Agreements for Professional Services to perform As-Needed Professional C... Page 1276 of 2161
3. Scope of Work | Page 30
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Responsible Personal
Task No.WORK TASK OR ITEM DESCRIPTIONProject Manager/ Resident EngineerOffice Engineer / Document ControlQuality Assurance Inspection SupportLabor Compliance & Certified Payroll MonitoringEnvironmental Monitoring & ReportingConstruction Survey StakingMaterial Testing and Acceptance 14 Daily and Weekly Reports
a. Prepare daily reports
b. Prepare weekly construction progress reports
15 Schedule
a. Baseline schedule
b. 3-week look ahead schedule
c. Overall progress report to City
d. Report non-conformance & delays
e. Schedule recommendations
16 Facilitate Meetings
a. Weekly job-site progress meetings
b. Meeting minutes
17 Labor Compliance
a. Monitor labor compliance
b. Review certified payroll
c. Ensure EEO compliance
18 Construction Completion and Closeout
a. Review & verify project completion
b. Final testing, documentation, and inspections
c. Punch-list
d. Corrections
e. Closeout documentation
f. Monitor warranty services
19 As-Builts
a. Obtain contractor red-lines drawings
b. Complete "As-Built" drawings
20 Project Acceptance
a. Finalize records
b. Secure department & agency acceptance
c. Liquidated damages & final payment
d. Notice of Completion
Agreements for Professional Services to perform As-Needed Professional C... Page 1277 of 2161 Appendix
Agreements for Professional Services to perform As-Needed Professional C... Page 1278 of 2161 Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1279 of 2161 Dynamic Engineering Services, Inc.
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1280 of 2161 Appendix: Resumes | Page 2
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Chia-Chi Wang, PE, PMP, QSD
Project Manager/Resident Engineer
Chia-Chi has more than 34 years of construction management and inspection experience on transportation and public works projects, including serving as the Project Manager and/or Resident Engineer on more than 50 construction management and inspection projects for public agencies. Prior to founding DESI, Chia-Chi spent 21 years at Caltrans, including 12 years as the Area Construction Manager for Riverside and San Bernardino Counties. In this role, she was responsible for overseeing the work of 65 engineers and providing construction management on high profile projects in throughout the Inland Empire such as the SR 60/91/215 Interchange Design-Sequencing Project and SR 91 Corridor Improvement and Devore Design-Build.
As a principal, project manager, and/or resident engineer for DESI, Chia-Chi has successfully delivered more than 20 projects for public agencies. All of the projects she served as resident engineer on were completed on schedule, within budget, and without claims. Her recent experience includes multiple paving and street improvement projects for the city including as resident engineer on the Rancho Los Coyotes Pavement Improvement Project and North Indio Paving Project as well as the project manager and prime consultant on the Traffic Signal Upgrade Project.
Chia-Chi has a history of managing similar scope including pavement widening and rehabilitation, street crossings, drainage facilities, new traffic signals, sidewalks, curb ramps, driveways, and removal and replacement of CVWD irrigation pipelines. She has a thorough understanding of the local, state, and federal requirements for this Project, including Caltrans regulations, policies, procedures, manuals, and standards and “GREENBOOK” Standard Specification for Public Works Construction. Chia-Chi is also a certified Caltrans Dispute Resolution Board Member and can provide dispute resolution for both the Project and the Contractor. She has a history of resolving claims at the lowest level possible and in the field through proactive communication.
RELEVANT PROJECT EXPERIENCE
Resident Engineer | Rancho Los Coyotes Street Improvement Project | City of Indio | Construction Value: $1.4M | Duration on the Project: 10/2023 – 12/2023
The specific scope of work includes paving Rancho Los Coyotes between Avenue 38 and Avenue 39 in Indio, north of Interstate 10. The project includes roadway excavation and grading, aggregate base, asphalt concrete pavement, drainage improvement, roll curb and driveway, and cross gutter.
Ms. Wang as the Resident Engineer managed the CM Team working with City Project Manager and Consultant Designers. She was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, office engineering, labor compliance monitoring and enforcement, SWPPP monitoring and inspection, QA inspection, progress payment and dispute resolution. In addition, Ms. Wang is responsible for labor compliance monitoring and prevailing wage enforcement.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
16/34
Education
• B.S. Civil Engineering
California State University,
Los Angeles
Certifications/Registrations
• Professional Engineer - Civil,
California, No. 50540
• PMP, PMI, No.1351346,
• QSP/QSD/ToR, CASQA No.
00998
Professional Associations
• Women in Transportation
Seminar
• American Society of Civil
Engineers
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
• Prevailing Wage Monitoring
and Enforcement
• Claim Mitigation and
Resolution
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• In-depth understanding of
local, state, and federal
regulations, policies,
procedures, manuals and
standards
• Managed similar projects for
the City and maintains
strong working relationships
with key stakeholders and
• regulatory agencies
• Strong working relationships
with key stakeholders and
regulatory agencies
Agreements for Professional Services to perform As-Needed Professional C... Page 1281 of 2161 Appendix: Resumes | Page 3
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Project Manager/Resident Engineer | SR-60 Central Avenue Interchange Improvement Project | SBCTA | Construction Value: $24M | Duration on the Project: 03/2021 – 05/2024 This project will widen the Central Avenue bridge and the on-ramp to accommodate three through lanes and double left-turn lanes in both directions and will widen the existing eastbound and westbound on-ramps to from one lane to two through lanes and a carpool lane. The project will relieve congestion and improve traffic flow on Central Avenue at SR-60 Interchange. Ms. Wang as the Resident Engineer managed the CM Team working with City Project Manager, Caltrans Oversight Engineers, and Consultant Designers. She was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, office engineering, labor compliance monitoring and enforcement, SWPPP monitoring and inspection, QA inspection, progress payment and dispute resolution. In addition, Ms. Wang is responsible for labor compliance monitoring and prevailing wage enforcement.
She verified employee Certified Payroll rate with DIR Rate Determination for each classification and Employee Interview Reports; verified contractor submit Certified Payroll Reports to Dir eCPR website and all contractor worked on the project are registered with DIR.
Resident Engineer | Cycle 9 Traffic Signal Improvement Project | City of Indio | Construction Value: $822K | Duration on the Project: 10/2023 – 01/2024 The project consists of the installation of advanced dilemma zone detection system, new traffic signal controllers to provide the compatibility for the new equipment and adding street lighting at fifteen (15) signalized intersections within the City of Indio. Ms. Wang as the Resident Engineer managed the CM Team working with City Project Manager and Consultant Designers. She was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, office engineering, labor compliance monitoring and enforcement, SWPPP monitoring and inspection, QA inspection, progress payment and dispute resolution. In addition, Ms. Wang is responsible for labor compliance monitoring and prevailing wage enforcement.
Resident Engineer | Monroe Traffic Signal Interconnect Project | City of Indio | Construction Value: $684K | Duration on the Project: 12/2019 – 02/2020 This project is to upgrade the existing traffic signals with new controller equipment at 11 intersection locations along Monroe Street and at the intersection of Doctor Carreon Boulevard and Oasis Street. Her responsibilities included contract administration, office engineering, labor compliance monitoring and enforcement, SWPPP monitoring and inspection, QA inspection, progress payment and dispute resolution. In addition, Ms. Wang is responsible for labor compliance monitoring and prevailing wage enforcement.
