – 763 5/5/2026

EXHIBIT
2 City Council 22 – 764 5/5/2026
Appendix E Prototype Language for Compliance
with 40 CFR 1502.22
EXHIBIT 2
City Council 22 – 765 5/5/2026
EXHIBIT 2
City Council 22 – 766 5/5/2026
Appendix C - Interim Guidance Update on Mobile Source Air Toxics Analysis in NEPA Documents - Environment - FHWA Environment FHWA > HEP > Environment > Air Quality > Air Toxics > memo APPENDIX C-Prototype Language for Compliance
with 40 CFR 1502.22
Sec. 1502.22 INCOMPETE OR UNAVAILABLE INFORMATION
When an agency is evaluating reasonably foreseeable significant adverse effects on the human environment in an environmental impact statement and there is incomplete or unavailable information, the agency shall always make clear that such information is lacking.
a. If the incomplete information relevant to reasonably foreseeable significant adverse impacts is essential to a reasoned choice among alternatives and the overall costs of obtaining it are not exorbitant, the agency shall include the information in the environmental impact statement. b. If the information relevant to reasonably foreseeable significant adverse impacts cannot be obtained because the overall costs of obtaining it are exorbitant or the means to obtain it are not known, the agency shall include within the environmental impact statement:

1. a statement that such information is incomplete or unavailable;

2. a statement of the relevance of the incomplete or unavailable information to evaluating reasonably foreseeable significant adverse impacts on the human environment;

3. a summary of existing credible scientific evidence which is relevant to evaluating the reasonably foreseeable significant adverse impacts on the human environment; and

4. the agency's evaluation of such impacts based upon theoretical approaches or research methods generally accepted in the scientific community. For the purposes of this section, "reasonably foreseeable" includes impacts that have catastrophic consequences, even if their probability of occurrence is low, provided that the analysis of the impacts is supported by credible scientific evidence, is not based on pure conjecture, and is within the rule of reason.
c. The amended regulation will be applicable to all environmental impact statements for which a Notice to Intent (40 CFR 1508.22) is published in the Federal Register on or after May 27, 1986. For environmental impact statements in progress, agencies may choose to comply with the requirements of either the original or amended regulation.

INCOMPLETE OR UNAVAILABLE INFORMATION FOR PROJECT-SPECIFIC MSAT HEALTH

IMPACTS ANALYSIS
In FHWA's view, information is incomplete or unavailable to credibly predict the project-specific health impacts due to changes in MSAT emissions associated with a proposed set of highway alternatives. The outcome of such an assessment, adverse or not, would be influenced more by the uncertainty introduced into the process through assumption and speculation rather than any genuine insight into the actual health impacts directly attributable to MSAT exposure associated with a proposed action.

The U.S. Environmental Protection Agency (EPA) is responsible for protecting the public health and welfare from any http://www.fhwa.dot.gov/environment/airtoxic/100109guidapc.htm (1 of 3) [7/7/2010 10:39:25 PM] EXHIBIT 2
City Council 22 – 767 5/5/2026
Appendix C - Interim Guidance Update on Mobile Source Air Toxics Analysis in NEPA Documents - Environment - FHWA known or anticipated effect of an air pollutant. They are the lead authority for administering the Clean Air Act and its amendments and have specific statutory obligations with respect to hazardous air pollutants and MSAT. The EPA is in the continual process of assessing human health effects, exposures, and risks posed by air pollutants. They maintain the Integrated Risk Information System (IRIS), which is "a compilation of electronic reports on specific substances found in the environment and their potential to cause human health effects" (EPA, http://www.epa.gov/ncea/iris/index.html). Each report contains assessments of non-cancerous and cancerous effects for individual compounds and quantitative estimates of risk levels from lifetime oral and inhalation exposures with uncertainty spanning perhaps an order of magnitude.

Other organizations are also active in the research and analyses of the human health effects of MSAT, including the Health Effects Institute (HEI). Two HEI studies are summarized in Appendix D of FHWA's Interim Guidance Update on Mobile source Air Toxic Analysis in NEPA Documents. Among the adverse health effects linked to MSAT compounds at high exposures are cancer in humans in occupational settings; cancer in animals; and irritation to the respiratory tract, including the exacerbation of asthma. Less obvious is the adverse human health effects of MSAT compounds at current environmental concentrations (HEI, http://pubs.healtheffects.org/view.php?id=282) or in the future as vehicle emissions substantially decrease (HEI, http://pubs.healtheffects.org/view.php?id=306).

The methodologies for forecasting health impacts include emissions modeling; dispersion modeling; exposure modeling; and then final determination of health impacts - each step in the process building on the model predictions obtained in the previous step. All are encumbered by technical shortcomings or uncertain science that prevents a more complete differentiation of the MSAT health impacts among a set of project alternatives. These difficulties are magnified for lifetime (i. e., 70 year) assessments, particularly because unsupportable assumptions would have to be made regarding changes in travel patterns and vehicle technology (which affects emissions rates) over that time frame, since such information is unavailable. The results produced by the EPA's MOBILE6.2 model, the California EPA's Emfac2007 model, and the EPA's DraftMOVES2009 model in forecasting MSAT emissions are highly inconsistent. Indications from the development of the MOVES model are that MOBILE6.2 significantly underestimates diesel particulate matter (PM) emissions and significantly overestimates benzene emissions.

Regarding air dispersion modeling, an extensive evaluation of EPA's guideline CAL3QHC model was conducted in an NCHRP study (http://www.epa.gov/scram001/dispersion_alt.htm#hyroad), which documents poor model performance at ten sites across the country - three where intensive monitoring was conducted plus an additional seven with less intensive monitoring. The study indicates a bias of the CAL3QHC model to overestimate concentrations near highly congested intersections and underestimate concentrations near uncongested intersections. The consequence of this is a tendency to overstate the air quality benefits of mitigating congestion at intersections. Such poor model performance is less difficult to manage for demonstrating compliance with National Ambient Air Quality Standards for relatively short time frames than it is for forecasting individual exposure over an entire lifetime, especially given that some information needed for estimating 70- year lifetime exposure is unavailable. It is particularly difficult to reliably forecast MSAT exposure near roadways, and to determine the portion of time that people are actually exposed at a specific location.

There are considerable uncertainties associated with the existing estimates of toxicity of the various MSAT, because of factors such as low-dose extrapolation and translation of occupational exposure data to the general population, a concern expressed by HEI (http://pubs.healtheffects.org/view.php?id=282 ). As a result, there is no national consensus on air doseresponse values assumed to protect the public health and welfare for MSAT compounds, and in particular for diesel PM.

The EPA (http://www.epa.gov/risk/basicinformation.htm#g ) and the HEI (http://pubs.healtheffects.org/getfile.php?u=395) have not established a basis for quantitative risk assessment of diesel PM in ambient settings. http://www.fhwa.dot.gov/environment/airtoxic/100109guidapc.htm (2 of 3) [7/7/2010 10:39:25 PM] EXHIBIT 2
City Council 22 – 768 5/5/2026
Appendix C - Interim Guidance Update on Mobile Source Air Toxics Analysis in NEPA Documents - Environment - FHWA There is also the lack of a national consensus on an acceptable level of risk. The current context is the process used by the EPA as provided by the Clean Air Act to determine whether more stringent controls are required in order to provide an ample margin of safety to protect public health or to prevent an adverse environmental effect for industrial sources subject to the maximum achievable control technology standards, such as benzene emissions from refineries. The decision framework is a two-step process. The first step requires EPA to determine a "safe" or "acceptable" level of risk due to emissions from a source, which is generally no greater than approximately 100 in a million. Additional factors are considered in the second step, the goal of which is to maximize the number of people with risks less than 1 in a million due to emissions from a source. The results of this statutory two-step process do not guarantee that cancer risks from exposure to air toxics are less than 1 in a million;in some cases, the residual risk determination could result in maximum individual cancer risks that are as high as approximately 100 in a million. In a June 2008 decision, the U.S. Court of Appeals for the District of Columbia Circuit upheld EPA's approach to addressing risk in its two step decision framework. Information is incomplete or unavailable to establish that even the largest of highway projects would result in levels of risk greater than safe or acceptable.

Because of the limitations in the methodologies for forecasting health impacts described, any predicted difference in health impacts between alternatives is likely to be much smaller than the uncertainties associated with predicting the impacts.

Consequently, the results of such assessments would not be useful to decision makers, who would need to weigh this information against project benefits, such as reducing traffic congestion, accident rates, and fatalities plus improved access for emergency response, that are better suited for quantitative analysis.

Due to the limitations cited, a discussion such as the example provided in this Appendix (reflecting any local and projectspecific circumstances), should be included regarding incomplete or unavailable information in accordance with Council on Environmental Quality (CEQ) regulations [40 CFR 1502.22(b)]. The FHWA Headquarters and Resource Center staff Victoria Martinez (787) 766-5600 X231, Shari Schaftlein (202) 366-5570, and Michael Claggett (505) 820-2047, are available to provide guidance and technical assistance and support.

FHWA Home | HEP Home | Feedback
United States Department of Transportation - Federal Highway Administration http://www.fhwa.dot.gov/environment/airtoxic/100109guidapc.htm (3 of 3) [7/7/2010 10:39:25 PM] EXHIBIT 2
City Council 22 – 769 5/5/2026

ID INTERSECTION SCENARIO L T R L T R L T R L T R
Existing 153 123 14 2 216 47 100 43 148 47 45 7
2016 Baseline1186 126 16 2 231 50 104 47 159 49 59 7
2016 + Project 186 126 24 2 231 50 104 47 159 62 63 11
2035 Baseline2412 456 28 21 758 266 169 59 245 52 89 17 2035 + Project 412 456 36 21 758 266 169 59 245 65 93 21 Existing 21 43 62 220 122 83 29 326 19 114 836 241
2016 Baseline 22 44 64 239 125 94 41 373 19 117 917 269 2016 Baseline122 44 64 248 125 98 41 373 19 108 909 273 2035 Baseline269 291 106 352 306 332 177 701 44 148 1086 606 2035 + Project 69 291 106 361 306 336 177 701 44 139 1078 610 Existing 0 0 0 0 0 21 0 616 0 0 1197 8
2016 Baseline10 0 0 0 0 22 0 683 0 0 1309 8
2016 + Project 0 0 0 0 0 0 0 683 0 0 1317 0
2035 Baseline30 0 0 0 0 24 0 742 0 0 1423 9
2035 + Project 0 0 0 0 0 0 0 742 0 0 1432 0
Existing 0 0 35 0 0 0 0 581 39 0 1201 0
2016 Baseline10 0 35 0 0 0 0 1323 39 0 2633 0
2016 + Project 0 0 35 0 0 0 0 1384 39 0 2702 0
2035 Baseline30 0 39 0 0 0 0 703 44 0 1427 0
2035 + Project 0 0 39 0 0 0 0 712 44 0 1414 0
Existing 22 0 23 1 0 1 4 583 25 32 1148 6
2016 Baseline123 0 24 1 0 1 4 650 26 33 1259 6
2016 + Project 23 0 24 1 0 1 4 659 26 33 1259 6
2035 Baseline325 0 26 1 0 1 4 705 28 36 1368 7
2035 + Project 25 0 26 1 0 1 4 714 28 36 1368 7
Existing 0 0 0 378 0 84 230 393 0 0 1114 264
2016 Baseline10 0 0 387 0 103 251 440 0 0 1207 271
2016 + Project 0 0 0 387 0 103 251 449 0 0 1207 271
2035 Baseline20 0 0 508 0 122 340 841 0 0 1203 219
2035 + Project 0 0 0 508 0 122 340 850 0 0 1203 219
Existing 99 844 18 106 1026 972 161 120 451 14 275 16
2016 Baseline1103 865 18 109 1052 1059 195 123 469 14 282 16 2016 + Project 103 865 18 109 1052 1059 204 123 469 14 282 16 2035 Baseline2192 1052 31 140 2161 1199 439 231 765 27 113 34 2035 + Project 192 1052 31 140 2161 1199 448 231 765 27 113 34 Source: AECOM. 2011 `
1 2016 Baseline traffic volumes developed by adding cumulative projects trip assignment and application of 0.5% annual growth rate to existing counts. 2 2035 Baseline traffic volumes referenced from Santa Ana Renaissance Specific Plan Traffic Study (KOA Corporation, 2010) 3 2035 Baseline traffic volumes developed by adding cumulative projects trip assignment and application of 0.5% annual growth rate to existing counts.

WB
Fuller St-Fruit St/Santa Ana Blvd
1 Santiago St/Civic Center Dr
2 Santiago St/Santa Ana Blvd

NB SB EB
6 I-5 SB Ramps/Santa Ana Blvd
7 Grand Ave/Santa Ana Blvd
Table A: Santa Ana Boulevard Grade Separation Weekday AM Peak Hour Traffic Volumes 3 Logan St/Santa Ana Blvd
4 SARTC Dwy/Santa Ana Blvd
5 EXHIBIT 2
City Council 22 – 770 5/5/2026

ID INTERSECTION SCENARIO L T R L T R L T R L T R
Existing 57 169 15 4 158 38 234 52 257 11 11 10
2016 Baseline180 173 16 4 175 40 242 65 294 12 16 10
2016 + Project 80 173 24 4 175 40 242 65 294 20 19 13
2035 Baseline2265 719 61 26 666 179 375 68 500 58 42 21 2035 + Project 265 719 69 26 666 179 375 68 500 66 45 24 Existing 42 77 104 240 128 61 43 750 16 103 439 142
2016 Baseline143 79 107 281 131 75 61 861 16 106 495 157 2016 + Project 43 79 107 286 131 78 61 861 16 101 489 162 2035 Baseline255 291 115 461 369 308 295 1018 126 148 907 506 2035 + Project 55 291 115 466 369 311 295 1018 126 143 901 511 Existing 0 0 0 0 0 14 0 1166 0 0 660 8
2016 Baseline10 0 0 0 0 14 0 1322 0 0 732 8
2016 + Project 0 0 0 0 0 0 0 1327 0 0 740 0
2035 Baseline30 0 0 0 0 16 0 1433 0 0 794 9
2035 + Project 0 0 0 0 0 0 0 1438 0 0 803 0
Existing 0 0 97 0 0 0 0 1076 33 0 680 0
2016 Baseline10 0 99 0 0 0 0 1230 34 0 752 0
2016 + Project 0 0 99 0 0 0 0 1235 34 0 760 0
2035 Baseline30 0 109 0 0 0 0 1332 37 0 817 0
2035 + Project 0 0 109 0 0 0 0 1337 37 0 826 0
Existing 24 0 82 16 1 6 7 1149 15 14 648 3
2016 Baseline125 0 84 16 1 6 7 1305 15 14 719 3
2016 + Project 25 0 84 16 1 6 7 1310 15 14 719 3
2035 Baseline327 0 92 18 1 7 8 1414 17 16 781 3
2035 + Project 27 0 92 18 1 7 8 1419 17 16 781 3
Existing 0 0 0 296 0 83 663 608 0 0 571 193
2016 Baseline10 0 0 304 0 95 719 711 0 0 630 199
2016 + Project 0 0 0 304 0 95 719 716 0 0 630 199
2035 Baseline20 0 0 351 0 305 527 943 0 0 1324 273
2035 + Project 0 0 0 351 0 305 527 948 0 0 1324 273
Existing 150 1573 19 44 573 372 269 207 323 31 145 65
2016 Baseline1158 1612 19 45 587 423 357 212 338 32 149 67 2016 + Project 158 1612 19 45 587 423 362 212 338 32 149 67 2035 Baseline2346 2707 59 186 1425 1098 517 242 515 109 246 124 2035 + Project 346 2707 59 186 1425 1098 522 242 515 109 246 124 Source: AECOM. 2011
1 2016 Baseline traffic volumes developed by adding cumulative projects trip assignment and application of 0.5% annual growth rate to existing counts. 2 2035 Baseline traffic volumes referenced from Santa Ana Renaissance Specific Plan Traffic Study (KOA Corporation, 2010) 3 2035 Baseline traffic volumes developed by adding cumulative projects trip assignment and application of 0.5% annual growth rate to existing counts.

