Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
14actions
8vendors
$10,549,551approved (recorded vote)
$3,753,205proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-10-13 | Musco Sports Lighting | Agreement with Musco Sports Lighting, LLC for the Brengle Terrace Park, Thibodo Park, and Vista Sports Park LED Lighting Upgrade Project check LED streetlights | Sole-source award | $742,000 | Approved 5-0 | staff report · other · city original | |
| 2026-03-24 | Baker Electric & Renewables | CIP NO. 8294 – Traffic Signal Interconnect for Emerald Drive, Poinsettia Avenue and N. Melrose Drive – Construction Change Order No. 3 check Other | Amendment | $72,204 | Approved 5-0 | staff report · city original | |
| 2026-02-10 | Blink Charging | CIP No. 8902 – City-Wide Electric Vehicle Charging Stations Project – First Amendment check EV charging | Amendment | $1,229,769 | 99 EV charging stalls consisting of Level 2 and Level 3 chargers | Approved 5-0 | staff report · city original |
| 2026-02-10 | BlinkCharging.com | Citywide Electric Vehicle Charging Stations First Amendment (CIP 8902) - Public Works quote Q-42773 check EV charging | Purchase order | $375,991 | 10 and 6 BLNK S8 MODEL 880 L2 - 48A; 3 CTX 180KW STANDALONE DCFC - CCS… | No vote recorded | staff report · city original |
| 2026-01-13 | Fonroche Lighting America | CIP NO. 8385 – SOLAR STREETLIGHT PROJECT – AWARD OF CONTRACTS (goods purchase contract with Fonroche Lighting America Inc.) Solar and solar PPAs | Sole-source award | $372,575 | 88 additional solar streetlights | Approved 5-0 | staff report · staff report · city original |
| 2026-01-13 | Select Electric | CIP NO. 8385 – SOLAR STREETLIGHT PROJECT – AWARD OF CONTRACTS (construction contract to Select Electric, Inc.) check Solar and solar PPAs | Award | see source | 88 additional solar streetlights | Approved 5-0 | staff report · staff report · staff report · city original |
| 2025-02-25 | Blink Charging | CIP 8902 – City-Wide Electric Vehicle Charging Stations Project – Equipment Purchase check EV charging | Cooperative purchase | $577,183 not to exceed | 99 EV charging stalls (Level 2 and Level 3) at 10 City-owned sites; 8 … | Approved 5-0 | staff report · staff report · city original |
| 2025-02-11 | Climatec | Agreement with Climatec, LLC for HVAC Updates at Fire Stations 1, 5, & 6 and Technical Support Services for Fire Stations 1, 5, & 6 and Public Works Building A Efficiency retrofits and ESPCs | Sole-source award | $439,304 | 1 Supervisor / Workstation, 1 Global Controller, 17 Single Zone VAV w/… Annual charges: $20,840.00, $21,882.00, $22,976.00, $24,125.00, $25,33… | Approved MOTION CARRIED: 5-0 | staff report · minutes · other · city original |
| 2024-12-10 | PAR Western Line Contractors | CIP NO. 8902 – CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT – FIRST AMENDMENT TO THE AGREEMENT WITH PAR WESTERN LINE CONTRACTORS, LLC check EV charging | Amendment | $3,839,304 not to exceed | 99 EV stalls | Approved MOTION CARRIED: 5-0 | minutes · other · other · city original |
| 2024-12-10 | PAR Western Line Contractors | City-Wide EV Charging Stations Project - First Amendment, GMP for Phase II construction services check EV charging | Amendment | $3,377,214 not to exceed | No vote recorded | staff report · city original | |
| 2024-09-24 | Baker Electric & Renewables | CIP NO. 8334 – CIVIC CENTER SOLAR PROJECT – FIRST AMENDMENT TO THE AGREEMENT WITH BAKER ELECTRIC & RENEWABLES, LLC Solar and solar PPAs | Amendment | $2,505,353 not to exceed | 977,601 kilowatt hours annually Civic Center's electrical utility bill will decrease by almost half; 6… | Approved 5-0 | staff report · other · city original |
| 2024-06-25 | PAR Western Line Contractors | CIP NO. 8902 – CITY-WIDE ELECTRIC VEHICLE CHARGING STATIONS PROJECT – DESIGN/BUILD AGREEMENT AWARD (CC) EV charging | Award | $462,090 | 90 EV charging stalls (Level 2 and Level 3) at 12 City-owned propertie… | Approved 4-0 (GREEN ABSENT) | staff report · staff report · minutes · other · city original |
| 2023-08-22 | Baker Electric & Renewables | CIP NO. 8334 CIVIC CENTER SOLAR PROJECT – DESIGN/BUILD AGREEMENT AWARD check Solar and solar PPAs | Award | $228,318 not to exceed | Electrical utility bill will significantly decrease; five-year payback… | Approved 5-0 | staff report · staff report · other · other · other |
| 2022-04-26 | Climatec | Agreement with Climatec, LLC for Civic Center HVAC Technical Support Services (CC) Efficiency retrofits and ESPCs | Sole-source award | $81,450 not to exceed | Approved | staff report · minutes · other · city original |