Project Manager/Resident Engineer | I-10 Montrey Avenue Ramp Realignment Project | City of Palm Desert/Caltrans | Construction Value: $9M | Duration on the Project: 03/2014 – 09/2015 This ramp modification project to: relocate WB off-ramp to Varner Road; and construct a direct loop on-ramp for NB Monterey Avenue traffic, construct Retaining Walls/Ground Anchor Wall and install new Traffic Signal, Lighting and Ramp Metering Systems. Ms. Wang managed the CM Team working with City Project Manager, Caltrans Oversight Engineers, and Consultant Designers. She was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, office engineering, labor compliance monitoring and enforcement, SWPPP monitoring and inspection, QA inspection, progress payment and dispute resolution.
Agreements for Professional Services to perform As-Needed Professional C... Page 1282 of 2161 Appendix: Resumes | Page 4
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Victor Moore
Assistant Project Manager / Safety Officer
Mr. Moore has more than 36 years of infrastructure construction experience on freeway and public works construction projects, including 10 years in Public Works Construction Inspection. Mr. Moore has been involved in all phases of Construction Engineering including Construction Management, Contract Administration, Field Engineering, Schedule and Submittal Review, Quality Assurance Inspection, Contract Change Order Cost Analysis, and Claim Resolution. His specialty includes Traffic Safety, Roadway Inspection, Storm Water Monitoring and Inspection, Traffic Signal Systems, Highway/Street Lighting Systems and Traffic Monitoring Systems. Mr. Moore is very familiar with FHWA Requirements, Caltrans Standard Plan, Specifications and OSHA safety and Health requirements for the construction industry.
RELEVANT PROJECT EXPERIENCE
ARE/Safety Officer | SR-60 Central Avenue Interchange
Improvement Project | SBCTA | Construction Value: $24M | Duration on the Project: 03/2021 – 05/2024
This project will widen the Central Avenue bridge and the on-ramp to accommodate three through lanes and double left-turn lanes in both directions and will widen the existing eastbound and westbound on-ramps to from one lane to two through lanes and a carpool lane. The project will relieve congestion and improve traffic flow on Central Avenue at SR-60 Interchange.
Mr. Moore is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; Utility Relocation Coordination, Project Schedule Review and Analysis, Contract Change Order Evaluation. In addition, he is the QA Manager for CM Team.
Senior Electrical Inspector/Safety Officer | I-15 Railroad Canyon Interchange Improvement Project | RCTC/Caltrans | Construction Value: $41M | Duration on the Project: 02/2020 – 02-2022 The project will address the needs of the area’s growing number of residents and recreational visitors. The project also will improve traffic flow for people traveling to and from Canyon Lake. The project includes building auxiliary lanes on I-15 to help drivers enter and exit the highway and reduce traffic back-ups; adding two new lanes on Railroad Canyon Road through the interchange and new lanes to the on-ramps and off-ramps with I-15; replacing the northbound diamond off-ramp with hook-style on- and off-ramps that both connect to Grape Street; constructing sidewalks and bike lanes along Railroad Canyon. Mr. Moore is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; Utility Relocation Coordination, Project Schedule Review and Analysis, Contract Change Order Evaluation. In addition, he is the QA Manager for DESI.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
16/36
Education
• William Workman High School
Certifications/Registrations
• OSHA 30-hour Occupational
Safety and Health Training for
Construction Industry,
• Competent Person-Confined
Space & Excavation Training
• Safety Through Maintenance
and Construction Zones.
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
• Contract Chang Order Cost
Negotiation
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 36 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1283 of 2161 Appendix: Resumes | Page 5
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
ARE/Electrical Inspector | Monroe Traffic Signal Interconnect Project | City of Indio | Construction Value: $684K | Duration on the Project: 12/2019 – 02/2020 This project is to upgrade the existing traffic signals with new controller equipment at 11 intersection locations along Monroe Street and at the intersection of Doctor Carreon Boulevard and Oasis Street. Mr. Moore is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for Traffic Signals and Fiber Optic Communication Systems. In addition, He also served as the CM Project Safety Officer.
ARE/Electrical Inspector | I-10 Jefferson Interchange Improvement Project | RCTD/Indio/Caltrans | Construction Value: $45M | Duration on the project: 09/2014 – 09/2018 This project is to replace the existing Jefferson Street Bridge and northbound Indio Boulevard overcrossing with a single bridge designed for traffic entering and exiting the freeway from both directions. The new eight-lane bridge includes two turning pockets in the middle, shoulders wide enough to accommodate bicycles and sidewalk on the northbound side of Jefferson Street. The bridge will also incorporate desert oasis aesthetic features and landscaping, providing a signature entrance to Indio. Mr. Moore is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection on Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering, Fiber Optic Communication, Irrigation Control, and Weather Monitoring Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
ARE/Electrical Inspector | I-10 Monterey Avenue Ramp Realignment Project | City of Palm Desert/Caltrans | Construction Value: $9M | Duration on the Project: 03/2014 – 09/2015 This ramp modification project to: relocate WB off-ramp to Varner Road; and construct a direct loop on-ramp for NB Monterey Avenue traffic, construct Retaining Walls/Ground Anchor Wall and install new Traffic Signal, Lighting and Ramp Metering Systems. Mr. Moore is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection on Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering, Fiber Optic Communication, Irrigation Control, and Weather Monitoring Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Agreements for Professional Services to perform As-Needed Professional C... Page 1284 of 2161 Appendix: Resumes | Page 6
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Nathaniel Battle
Roadway / SWPPP Inspector
Mr. Battle has twelve years of construction inspection experience focusing on bridge and roadway construction, including pile driving operations, concrete pours, surface aggregate, drainage, utilities, and traffic control. His project experience has spanned throughout California, and has required coordination with Caltrans, Metro Los Angeles, Metrolink, RCTC, SBCTA, Central Federal Lands Highway Division (FHWA), SBCTA, BNSF, City of Los Angeles, Department of Water and Power and other local agencies including the City of Riverside. Mr. Battle is knowledgeable in both Caltrans Standard Specification and the Standard Specifications for Public Work Construction “GREEN BOOK.”
RELEVANT PROJECT EXPERIENCE
Roadway Inspector | Rancho Los Coyotes Street Improvement Project | City of Indio | Construction Value: $1.4M | Duration on the Project: 10/2023 – 12/2023
The specific scope of work includes paving Rancho Los Coyotes between Avenue 38 and Avenue 39 in Indio, north of Interstate 10. The project includes roadway excavation and grading, aggregate base, asphalt concrete pavement, drainage improvement, roll curb and driveway, and cross gutter.
Mr. Battle was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, quality assurance inspection, SWPPP monitoring and inspection, roadway and drainage inspection, progress payment and dispute resolution.
Lead Construction Inspector | SR-60 Central Avenue Interchange Improvement Project | SBCTA | Construction Value: $24M | Duration on the Project: 11/2023 – 05/2024
This project will widen the Central Avenue bridge and the on-ramp to accommodate three through lanes and double left-turn lanes in both directions and will widen the existing eastbound and westbound on-ramps to from one lane to two through lanes and a carpool lane. The project will relieve congestion and improve traffic flow on Central Avenue at SR-60 Interchange.
Mr. Battle is responsible for Construction Contract Administration; Quality Assurance Inspection included but not limited to Traffic Control, Lane Closure, Earthwork, Drainage System Construction, JPCP, HMA, ADA Ramp, Curb and Gutters; Prevailing Wage Monitoring. In addition, he is the designated inspector for the Weekly SWPPP Inspection Report and Temporary Pedestrian Route Inspection Report.