WB
Fuller St-Fruit St/Santa Ana Blvd
1 Santiago St/Civic Center Dr
2 Santiago St/Santa Ana Blvd

NB SB EB
6 I-5 SB Ramps/Santa Ana Blvd
7 Grand Ave/Santa Ana Blvd
Table B: Santa Ana Boulevard Grade Separation Weekday PM Peak Hour Traffic Volumes 3 Logan St/Santa Ana Blvd
4 SARTC Dwy/Santa Ana Blvd
5 EXHIBIT 2
City Council 22 – 771 5/5/2026

CITY OF SANTA ANA
ATTACHMENT N5

INITIAL SITE ASSESSMENT REPORT
EXHIBIT 2
City Council 22 – 772 5/5/2026
October 22, 2012
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, California 92701
Attention: Mr. Jason Gabriel, Project Manager
Subject: Initial Site Assessment Report
Project Site: Santa Ana Boulevard/Metrolink Railroad Grade Separation Project Santa Ana, California 91325
AECOM Project No.: 60196303.1.12
Dear Mr. Gabriel:

We have completed the preparation of the Initial Site Assessment checklist and report. The results of our investigation, together with our conclusions, are presented in the attached report.

Based upon our review of the information presented in the report we conclude and recommend the following:
 The study area for the Proposed Project is in an area of mostly light-industrial land usage that was originally developed in the 1950s or before. Numerous sites within the project limits or in the immediate area appear on the various regulatory database lists, including those for Leaking Underground Storage Tanks. The study area for this investigation includes eleven parcels totaling

8.24 acres proposed for full acquisition, two parcels proposed for partial acquisition totaling 0.36 acres, and nine parcels (including other parts of the two partial acquisition parcels) for which temporary construction easements only will be required and totaling 2.17 acres. The acquisition parcels include several older industrial buildings, part of the County of Orange maintenance yard (which includes a former petroleum storage facility), a former chemical plant, an office building and two relatively new buildings occupied by a drilling contractor. The temporary construction easement and partial acquisition parcels include other parts of the County maintenance facility (where a previous Phase II study found impacts to soil gas by perchloroethylene and trichloroethylene), an area of former agricultural usage where soil impacts by heavy metals have previously been identified, and an auto wrecking yard that was formerly the site of a battery manufacturing plant.

The following investigations are recommended for the study area during the Environmental Phase:
 Phase I Environmental Site Assessments on the acquisition parcels or areas, with inspections of the interiors of the building, including at a minimum Phase I ESAs on the area along Fuller Street north of Fruit Street, the County maintenance facility and the industrial buildings at the south end of the acquisition area, south of Sixth Street. Nearby TCE parcels, which are of less concern since minimal surface disturbance is anticipated, would be described as part of the proposed reports.  A Phase II Environmental Site Assessment on the project site as a whole, or a series of several focused Phase II ESAs to include at a minimum the former petroleum product storage facility (parcel A-9, 1111 E. Fruit Street), the County maintenance buildings, the former Jasco Chemical plant (parcel A-7, 1006 N. Fruit Street) (soil testing and soil gas survey recommended) and the auto wrecking yard/former battery manufacturer (parcel T-9, 1041 E. 6th Street). Other areas of investigation may be indicated by the Phase I assessments, particularly at the older industrial buildings along Fuller Street.

EXHIBIT 2
City Council 22 – 773 5/5/2026
 Removal of the three closed-in-place USTs at the former Jasco Chemical plant should be considered.
 Inspection and sampling for asbestos, lead-based paint, PCBs and mercury switches in the buildings in the acquisition area.
.

We appreciate this opportunity to provide environmental services to the City of Santa Ana and look forward to being of continued service on future projects. Please do not hesitate to contact us if you have any questions regarding our report.

Sincerely,
AECOM Technology Corporation
Robert Olsen, R.G., R.E.A. II
Senior Geologist
Attachment: as stated
EXHIBIT 2
City Council 22 – 774 5/5/2026

INITIAL SITE ASSESSMENT REPORT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project Santa Ana, California
AECOM Project Number: 60196303.1.12
Federal Project No. STPL 5063 (136)
Prepared for:

Mr. Jason Gabriel
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, California 92701
Prepared by:

AECOM Technology Corporation
999 Town & Country Road, Fourth Floor
Orange, California 92868
(714) 835-4447
fax (714) 953-6989
October 22, 2012
EXHIBIT 2
City Council 22 – 775 5/5/2026

TABLE OF CONTENTS
SUMMARY OF CONCLUSIONS..................................................................................... 1

1.0 INTRODUCTION .................................................................................................. 3

2.0 PROJECT DESCRIPTION AND HISTORICAL INFORMATION .......................... 4

2.1 Project Description ............................................................................................ 4

2.2 Acquisition and Temporary Construction Easement Parcels ............................ 5

2.3 Geological Information ...................................................................................... 5

2.4 Historical Aerial Photograph Review ................................................................. 6

2.5 Other Historical Information Sources ................................................................ 7

3.0 PHYSICAL SITE INSPECTION............................................................................ 9

3.1 Site Visit ............................................................................................................ 9

3.2 Infrastructure Hazards .................................................................................... 15

4.0 REGULATORY RECORDS REVIEW ................................................................. 16

5.0 CONCLUSIONS AND RECOMMENDATIONS .................................................. 22

6.0 LIMITATIONS ..................................................................................................... 24

7.0 PREPARER’S CERTIFICATION ........................................................................ 25 APPENDIX A: INITIAL SITE ASSESSMENT CHECKLIST
APPENDIX B: SITE VICINITY MAP, PROJECT PLANS AND PHOTOGRAPHS APPENDIX C: REGULATORY RECORDS DOCUMENTATION (EXECUTIVE

SUMMARY AND RADIUS MAP)
APPENDIX D: HISTORICAL RESEARCH DOCUMENTATION

HISTORICAL AERIAL PHOTOGRAPHS

SANBORN FIRE INSURANCE MAPS

HISTORICAL TOPOGRAPHIC MAPS

INFORMATION ON SPECIFIC SITES OF CONCERN
APPENDIX E: RESUME OF PREPARER
APPENDIX F: CONCEPTUAL WORKPLAN FOR PHASE II ENVIRONMENTAL

SITE ASSESSMENT
APPENDIX G: COMPLETE EDR REGULATORY RECORDS SEARCH (CD, in pocket)
TABLE A: ENVIRONMENTAL CONCERNS
TABLE 1: ACQUISITION AND TEMPORARY CONSTRUCTION EASEMENT

PARCELS
TABLE 2: AERIAL PHOTOGRAPH REVIEW
TABLE 3: SANBORN FIRE INSURANCE MAP REVIEW
TABLE 4: HISTORICAL TOPOGRAPHIC MAP REVIEW
TABLE 5: ACQUISITION AND TEMPORARY CONSTRUCTION EASEMENT

PARCELS WITH USAGE DATA
TABLE 6: DATABASES REVIEWED
TABLE 7: UNDERGROUND STORAGE TANKS AT JASCO CHEMICAL
(PARCEL 8)
TABLE 8: ENVIRONMENTAL CONCERNS
EXHIBIT 2
City Council 22 – 776 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 1
October 22, 2012
Initial Site Assessment Report

SUMMARY OF CONCLUSIONS
Name of Project: Santa Ana Boulevard/Metrolink Railroad Grade Separation Project
Location: Vicinity of Santa Ana Boulevard and Fruit Street, Santa Ana, California
Consultant Name: AECOM Technology Corporation
Consultant Project Number: 60196303.1.12
Environmental Professional: Robert Olsen, P.G., R.E.A.II I. Property Use
The study area is an irregular area comprising approximately eleven full acquisition parcels (8.24 acres), two partial acquisition parcels (totaling 0.36 acres) and nine parcels for which temporary construction easements on 2.17 acres would be obtained.

The acquisition parcels include industrial buildings, a former chemical plant, an auto wrecking yard, a County of Orange vehicle and road maintenance facility, and a large warehouse building occupied by a drilling contractor. Known sites of environmental concern include a former chemical plant with three closed-in-place underground storage tanks, a former petroleum storage facility, two areas of known contamination (on construction easement parcels), and the auto wrecking yard (formerly used as a battery manufacturing plant; also on an easement parcel).

Other sites of potential environmental concern include the County road maintenance facility, the old industrial buildings along Fuller Street, and the drilling contractor warehouse. No interior inspections of the facilities in the study area were conducted.

II. Investigations
Scope of Work: This assessment was prepared to conform to the Caltrans Guidance for the preparation of the Initial Site Assessment checklist (Project Development Procedures Manual, 07/01/1999, pp. DD-3 to DD-6).

III. Findings
The site reconnaissance and review of historical information sources indicated the following identified or potential environmental concerns regarding the acquisition and temporary construction easement parcels (BOLD = Recognized Environmental Condition):

EXHIBIT 2
City Council 22 – 777 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 2
October 22, 2012

TABLE A

ENVIRONMENTAL CONCERNS
Area Parcel Numbers Current Concerns Historical Concerns Fuller Street A-1 through A-8
(and T-1)
Industrial buildings Chemical plant with
removed and closedin-place USTs (closed
LUST case 2000)
County yard A-9 Repair/service facilities Former petroleum storage facility
South Warehouses A-11 Possible hazardous materials
usage
Former warehouses,
light-industrial buildings
and auto repair shops
East of Fuller Street T-4 Known low-level soil impacts
by heavy metals
Agriculture
County Yard T-8 Gas station, known low-level
impacts by PCE and TCEy to
soil vapor, repair/service
facilities
--
Auto Wrecking Yard T-9 Auto wrecking yard Battery manufacturer In general, the temporary construction easement parcels are of less concern than the acquisition parcels; however, where significant environmental impacts have been or may be identified, further evaluation, including Phase II sampling, may be warranted.

IV. Opinions and Recommendations
The following investigations are recommended for the study area, and specifically for the proposed acquisition parcels/structures, during the Environmental Phase of the project:
 Phase I Environmental Site Assessments on the acquisition parcels or areas, with inspections of the interiors of the building, including at a minimum Phase I ESAs on the area along Fuller Street north of Fruit Street, the County maintenance facility and the industrial buildings at the south end of the acquisition area, south of Sixth Street. Nearby TCE parcels, which are of less concern since minimal surface disturbance is anticipated, would be described as part of the proposed reports.
 A Phase II Environmental Site Assessment on the project site as a whole, or a series of several focused Phase II ESAs to include at a minimum the former petroleum product storage facility (parcel A-9, 1111 E. Fruit Street), the County maintenance buildings, the former Jasco Chemical plant (parcel A-7, 1006 N.

Fruit Street) (soil testing and soil gas survey recommended) and the auto wrecking yard/former battery manufacturer (parcel T-9, 1041 E. 6th Street). Other areas of investigation may be indicated by the Phase I assessments, particularly at the older industrial buildings along Fuller Street.

EXHIBIT 2
City Council 22 – 778 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 3
October 22, 2012
 Removal of the three closed-in-place USTs at the former Jasco Chemical plant should be considered.
 Inspection and sampling for asbestos, lead-based paint, PCBs and mercury switches in the buildings in the acquisition area.

1.0 INTRODUCTION
The study area for this Initial Site Assessment (ISA) is centered at the crossing of Santa Ana Boulevard and the Metrolink railroad tracks in the northeastern part of central Santa Ana, California. The study area includes eleven full acquisition parcels, two partial acquisition parcels and nine parcels that will have temporary construction easements. The Proposed Project will entail creation of a grade separation, with Santa Ana Boulevard in an underpass below the Metrolink rail line. A shoofly rail line will provide temporary service during construction. The Project Description is presented below in Section 2.1. An aerial photograph showing the conformation of the study area and the affected parcels is presented in Appendix B.

The purpose of this investigation was to identify and evaluate potential hazardous waste sites and update the evaluation of environmental factors that may have impacted the soil and groundwater in the project vicinity due to past and present industrial or commercial activities. This report was prepared by AECOM Transportation, a division of AECOM Technology Corporation, Inc.

Activities associated with the preparation of the ISA included the following:
 Site visit
 Review of project documents
 Review of historical aerial photographs and topographic maps  Review of geological and hydrological data
 Review of available agency records for listed sites of potential concern  Preparation of this summary report, including the ISA Checklist (see Appendix A) The following sections present the information developed and the findings of the Phase I Initial Site Assessment:
 Section 2.0 Project Description and Historical Information  Section 3.0 Site Reconnaissance
 Section 4.0 Regulatory Database Search
 Section 5.0 Conclusions and Recommendations
 Section 6.0 Limitations
EXHIBIT 2
City Council 22 – 779 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 4
October 22, 2012

2.0 PROJECT DESCRIPTION AND HISTORICAL INFORMATION

2.1 Project Description
The City of Santa Ana, in coordination with the California Department of Transportation (Department), is proposing to grade separate the existing Santa Ana Boulevard/OCTA Metrolink at-grade railroad crossing in the City of Santa Ana, Orange County, California.

Currently, 66 trains cross Santa Ana Boulevard at this location on weekdays. The purpose of the proposed project is to eliminate the at-grade crossing of Santa Ana Boulevard and the OCTA Metrolink tracks by creating a grade separation, including depressing the profile of Santa Ana Boulevard under the adjacent Metrolink tracks in order to enhance traffic operations, improve pedestrian and bicycle user safety, improve emergency response times, and reduce existing traffic congestion along Santa Ana Boulevard.

The proposed project improvements extend along Santa Ana Boulevard from approximately Santiago Street at the west end to the west side of the Interstate 5 (I-5) southbound off-ramp intersection with Santa Ana Boulevard. As part of the grade separation the proposed project includes: minor improvements to the Santa Ana Boulevard/Santiago Street intersection; terminating Logan Street north of Santa Ana Boulevard by constructing a cul-de-sac; and improvements to Fuller Street, both north and south of Santa Ana Boulevard.

The project proposes to relocate Santa Ana Boulevard approximately 30 feet south of its existing alignment, to construct a utility corridor on the north side of the roadway, and to maintain the existing lane configuration of three lanes in each direction for the entire length of the project. The proposed project would include the construction of an underpass bridge (i.e., roadway going under the railroad tracks) and retaining walls, installation of paving, curbs, gutters, medians, sidewalks, streetlights, landscape and irrigation features, drainage facilities, and the relocation of utilities.

During construction the project proposes to construct a temporary two-track shoofly railroad alignment for the purpose of constructing the underpass structure while maintaining railroad service, which is to be constructed beginning just south of the existing Metrolink crossing of I-5 and terminating south of the Santa Ana Regional Transportation Center near 4th Street. This shoofly alignment would be located immediately to the east of the existing railroad alignment.

The project also proposes to construct a two-lane detour road south of Santa Ana Boulevard, which would be used by vehicular traffic during the construction of the underpass bridge and its approaches, and to use Fruit Street as a detour route during the final phase of construction. New right-of-way, including both permanent acquisition and temporary easements, would be needed for the construction of the shoofly alignment and detour road.

EXHIBIT 2
City Council 22 – 780 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 5
October 22, 2012

2.2 Acquisition and Temporary Construction Easement Parcels For the purposes of the present report, reference numbers have been assigned to the acquisition parcels and temporary construction easement parcels. The acquisition parcels are numbered from A-1 to A-11, from north to south. The two partial-acquisition parcels are numbered P-1 and P-2. The temporary construction easement parcels are designated T-1 through T-9, also numbered from north to south. The following table presents the designations, street addresses and Assessor’s Parcel Numbers. The table is reproduced with additional information in Section 3.1 below.

TABLE 1

ACQUISITION AND TEMPORARY EASEMENT PARCELS
Ref. No. APN Address
A-1 398-093-03 1024 Fuller
A-2 398-093-04 1022 Fuller
A-3 398-093-05 1022 Fuller
A-4 398-093-06 1020 Fuller
A-5 398-093-07 1016 Fuller
A-6 398-093-08 1012 Fuller
A-7 398-093-13 1006 Fuller
A-8 398-092-02 1013 Fuller
A-9 398-207-01 1102 E. Fruit
A-10 398-208-01 --
A-11 398-342-18 1043 E. 4th
P-1 398-101-15 1143 E. Fruit (a)
P-2 398-101-16 1207 E. Fruit (a)
T-1 398-093-01 1102-1112 E. Washington
T-2 398-092-15 --
T-3 398-092-14 --
T-4 398-092-13 --
T-5 398-092-12 --
T-6 398-101-15 1143 E. Fruit (a)
T-7 398-101-16 1207 E. Fruit (a)
T-8 398-361-07 1111 E. Fruit
T-9 398-361-12 1041 E. 6th
(a) Partial acquisition only; also temporary construction easement

2.3 Geological Information
The Site Vicinity Map (Appendix B) depicts the location of the study area. Plans of the proposed project are also included in Appendix B. Historical aerial photographs, as available, are included in Appendix D.

Information on the surface topography and soil classification of the Property was obtained from the U. S. Geological Survey 7.5-minute topographic maps (Tustin and Orange CA), and from the USDA Natural Resources Conservation Service (formerly Soil Conservation Service) STATSGO database.

EXHIBIT 2
City Council 22 – 781 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 6
October 22, 2012
The overall topographic slope of the vicinity of the project site is to the southwest. The average elevation is approximately 110 feet above mean sea level. Soils underlying the Property are classified as Hanford, Ramona-Placentia and other groups, and consist of sandy to silty materials associated with the Santa Ana River and Santiago Creek drainage systems. These soils generally have moderate permeability.

The depth to ground water in this area, based on water levels in groundwater monitoring wells at nearby gas stations with leaking underground storage tanks, is approximately 100 feet. The regional groundwater flow direction in the area is similar to the topographic slope, to the southwest.

2.4 Historical Aerial Photograph Review
AECOM reviewed aerial photographs provided by Environmental Data Resources, Inc. (EDR). The photographs are reproduced in Appendix D. The following table summarizes the information obtained from the aerial photographs.

EXHIBIT 2
City Council 22 – 782 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 7
October 22, 2012
TABLE 2

AERIAL PHOTOGRAPH REVIEW
Date Scale Description
1938 1” = 555’ Poor quality photo (overexposed): Northern part open land with some orange groves and single-family dwellings. Industrial and warehouse area south of Fruit Street.
1947 1” = 666’ Northern part: orange groves, single-family dwellings, commercial area on west side toward Santiago Boulevard. Petroleum storage facility at northeast corner of Lincoln Avenue and Fruit Street. Southern part of study area includes industrial buildings (County yard) with warehouses at south end.
1952 1” = 666’ Generally as above. Orange trees removed from northern part (along future Fuller Street), graded for development.
1968 1” = 480’ New industrial buildings along Fuller Street at north end of study area. 1977 1” = 666’ Similar to 1968 photo.
1990 1” = 666’ Similar to above.
2002 1” =666’ Warehouses at south end of study area have been replaced by two large warehouse buildings (Parcel A-11) as presently existing. 2005 1” = 604’ As above.

2.5 Other Historical Information Sources
AECOM found historical sources from 1898 to the present, as follows.

Fire Insurance Maps: EDR-Sanborn furnished Sanborn Maps for the years 1888, 1891, 1895, 1906, 1949, 1963 and 1969. Coverage was only available for part of the project area and did not include the area north of Santa Ana Boulevard. The following table summarizes the information obtained from the Sanborn maps (the 1888 map did not depict any of the parcels comprising the study area and hence is omitted from the table). On the table, NC indicates No Coverage of the designated parcel/area.

EXHIBIT 2
City Council 22 – 783 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 8
October 22, 2012
TABLE 3

SANBORN FIRE INSURANCE MAP REVIEW
Parcel No. 1891 1895 1906 1949 1963 1969
A-9 NC NC NC Yard for
County Road
Department
and County
Agriculture
Department
Yard for
County Road
Department
and County
Agriculture
Department
Yard for County
Road
Department
and County
Agriculture
Department
A-11 Warehouse
(feed)
Two warehousesFour wareHousesFour warehousesWarehouses Warehouses P-1/T-6 NC NC NC County
Juvenile
Detention
Home (a)
Orange
County
Juvenile
Detention
Home (a)
Orange County
Juvenile
Detention
Home (a)
P-2/T-7 NC NC NC County Flood
Control (a)
County Flood
Control (a)
County Flood
Control (a)
T-8 NC NC NC General
Petroleum
storage
facility (SW
corner of
parcel)
Mobil Oil
storage facility
(SW corner of
parcel)
Mobil Oil
storage facility
(SW corner of
parcel)
T-9 NC NC NC Sun Battery
mfg., rock
processing,
machine
shop
Sun Battery,
fertilizer mfg.

Sun Battery,
fertilizer mfg.
(a) The small areas of partial acquisition (P-1 and P-2) at the north ends of these two parcels are not depicted.

Historical Topographic Maps: Historical topographic maps as shown below were provided by EDR. The maps are presented in Appendix D. The study area includes parts of two current 7.5-minute topographic quadrangle maps (Orange and Tustin). Contemporaneous topographic maps are described together below.

EXHIBIT 2
City Council 22 – 784 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 9
October 22, 2012

TABLE 4

HISTORICAL TOPOGRAPHIC MAP REVIEW
Date Name Scale Description (Study Area)
1898 Anaheim 15’ Northeast edge of City of Santa Ana; Southern Pacific Railroad (now Metrolink) line and streets already laid out, scattered small buildings
1901 Southern California
Sheet 1
60’ Large scale, no meaningful information
1901 Santa Ana 15’ As above
1902 Corona 30’ Large scale, no meaningful information
1935 Orange 7.5’ Approximately 25 small structures (dwellings or small industrial buildings)
1942 Anaheim, Santa Ana 15’ The area south of Fruit Street is an undifferentiated urban area; north of Fruit Street is urban (west of the railroad tracks) and orchard/orange grove with scattered dwellings (east of the railroad tracks)
1948,
1950
Tustin, Orange 7.5’ Undifferentiated urban area except for east of Lincoln Avenue and north of Fruit Street. Two round structures (probably oil storage tanks) are shown at the northeast corner of Lincoln and Fruit (Sanborn maps show this location, in Parcel A-7, as a General Petroleum and Mobil Oil petroleum storage facility). 1964,
1965
Tustin, Orange 7.5’ Undifferentiated urban area except for the eastern extension of Fruit Street toward Grand Avenue: Santa Ana Freeway
present one block northeast
1972 Tustin, Orange 7.5’ As above
1981 Tustin, Orange 7.5’ As above

3.0 PHYSICAL SITE INSPECTION
On September 2, 2011 and October 22, 2012, Robert Olsen of AECOM conducted an environmental assessment of the subject site to find if current usage or activities on the subject site have created, or have the potential to create, an environmental impairment to the site. The results of this assessment are presented below.

3.1 Site Visit
Acquisition Parcels
The following table summarizes the current and historical usage of the parcels comprising the study area, generally from north to south. The parcels are keyed to reference numbers used elsewhere in this report. Parcels A-1 through A-11 are proposed for full or partial acquisition. Parcels T-1 through T-9 are proposed for temporary construction easements only. Parcels P-1 and P-2 are proposed for partial acquisition and consist of relatively small portions of Parcels T-6 and T-7.

EXHIBIT 2
City Council 22 – 785 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 10
October 22, 2012
TABLE 5

ACQUISITION AND TEMPORARY EASEMENT PARCELS
Ref.

No.

APN
Addr.

Owner
Curr.

Use
Constr
Date
Fmr
Use
A-1 398-093-03 1024 Fuller Kathrine Swiatek Vacant? 1956 -- A-2 398-093-04 1022 Fuller Dale Swiatek Vacant? 1956 -- A-3 398-093-05 1022 Fuller Dale Swiatek Parking Lot 1956 -- A-4 398-093-06 1020 Fuller Dale Swiatek Macera
(Crematorium)
1955 --
A-5 398-093-07 1016 Fuller Richard Preston Vacant 1955 -- A-6 398-093-08 1012 Fuller Michael Alan
Freedman Corp.

Vacant 1954 --
A-7 398-093-13 1006 Fuller Michael Alan
Freedman Corp.

American
Office
Furniture
(warehouse)
1980 Jasco Chemical plant
(closed LUST, 2000)
A-8 398-092-02 1013 Fuller Pacific Link LLC Office Building 1971 -- A-9 398-207-01 1102 E. Fruit County of
Orange
County Yard County yard since
before 1940s
A-10 398-208-01 -- County of
Orange
Parking lot -- --
A-11 931-104-67 1043 E. 4th 1039 & 1054 E.
4 th LLC
J&H Drilling 1990s Warehouses (mainly
produce)
P-1 398-101-15 1207 E. Fruit Phoenix Houses
of California
Youth Home 1930s Probably orange
grove
P-2 398-101-16 1143 E. Fruit County of
Orange
County Yard 1960s --
T-1 398-093-01 1102-1112 E.

Washington
Santa Ana
Industrial Co.

Advanced
Coated
Plastics
1955 --
T-2 398-092-15 -- Cul-de-sac
street
-- --
T-3 398-092-14 -- City of Santa
Ana
Vacant lot -- Commercial or
industrial building,
1960s
T-4 398-012-13 -- County of
Orange
Vacant lot -- Commercial or
industrial building,
1960s
T-5 398-012-12 -- State of
California
Vacant land -- --
T-6 398-101-15 1207 E. Fruit Phoenix Houses
of California
Youth Home 1930s Probably orange
grove
T-7 398-101-16 1143 E. Fruit County of
Orange
County Yard 1960s --
T-8 398-361-07 1111 E. Fruit County of
Orange
County Yard Petroleum product
storage, planing mill,
lumber yard
T-9 398-361-12 1041 E. 6th Batool Japelaghi Freeway Auto Wrecking,
County
parking
N/A Battery manufacturer
(1960s or before)
(b) Partial acquisition only; also temporary construction easement EXHIBIT 2
City Council 22 – 786 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 11
October 22, 2012
Included within the disturbance limits of the proposed project are nine parcels (T-1 through T-9) for which temporary construction easements will be obtained. Because these parcels will not be acquired for the project, and because ground disturbance is expected to be minimal, they pose less environmental concern than the acquisition parcels. However, it should be noted that two of the parcels (T-4 and T-7) have previously been found to have impacted soil (by heavy metals and by perchloroethylene and trichloroethylene respectively).

Current Use of Adjoining Properties
The project area is irregular in shape. In general it is bounded on the north by industrial buildings with the Santa Ana Freeway beyond; on the east by various industrial buildings, including parts of the County of Orange maintenance yard; on the south by 4 th Street with warehouse buildings beyond; and on the west by the Metrolink railway tracks with (from south to north) a junkyard, the existing Metrolink station and parking lot, and an area of single-family dwellings beyond. No sites that appeared to be of immediate environmental concern were noted in the field; however, the project site is located in an area of mixed usage that historically included several gas stations as well as petroleum storage facilities, industrial buildings and other facilities of potential concern.

Site Observations
Generally, the study area consists of the acquisition parcels and the associated temporary construction easement (TCE) parcels. The acquisition area consists of privately and publicly–held parcels. This study focused on environmental risks associated with the acquisition parcels, but includes an evaluation of the TCE parcels as well since two of them are known to be impacted by historical releases of hazardous materials.

Generally, the acquisition parcels fall into four categories, as follows:

Privately-Owned Properties, Fuller Street North of Santa Ana Boulevard This group includes eight parcels, seven on the west side of Fuller Street (backing up on the Metrolink right-of-way on the west, and including Lincoln Avenue west of the railroad tracks), and one parcel east of Fuller Street immediately north of Santa Ana Boulevard. Most of these buildings were constructed in the 1950s; two were constructed in 1971 and 1980. Also included in this area is parcel T-1, a narrow strip of land behind (west of) a plastics manufacturing plant at the north end of the study area, adjacent to the Metrolink tracks. Most of the buildings in this area bear minimal or out-of-date signage; most appeared to be vacant. Current tenants include a crematorium and a warehouse for office furniture. The building east of Fuller appeared to be mostly medical offices. East of the medical office building are three parcels of land EXHIBIT 2
City Council 22 – 787 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 12
October 22, 2012
(vacant lots and a street cul-de-sac) for which temporary construction easements will be obtained.

No immediate environmental concerns related to hazardous materials at the buildings on the acquisition parcels were noted; however, without interior inspections no conclusions can be drawn regarding current hazardous materials usage, and since the buildings have been industrial since construction, it is possible that some historical hazardous materials usage has occurred. Also, the building on parcel A-7 was formerly occupied by a chemical plant, and three underground storage tanks were closed in place in 2000 and are presumed still to be present. No Sanborn map coverage was found for this area.

County Yard Facilities
Various County of Orange agencies, including the Facilities, Operations and Maintenance Divisions, are located on two of the full acquisition parcels, one partial acquisition parcel, and one temporary construction easement parcel. The area south of Fruit Street (parcel T-8) appears to have been acquired for usage by the County in the 1940s or before; the area north of Fruit Street (A-9 and A10) was formerly privately owned and includes an area (at the northeast corner of Fruit Street and the current Metrolink tracks) that was formerly a Mobil Oil petroleum product storage facility. Buildings in both areas appear to date from the 1950s or earlier. The County of Orange maintains a gas station at the northeast corner of parcel T-8 (adjacent to Fuller Street and not within the TCE area); the station dispenses gasoline only and diesel is dispensed elsewhere at the County facility. The gas station is a closed Leaking Underground Storage Tank case. The County facility was not inspected in detail but it appears to include shop areas for vehicle maintenance and repair, including trucks and heavy equipment, as well as mechanical shops, supply and inventory areas and offices. The gas station, vehicle repair facilities and possible diesel tanks indicate significant environmental concerns, but most of these areas are not within the temporary construction easement parcels. As noted below, soil vapor impacts by the halogenated solvents perchloroethylene and trichloroethylene have been found at the County yard facility.