Lead Roadway Inspector | I-15 Railroad Canyon Interchange Project | RCTC/Caltrans District 8 | Construction Value: $41M | Duration on the Project: 02/2020 – 03/2021
The project includes building auxiliary lanes on I-15 to help drivers enter and exit the highway and reduce traffic back-ups; adding two new lanes on Railroad Canyon Road through the interchange and new lanes to the onramps and off-ramps with I-15; replacing the northbound diamond off-ramp Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
3/12
Education
• Granite Hills High School, San
Diego, CA
• Grossmont Community
College, San Diego, CA
Certifications/Registrations
• Qualified SWPPP Practitioner-
#25486
• CISEC Certified Inspection of
Sediment and Erosion
Control, #1341
• OSHA 10-Hour Safety thru
Construction Zone
Professional Associations
•
Expertise
• Construction Management
• Quality Assurance Inspection
on Roadway, Pavement,
Drainage and SWPPP.
• Great Communication and
Coordination Skills
• Claim Mitigation and
Resolution
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 12 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
Agreements for Professional Services to perform As-Needed Professional C... Page 1285 of 2161 Appendix: Resumes | Page 7
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
with hook-style on- and off-ramps that both connect to Grape Street; constructing sidewalks and bike lanes along Railroad Canyon. Mr. Battle is responsible for monitoring and inspecting the placement of the Jointed Plain Concrete Pavement, Hot Mix Asphalt Pavement, grading and excavating operations, traffic control on Caltrans and City roadways (Night and Day shifts), drainage structures, curb and gutter inspection, temporary and permanent signs, He provides weekly inspections for SWPPP throughout the project limits. He is also responsible for coordinating with Caltrans Oversight. Nathaniel is responsible for the monthly Pay estimate. He requests and coordinates with the Quality Assurance testing lab for testing and sampling on the project. Nathaniel coordinates with the City of Lake Elsinore with traffic control and various issues within the City right of way.
Lead Construction Inspector | US-395 Roadway Widening Project | SBCTA/Caltrans District 8 | Construction Value: $25M | Duration on the Project: 07/2019 – 01/2021 The City of Adelanto, City of Victorville, and San Bernardino County Transit Authority are widening US-395 approximately five miles of US 395 between State Route 18 (Palmdale Road) to Chamberlain Way from two to four lanes, repave existing lanes, modify five signals and upgrade ADA access, add turn lanes, add sound walls and extend bridge at Joshua Wash. Mr. Battle recorded man hours, equipment and observing Structures for the project.
He observed and inspected the CIDH piles, reinforcement, concrete for the Sound Walls. Excavation of the Retaining Wall footings, placement of reinforcement and concrete for footings and walls. He inspected the excavation, placement of reinforcement and concrete for the Joshua Wash Bridge culvert and wingwalls. Nathaniel also provided inspections for SWPPP and safety throughout the project limits. Mr. Battle conducted Safety Meetings with the Contractor periodically as well.
Roadway Inspector | Kraemer Blvd. Grade Separation Project | OCTA | Construction Value: $32M | Duration on the Project: 04/2018 – 06/2019
The OCTA, City of Anaheim, City of Placentia, and Burlington North Santa Fe (BNSF) constructed a new under passing on Kraemer Boulevard between Orange Thorpe Avenue and Chapman Avenue allowing emergency vehicles and traveling public to pass without interruption from the rail-road crossing. As Roadway Inspector, Mr.
Battle was responsible for recording hours and equipment documentation, observing and inspecting footing excavation, rebar placement, concrete footing pours and retaining wall, and cast-in-place wall fabrication. Cast-inPlace wall fabrication included checking rebar clearance and spacing, reinforcing placement, and concrete pours.
He inspected pile cap that included checking forms for line and grade and made sure they remained serviceable.
Nathaniel also inspected CIDH pile placements for the cast-in-place walls, and barrier rail placement on top of the cast-in-place walls.
Agreements for Professional Services to perform As-Needed Professional C... Page 1286 of 2161 Appendix: Resumes | Page 8
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Steve Carbajal
Roadway / Electrical Inspector
Mr. Carbajal has over 28 years of experience in infrastructure construction experiences on freeway and public works construction projects. Mr. Carbajal has been involved in all phases of construction engineering including construction management, contract administration, field engineering, schedule and submittal review, quality assurance inspection, and contract change order cost analysis. He specializes inspection and maintenance of traffic signal related equipment, signal timing, traffic coordination, traffic control, traffic control, signing and striping roadway inspection, highway/street lighting systems and traffic monitoring systems. Mr. Carbajal has an extensive background in utilities work including high voltage work on the High Desert Power Plant and Mountain View Power Plant projects for SCE. Mr. Carbajal is very familiar with FHWA Requirements, Caltrans Standard Plan, Specifications and the Standard Specifications for Public Work Construction “GREENBOOK”.
RELEVANT PROJECT EXPERIENCE
Senior Construction Inspector | SR-210 lane Addition & Baseline Road Interchange Project | SBCTA/Caltrans District 8 |
Construction Value: 130M | Duration on the Project: 02/2020 – 12/2023
SR 210 will be widened from Sterling Avenue to San Bernardino Avenue in the cities of San Bernardino, Highland, and Redlands, as well as an unincorporated portion of San Bernardino County. Base Line Interchange will also be widened from Buckeye Street to Seine Avenue in the City of Highland.
Mr. Carbajal is responsible for Quality Assurance Inspection on Electrical related items including Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems.
Senior Electrical Inspector | SR-60 Truck Climbing Lane Project | RCTC/Caltrans District 8 | Construction Value: 113M | Duration on the Project: 03/2019 – 03/2022
The project is widening a 4.5-mile section of State Route 60 between Gilman Springs Road and 1.4 miles west of Jack Rabbit Trail between Moreno Valley and Beaumont. This project consists of constructing an eastbound truck climbing lane and westbound truck descending lane, widening shoulders to standard widths, improving motorist sight distance by flattening roadway curves. Mr. Carbajal is responsible for Quality Assurance Inspection on Electrical related items including Highway Lighting, Ramp Metering and Fiber Optic Communication Systems.
Senior Construction Inspector | I-15 Limonite Avenue Interchange Improvement Project | RCTD/Caltrans District 8 | Construction Value: 39M | Duration on the Project: 08/2018 – 07/2020 Limonite Avenue is an east-west arterial roadway between Hamner Avenue and Wineville Avenue.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
7/28
Education
• Fullerton College, General
Education
Certifications/Registrations
• General Electrician, CA
#106510
• OSHA 10-Hour Safety thru
Construction Zone
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on HMA. JPCP, Drainage,
Striping, and Signage
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
• Contract Chang Order Cost
Negotiation
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 28 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1287 of 2161 Appendix: Resumes | Page 9
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
The proposed improvements consist of a new 8-lane overcrossing, 3 through lanes in each direction plus 2 turn lanes, widening of the off-ramps from 2 to 4 lanes, the addition of 2 new loop on-ramps, and the widening of Limonite Avenue to 4 lanes in each direction between Hamner Avenue and Wineville Avenue. Mr. Carbajal is responsible for Quality Assurance Inspection on Electrical related items including Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems.
Electrical Inspector | SR-210 Pepper Avenue Interchange Project | SBCTA/Caltrans District 8 | Construction Value: $22M | Duration on the Project: 084/2017 – 02/2018 The interchange will provide a connection between the recently extended Pepper Avenue and SR-210, offering a new option for commuting and moving goods through the region. Ramps will be built in a tight diamond shape with two lanes per ramp. The Eastbound and westbound on-ramps will include carpool lanes and ramp meters. Mr.