On the east side of Fuller Street are more County of Orange Department of Public Works facilities. The northernmost part of the two County-owned parcels in this area are parcels P-2 and T-7 of the proposed project; the existing structures will remain. The two existing buildings in this area appear to be storage and vehicle maintenance facilities; one of the buildings bears the National Fire Protection Association (NFPA) placard 0-4-1 OXY, indication the presence of slightly toxic materials, extreme flammability hazard (probably from propane) and strong oxidizers (possibly welding gases).

Adjacent to the P-2/T/7 area of the County yard facility, on the northeast, is the northwest corner of the Phoenix House youth home facility. This area includes a EXHIBIT 2
City Council 22 – 788 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 13
October 22, 2012
partial acquisition and TCE area (P-1/T-6). No environmental concerns were evident, either in the affected area or at the Phoenix House facility in general.

Auto Wrecking Yard and County Parking Lot
The parcel of land south of the County yard facility is privately owned, and is occupied mostly by Freeway Auto Wrecking, an auto wrecking yard. The westernmost part of the property is a TCE area, T-9. Part of this parcel is also used as a parking lot for police cars (the black-and-white police cars did not bear insignias but are presumed to be County vehicles). The auto wrecking yard was surrounded by steel-plate fences and the interior was not observed; typically, such facilities have heavy surface hydrocarbon staining from leaking motor oil and other hydrocarbons. As noted above, this parcel was former occupied by a battery manufacturing facility.

South Warehouses
The southernmost acquisition parcel (A-11) is occupied by two warehouse buildings that appeared to have been constructed within the past 20 years and are thus newer than other buildings in the acquisition area. Signage on the larger building shows it to be occupied by J&H Drilling, a water well and environmental drilling contractor. This facility does not appear on the regulatory databases but is likely to have some hazardous materials (fuels, drilling additives, welding gases) present, based on the type of business conducted.

Areas of Known Contamination in the Temporary Construction Easement Areas Parcel T-4 (“Parcel B”)
Parcel T-4 is located on the north side of Santa Ana Boulevard, east of acquisition parcel A-8 and west of an offramp for I-5. The parcel consists of vacant land owned by the County of Orange. Two concrete foundations are present on the parcel; based on historical aerial photographs the parcel was formerly part of an orange grove. Limited soil sampling performed by Pacific Edge Engineering in 2002 included the installation of six 10-foot soil borings on the parcel. Soil samples were analyzed for total petroleum hydrocarbons with carbon chain breakdown, Title 22 metals, volatile organic compounds, organochlorine pesticides and chlorinated herbicides by EPA methods 8015 (modified), 6010B, 8260B, 8081A and 8151A respectively. The laboratory results did not indicated reportable levels of the contaminants of concern, except for Title 22 metals; of these, levels of arsenic, cadmium, lead and mercury were above Preliminary Remediation Goals in at least one sample. Specifically, all of the analyzed samples contained levels of arsenic and mercury above the PRGs.

Pacific Edge Engineering recommended additional soil sampling for the metals, to be followed by an evaluation of the associated risks (i.e. a human Health Risk Assessment).

EXHIBIT 2
City Council 22 – 789 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 14
October 22, 2012
Based on the documents made available to AECOM by the City of Santa Ana, numerous proposals for additional soil testing were solicited and received by the County in 2006, but follow-up testing was apparently never performed.

Parcels T-5 and T-7 (County Yard)
In 2008, Environmental Equalizers, Inc. (EEI) performed a Phase I Environmental Site Assessment on the County maintenance facility at 1102, 1111, 1140 and 1143 E. Fruit Street. The study was followed up by a Limited Phase II Environmental Site Assessment dated February 15, 2008 performed by Converse Consultants. The EEI report identified the following Recognized Environmental Conditions at the County facility: in-ground hydraulic auto lifts, drains and clarifiers, the County gas station, a former waste oil storage area, and a metal shop.

The Phase II report was intended to address these concerns and included the installation of 17 soil borings and 10 soil vapor borings at various locations at the County facility. Only the southwestern and northeastern sections of the County facility (T-5 and T-7 of the current report) were investigated; other County facilities or County-owned land (T-4, A-8 and A-9) were not included.

One soil vapor probe location was within the TCE area in the northeastern part of the facility (T-5), and two soil borings and two soil vapor probe locations were within the TCE area on Parcel T-7; the other soil borings and vapor probes were mostly located in the main part of the County maintenance facility east of the Metrolink tracks and south of Fruit Street.

Soil samples were analyzed for total petroleum hydrocarbons with carbon chain breakdown, polychlorinated biphenyls (PCBs), Title 22 metals and volatile organic compounds as appropriate to each individual area of investigation. Soil vapor samples were analyzed for volatile organic compounds only.

The analytical results from the soil sampling indicated the presence of several Title 22 metals in all of the soil samples (most at natural levels) and the presence of petroleum hydrocarbons and several species of volatile organic compounds (VOCs), principally perchloroethylene (PCE) and trichloroethylene (TCEy). (Note:
for the purposes of this discussion, the chemical trichloroethylene is abbreviated TCEy instead of the standard TCE, to distinguish it from discussion of the Temporary Construction Easement parcels). PCE and TCEy were the only contaminants found to be of concern; they were found in three soil vapor samples and two soil vapor samples respectively. The analytical results were compared to California Human Health Screening Levels (CHHSLs) to determine the degree of environmental concern indicated.

EXHIBIT 2
City Council 22 – 790 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 15
October 22, 2012
Specific to the TCE parcels for the present study area, no reportable concentrations of petroleum hydrocarbons, VOCs or other contaminants of concern were found in the soil samples (borings GP-19 and GP-20), and no reportable concentrations of PCE or TCEy were found in the soil vapor samples from SV-3, SV-4 or SV-10. The only chemical reported from the VOC analysis was trichlorofluoroethane (TCFA), a type of Freon with low toxicity, in SV-3 and SV-4. No immediate concerns are indicated.

The Converse Consultants report concludes:
“The soil vapor PCE and TCE concentrations exceeding CHHSLs were collected from borings located in outdoor areas, but the soil vapor CHHSLs are intended to evaluate vapor intrusion in indoor areas. In addition, additional soil samples collected at or near the soil vapor borings did not have any reported concentrations above their respective PRGs. For these reasons, Converse does not consider the PCE and TCE[y] exceedances significant. No additional assessment appears warranted unless the County of Orange conveys the property to another agency or entity for redevelopment.” Discussion:

The study area for the Converse report includes two temporary construction easement parcels (T-5 and T-7), but no acquisition parcels such as A-9 or A-10.

The detected presence of PCE and TCEy in the soils in some parts of parcel T-7 does not appear to be of significant concern in view of the minimal ground disturbance contemplated for the Proposed Project. However, some soil vapor sampling in the easement area along the Metrolink tracks is advisable to provide confirmation of the previous findings.

3.2 Infrastructure Hazards
Asbestos was formerly used in a variety of building materials due to its fire retardant properties. Examples of building materials that have been found to contain asbestos include floor coverings such as linoleum and vinyl tile, spray-applied ceiling texture and fireproofing, window putty, drywall mud, asbestos-cement pipe (“transite”), bridge structures and heating element insulation. The association of asbestos fiber inhalation with certain types of lung cancer led to the banning of most types of asbestoscontaining building materials circa 1980. The most hazardous types of ACMs are the friable types (susceptible to crumbling under ordinary use or handling), but damaged nonfriable ACMs are also of concern. Structures built before 1980 (as well as structures built for several years thereafter since the usage of ACMs in inventory was allowed) are therefore suspect. Most of the buildings in the acquisition area were constructed in the 1960s or before, and therefore there is a significant potential for the presence of asbestos.

EXHIBIT 2
City Council 22 – 791 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 16
October 22, 2012
Due to the age of the buildings, there is also significant potential for the presence of lead-based paint. Further, electrical or mechanical equipment in the buildings may contain polychlorinated biphenyls (PCBs), and mercury switches could also be present.

All of these materials can be environmentally hazardous if disturbed during demolition.

Comprehensive sampling, testing or inspection for asbestos, lead-based paint, PCBs and mercury switches is recommended before any demolition is initiated in the study area.

4.0 REGULATORY RECORDS REVIEW
AECOM reviewed a search of environmental records conducted by Environmental Data Resources, Inc. (EDR). The search area was centered at the County yard facility but expanded to include the irregular extensions along nearby streets. Search radii were those required for ASTM Standard Practice E1527-05, for Phase I Environmental Site Assessments. The index map and the Executive Summary from EDR’s report are presented in Appendix C. Because the complete EDR report runs 466 pages, it is included as a CD (Appendix F) in a pocket at the rear of this report rather than as a hard copy. The following environmental regulatory databases were reviewed as specified for the project site and adjacent and nearby properties:

TABLE 6

REGULATORY DATABASES REVIEWED
Database Reviewed Responsible Agency Search
Radius
(miles)
Federal ASTM Standard Databases
Federal National Priorities List (NPL), Proposed NPL,
Delisted NPL, NPL Areas of Concern, NPL Recovery
U.S. Environmental Protection
Agency (EPA)

1.0 Federal Comprehensive Environmental Response,
Compensation & Liability Information System (CERCLIS)
U.S. EPA 0.5
CERCLIS - NFRAP (No Further Remedial Action
Planned)
U.S. EPA 0.25
Federal Corrective Action Report (CORRACTS) U.S. EPA 1.0 Federal Resource Conservation and Recovery Act
(RCRA) Treatment, Storage and Disposal (TSD) Facilities List
U.S. EPA 0.5
Federal RCRA Generators List (RCRA – SQG, RCRA –
LQG)
U.S. EPA 0.25
Emergency Response Notification System (ERNS) U.S. EPA Subject Property
State of California ASTM Standard Databases
Annual Work Plan (AWP) Sites California Environmental
Protection Agency (CalEPA)

1.0 EXHIBIT 2
City Council 22 – 792 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 17
October 22, 2012
Database Reviewed Responsible Agency Search
Radius
(miles)
Abandoned Sites Program (Cal-Sites) CalEPA Department of Toxic Substances Control (DTSC)

0.5 Hazardous Material Incident Report System (CHMIRS) Office of Emergency Services Subject Property
Cortese List (Combined Report List for Leaking USTs,
Solid Waste Landfills [SWLs] and CalSites; inactive)
CalEPA and Office of
Emergency Services

0.5 State Proposition 65 (LUST only) SWRCB 1.0
Toxic Pits Cleanup Act Sites SWRCB 1.0
State Solid Waste Information System (Landfills/SWIS) State Integrated Waste Management Board (IWMB)

0.5 State Waste Management Unit Database (WMUDS),
Solid Waste Assessment Test (SWAT)
SWRCB 0.5 (SWLs
and
SWAT)
State Leaking Underground Storage Tanks (LUST) State Water Resources Control Board (SWRCB) and Regional
Water Quality Control Board
(RWQCB)

0.5 State Bond Expenditure Plan (BEP) California Department of Health Services (DHS)

1.0 Underground Storage Tanks (USTs), Historical USTs,
Facility Index Database (FID) USTs, Sweeps USTs
SWRCB 0.25
Voluntary Cleanup Program (VCP) Properties CalEPA DTSC 0.5 Indian Lands UST, Indian Lands LUST, Indian
Reservations
U.S. EPA Region IX 0.25, 0.5,

1.0 State Waste Recycling Facilities (SWRCY) Dept. of Conservation 0.5 Federal ASTM Supplemental Databases
Federal Superfund Consent Decrees (CONSENT) U.S. EPA 1.0 Federal Records of Decision (ROD) NTIS 1.0
Federal Facility Index System (FINDS) U.S. EPA/NTIS Subject Property
Federal Hazardous Materials Spill Incidents (HMIRS) U.S. Department of Transportation (DOT)
Subject
Property
Federal Material Licensing Tracking System (MLTS) for
Radioactive Materials
Nuclear Regulatory
Commission
Subject
Property
Federal Mines Master Index File (MINES) U.S. Department of Labor, Mine Safety and Health
Administration

0.25 Federal Superfund Liens U.S. EPA Subject
Property
Federal PCB Activity Database (PADS) U.S. EPA Subject
Property
Uranium Mill Tailings (UMTRA) E.S. EPA 0.5
Federal Engineering Controls U.S. EPA 0.5
ODI (Open Dump Inventory U.S. EPA 0.5
FUDS (Formerly Used Defense Sites U.S. Army Corps of Engineers 1.0 Federal Department of Defense Sites (DOD) U.S. Geological Survey 1.0 Federal RCRA Administrative Action Tracking System U.S. EPA Subject EXHIBIT 2
City Council 22 – 793 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 18
October 22, 2012
Database Reviewed Responsible Agency Search
Radius
(miles)
(RAATS) Property
Federal Toxic Release Inventory System (TRIS) U.S. EPA/NTIS Subject Property
Federal Toxic Substances Control Act (TSCA) Chemical
Substance Inventory Control List
U.S. EPA/NTIS Subject
Property
Federal Section 7 Tracking Systems (SSTS) for
Registered Pesticide-Producing Establishments
Section 7 of the Federal
Insecticide, Fungicide and
Rodenticide Act (FIFRA)
Subject
Site
FIFRA/TSCA Tracking System (FTTS) for Administrative
Cases and Pesticide Enforcement Actions and
Compliance Activities Related to FIFRA, TSCA and
EPCRA (Emergency Planning and Community Right-toKnow Act) U.S. EPA Office of Prevention,
Pesticides and Toxic
Substances
Subject
Property
State and Local ASTM Supplemental Databases
State Aboveground Petroleum Storage Tanks (ASTs) SWRCB Subject Property
State Drycleaner Facilities with Waste Generator
Identification Numbers (Cleaners)
CalEPA DTSC 0.25
State Waste Discharge System (WDS) SWRCB Subject
Property
State List of Deed Restrictions (DEED) CalEPA DTSC Subject Property
State Properties Needing Further Evaluation (NFE) CalEPA DTSC Adjacent Properties
State School Property Evaluation Program (SCH) CalEPA DTSC Adjacent Properties
Well Investigation Program (WIP) RWQCB 0.25
Air Emissions Permits (EMI) AQMD Subject
Property
State Unconfirmed Properties Referred to Another
Agency (REF)
CalEPA DTSC Adjacent
Properties
State No Further Action Properties (NFA) CalEPA DTSC Adjacent Properties
State Toxic Leak Site Investigations (SLIC) RWQCB 0.5
State Hazardous Waste Information System (HazNet) for
Waste Generators
CalEPA Adjacent
Properties
County Hazardous Materials Sites (HMS) County Agency Subject Property
County Site Mitigation County Agency Subject
Property
Tribal Records
Indian Reservations U.S. Geological Survey 1.0
Indian Leaking Underground Storage Tanks U.S. EPA 0.5
Indian Underground Storage Tanks U.S. EPA 0.25
Brownfields Databases
U.S. Brownfields U.S. EPA 0.5
U.S. Institutional Controls U.S. EPA 0.5
EXHIBIT 2
City Council 22 – 794 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 19
October 22, 2012
Database Reviewed Responsible Agency Search
Radius
(miles)
EDR Proprietary Historical Databases
Gas Stations and Dry Cleaners EDR 0.25
Coal Gas Manufacturing Plants EDR 1.0
The following listings apply to the project study area:

Fruit Street Fueling Station/Orange County GSA & Transportation/Orange County Fruit Street Shops/GW Maintenance, Inc., 1102 E. Fruit Street (Parcel T-8) (EDR Map Codes A1, A3, A4, A5, A11, A17, A18, I44 and I45)
The site appears on the LUST, RCRA – SQG, FINDS, UST, FID UST, Sweeps UST, Historical UST and Historical Cortese databases. These listings apply principally to the gas station at the northeast corner of the parcel, but some also generally to the County maintenance facility as well. The listings show two underground storage tank releases at the gas station: a release of waste oil in 1993, and a release of gasoline in 1999. Both releases were to soil only and both were closed in 2004 after excavation of impacted soil associated with the waste oil release (no cleanup for the gasoline release is specified). In view of the current regulatory status of the gas station, no immediate environmental concerns are indicated. Other parts of the shop area should also be inspected for other USTs or other indications of a potential release, and soil sampling as appropriate should be performed.