Carbajal is responsible for Construction Contract Administration, Safety Review, Quality Assurance Inspection on Electrical related items include Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Electrical QA Inspector | SR-91 Corridor Improvement Design-Built Project | RCTC/Caltrans District 8 | Construction Value: $1.4B | Duration on the Project: 09/2016 – 07/2017 The 91 Project is adding regular and express lanes to EB and WB 91, widening the interstate from 5 to 8 lanes in each direction and extending the existing express lanes 8 miles east to I-15. Mr. Carbajal’s responsibilities including, but not limited to inspection of electronic toll equipment; traffic management systems (fiber communications); highway lighting, traffic signal, and ramp meter systems; and City of Corona traffic signals, street lighting, and fiber communications systems. This work requires extensive knowledge in Caltrans Standard Specifications (Section 86) as well as the Standard Specifications for Public Works Construction (Green Book)
Agreements for Professional Services to perform As-Needed Professional C... Page 1288 of 2161 Appendix: Resumes | Page 10
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Michael Roush
Roadway / Electrical Inspector
Mr. Roush has over 23 years of experience in infrastructure construction experiences on freeway and public works construction projects. Mr. Roush has been involved in all phases of construction engineering including construction management, contract administration, field engineering, schedule and submittal review, quality assurance inspection, and contract change order cost analysis. He specializes inspection and maintenance of traffic signal related equipment, signal timing, traffic coordination, traffic control, traffic control, signing and striping roadway inspection, highway/street lighting systems and traffic monitoring systems. Mr. Roush has extensive knowledge of construction practices on Caltrans Freeway Systems, Standard Specification, Standard Plans, and the Standard Specifications for Public Work Construction “GREEN BOOK.”
RELEVANT PROJECT EXPERIENCE
Roadway Inspector | Rancho Los Coyotes Street Improvement Project | City of Indio | Construction Value: $1.4M | Duration on the Project: 10/2023 – 12/2023
The specific scope of work includes paving Rancho Los Coyotes between Avenue 38 and Avenue 39 in Indio, north of Interstate 10. The project includes roadway excavation and grading, aggregate base, asphalt concrete pavement, drainage improvement, roll curb and driveway, and cross gutter.
Mr. Roush was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, quality assurance inspection, SWPPP monitoring and inspection, roadway and drainage inspection, progress payment and dispute resolution.
Electrical Inspector | Rancho Road Corridor Widening Project | City of Hesperia | Construction Value: $46M | Duration on the Project: 05/22 - current
This project is to enhance the five mile-corridor of Ranchero Road, thereby reducing roadway congestion, accommodating an increase in travel, and reducing response times for emergency vehicles. Major enhancements include: widen Ranchero Road to accommodate two lanes in each direction and a center striped median; construct a new bridge at the California DWR aqueduct; widen the at-grade crossing at the UPRR railroad tracks; and various utility Mr. Roush is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
3/23
Education
• High School Diploma
Certifications/Registrations
• General Electrician, CA
#107004
• OSHA 30-hour Hazard
Recognition Training for
Construction Industry
• Confined Spaces in
Construction
• Excavation Safety for
Competent Person
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 36 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1289 of 2161 Appendix: Resumes | Page 11
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Electrical Inspector | I-10 Lane Replacement Project | Caltrans District 8 | Construction Value:
$90M | Duration on the Project: 09/2017 – 11/2020
This 20-miles long pavement rehabilitation project will replace various damaged concrete slabs, rehabilitate the pavement in the project area, upgrade various on and off ramps, and upgrade the guardrail and drainage systems.
A crossover lane creates a workspace by shifting one lane of traffic to the other side of the freeway using temporary k-rail. Mr. Roush is responsible for Construction Contract Administration, Safety Review, Quality Assurance Inspection on Electrical related items include Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Electrical QC Inspector | I-15 Cajalco Road Interchange Improvement Project | City of Corona/ Caltrans District 8 | Construction Value: $36M | Duration on the Project: 09/2017 – 11/2020 This project improvement includes the widening of Cajalco Road from a two-lane bridge to a six-lane overcrossing bridge on a new alignment north of the existing bridge. In addition, the bridge will include a striped median, outside shoulders, and a sidewalk on the southern side. The improvements will increase the capacity of the bridge and ramps in order to reduce congestion and accommodate projected growth in the area. Mr. Roush is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Electrical QC Inspector | Tyler Street Resurfacing Project | City of Riverside | Construction Value:
$5M | Duration on the Project: 07/2017 – 10/2018
Tyler Street is classified as a Major Road in the County of Riverside General Plan. Tyler Street is a two-lane road that varies from 26-49 feet wide with curb/gutter at various segments of the roadway. Approximately 1 mile of Tyler Street from Airport Boulevard to 54th Avenue will be improved which consists of Cold-in-Place Recycling (CIR) the roadway and overlaying with Hot Mix Asphalt (HMA). Additional improvements include reconstruction of asphalt concrete driveway; placement of safety edge and shoulder backing; utility adjustments; striping of roadway. No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. Mr. Roush is responsible for Construction Contract Administration, Quality Assurance Inspection, SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Agreements for Professional Services to perform As-Needed Professional C... Page 1290 of 2161 Appendix: Resumes | Page 12
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Craig Soucy
Roadway / Electrical Inspector
Mr. Soucy has 29 years of experience in infrastructure construction experiences on freeway and public works construction projects. Mr. Soucy has been involved in all phases of construction engineering including construction management, contract administration, field engineering, schedule and submittal review, quality assurance inspection, and contract change order cost analysis. He specializes inspection and maintenance of traffic signal related equipment, signal timing, traffic coordination, traffic control, traffic control, signing and striping roadway inspection, highway/street lighting systems and traffic monitoring systems. Mr. Soucy has extensive knowledge of construction practices on Caltrans Freeway Systems, Standard Specification, Standard Plans, and the Standard Specifications for Public Work Construction “GREEN BOOK.”
RELEVANT PROJECT EXPERIENCE
Roadway Inspector | Rancho Los Coyotes Street Improvement Project | City of Indio | Construction Value: $1.4M | Duration on the Project: 10/2023 – 12/2023
The specific scope of work includes paving Rancho Los Coyotes between Avenue 38 and Avenue 39 in Indio, north of Interstate 10. The project includes roadway excavation and grading, aggregate base, asphalt concrete pavement, drainage improvement, roll curb and driveway, and cross gutter.
Mr. Soucy was responsible for overall project scope, schedule, and cost. Her responsibilities included contract administration, quality assurance inspection, SWPPP monitoring and inspection, roadway and drainage inspection, progress payment and dispute resolution.
Electrical Inspector | Dune Palms Low Crossing Bridge Project | City of La Quinta | Construction Value: $30M | Duration on the Project: 11/2023 – current
This project will construct a 480-foot-long bridge that will be approximately 86 feet wide and feature 4 vehicle travel lanes, 2 in each direction; 8-foot-wide bike/cart paths; 6-foot-wide sidewalks, and a 9-foot, 8-inch raised center median. The project also will complete bridge approach roadway improvements (including drainage) to accommodate the raised profile for the bridge, and it will tie into the CV LINK multi-use trail under the bridge and at two secondary connecter trails from Dune Palms Road. Mr. Soucy is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
1/29
Education
• High School Diploma
Certifications/Registrations
• IMSA Level II Certified
• IMSA Traffic Signal Inspector
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 29 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1291 of 2161 Appendix: Resumes | Page 13
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Construction Engineer | SR-60 Central Avenue Interchange Improvement Project | SBCTA | Construction Value: $24M | Duration on the Project: 11/2023 – 05/2024 This project will widen the Central Avenue bridge and the on-ramp to accommodate three through lanes and double left-turn lanes in both directions and will widen the existing eastbound and westbound on-ramps to from one lane to two through lanes and a carpool lane. The project will relieve congestion and improve traffic flow on Central Avenue at SR-60 Interchange. Mr. Soucy is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Construction Inspector | Clinton Keith Road Extension Phase III Project | RCTD | Construction Value: 26M | Duration on the Project: 10/2022 – 11/2023 In the mid 1990’s, the County of Riverside with the cooperation of the City of Murrieta initiated a project to extend Clinton Keith Road from I-215 to State route 79. The purpose of the project was to address the need for another east-west corridor to accommodate the increase in traffic demand. The Clinton Keith Road as an urban arterial road. The project has been constructed in phases over the last several years as funding became available. The opening of the Clinton Keith Extension Project makes it easier for motorists throughout the region to access I-215.
This project widened the section from I-215 to Whitewood Road and Whitewood Road to Leon Road, providing six full lanes that offer access from I-215 to SR-79. Mr. Soucy is responsible for Construction Contract Administration, Safety Review, Quality Assurance Inspection for Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Construction Inspector | I-215 Placentia Interchange Improvement Project | RCTD/Caltrans District 8 | Construction Value: $32M | Duration on the Project: 08/2020 – 10/2023 This interchange is “Construction Contract #1” of RCTC’s Mid County Parkway Project, which will provide a new 16- mile east-west transportation corridor between San Jacinto and Perris. The new interchange located between Ramona Expressway to the north and Nuevo Road to the south, is designed to meet the needs of the area’s growth population. Mr. Soucy is responsible for Construction Contract Administration, Safety Review, Quality Assurance Inspection for Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering and Fiber Optic Communication Systems, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Agreements for Professional Services to perform As-Needed Professional C... Page 1292 of 2161 Appendix: Resumes | Page 14
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
John Kannor
Roadway / Electrical Inspector
Mr. Kannor has more than 34 years of infrastructure construction experience on freeway and public works construction projects. Mr. Kannor has been involved in all phases of construction engineering including construction management, contract administration, field engineering, schedule and submittal review, quality assurance inspection, and contract change order cost analysis. His specialty is inspection and maintenance of traffic signal related equipment, signal timing, traffic coordination, traffic control, traffic control, signing and striping roadway inspection, highway/street lighting systems and traffic monitoring systems. He has also performed constructability review and design assistance. Mr. Kannor is very familiar with FHWA Requirements, Caltrans Standard Plan, Specifications and the Standard Specifications for Public Work Construction “GREEN BOOK”.
RELEVANT PROJECT EXPERIENCE
Senior Electrical Inspector/Safety Officer | I-15 Railroad Canyon Interchange Improvement Project | RCTC/Caltrans | Construction Value: $41M | Duration on the Project: 02/2020 – 02-2022 The project will address the needs of the area’s growing number of residents and recreational visitors. The project also will improve traffic flow for people traveling to and from Canyon Lake. The project include constructing the auxiliary lanes on I-15 to help drivers enter and exit the highway and reduce traffic back-ups; adding two new lanes on Railroad Canyon Road through the interchange and new lanes to the on-ramps and off-ramps with I-15; replacing the northbound diamond off-ramp with hook-style on- and off-ramps that both connect to Grape Street; constructing sidewalks and bike lanes along Railroad Canyon. Mr. Kannor is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; Utility Relocation Coordination, Project Schedule Review and Analysis, Contract Change Order Evaluation.
ARE/Electrical Inspector | Monroe Traffic Signal Interconnect Project | City of Indio | Construction Value: $684K | Duration on the Project: 12/2019 – 02/2020
This project is to upgrade the existing traffic signals with new controller equipment at 11 intersection locations along Monroe Street and at the intersection of Doctor Carreon Boulevard and Oasis Street. Mr. Kannor is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for Traffic Signals and Fiber Optic Communication Systems.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
10/36
Education
• Riverside Community College
Certifications/Registrations
• Certified IMSA Level 3
Technician & Electrician
• Iterius Video Detection
System Trained
• Certificate, OSHA 10-Hour
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
• Contract Chang Order Cost
Negotiation
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 34 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1293 of 2161 Appendix: Resumes | Page 15
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Roadway Inspector | North Indio Pavement Improvement Project | City of Chino | Construction Value: $1.8M | Duration on the Project: 06/2019 – 05/2020 The specific scope of work includes paving Rancho Los Cerritos between Avenue 38 and Avenue 39, Primrose Lane from Avenue 38 to Lindy Lane, Sabrina Court and Galindo Court in Indio, north of Interstate 10. The project includes grading, drainage improvements, and installing asphalt concrete, aggregate base, and curb and gutter. Mr. Kannor is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for excavation, grading, HMA Paving and Dry Well Drainage System; SWPPP Review and Inspection, Utility Relocation Coordination, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
ARE/Electrical Inspector | I-10 Jefferson Interchange Improvement Project | RCTD/Indio/Caltrans | Construction Value: $45M | Duration on the project: 09/2014 – 09/2018 This project is to replace the existing Jefferson Street Bridge and northbound Indio Boulevard overcrossing with a single bridge designed for traffic entering and exiting the freeway from both directions. The new eight-lane bridge includes two turning pockets in the middle, shoulders wide enough to accommodate bicycles and sidewalk on the northbound side of Jefferson Street. The bridge will also incorporate desert oasis aesthetic features and landscaping, providing a signature entrance to Indio. Mr. Kannor is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection on Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering, Fiber Optic Communication, Irrigation Control, and Weather Monitoring Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
ARE/Construction Inspector | I-10 Monterey Avenue Ramp Realignment Project | City of Palm Desert/Caltrans | Construction Value: $9M | Duration on the Project: 03/2014 – 09/2015 This ramp modification project to: relocate WB off-ramp to Varner Road; and construct a direct loop on-ramp for NB Monterey Avenue traffic, construct Retaining Walls/Ground Anchor Wall and install new Traffic Signal, Lighting and Ramp Metering Systems. Mr. Kannor is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection on Electrical related contract items which include Traffic Signal, Bridge and highway Lighting, Ramp Metering, Fiber Optic Communication, Irrigation Control, and Weather Monitoring Systems, SWPPP Review and Inspection, Utility Relocation and Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation and coordination with stakeholders.
Agreements for Professional Services to perform As-Needed Professional C... Page 1294 of 2161 Appendix: Resumes | Page 16
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Phillip Ruiz
Roadway / Electrical Inspector
Mr. Ruiz has more than 29 years of infrastructure construction experience on freeway and public works construction projects. He has been involved in all phases of construction projects. He is well versed in Roadway and Electrical Inspection. His expertise includes construction management, contract administration, field engineering, schedule and submittal review, quality assurance inspection, SWPPP monitoring and inspection, contract change order cost analysis, claim mitigation and resolution. Mr. Ruiz has extensive knowledge of construction practices on Caltrans Freeway Systems, Standard Specification, Standard Plans, and the Standard Specifications for Public Work Construction “GREEN BOOK.” Construction “GREEN BOOK.”
RELEVANT PROJECT EXPERIENCE
Senior Construction Inspector, I-5 Rodway Improvement and Widening Project Segment I | OCTA/Caltrans District 12 | Construction Value: 150M | Duration on the Project: 10/2022 – current
This project is part of the I-5 Corridor Improvement Project in Orange County.