Orange County Facility Operations Headquarters Shops, 1143 Fruit Street (Parcel T7/P-2) (EDR Map Code A2) This facility appears on the RCRA – SQG, FINDS and HAZNET databases as a small-quantity generator of hazardous waste (waste oil and mixed oil), likely indicating that it includes a maintenance facility for County vehicles. In the field it consisted of two buildings, one of which bore a hazardous materials placard indicating the presence of slight health risk, very severe fire hazard (likely from propane) and oxidizers. The Proposed Project includes the acquisition of a narrow strip of the northern end of this facility (P-2). A detailed reconnaissance would be required to determine whether any hazardous materials concerns are present in the acquisition area.

Freeway Auto Wreckers, 1041 E. 6th Street (Parcel T-8) (EDR Map Codes D12 and D13)
This site appears on the RCRA – SQG, FINDS, CERCLIS and ENVIROSTOR databases. The RCRA and FINDS listing indicate a small-quantity generator of hazardous waste (presumed to be waste oil or waste antifreeze). The CERCLIS EXHIBIT 2
City Council 22 – 795 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 20
October 22, 2012
listing shows a low-priority site with no investigation having been performed. The ENVIROSTOR listing shows a site that “Needs Evaluation”, with no assessment having been performed. Businesses of this type typically have surface releases and staining by waste oil, which usually does not penetrate far into the subsurface. Inspection and, as indicated, soil sampling of this site is recommended.

Jasco Chemical, 1008 N. Fuller Street (Parcel A-7) (EDR Map Codes B8, B9 and B10) This facility is a former chemical plant that appears on the LUST, Historical UST, Historical Cortese, FID UST and EMI databases. The LUST listing shows a close, soil-only case involving releases of petroleum hydrocarbons, acetone and methylene chloride. Review of available information on the Water Quality Control Board Geotracker database shows that the facility had eight underground storage tanks that were closed in 2000 as follows:

TABLE 7
UNDERGROUND STORAGE TANKS AT JASCO CHEMICAL (PARCEL NO. A-7) Tank No. Size (gal.) Contents Closure
1 12,000 Paint Thinner Removed
2 9,970 Neutral Oil Removed
3 8,000 Acetone Removed
4 6,000 Paint Thinner Removed
5 9,970 Kerosene Removed
6 5,000 Methylene Chloride Abandoned in Place
7 5,000 Methyl Ethyl Ketone Abandoned in Place
8 5,000 Methanol Abandoned in Place
The case narrative indicates that the USTs were removed/closed in 1998 under the direction of the City of Santa Ana Fire Department. In response to a closure request, the Regional Water Quality Control Board required the installation of slant soil borings under the closed-in-place tanks and the installation of vapor extraction wells for an extended vapor extraction test. A low level of “neutral oil” was found in three of the soil samples collected. The results of the vapor extraction test indicated a very low concentration of perchloroethylene (PCE) in one probe location but no other detections. The Regional Board accordingly granted closure in 2000.

The Case Summary notes that corrective action should be reviewed if land use changes. The former chemical usage at this site, and the presence of three closed-in-place underground storage tanks, indicate that soil sampling should be performed on this site before acquisition. Soil gas sampling should also be performed. The feasibility of removing the three closed-in-place USTs should also be investigated.

EXHIBIT 2
City Council 22 – 796 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 21
October 22, 2012
D.V. Webb, 1045 E. 4th Street (rear) (Parcel A-11)
This address is not currently used but is presumed to be part of the current parcel with a 1043 E. 4th Street address. This site appears on EDR's proprietary Historical Auto Stations database, which is compiled from telephone directories and includes gas stations and repair shops. The site was active in 1945. This site does not appear on the UST or LUST databases, which postdate the period when the site was active, and hence does not appear to be of immediate environmental concern to the subject Property.

The following listed sites are adjacent to or near the project site:

Service Manufacturing and Engineering, 1029 Fuller Street (EDR Map Code A6), east side of Fuller Street
This site appears on the RCRA – NonGen database. It also appears on the FINDS database. In the field the building was observed to be occupied by KS Direct, a warehouse business. It appears that the Service Manufacturing and Engineering listing is for a former tenant. As such it does not appear to be of immediate concern.

Lincoln Avenue Service Station, 1312 Lincoln Street (EDR Map Code C7), at the northwest corner of Lincoln and Washington
This site, which is adjacent to the northern end of the disturbance limits for the Proposed Project, is currently occupied by a single-family dwelling. The site appears on EDR's proprietary Historical Auto Stations database, which is compiled from telephone directories and includes gas stations and repair shops.

The site was active in 1936. This site does not appear on the UST or LUST databases, which postdate the period when the site was active, and hence does not appear to be of immediate environmental concern to the subject Property.

S. L. Johnson, 510 Terminal Street (EDR Map Code D14)
This site appears on EDR's proprietary Historical Auto Stations database, which is compiled from telephone directories and includes gas stations and repair shops. The site was active in 1945. This site does not appear on the UST or LUST databases, which postdate the period when the site was active, and hence does not appear to be of immediate environmental concern to the subject Property.

Connelly Machine Co., 420 Terminal Street (EDR Map Code E22) This site appears on the RCRA - SQG database. It also appears on the FINDS and HAZNET databases. The listings reflect the status of the facility as a EXHIBIT 2
City Council 22 – 797 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 22
October 22, 2012
hazardous-waste generator. Wastes include aqueous solutions and blended fuels. The facility does not appear on the listings of known contaminated sites and hence does not appear to be of immediate concern to the subject Property.

Madison Materials, 1035 E. 4th Street (EDR Map Codes E23-E24-E25-E26) (adjacent tp Parcel A-11 west of the Metrolink tracks in the southwestern part of the study area) The site appears on the SWF/LF database as a landfill or junkyard that accepts inert waste. It also appears on the RCRA – SQG, FINDS and HAZNET databases as a small-quantity hazardous waste generator. In the field the facility appeared to be a recycling facility or junkyard. No immediate environmental concerns were evident.

Liebert Scrap Metals, 1051 E. Sixth Street (EDR Map Code D28) This site appears on the RCRA - SQG database. It also appears on the FINDS database. The listings show the facility as a small-quantity hazardous waste generator. The facility does not appear on the listings of known contaminated sites and hence does not appear to be of immediate concern to the subject Property. In the field this facility appears to currently be part of a wholesale roofing supply company at 1101 E. Sixth.

Other listed sites are more than one-quarter mile away, not hydraulically upgradient, or otherwise not of immediate environmental concern due to their listing type, current status or other considerations.

5.0 CONCLUSIONS AND RECOMMENDATIONS
The site reconnaissance and review of historical information sources indicated the following identified or potential environmental concerns regarding the acquisition and temporary construction easement parcels (BOLD = Recognized Environmental Condition):

EXHIBIT 2
City Council 22 – 798 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 23
October 22, 2012
TABLE 8

ENVIRONMENTAL CONCERNS
Area Parcel Numbers Current Concerns Historical Concerns Fuller Street A-1 through A-8
(and T-1)
Industrial buildings Chemical plant with
removed and closedin-place USTs (closed
LUST case 2000)
County yard A-9 Repair/service facilities Former petroleum storage facility
South Warehouses A-11 Possible hazardous materials
usage
Former warehouses,
light-industrial buildings
and auto repair shops
East of Fuller Street T-4 Known low-level soil impacts
by heavy metals
Agriculture
County Yard T-8 Gas station, known low-level
impacts by PCE and TCEy to
soil vapor, repair/service
facilities
--
Auto Wrecking Yard T-9 Auto wrecking yard Battery manufacturer In general, the temporary construction easement parcels are of less concern than the acquisition parcels; however, where significant environmental impacts have been or may be identified, further evaluation, including Phase II sampling, may be warranted.

Recommendations:

The following investigations are recommended for the study area during the Environmental Phase:
 Phase I Environmental Site Assessments on the acquisition parcels or areas, with inspections of the interiors of the building, including at a minimum Phase I ESAs on the area along Fuller Street north of Fruit Street, the County maintenance facility and the industrial buildings at the south end of the acquisition area, south of Sixth Street. Nearby TCE parcels, which are of less concern since minimal surface disturbance is anticipated, would be described as part of the proposed reports.
 A Phase II Environmental Site Assessment on the project site as a whole, or a series of several focused Phase II ESAs to include at a minimum the former petroleum product storage facility (parcel A-9, 1111 E. Fruit Street), the County maintenance buildings, the former Jasco Chemical plant (parcel A-7, 1006 N.

Fruit Street) (soil testing and soil gas survey recommended) and the auto wrecking yard/former battery manufacturer (parcel T-9, 1041 E. 6th Street). Other areas of investigation may be indicated by the Phase I assessments, particularly at the older industrial buildings along Fuller Street.

EXHIBIT 2
City Council 22 – 799 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 24
October 22, 2012
 Removal of the three closed-in-place USTs at the former Jasco Chemical plant should be considered.
 Inspection and sampling for asbestos, lead-based paint, PCBs and mercury switches in the buildings in the acquisition area.

6.0 LIMITATIONS
The conclusions and recommendations presented in this report are based upon reasonable visual inspection of the project site and research of available materials within the scope and budget of the contract. Individual buildings were not entered, nor were interviews conducted with current site occupants. The information presented is relevant to the dates of our site visit and should not be relied upon to represent conditions at later dates.

The opinions expressed herein are based on information obtained during our effort and on our experience. If additional information becomes available, we request the opportunity to review the information and modify our opinions, if necessary.

Our services have been provided using that degree of care and skill ordinarily exercised, under similar circumstances, by environmental consultants practicing in this or similar localities. No other warranty, expressed or implied, is made as to the professional opinions presented in this report. AECOM is not responsible for the conclusions, opinions, or recommendations made by others based on this information.

EXHIBIT 2
City Council 22 – 800 5/5/2026

INITIAL SITE ASSESSMENT
Santa Ana Boulevard/Metrolink Railroad Grade Separation Project, Santa Ana, California AECOM Technology Corporation Page 25
October 22, 2012

7.0 PREPARER’S CERTIFICATION
This report has been prepared by the staff of AECOM under the professional supervision of the principal and/or senior staff whose seal(s) and signatures appear hereon. Neither AECOM, nor any staff member assigned to this investigation, has any interest or contemplated interest, financial or otherwise, in the subject or surrounding properties, or in any entity which owns, leases, or occupies the subject or surrounding properties or which may be responsible for environmental issues identified during the course of this investigation, and has no personal bias with respect to the parties involved.

The conclusions represent professional judgments and are founded upon the findings of the investigations identified in the report and the interpretation of such data based on our experience and expertise according to the existing standard of care. No other warranty or limitation exists, either expressed or implied.

The investigation was prepared for the use and benefit of «ClientCompany», its successors, and assignees. It is based, in part, upon documents, writings, and information owned, possessed, or secured by «ClientCompany». Neither this report, nor any information contained herein, shall be used or relied upon for any purpose by any other person or entity without the express written permission of «ClientCompany» and AECOM
It should be recognized that this report is limited in the sense that conclusions are drawn on the basis of surficial observations and reasonably obtainable data. No environmental site assessment can wholly eliminate uncertainty regarding the potential for recognized environmental conditions in connection with a property; all appropriate inquiry does not mean an exhaustive assessment of a clean property (ASTM E 1527-05, Sec. 4.5.1-4.5.2). Under special conditions existing contamination can escape detection using these methods. Also, the passage of time may result in changed conditions that would supersede the data presented in this report.

I, Robert Olsen, declare that to the best of my knowledge and belief, I meet the definition of Environmental Professional as defined in 40 CFR 312.10. I have the specific qualifications based on education, training, and experience to assess a property of the nature, history, and setting of the subject property. I have developed and performed the all appropriate inquiries in accordance with the standards and practices set forth in ASTM Standard E 1527-05.

Submitted:

Robert R. Olsen, R.G., R.E.A. II
Senior Geologist
EXHIBIT 2
City Council 22 – 801 5/5/2026

PHOTOGRAPHS
EXHIBIT 2
City Council 22 – 802 5/5/2026
EXHIBIT 2
City Council 22 – 803 5/5/2026
EXHIBIT 2
City Council 22 – 804 5/5/2026
EXHIBIT 2
City Council 22 – 805 5/5/2026
EXHIBIT 2
City Council 22 – 806 5/5/2026
EXHIBIT 2
City Council 22 – 807 5/5/2026
EXHIBIT 2
City Council 22 – 808 5/5/2026

APPENDIX A

INITIAL SITE

ASSESSMENT CHECKLIST
EXHIBIT 2
City Council 22 – 809 5/5/2026

Initial Site Assessment (ISA) Checklist
Project Information
Caltrans District: 12 County: Orange Route: N/A (Santa Ana Boulevard Improvements) Post Mile: N/A EA: N/A
Description:

The City of Santa Ana, in coordination with the California Department of Transportation (Department), is proposing to grade separate the existing Santa Ana Boulevard/Orange County Transportation Authority (OCTA) Metrolink at-grade railroad crossing in the City of Santa Ana, Orange County, California. The purpose of the proposed project is to improve safety, as it will remove the existing atgrade conflict between vehicular traffic and rail traffic. In addition, the proposed project would reduce the congestion and inconvenience caused by this existing at-grade facility.

Is the project on the HW Study Minimal-Risk Projects List (HW1)? No Project Manager: Jason Gabriel, City of Santa Ana 714-647-5664 Project Screening
Attach the project location map to this checklist to show location of all known and/or potential HW sites identified. See Attachment C.