This project will construct general purpose lane from Avery Parkway to Alicia Parkway to increase capacity, extension of the second carpool lane from Alicia Parkway to El Toro Road, in both directions, reconstruct two interchanges, as well as widen bridges, modify multiple on- and off-ramps, add new sound and retaining walls. Mr. Ruiz is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for all Electrical related items include Traffic Signals, Bridge and Highway Lighting, Ramp Metering and Fiber Optic Communication Systems; SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Assistant Resident Engineer/Construction Inspector | I-5 Corridor Mitigation Project Phase II | Caltrans District 7 | Construction Value: 2.3M | Duration on the Project: 06/2021 – 09/2022 This mitigation project includes constructing new ADA wheelchair ramps, type Al-6 and A2-8 curb and gutters, new PCC sidewalk, 8" PCC cross gutter and spandrels, cold mill AC pavement, roadway dig-outs, ARHM paving, adjusting water valves, gas valves, and electrical vaults. Mr. Ruiz is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for not only the Roadway related contract items, but he is also responsible for all Electrical related contract items which include Traffic Signal, Bridge, Highway and Street Lighting, Ramp Metering, CCTV, and Fiber Optic Communication Systems. In addition, SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
5/29
Education
• John A Rowland High School,
Rowland Heights, CA
Certifications/Registrations
• Certificate, OSHA 10-Hour
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Quality Assurance Inspection
on HMA. JPCP, Drainage,
Striping, and Signage
• Quality Assurance Inspection
on Traffic Signal, Lighting and
Fiber Communication
• Claim Mitigation and
Resolution
• Contract Chang Order Cost
Negotiation
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 29 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
• Familiar with Standard
Specifications Section 86 to
88
Agreements for Professional Services to perform As-Needed Professional C... Page 1295 of 2161 Appendix: Resumes | Page 17
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Assistant Resident Engineer/Construction Inspector | On-Call Construction Management Services | Caltrans District 7 | Construction Value: $20M | Duration on the Project: 07/2018 – 06/2021
Mr. Ruiz is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for not only the Roadway related contract items such as ADA wheel chair ramps, guiderail reconstruction, HMA overlay, he is also responsible for all Electrical related contract items which include Traffic Signal, Bridge, Highway and Street Lighting, Ramp Metering, CCTV, and Fiber Optic Communication Systems. In addition, SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Assistant Resident Engineer/Construction Inspector | Agoura Road Widening Project | City of Agoura Hills | Construction Value: 17M | Duration on the Project: 02/2017 – 06/2018 The project is 2.5 miles of divided roadway arterial, a total of five miles. Project included intensive environmental work with protected species of oak trees, flower Lyon's Pentachaeta and additional protected flora and fauna and roadway widening of south of road centerline of an average width of 35-feet, involving excavation, fill, and export for the earthwork. Earthwork also includes two soil nail wall assemblies where each assembly has more than one tier.
Storm drains work consisted of reconstruction of two debris basins, catch basins, new pipeline work for each drainage line and a new outlet and inlet structures for the debris basins. In addition, the project involved new landscaping and hardscape work, as well as electrical work, cantilever bridge walkway, new striping and retaining walls and new 8" water pipe with several laterals for service feeds. Mr. Ruiz is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for not only the Roadway related contract items, but he is also responsible for all Electrical related contract items which include Traffic Signal, Bridge, Highway and Street Lighting, Ramp Metering, CCTV, and Fiber Optic Communication Systems. In addition, SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Assistant Resident Engineer/Construction Inspector | Avenue I and SR-14 Interchange Improvement Project | City of Lancaster | Construction Value: $8M | Duration on the Project:
09/2015 – 01/2017
This project consists of the installation of retaining walls construction of a new southbound off-ramp including a new independent bridge over A venue I, modification of existing southbound on / off-ramps, northbound on / off-ramps, improvements and widening of existing A venue I including tieback walls along existing and proposed abutments, construction and installation of interchange site improvements, installation of a drainage system on A venue I, modification and installation of a water system within the perimeter of the interchange, installation and relocation of various utility facilities within the project site. Installation of new electrical services, street lighting and modifying existing traffic signals. Mr. Ruiz is responsible for Construction Contract Administration, Safety Review, and Quality Assurance Inspection for not only the Roadway related contract items, but he is also responsible for all Electrical related contract items which include Traffic Signal, Bridge, Highway and Street Lighting, Ramp Metering, CCTV, and Fiber Optic Communication Systems. In addition, SWPPP Review and Inspection, Utility Relocation Coordination, Prevailing Wage Monitoring, Project Schedule Review and Analysis, Contract Change Order Evaluation and Cost Negotiation and Potential Claim Evaluation.
Agreements for Professional Services to perform As-Needed Professional C... Page 1296 of 2161 Appendix: Resumes | Page 18
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Michael Ervolina
Office Engineer / Document Control
Mr. Ervolina has five years of infrastructure construction experience on freeway and public works construction projects. He has been involved in all phases of contract administration/office engineer including setup project file; perform quantity calculation and prepare monthly pay estimate; request lane closures, material testing, COZEEP service; process contract change order and verify extra work billing for accuracy; assist Resident Engineer preparing correspondence; archive completed project file; and any other necessary office duties. Mr. Ervolina specializes in construction document control. He is familiar with FHWA Requirements, Caltrans Standard Plan and Specifications, Construction Manuel, and Local Assistance Procedures.
RELEVANT PROJECT EXPERIENCE
Roadway Inspector | Rancho Los Coyotes Street Improvement Project | City of Indio | Construction Value: $1.4M | Duration on the Project: 10/2023 – 12/2023
The specific scope of work includes paving Rancho Los Coyotes between Avenue 38 and Avenue 39 in Indio, north of Interstate 10. The project includes roadway excavation and grading, aggregate base, asphalt concrete pavement, drainage improvement, roll curb and driveway, and cross gutter.
Mr. Ervolina performed document control for this project; she also assisted the Resident Engineer in preparing quantity calculation, monthly progress pays estimates, correspondents to the contractor, contract change orders, verify, and process extra work billings.
Office Engineer | SR-60 Central Avenue Interchange Improvement Project | SBCTA | Construction Value: $24M | Duration on the Project: 03/2022 – 05/2024
This project will widen the Central Avenue bridge and the on-ramp to accommodate three through lanes and double left-turn lanes in both directions and will widen the existing eastbound and westbound on-ramps to from one lane to two through lanes and a carpool lane. The project will relieve congestion and improve traffic flow on Central Avenue at SR-60 Interchange.
Mr. Ervolina performed document control for this project; she also assisted the Resident Engineer in preparing quantity calculation, monthly progress pays estimates, correspondents to the contractor, contract change orders, verify, and process extra work billings. In addition, Mr. Ervolina served as the Labor Compliance Specialist, he reviewed Certified Payroll Reports, conducted employee interviews, and ensured the construction worker were paid in accordance with DIR prevailing wages.
Resident Engineer | Cycle 9 Traffic Signal Improvement Project | City of Indio | Construction Value: $822K | Duration on the Project: 10/2023 – 01/2024 The project consists of the installation of advanced dilemma zone detection system, new traffic signal controllers to provide the compatibility for the new equipment and adding street lighting at fifteen (15) signalized intersections within the City of Indio. Mr. Ervolina performed document control for this project; she also assisted the Resident Engineer in preparing quantity calculation, monthly progress pays estimates, correspondents to the contractor, contract change orders, verify, and process extra work billings.
Firm
Dynamic Engineering Services,
Inc.