1. Project Features: New R/W? Yes Excavation? Yes Railroad Involvement? Yes (Metrolink)
Structure demolition/modification? Yes Subsurface utility relocation? Yes

2. Project Setting
Rural or Urban? Urban
Current land uses: Light-industrial, County yard facility Adjacent land uses: Residential, commercial, industrial

3. Check federal, State, and local environmental and health regulatory agency records as necessary, to see if any known hazardous waste site is in or near the project area. If a known site is identified, show its location on the attached map and attach additional sheets, as needed, to provide pertinent information for the proposed project. See Appendix C

4. Conduct Field Inspection. Date: September 2, 2011 and October 22, 2012 STORAGE STRUCTURES / PIPELINES:

Underground tanks: Yes Surface tanks: Yes (propane)
Sumps: Not observed Ponds: None
Drums: Not observed Basins: None
EXHIBIT 2
City Council 22 – 810 5/5/2026

Transformers: Yes Landfills: None
Other: None
CONTAMINATION: (spills, leaks, illegal dumping, etc.)
Surface staining: Not observed, likely Oil sheen: Not observed Odors: None Vegetation damage: None
Other: None
HAZARDOUS MATERIALS: (asbestos, lead, etc.)
Buildings: Approximately 20 Spray-on fireproofing: Not observed Pipe wrap: Not observed Friable tile: Not observed
Acoustical plaster: Not observed Serpentine: None
Paint: Likely present
Other: Significant current and historical hazardous materials usage: petroleum storage, battery manufacturer, chemical plant, vehicle maintenance facility, auto wrecking yard.

5. Additional record search, as necessary, of subsequent land uses that could have resulted in a hazardous waste site. Use the attached map to show the location of potential hazardous waste sites. See Appendix B.

6. Other comments and/or observations:

Numerous Recognized Environmental Conditions apply to the study area, as follows:

Current RECs:
 Former petroleum storage facility on current County of Orange maintenance yard site (acquisition parcel)
 Auto wrecking yard, same location as former battery manufacturing (TCE parcel)  Former chemical plant with three closed-in-place underground storage tanks (acquisition parcel)
 Vacant parcel with documented low-level soil impacts by heavy metals (TCE parcel)  Southern part of County of Orange maintenance facility (TCE parcel) with documented lowlevel soil vapor impacts by PCE and TCEy (TCE parcel) Possible RECs (not inspected):
 Older industrial buildings along Fuller Street (acquisition parcels)  Drilling contractor facility (acquisition parcel)
Historical REC:
 Closed Leaking Underground Storage Tank (LUST) case at County gas station (case closed 2004) (TCE parcel, but not in area of easement)
ISA Determination
Does the project have potential hazardous waste involvement? Yes If there is known or potential hazardous waste involvement, is additional ISA work needed before task orders can be prepared for the Investigation? Yes: During the Environmental Phase of the project, Phase EXHIBIT 2
City Council 22 – 811 5/5/2026

I and Phase II Environmental Site Assessments should be prepared for individual or groups of acquisition parcels and buildings as appropriate. At least three Phase Is and at least three Phase IIs are indicated. Surveys for asbestos, lead-based paint, PCBs and mercury (in electrical switches) should be performed. Removal of three closed-in-place underground storage tanks should also be considered.

ISA Conducted by: Robert R. Olsen, P.G., R.E.A. II
Date: October 22, 2012
Reference: 07/10/99 Project Development Procedures Manual DD-6 EXHIBIT 2
City Council 22 – 812 5/5/2026

APPENDIX B

SITE PLAN
EXHIBIT 2
City Council 22 – 813 5/5/2026

EXHIBIT
2 City Council 22 – 814 5/5/2026

EXHIBIT
2 City Council 22 – 815 5/5/2026

APPENDIX C

REGULATORY DATABASE
SEARCH
(Executive Summary and
Map Only)
EXHIBIT 2
City Council 22 – 816 5/5/2026

APPENDIX D

HISTORICAL RESEARCH

DOCUMENTATION
EXHIBIT 2
City Council 22 – 817 5/5/2026
EXHIBIT 2
City Council 22 – 818 5/5/2026
EXHIBIT 2
City Council 22 – 819 5/5/2026
EXHIBIT 2
City Council 22 – 820 5/5/2026
EXHIBIT 2
City Council 22 – 821 5/5/2026
EXHIBIT 2
City Council 22 – 822 5/5/2026
EXHIBIT 2
City Council 22 – 823 5/5/2026
EXHIBIT 2
City Council 22 – 824 5/5/2026
EXHIBIT 2
City Council 22 – 825 5/5/2026
EXHIBIT 2
City Council 22 – 826 5/5/2026
EXHIBIT 2
City Council 22 – 827 5/5/2026
EXHIBIT 2
City Council 22 – 828 5/5/2026
EXHIBIT 2
City Council 22 – 829 5/5/2026
EXHIBIT 2
City Council 22 – 830 5/5/2026
EXHIBIT 2
City Council 22 – 831 5/5/2026
EXHIBIT 2
City Council 22 – 832 5/5/2026
EXHIBIT 2
City Council 22 – 833 5/5/2026
EXHIBIT 2
City Council 22 – 834 5/5/2026
EXHIBIT 2
City Council 22 – 835 5/5/2026
EXHIBIT 2
City Council 22 – 836 5/5/2026
EXHIBIT 2
City Council 22 – 837 5/5/2026
EXHIBIT 2
City Council 22 – 838 5/5/2026
EXHIBIT 2
City Council 22 – 839 5/5/2026
EXHIBIT 2
City Council 22 – 840 5/5/2026
EXHIBIT 2
City Council 22 – 841 5/5/2026
EXHIBIT 2
City Council 22 – 842 5/5/2026
EXHIBIT 2
City Council 22 – 843 5/5/2026
EXHIBIT 2
City Council 22 – 844 5/5/2026
EXHIBIT 2
City Council 22 – 845 5/5/2026
EXHIBIT 2
City Council 22 – 846 5/5/2026
EXHIBIT 2
City Council 22 – 847 5/5/2026
EXHIBIT 2
City Council 22 – 848 5/5/2026
EXHIBIT 2
City Council 22 – 849 5/5/2026
EXHIBIT 2
City Council 22 – 850 5/5/2026
EXHIBIT 2
City Council 22 – 851 5/5/2026
EXHIBIT 2
City Council 22 – 852 5/5/2026
EXHIBIT 2
City Council 22 – 853 5/5/2026
EXHIBIT 2
City Council 22 – 854 5/5/2026
EXHIBIT 2
City Council 22 – 855 5/5/2026
EXHIBIT 2
City Council 22 – 856 5/5/2026
EXHIBIT 2
City Council 22 – 857 5/5/2026
EXHIBIT 2
City Council 22 – 858 5/5/2026
EXHIBIT 2
City Council 22 – 859 5/5/2026
EXHIBIT 2
City Council 22 – 860 5/5/2026
EXHIBIT 2
City Council 22 – 861 5/5/2026
EXHIBIT 2
City Council 22 – 862 5/5/2026
EXHIBIT 2
City Council 22 – 863 5/5/2026
EXHIBIT 2
City Council 22 – 864 5/5/2026
EXHIBIT 2
City Council 22 – 865 5/5/2026
EXHIBIT 2
City Council 22 – 866 5/5/2026
EXHIBIT 2
City Council 22 – 867 5/5/2026
EXHIBIT 2
City Council 22 – 868 5/5/2026
EXHIBIT 2
City Council 22 – 869 5/5/2026
EXHIBIT 2
City Council 22 – 870 5/5/2026
EXHIBIT 2
City Council 22 – 871 5/5/2026
EXHIBIT 2
City Council 22 – 872 5/5/2026
EXHIBIT 2
City Council 22 – 873 5/5/2026
EXHIBIT 2
City Council 22 – 874 5/5/2026
EXHIBIT 2
City Council 22 – 875 5/5/2026
EXHIBIT 2
City Council 22 – 876 5/5/2026
EXHIBIT 2
City Council 22 – 877 5/5/2026
EXHIBIT 2
City Council 22 – 878 5/5/2026
EXHIBIT 2
City Council 22 – 879 5/5/2026
EXHIBIT 2
City Council 22 – 880 5/5/2026
EXHIBIT 2
City Council 22 – 881 5/5/2026
EXHIBIT 2
City Council 22 – 882 5/5/2026
EXHIBIT 2
City Council 22 – 883 5/5/2026
EXHIBIT 2
City Council 22 – 884 5/5/2026
EXHIBIT 2
City Council 22 – 885 5/5/2026
EXHIBIT 2
City Council 22 – 886 5/5/2026
EXHIBIT 2
City Council 22 – 887 5/5/2026
EXHIBIT 2
City Council 22 – 888 5/5/2026
EXHIBIT 2
City Council 22 – 889 5/5/2026
EXHIBIT 2
City Council 22 – 890 5/5/2026
EXHIBIT 2
City Council 22 – 891 5/5/2026
EXHIBIT 2
City Council 22 – 892 5/5/2026
EXHIBIT 2
City Council 22 – 893 5/5/2026
EXHIBIT 2
City Council 22 – 894 5/5/2026
EXHIBIT 2
City Council 22 – 895 5/5/2026
EXHIBIT 2
City Council 22 – 896 5/5/2026
EXHIBIT 2
City Council 22 – 897 5/5/2026
EXHIBIT 2
City Council 22 – 898 5/5/2026
EXHIBIT 2
City Council 22 – 899 5/5/2026
EXHIBIT 2
City Council 22 – 900 5/5/2026
EXHIBIT 2
City Council 22 – 901 5/5/2026
EXHIBIT 2
City Council 22 – 902 5/5/2026
EXHIBIT 2
City Council 22 – 903 5/5/2026
EXHIBIT 2
City Council 22 – 904 5/5/2026
EXHIBIT 2
City Council 22 – 905 5/5/2026
EXHIBIT 2
City Council 22 – 906 5/5/2026
EXHIBIT 2
City Council 22 – 907 5/5/2026
EXHIBIT 2
City Council 22 – 908 5/5/2026
EXHIBIT 2
City Council 22 – 909 5/5/2026
EXHIBIT 2
City Council 22 – 910 5/5/2026
EXHIBIT 2
City Council 22 – 911 5/5/2026
EXHIBIT 2
City Council 22 – 912 5/5/2026
EXHIBIT 2
City Council 22 – 913 5/5/2026
EXHIBIT 2
City Council 22 – 914 5/5/2026
EXHIBIT 2
City Council 22 – 915 5/5/2026
EXHIBIT 2
City Council 22 – 916 5/5/2026
EXHIBIT 2
City Council 22 – 917 5/5/2026
EXHIBIT 2
City Council 22 – 918 5/5/2026
EXHIBIT 2
City Council 22 – 919 5/5/2026
EXHIBIT 2
City Council 22 – 920 5/5/2026
EXHIBIT 2
City Council 22 – 921 5/5/2026
EXHIBIT 2
City Council 22 – 922 5/5/2026
EXHIBIT 2
City Council 22 – 923 5/5/2026
EXHIBIT 2
City Council 22 – 924 5/5/2026
EXHIBIT 2
City Council 22 – 925 5/5/2026
EXHIBIT 2
City Council 22 – 926 5/5/2026
EXHIBIT 2
City Council 22 – 927 5/5/2026
EXHIBIT 2
City Council 22 – 928 5/5/2026
EXHIBIT 2
City Council 22 – 929 5/5/2026
EXHIBIT 2
City Council 22 – 930 5/5/2026
EXHIBIT 2
City Council 22 – 931 5/5/2026
EXHIBIT 2
City Council 22 – 932 5/5/2026
EXHIBIT 2
City Council 22 – 933 5/5/2026
EXHIBIT 2
City Council 22 – 934 5/5/2026
EXHIBIT 2
City Council 22 – 935 5/5/2026
EXHIBIT 2
City Council 22 – 936 5/5/2026
EXHIBIT 2
City Council 22 – 937 5/5/2026
EXHIBIT 2
City Council 22 – 938 5/5/2026
EXHIBIT 2
City Council 22 – 939 5/5/2026
EXHIBIT 2
City Council 22 – 940 5/5/2026
EXHIBIT 2
City Council 22 – 941 5/5/2026
EXHIBIT 2
City Council 22 – 942 5/5/2026
EXHIBIT 2
City Council 22 – 943 5/5/2026
EXHIBIT 2
City Council 22 – 944 5/5/2026
EXHIBIT 2
City Council 22 – 945 5/5/2026
EXHIBIT 2
City Council 22 – 946 5/5/2026
EXHIBIT 2
City Council 22 – 947 5/5/2026
EXHIBIT 2
City Council 22 – 948 5/5/2026
EXHIBIT 2
City Council 22 – 949 5/5/2026
EXHIBIT 2
City Council 22 – 950 5/5/2026
EXHIBIT 2
City Council 22 – 951 5/5/2026

APPENDIX E
Resume of Preparer
EXHIBIT 2
City Council 22 – 952 5/5/2026

Robert Olsen, R.G., R.E.A.

Senior Geologist
Education
M.S., Geology, University of Oregon
B.S., Geology, University of California, Los Angeles
Registrations
Registered Geologist, CA, 1990
Registered Environmental Assessor, CA, 1992
Registered Environmental Assessor II, 2001
OSHA HAZWOPER, 40 Hours and Current 8-Hour Refresher
Professional Affiliations
National Groundwater Association
South Coast Geological Society
Years of Experience (updated 4/08)
With AECOM: 15
With other firms: 24
Experience
Mr. Olsen has over 30 years of experience as a geologist and hydrogeologist in the fields of environmental consulting, petroleum exploration and groundwater resource development. He has managed projects including geological and hydrogeological investigations, drilling and monitoring well installation, environmental site assessments, borehole geophysical logging, geotechnical sampling, aquifer tests, and subsurface mapping. In addition, Mr. Olsen has served as liaison with regulatory agencies to determine the applicable regulations that apply to property transfer site assessments, soil and groundwater characterization studies, and uncontrolled releases.

Selected Projects
U.S. Navy Landfill, San Clemente Island, CA. Senior Project Geologist for the preparation of a Solid Waste Assessment Test Workplan for a landfill that had previously not been evaluated for its potential for leachate generation; installed soil borings and lysimeters using hollow-stem auger and air-percussion drilling rigs; sampled lysimeters; prepared Solid Waste Assessment Test report for submittal to Los Angeles Regional Water Quality Control Board.

Contamination Site, Visalia, CA. Project Geologist for site investigation at a major TCE contamination site in Central California. Project included the organization and implementation of a domestic well sampling program, investigation and abandonment of a dry well system, plume characterization, site history research, pilot soil vapor extraction system installation, groundwater and soil sampling, and the drilling and installation of groundwater-monitoring and groundwaterextraction wells.

Naval Station San Diego, CA. Project Manager responsible for analyzing the results of past investigations at 10 underground storage tank facilities where unauthorized releases were suspected to have occurred. He determined the locations of planned groundwater monitoring wells, prepared the Work Plans and Health and Safety Plans for Phase II Environmental Site EXHIBIT 2
City Council 22 – 953 5/5/2026

Assessments in accordance with applicable state, local, and Navy regulations, and interpreted the results of geotechnical testing to determine the design of future monitoring wells and remediation by vapor extraction.