Years with Firm/Total
5/5
Education
• B.S. in Social and Behavioral
Science, California State
University, Fullerton
Certifications/Registrations
• OSHA 10-hour Hazard
Recognition Training for
Construction Industry
Professional Associations
•
Expertise
• Construction Management
• Document Control
• Office Engineering
Benefits to the City of Indio
• History of successfully
delivering similar projects
on time, within budget, and
without claims
• 5 Years of Construction
Management Experience on
Municipal, Local Agency
and Public Work’s Projects
• Extensive Experiences with
Caltrans Standards,
Policies, Procedures &
Construction Guidelines
Agreements for Professional Services to perform As-Needed Professional C... Page 1297 of 2161 Appendix: Resumes | Page 19
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Office Support | Highway 111 at 66th Street Grade Separation Project | RCTD/Caltrans District 8 | Construction Value: $66M | Duration on the Project: 03/2020 – 04/2022 The Avenue 66 Grade Separation project has been in the works for more than a decade. As trucking and train traffic in the regional freight corridor increases, and the community continues to grow, a safe and reliable access point in and out of Mecca is critical. This new, 800-foot-long bridge will cross Hammond Street, the Union Pacific Railroad and Highway 111, to safely connect cyclists, pedestrians, and vehicles from Mecca to Avenue 66 and Highway 111.
Mr. Ervolina performed document control for this project; she also assisted the Resident Engineer in preparing quantity calculation, monthly progress pays estimates, correspondents to the contractor, contract change orders, verify, and process extra work billings.
Agreements for Professional Services to perform As-Needed Professional C... Page 1298 of 2161 Appendix: Resumes | Page 20
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Connect & Company, LLC
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1299 of 2161 Appendix: Resumes | Page 21
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Andrea Suarez Resume
Connect & Company, March 2024
1 Andrea Suarez
Community Outreach Director
Drawing on an extensive background in public sector communications and community outreach experience, Andrea excels in developing and implementing award-winning communications strategy, community outreach programs and collateral materials. Andrea is the Founder and Principal of Connect & Company, a full-service, DBE certified PR firm providing public outreach programs for transportation infrastructure projects in Southern California.
Experience Highlights/Strengths
• Award-winning strategic community outreach plan
development and implementation skills specializing in transportation infrastructure projects.
• Longtime experience working for, and with, city and county governments and entities, and private PR agencies
• Thoughtful and thorough coordination and communication with construction team and stakeholders
• Strong team management for effective and efficient results • Problem solving with empathetic outreach
• Award-winning, bilingual collateral development
Relevant Project Experience
Avenue 66 Grade Separation Project
Owner: Riverside County Transportation Department, completed in 2022 | Location: Mecca, CA
Project Description Connect developed and implemented the community outreach strategic plan for the $56 million Avenue 66 Grade Separation project that built a new 800-foot-long bridge over the Union Pacific Railroad, Highway 111 and Hammond Road to create safe and reliable access in and out of Mecca.
Role and Responsibility Andrea was the Community Outreach Director on the project. She developed the outreach plan, messaging and bilingual project collateral. Andrea oversaw the outreach plan implementation including the team’s grass roots bilingual outreach efforts (English/Spanish); the Ave66project.com website, weekly updates and text/email alert system; social media planning, posting and monitoring; and responding to and tracking resident and business concerns. Andrea served as the primary liaison between the construction management team and stakeholders, including the County Supervisor’s office; she hosted two emergency services meetings; and coordinated media interviews. Andrea oversaw the Connect team in hosting the award-winning Community Ribbon Cutting event attended by more than 150 people including elected officials, emergency responders, community organizations and community residents.
Years of Experience 25 years
Years with the Firm 6 years
Current Location Carlsbad, CA
Firm: Connect & Company
Availability for On-Call projects
Start 75%, maintenance, 30%
Education
B.A. Communications, UCSB
Licenses/Certifications
• IAP2 Public Participation
Certificate
• WTS Member
• PRSA Inland Empire member
• CAPIO member/past board
member
Awards
• 2022 PRSA-Inland Empire
“Polaris Capella Award”, Special
Event for the Ave. 66 Grade
Separation Ribbon Cutting
• 2021 PRSA-Inland Empire
“Polaris Capella Award”, Audio
Visual—Long Format for the
Ave. 66 Groundbreaking video
• 2020 CAPIO EPIC Award of
Distinction, Caltrans 60 Swarm
Marketing Plan/Campaign
• 2020 Caltrans Headquarters
chose the 60 Swarm outreach
campaign as one of five
projects to represent California
in the AASHTO awards.
Agreements for Professional Services to perform As-Needed Professional C... Page 1300 of 2161 Appendix: Resumes | Page 22
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Andrea Suarez Resume
Connect & Company, March 2024
2 Herbert Hoover Pedestrian Improvement Program
Owner: City of Indio, completed in August 2023.
Location: Indio, CA
Project Description The City of Indio’s sidewalk improvement project constructed about 300 new driveway approaches; added sidewalks; added crosswalks; and updated ADA accessibility ramps to improve safety and pedestrian access in the neighborhood around Herbert Hoover Elementary School.
Role and Responsibility Andrea developed and managed the implementation of a community outreach program to inform residents about the project and expected impacts. Outreach included a project briefing for emergency services and key stakeholders; a project website with information updated by street name and unique address; an English/Spanish construction hotline monitored by Connect staff; grass roots door-todoor outreach before and during construction; and ongoing coordination between the contractor, residents and the city.
Rancho Los Coyotes Drive Pavement Improvement Project
Owner: City of Indio, completed in December, 2023.
Location: Indio, CA
Project Description The City of lndio's Rancho Los Coyotes Drive pavement improvement project removed and replaced existing roadway pavement; removed and replaced the existing concrete driveways, curb, gutter and cross-gutters in the right of way; and replaced them with concrete wedge curbs and curb transitions, driveway tie-ins and concrete cross gutters. The project also constructed a water well drainage system to improve drainage on the street.
Role and Responsibility Andrea developed and managed the implementation of a community outreach program to inform residents about the project and expected impacts. Outreach included a pop-up resident briefing with City staff, design team staff and construction management staff available for consultation; weekly updates for posting on the City website; an English/Spanish construction hotline monitored by Connect staff; grass roots door-to-door outreach before and during construction; and ongoing coordination between the contractor, residents and the city.
Dune Palms Road Bridge Improvement Project
Owner: City of La Quinta, estimated completion early 2025 Location: Dune Palms Road in La Quinta, CA
Project Description The project will construct an all-weather access bridge across the Coachella Valley Storm Water Channel in La Quinta. The new, 480-foot-long bridge will address flooding and excess debris on the existing roadway during storms and will provide Coachella Valley motorists, pedestrians and emergency services with a safe and reliable crossing, regardless of adverse weather.
Role and Responsibility Andrea is the Community Outreach Director for the project and developed the outreach plan, messaging and bilingual project collateral. Andrea is managing the outreach plan implementation and informs and coordinates with project stakeholders including La Quinta emergency services, Desert Sands Unified School District, Dune Palms Mobile Homes Estates, project neighbors and nearby businesses. Andrea manages the Connect team that implements the outreach plan tactics including managing the project website, dunepalms.com; managing weekly update development and distribution; social media planning, posting and monitoring; responding to and tracking resident and business concerns and completing in-person, bi-lingual door-to-door outreach as needed.
Agreements for Professional Services to perform As-Needed Professional C... Page 1301 of 2161 Appendix: Resumes | Page 23
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Andrea Suarez Resume
Connect & Company, March 2024
3 I-215/Scott Road Interchange project
Owner: City of Menifee/ Riverside County Transportation Department, completed in 2020 Location: I-125 at Scott Road in Menifee, CA
Project Description Andrea developed and implemented the community outreach strategic plan for this $54.7 million project that constructed a partial cloverleaf interchange with a new overpass bridge to improve traffic flow on Scott Road, a regional connector.