Private and Public Clients, California - Nevada – Arizona. Project Manager for numerous Phase II Environmental Site Assessments at commercial and industrial sites where soil and/or ground water contamination was known or suspected. Prepared Workplans and Health and Safety Plans as required; maintained liaison with regulatory agencies; supervised drilling, field observations of indications of contamination, and the collection of soil and ground water samples; interpreted the results of laboratory analyses; and prepared reports with recommendations for site closure, further investigation or remediation, as appropriate.

Service Station, Anaheim, CA. Project Geologist performing Phase II Environmental Site Assessment and Phase II remediation at a service station where a piping leak had resulted in soil and ground water contamination by gasoline; installed ground water monitoring wells, vapor extraction wells, and soil borings; evaluated remedial alternatives; monitored the operation of a vapor extraction system; supervised the remediation of contaminated soil by pattern drilling; coordinated activities with City agencies when the contaminated part of the site was condemned for street widening.

Proposed School Sites, Chula Vista and Rancho Cucamonga, CA. Performed Preliminary Endangerment Assessments at sites where former agricultural lands were to be redeveloped for elementary and magnet school use; prepared Workplans, Health and Safety Plans, and Quality Assurance Project Plans; coordinated with school districts and the California Department of Toxic Substances Control to ensure that the project were completed in a timely manner and approved for school development.

Former Aerospace Research and Testing Facility, San Diego, CA. Performed Phase II Environmental Site Assessments and Preliminary Endangerment Assessment at a former rocket testing and research facility that was to be redeveloped for residential housing; researched and tested for the potential impact of perchlorate releases to surface soils.

South Orange County Transportation Infrastructure Improvement Project, Orange County, California: Produced the Hazards and Hazardous Materials Technical Report, a CEQA/NEPA document describing potential hazardous-materials concerns associated with the proposed extension of State Route 273 from Irvine to San Clemente. Evaluated existing potentially contaminated sites and the impacts to the environmental from the construction and operation of the proposed toll road. Applied the information obtained from the Technical Report study to the review and evaluation of the Hazards and Hazardous Materials section of the Environmental Impact Report for the project.

Proposed Private High School Site, Yorba Linda, California: Performed file review, Phase I and Phase II Environmental Site Assessments and a soil vapor survey on the site of a proposed Christian high school located in an area of historical oil production and citrus orchards.

Conferred with and advised client’s legal representatives regarding appropriate inquiries to be the equivalent of a Preliminary Endangerment Assessment if the site were eligible for Department of Toxic Substances Control Supervision. Testified before City Planning Commission and City Council regarding findings and the suitability of the site for the intended use.

EXHIBIT 2
City Council 22 – 954 5/5/2026

APPENDIX F
Conceptual Workplan
(Scope of Work) for Phase
II Environmental Site
Assessment
EXHIBIT 2
City Council 22 – 955 5/5/2026

Introduction
This conceptual workplan (Scope of Work) for Phase II assessments in the study area is based on known environmental concerns as identified in the Initial Site Assessment (ISA). As noted in the ISA, additional investigation in the form of a series of Phase I Environmental Site Assessments, which would entail detailed inspections of the subject facilities and additional historical research, is recommended. One possible scenario would be three Phase I assessments: on the older industrial buildings along Fuller Street, on the County Yard area, and on the warehouses in the southern part of the study area. Such Phase I assessments would be intended to provide historical and contemporary land and hazardous materials usage information leading to an appropriate Scope of Work for the Phase II assessment(s).

The following presents a conceptual Scope of Work for Phase II assessments at the various areas or parcels of potential concerns as noted in Table 8, page 22, of the ISA report. In the Scope of Work the following analytical methods (EPA methods) are indicated:

Total Recoverable Petroleum Hydrocarbons (TRPH): 418.1
Total Petroleum Hydrocarbons with carbon chain breakdown (TPHcc): 8015 (modified)
Methanol: 8015 (modified)
Volatile Organic Compounds (VOCs) (includes PCE, TCEy, as well as gasoline constituents): 8260B (for soil) or TO-15 (for vapor)
Title 22 (aka CAM-17) Metals, including Lead and Cadmium: 6000 series Drilling and soil sampling is presumed to be by direct-push equipment (Geoprobe).

Fuller Street (Parcels A-1 through A-6, A-8 and T-1): No known concerns: likely some machine shops in this area with screening for hydrocarbon releases recommended.

Scope: 4 to 8 soil borings drilled to 20 feet, with soil samples collected at 2, 5, 10, 15 and 20 feet: analyze 2-5-10 foot soil samples for TRPH; analyze two samples with highest TRPH for VOCs.

Fuller Street (Parcel A-7): Former chemical plant with three closed-in-place USTs: soil gas survey for VOCs (12 points sampled at depths of 5 feet), eight soil borings (adjacent to in-place USTs, outside and possibly inside the building), sampling plan as above, analyzed for VOCs, selected samples/locations for to be analyzed for methanol.

County Yard (Parcel A-9): Former petroleum storage facility: ten soil borings, sampling plan as above, analyzed for TRPH, TPHcc and VOCs. Soil gas survey for VOCs and TPHcc (12 points sampled at depths of 5 feet)
East of Fuller Street (Parcel T-4): Four soil borings to be installed in area of temporary construction easement; sampled at 1, 3 and 5 feet: 1-foot and 3-foot samples to be analyzed for Title 22 metals to document existing conditions.

EXHIBIT 2
City Council 22 – 956 5/5/2026

County Yard (Parcel T-8): Previously documented soil impacts by PCE and TCEy; recommend soil gas survey in west part of parcel (temporary construction easement area) to document existing conditions; approximately six sampling locations, soil gas samples at 5 feet to be tested for VOCs.

Auto Wrecking Yard/Former Battery Manufacturer (Parcel T-9): Six soil borings in west part of parcel, sampled at 1, 3, 5, 10, 15 and 20 feet, 1, 5 and 10-foot samples analyzed for TRPH and/or TPHcc with selected samples to be analyzed for VOCs. 1- foot and 3-foot samples to be analyzed for lead and cadmium with selected samples to be analyzed for Title 22 metals. Soil sas survey with 6 South Warehouses (Parcel A-11): No known concerns: possibly some machine shop or fuel storage activities in warehouse areas; former auto repair shops but no identified concerns. Screening recommended with six 20-foot soil borings, sampling program as above for other 20-foot borings, analysis for TRPH or TPHcc, analyze selected soil samples for VOCs.

EXHIBIT 2
City Council 22 – 957 5/5/2026

CITY OF SANTA ANA
ATTACHMENT N6
PHASE I ENVIRONMENTAL SITE ASSESSMENT – NORTH AREA
EXHIBIT 2
City Council 22 – 958 5/5/2026
EXHIBIT 2
City Council 22 – 959 5/5/2026
EXHIBIT 2
City Council 22 – 960 5/5/2026
EXHIBIT 2
City Council 22 – 961 5/5/2026
EXHIBIT 2
City Council 22 – 962 5/5/2026
EXHIBIT 2
City Council 22 – 963 5/5/2026
EXHIBIT 2
City Council 22 – 964 5/5/2026
EXHIBIT 2
City Council 22 – 965 5/5/2026
EXHIBIT 2
City Council 22 – 966 5/5/2026
EXHIBIT 2
City Council 22 – 967 5/5/2026
EXHIBIT 2
City Council 22 – 968 5/5/2026
EXHIBIT 2
City Council 22 – 969 5/5/2026
EXHIBIT 2
City Council 22 – 970 5/5/2026
EXHIBIT 2
City Council 22 – 971 5/5/2026
EXHIBIT 2
City Council 22 – 972 5/5/2026
EXHIBIT 2
City Council 22 – 973 5/5/2026
EXHIBIT 2
City Council 22 – 974 5/5/2026
EXHIBIT 2
City Council 22 – 975 5/5/2026
EXHIBIT 2
City Council 22 – 976 5/5/2026
EXHIBIT 2
City Council 22 – 977 5/5/2026
EXHIBIT 2
City Council 22 – 978 5/5/2026
EXHIBIT 2
City Council 22 – 979 5/5/2026
EXHIBIT 2
City Council 22 – 980 5/5/2026
EXHIBIT 2
City Council 22 – 981 5/5/2026
EXHIBIT 2
City Council 22 – 982 5/5/2026
EXHIBIT 2
City Council 22 – 983 5/5/2026
EXHIBIT 2
City Council 22 – 984 5/5/2026
EXHIBIT 2
City Council 22 – 985 5/5/2026
EXHIBIT 2
City Council 22 – 986 5/5/2026
EXHIBIT 2
City Council 22 – 987 5/5/2026
EXHIBIT 2
City Council 22 – 988 5/5/2026
EXHIBIT 2
City Council 22 – 989 5/5/2026
EXHIBIT 2
City Council 22 – 990 5/5/2026
EXHIBIT 2
City Council 22 – 991 5/5/2026
EXHIBIT 2
City Council 22 – 992 5/5/2026
EXHIBIT 2
City Council 22 – 993 5/5/2026
EXHIBIT 2
City Council 22 – 994 5/5/2026
EXHIBIT 2
City Council 22 – 995 5/5/2026
EXHIBIT 2
City Council 22 – 996 5/5/2026
EXHIBIT 2
City Council 22 – 997 5/5/2026
EXHIBIT 2
City Council 22 – 998 5/5/2026
EXHIBIT 2
City Council 22 – 999 5/5/2026
EXHIBIT 2
City Council 22 – 1000 5/5/2026
EXHIBIT 2
City Council 22 – 1001 5/5/2026
EXHIBIT 2
City Council 22 – 1002 5/5/2026
EXHIBIT 2
City Council 22 – 1003 5/5/2026
EXHIBIT 2
City Council 22 – 1004 5/5/2026
EXHIBIT 2
City Council 22 – 1005 5/5/2026
EXHIBIT 2
City Council 22 – 1006 5/5/2026
EXHIBIT 2
City Council 22 – 1007 5/5/2026
EXHIBIT 2
City Council 22 – 1008 5/5/2026
EXHIBIT 2
City Council 22 – 1009 5/5/2026
EXHIBIT 2
City Council 22 – 1010 5/5/2026
EXHIBIT 2
City Council 22 – 1011 5/5/2026
EXHIBIT 2
City Council 22 – 1012 5/5/2026
EXHIBIT 2
City Council 22 – 1013 5/5/2026
EXHIBIT 2
City Council 22 – 1014 5/5/2026
EXHIBIT 2
City Council 22 – 1015 5/5/2026
EXHIBIT 2
City Council 22 – 1016 5/5/2026
EXHIBIT 2
City Council 22 – 1017 5/5/2026
EXHIBIT 2
City Council 22 – 1018 5/5/2026
EXHIBIT 2
City Council 22 – 1019 5/5/2026
EXHIBIT 2
City Council 22 – 1020 5/5/2026
EXHIBIT 2
City Council 22 – 1021 5/5/2026
EXHIBIT 2
City Council 22 – 1022 5/5/2026
EXHIBIT 2
City Council 22 – 1023 5/5/2026
EXHIBIT 2
City Council 22 – 1024 5/5/2026
EXHIBIT 2
City Council 22 – 1025 5/5/2026
EXHIBIT 2
City Council 22 – 1026 5/5/2026
EXHIBIT 2
City Council 22 – 1027 5/5/2026
EXHIBIT 2
City Council 22 – 1028 5/5/2026
EXHIBIT 2
City Council 22 – 1029 5/5/2026
EXHIBIT 2
City Council 22 – 1030 5/5/2026
EXHIBIT 2
City Council 22 – 1031 5/5/2026
EXHIBIT 2
City Council 22 – 1032 5/5/2026
EXHIBIT 2
City Council 22 – 1033 5/5/2026
EXHIBIT 2
City Council 22 – 1034 5/5/2026
EXHIBIT 2
City Council 22 – 1035 5/5/2026
EXHIBIT 2
City Council 22 – 1036 5/5/2026
EXHIBIT 2
City Council 22 – 1037 5/5/2026
EXHIBIT 2
City Council 22 – 1038 5/5/2026
EXHIBIT 2
City Council 22 – 1039 5/5/2026
EXHIBIT 2
City Council 22 – 1040 5/5/2026
EXHIBIT 2
City Council 22 – 1041 5/5/2026
EXHIBIT 2
City Council 22 – 1042 5/5/2026
EXHIBIT 2
City Council 22 – 1043 5/5/2026
EXHIBIT 2
City Council 22 – 1044 5/5/2026
EXHIBIT 2
City Council 22 – 1045 5/5/2026
EXHIBIT 2
City Council 22 – 1046 5/5/2026
EXHIBIT 2
City Council 22 – 1047 5/5/2026
EXHIBIT 2
City Council 22 – 1048 5/5/2026
EXHIBIT 2
City Council 22 – 1049 5/5/2026
EXHIBIT 2
City Council 22 – 1050 5/5/2026
EXHIBIT 2
City Council 22 – 1051 5/5/2026
EXHIBIT 2
City Council 22 – 1052 5/5/2026
EXHIBIT 2
City Council 22 – 1053 5/5/2026
EXHIBIT 2
City Council 22 – 1054 5/5/2026
EXHIBIT 2
City Council 22 – 1055 5/5/2026
EXHIBIT 2
City Council 22 – 1056 5/5/2026
EXHIBIT 2
City Council 22 – 1057 5/5/2026
EXHIBIT 2
City Council 22 – 1058 5/5/2026
EXHIBIT 2
City Council 22 – 1059 5/5/2026
EXHIBIT 2
City Council 22 – 1060 5/5/2026
EXHIBIT 2
City Council 22 – 1061 5/5/2026
EXHIBIT 2
City Council 22 – 1062 5/5/2026
EXHIBIT 2
City Council 22 – 1063 5/5/2026
EXHIBIT 2
City Council 22 – 1064 5/5/2026
EXHIBIT 2
City Council 22 – 1065 5/5/2026
EXHIBIT 2
City Council 22 – 1066 5/5/2026
EXHIBIT 2
City Council 22 – 1067 5/5/2026
EXHIBIT 2
City Council 22 – 1068 5/5/2026
EXHIBIT 2
City Council 22 – 1069 5/5/2026
EXHIBIT 2
City Council 22 – 1070 5/5/2026
EXHIBIT 2
City Council 22 – 1071 5/5/2026
EXHIBIT 2
City Council 22 – 1072 5/5/2026
EXHIBIT 2
City Council 22 – 1073 5/5/2026
EXHIBIT 2
City Council 22 – 1074 5/5/2026
EXHIBIT 2
City Council 22 – 1075 5/5/2026
EXHIBIT 2
City Council 22 – 1076 5/5/2026
EXHIBIT 2
City Council 22 – 1077 5/5/2026
EXHIBIT 2
City Council 22 – 1078 5/5/2026
EXHIBIT 2
City Council 22 – 1079 5/5/2026
EXHIBIT 2
City Council 22 – 1080 5/5/2026
EXHIBIT 2
City Council 22 – 1081 5/5/2026
EXHIBIT 2
City Council 22 – 1082 5/5/2026
EXHIBIT 2
City Council 22 – 1083 5/5/2026
EXHIBIT 2
City Council 22 – 1084 5/5/2026
EXHIBIT 2
City Council 22 – 1085 5/5/2026
EXHIBIT 2
City Council 22 – 1086 5/5/2026
EXHIBIT 2
City Council 22 – 1087 5/5/2026
EXHIBIT 2
City Council 22 – 1088 5/5/2026
EXHIBIT 2
City Council 22 – 1089 5/5/2026
EXHIBIT 2
City Council 22 – 1090 5/5/2026
EXHIBIT 2
City Council 22 – 1091 5/5/2026
EXHIBIT 2
City Council 22 – 1092 5/5/2026
EXHIBIT 2
City Council 22 – 1093 5/5/2026
EXHIBIT 2
City Council 22 – 1094 5/5/2026
EXHIBIT 2
City Council 22 – 1095 5/5/2026
EXHIBIT 2
City Council 22 – 1096 5/5/2026
EXHIBIT 2
City Council 22 – 1097 5/5/2026
EXHIBIT 2
City Council 22 – 1098 5/5/2026
EXHIBIT 2
City Council 22 – 1099 5/5/2026
EXHIBIT 2
City Council 22 – 1100 5/5/2026
EXHIBIT 2
City Council 22 – 1101 5/5/2026
EXHIBIT 2
City Council 22 – 1102 5/5/2026
EXHIBIT 2
City Council 22 – 1103 5/5/2026
EXHIBIT 2
City Council 22 – 1104 5/5/2026
EXHIBIT 2
City Council 22 – 1105 5/5/2026
EXHIBIT 2
City Council 22 – 1106 5/5/2026
EXHIBIT 2
City Council 22 – 1107 5/5/2026
EXHIBIT 2
City Council 22 – 1108 5/5/2026
EXHIBIT 2
City Council 22 – 1109 5/5/2026
EXHIBIT 2
City Council 22 – 1110 5/5/2026
EXHIBIT 2
City Council 22 – 1111 5/5/2026
EXHIBIT 2
City Council 22 – 1112 5/5/2026
EXHIBIT 2
City Council 22 – 1113 5/5/2026
EXHIBIT 2
City Council 22 – 1114 5/5/2026
EXHIBIT 2
City Council 22 – 1115 5/5/2026
EXHIBIT 2
City Council 22 – 1116 5/5/2026
EXHIBIT 2
City Council 22 – 1117 5/5/2026
EXHIBIT 2
City Council 22 – 1118 5/5/2026
EXHIBIT 2
City Council 22 – 1119 5/5/2026
EXHIBIT 2
City Council 22 – 1120 5/5/2026
EXHIBIT 2
City Council 22 – 1121 5/5/2026
EXHIBIT 2
City Council 22 – 1122 5/5/2026
EXHIBIT 2
City Council 22 – 1123 5/5/2026
EXHIBIT 2
City Council 22 – 1124 5/5/2026
EXHIBIT 2
City Council 22 – 1125 5/5/2026
EXHIBIT 2
City Council 22 – 1126 5/5/2026
EXHIBIT 2
City Council 22 – 1127 5/5/2026
EXHIBIT 2
City Council 22 – 1128 5/5/2026
EXHIBIT 2
City Council 22 – 1129 5/5/2026
EXHIBIT 2
City Council 22 – 1130 5/5/2026
EXHIBIT 2
City Council 22 – 1131 5/5/2026
EXHIBIT 2
City Council 22 – 1132 5/5/2026
EXHIBIT 2
City Council 22 – 1133 5/5/2026
EXHIBIT 2
City Council 22 – 1134 5/5/2026
EXHIBIT 2
City Council 22 – 1135 5/5/2026
EXHIBIT 2
City Council 22 – 1136 5/5/2026
EXHIBIT 2
City Council 22 – 1137 5/5/2026
EXHIBIT 2
City Council 22 – 1138 5/5/2026
EXHIBIT 2
City Council 22 – 1139 5/5/2026
EXHIBIT 2
City Council 22 – 1140 5/5/2026
EXHIBIT 2
City Council 22 – 1141 5/5/2026
EXHIBIT 2
City Council 22 – 1142 5/5/2026
EXHIBIT 2
City Council 22 – 1143 5/5/2026
EXHIBIT 2
City Council 22 – 1144 5/5/2026
EXHIBIT 2
City Council 22 – 1145 5/5/2026
EXHIBIT 2
City Council 22 – 1146 5/5/2026
EXHIBIT 2
City Council 22 – 1147 5/5/2026
EXHIBIT 2
City Council 22 – 1148 5/5/2026
EXHIBIT 2
City Council 22 – 1149 5/5/2026
EXHIBIT 2
City Council 22 – 1150 5/5/2026
EXHIBIT 2
City Council 22 – 1151 5/5/2026
EXHIBIT 2
City Council 22 – 1152 5/5/2026
EXHIBIT 2
City Council 22 – 1153 5/5/2026
EXHIBIT 2
City Council 22 – 1154 5/5/2026
EXHIBIT 2
City Council 22 – 1155 5/5/2026
EXHIBIT 2
City Council 22 – 1156 5/5/2026
EXHIBIT 2
City Council 22 – 1157 5/5/2026
EXHIBIT 2
City Council 22 – 1158 5/5/2026
EXHIBIT 2
City Council 22 – 1159 5/5/2026
EXHIBIT 2
City Council 22 – 1160 5/5/2026
EXHIBIT 2
City Council 22 – 1161 5/5/2026
EXHIBIT 2
City Council 22 – 1162 5/5/2026
EXHIBIT 2
City Council 22 – 1163 5/5/2026
EXHIBIT 2
City Council 22 – 1164 5/5/2026
EXHIBIT 2
City Council 22 – 1165 5/5/2026
EXHIBIT 2
City Council 22 – 1166 5/5/2026
EXHIBIT 2
City Council 22 – 1167 5/5/2026
EXHIBIT 2
City Council 22 – 1168 5/5/2026
EXHIBIT 2
City Council 22 – 1169 5/5/2026
EXHIBIT 2
City Council 22 – 1170 5/5/2026
EXHIBIT 2
City Council 22 – 1171 5/5/2026
EXHIBIT 2
City Council 22 – 1172 5/5/2026
EXHIBIT 2
City Council 22 – 1173 5/5/2026
EXHIBIT 2
City Council 22 – 1174 5/5/2026
EXHIBIT 2
City Council 22 – 1175 5/5/2026
EXHIBIT 2
City Council 22 – 1176 5/5/2026
EXHIBIT 2
City Council 22 – 1177 5/5/2026
EXHIBIT 2
City Council 22 – 1178 5/5/2026
EXHIBIT 2
City Council 22 – 1179 5/5/2026
EXHIBIT 2
City Council 22 – 1180 5/5/2026
FORM-PB7-ARB
The EDR Radius Map™ Report with GeoCheck®
440 Wheelers Farms Road
Milford, CT 06461
Toll Free: 800.352.0050
www.edrnet.com
Santa Ana Boulevard/Metrolink Project, North Area
1008 N. Fuller Street
Santa Ana, CA 92701
Inquiry Number: 3593430.2s
May 01, 2013
EXHIBIT 2
City Council 22 – 1181 5/5/2026

SECTION PAGE
Executive Summary ES1
Overview Map 2
Detail Map 3
Map Findings Summary 4
Map Findings 8
Orphan Summary 212
Government Records Searched/Data Currency Tracking GR-1

GEOCHECK ADDENDUM
Physical Setting Source Addendum A-1
Physical Setting Source Summary A-2
Physical Setting SSURGO Soil Map A-6
Physical Setting Source Map A-8
Physical Setting Source Map Findings A-10
Physical Setting Source Records Searched A-19
TC3593430.2s Page 1
Thank you for your business.

Please contact EDR at 1-800-352-0050
with any questions or comments.

Disclaimer - Copyright and Trademark Notice
This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE,

ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property. Additionally, the information provided in this Report is not to be construed as legal advice.

Copyright 2013 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission.

EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners.

TABLE OF CONTENTS
EXHIBIT 2
City Council 22 – 1182 5/5/2026

EXECUTIVE SUMMARY
TC3593430.2s EXECUTIVE SUMMARY 1
A search of available environmental records was conducted by Environmental Data Resources, Inc (EDR).

The report was designed to assist parties seeking to meet the search requirements of EPA’s Standards and Practices for All Appropriate Inquiries (40 CFR Part 312), the ASTM Standard Practice for Environmental Site Assessments (E 1527-05) or custom requirements developed for the evaluation of environmental risk associated with a parcel of real estate.

TARGET PROPERTY INFORMATION

ADDRESS
1008 N. FULLER STREET
SANTA ANA, CA 92701

COORDINATES
Latitude (North): 33.7536000 - 33˚ 45’ 12.96’’
Longitude (West): 117.8554000 - 117˚ 51’ 19.44’’
Universal Tranverse Mercator: Zone 11
UTM X (Meters): 420775.4
UTM Y (Meters): 3734971.2
Elevation: 145 ft. above sea level

USGS TOPOGRAPHIC MAP ASSOCIATED WITH TARGET PROPERTY
Target Property Map: 33117-G7 ORANGE, CA
Most Recent Revision: 1981
South Map: 33117-F7 TUSTIN, CA
Most Recent Revision: 1981

AERIAL PHOTOGRAPHY IN THIS REPORT
Photo Year: 2012
Source: USDA

TARGET PROPERTY SEARCH RESULTS
The target property was identified in the following records. For more information on this property see page 8 of the attached EDR Radius Map report:

Site Database(s) EPA ID
JASCO CHEMICAL CORP.
1008 N FULLER
SANTA ANA, CA 92701

LUST N/A
Status: Completed - Case Closed

CA FID UST

SWEEPS UST

JASCO CHEMICAL CORP
1008 FULLER
SANTA ANA, CA 92701

SSTS N/A

JASCO CHEMICAL CORP
1008 FULLER
SANTA ANNA, CA 92701

SSTS N/A
EXHIBIT 2
City Council 22 – 1183 5/5/2026

EXECUTIVE SUMMARY
TC3593430.2s EXECUTIVE SUMMARY 2
JASCO CHEMICAL CORP.
1008 FULLER ST
SANTA ANA, CA 92701

HIST UST N/A
JASCO CHEMICAL CORP.
1008 FULLER ST.

SANTA ANA, CA 92701

FINDS N/A

JASCO CHEMICAL CORP
1008 FULLER ST
SANTA ANA, CA 92701

WDS N/A

JASCO CHEMICAL CORPORATION
1008 FULLER ST. SANTA ANA CA 92701
SANTA ANA, CA 92701

ICIS N/A

JASCO CHEMICAL CORP
1008 N FULLER
SANTA ANA, 92701

SSTS N/A

JASCO CHEMICAL CORP
1008 FULLER ST
SANTA ANA, CA 92701

HAZNET N/A

DATABASES WITH NO MAPPED SITES
No mapped sites were found in EDR’s search of available ("reasonably ascertainable ") government records either on the target property or within the search radius around the target property for the following databases:

STANDARD ENVIRONMENTAL RECORDS
Federal NPL site list
NPL National Priority List
Proposed NPL Proposed National Priority List Sites
NPL LIENS Federal Superfund Liens
Federal Delisted NPL site list
Delisted NPL National Priority List Deletions
Federal CERCLIS list
FEDERAL FACILITY Federal Facility Site Information listing EXHIBIT 2
City Council 22 – 1184 5/5/2026

EXECUTIVE SUMMARY
TC3593430.2s EXECUTIVE SUMMARY 3
Federal CERCLIS NFRAP site List
CERC-NFRAP CERCLIS No Further Remedial Action Planned
Federal RCRA non-CORRACTS TSD facilities list
RCRA-TSDF RCRA - Treatment, Storage and Disposal
Federal RCRA generators list
RCRA-LQG RCRA - Large Quantity Generators
RCRA-CESQG RCRA - Conditionally Exempt Small Quantity Generator Federal institutional controls / engineering controls registries US ENG CONTROLS Engineering Controls Sites List
US INST CONTROL Sites with Institutional Controls
LUCIS Land Use Control Information System
Federal ERNS list
ERNS Emergency Response Notification System
State- and tribal - equivalent NPL
RESPONSE State Response Sites
State and tribal leaking storage tank lists
SLIC Statewide SLIC Cases
INDIAN LUST Leaking Underground Storage Tanks on Indian Land State and tribal registered storage tank lists
INDIAN UST Underground Storage Tanks on Indian Land
FEMA UST Underground Storage Tank Listing
State and tribal voluntary cleanup sites
INDIAN VCP Voluntary Cleanup Priority Listing
VCP Voluntary Cleanup Program Properties

ADDITIONAL ENVIRONMENTAL RECORDS
Local Brownfield lists
US BROWNFIELDS A Listing of Brownfields Sites
Local Lists of Landfill / Solid Waste Disposal Sites
DEBRIS REGION 9 Torres Martinez Reservation Illegal Dump Site Locations ODI Open Dump Inventory
HAULERS Registered Waste Tire Haulers Listing
EXHIBIT 2
City Council 22 – 1185 5/5/2026

EXECUTIVE SUMMARY
TC3593430.2s EXECUTIVE SUMMARY 4
INDIAN ODI Report on the Status of Open Dumps on Indian Lands Local Lists of Hazardous waste / Contaminated Sites
US CDL Clandestine Drug Labs
HIST Cal-Sites Historical Calsites Database
SCH School Property Evaluation Program
Toxic Pits Toxic Pits Cleanup Act Sites
CDL Clandestine Drug Labs
US HIST CDL National Clandestine Laboratory Register
Local Land Records
LIENS 2 CERCLA Lien Information
LIENS Environmental Liens Listing
DEED Deed Restriction Listing
Records of Emergency Release Reports
HMIRS Hazardous Materials Information Reporting System
CHMIRS California Hazardous Material Incident Report System LDS Land Disposal Sites Listing
MCS Military Cleanup Sites Listing
Orange Co. Industrial Site List of Industrial Site Cleanups SPILLS 90 SPILLS 90 data from FirstSearch
Other Ascertainable Records
DOT OPS Incident and Accident Data
DOD Department of Defense Sites
FUDS Formerly Used Defense Sites
CONSENT Superfund (CERCLA) Consent Decrees
ROD Records Of Decision
UMTRA Uranium Mill Tailings Sites
US MINES Mines Master Index File
TRIS Toxic Chemical Release Inventory System
TSCA Toxic Substances Control Act
FTTS FIFRA/ TSCA Tracking System - FIFRA (Federal Insecticide, Fungicide, & Rodenticide Act)/TSCA (Toxic Substances Control Act)
HIST FTTS FIFRA/TSCA Tracking System Administrative Case Listing PADS PCB Activity Database System
MLTS Material Licensing Tracking System
RADINFO Radiation Information Database
RAATS RCRA Administrative Action Tracking System
RMP Risk Management Plans
NPDES NPDES Permits Listing
UIC UIC Listing
Cortese "Cortese" Hazardous Waste & Substances Sites List CUPA Listings CUPA Resources List
DRYCLEANERS Cleaner Facilities
WIP Well Investigation Program Case List
ENF Enforcement Action Listing
EMI Emissions Inventory Data
INDIAN RESERV Indian Reservations
SCRD DRYCLEANERS State Coalition for Remediation of Drycleaners Listing EXHIBIT 2
City Council 22 – 1186 5/5/2026

← All documents from this meeting