Role and Responsibility Andrea was the Community Outreach Director and managed execution of the community outreach strategy. Highlights include planning and executing the groundbreaking and virtual ribbon cutting ceremonies; pre-construction coordination with stakeholders, area businesses and emergency services; planning and hosting a project open house attended by 97 stakeholders; developing the project’s graphics and collateral materials; planning and hosting a VIP tour and a media briefing/tour; extensive regional community outreach for the “Scott Shuffle” 55-hour interchange closure to open the new bridge; developing weekly updates with project videos/photos, eblast emails and social media posts; and serving as the project liaison to the City of Menifee, RCTD, Caltrans and area PIOs.
Jurupa Road Grade Separation Project
Owner: City of Jurupa Valley and Riverside County Transportation Department, ongoing through 2026 Location: Jurupa Valley, CA
Project Description Connect developed and is implementing the community outreach plan for this $133.4 million safety and traffic circulation improvement project. It will separate trains from traffic by constructing a bridge on Van Buren Boulevard, a bridge for UPRR and lowering Jurupa Road for vehicles, pedestrians and cyclists to travel under the bridges.
Role and Responsibility Andrea serves as the Community Outreach Director. She developed and is managing the implementation of the outreach strategy for this project that impacts neighboring businesses, residents, schools and the trucking community. Andrea serves as the primary liaison between the construction management team and stakeholders; manages all external communication and collateral; develops mini plans and manages outreach for traffic pattern changes and major closures. She also oversees the team’s weekly outreach tasks including JurupaGradeSeparation.com website updates and text/email notifications; social media planning and strategy; and weekly reporting. She oversees emergency services and stakeholder coordination; the team’s bilingual grass roots outreach to area businesses and residents; and all eventrelated activities. Andrea and her team designed and manages the project’s website and automated notification system; the construction hotline and all project specific social media platforms.
Hamner Avenue Bridge and Widening Project
Owner: City of Norco and Riverside County Transportation Department, ongoing through Summer 2024 Location: Norco, CA
Project Description Connect developed and is implementing the community outreach plan for this $71 million project that will improve traffic flow on Hamner Avenue with a new 1,200-foot-long bridge over the Santa Ana River in Norco. The project will also widen/improve the roadway on both ends of the bridge in Norco and Eastvale.
Agreements for Professional Services to perform As-Needed Professional C... Page 1302 of 2161 Appendix: Resumes | Page 24
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Andrea Suarez Resume
Connect & Company, March 2024
4 Role and Responsibility Andrea is the Community Outreach Director on the project and developed and manages the outreach plan that impacts motorists, nearby residents, businesses, neighboring cities, emergency services and stakeholders. She created the project messaging and developed the collateral materials alongside Connect’s graphic designer. Andrea manages all external communication efforts including outreach for traffic pattern changes and road closures; emergency services and stakeholder coordination; the team’s connections with area businesses and residents; grass roots outreach efforts and all outreach tools including the website, construction hotline and project email. She oversees the team’s weekly outreach tasks including updating the HamnerAveProject.com website and text/email alert system; social media strategy, planning and monitoring; and weekly reporting.
RCTD Road & Drainage projects
Owner: Riverside County Transportation Department
Location: Throughout Riverside County, CA
Project Description Multiple projects from 2019 through present.
Role and Responsibility Connect & Company, under Andrea’s direction, provides community outreach for high profile road resurfacing and drainage projects that may impact businesses and residents in Riverside County. Outreach for these projects includes researching stakeholders; developing collateral materials; presenting to and educating elected officials, MAC members and staff at neighboring cities and agencies; informing stakeholders; collaboration with emergency services representatives; door-to-door outreach to residents and businesses located in the project area; providing construction alerts/updates and social media posts; managing the bilingual construction hotline and responding to public concerns.
Projects include
• Idyllwild roadway improvement and retaining wall project on nearly 5 miles of roadway in town.
Completed in Fall 2023.
• Sycamore Canyon roadway reconstruction; Completed in Fall 2023 • Stetson and Girard roadway reconstruction project near Hemet, completed in 2023. • Ramona Expressway median project including nighttime lane closures on 9.5 miles of roadway; coordinated with businesses, residents, dairies, emergency services and neighboring communities.
Completed in 2023.
• Lincoln Street roadway rehabilitation project next to a school in the Home Garden community.
Completed in 2023.
• The Rancho California Roadway Rehabilitation project in Temecula’s Wine Country which closed Rancho California, a main regional thoroughfare, for one week during construction. Connect provided a stakeholder and emergency services briefing and collaborated with the City of Temecula, Supervisor Washington’s office, the Winery Association, the Temecula Visitors Bureau and other stakeholders to notify businesses, residents and visitors about the closure and detour route. Completed in spring 2022. • Ramona Expressway rehabilitation project with nighttime lane closures on 9.5 miles of the roadway impacting dairies and residences on both sides of the busy road in 2021. • Hostettler Road Emergency Road and Culvert Repair project in the Temescal Valley area in 2021. • The Cajalco Road Safety and Rehabilitation project and the Clark Street Sidewalk project in Mead Valley in 2020.
• The Gilman Springs Road Resurfacing project between San Jacinto and SR-60 with nighttime lane closures in 2019.
• Idyllwild pavement rehabilitation project in downtown Idyllwild in 2019. • Temescal Canyon Drainage project which closed Temescal Canyon Road for three weeks in Summer 2019.
Agreements for Professional Services to perform As-Needed Professional C... Page 1303 of 2161 Appendix: Resumes | Page 25
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Christine Feldman Resume
Connect & Company, March 2024
1 Christine Feldman
Creative Director/Graphic Designer
Christine brings 30 years of graphic design and art directing experience in print and multimedia design to Connect’s
transportation projects. Her work is guided by a belief in design as a problem-solving tool, and as a way of recognizing and forming relationships between ideas and reality through strong graphic elements. Christine has achieved mastery in Photoshop,
PowerPoint, InDesign and Illustrator.
Experience Highlights/Strengths
• Creative, clean and original design
to clearly communicate information
• Expert at interpreting and drawing maps and
traffic pattern changes
• Proficient in Photoshop, PowerPoint, InDesign
and Illustrator
Relevant Project Experience
Avenue 66 Grade Separation Project
Owner: Riverside County Transportation Department, completed in 2022
Location: Mecca, CA
Project Description Connect developed and implemented the community outreach strategic plan for the $56 million Avenue 66 Grade Separation project that built a new bridge over the Union Pacific Railroad, Highway 111 and Hammond Road to create safe and reliable access in and out of the Mecca community.
Role and Responsibility Christine served as the art director on this award-winning project. She developed the project logo and brand and designed collateral materials including: website; large, detailed map and smaller detour maps; fact sheets in English and Spanish; PowerPoint presentations; flyers; door hangers; and construction cards.
Herbert Hoover Pedestrian Improvement Program
Owner: City of Indio, completed in August 2023.
Location: Indio, CA
Project Description The City of Indio’s sidewalk improvement project constructed about 300 new driveway approaches; added sidewalks; added crosswalks; and updated ADA accessibility ramps to improve safety and pedestrian access in the neighborhood around Herbert Hoover Elementary School.
Role and Responsibility As the project art director, Christine developed a project brand reflective of Indio’s image and bright logo colors which has been used in other projects. She integrated the brand into bi-lingual English and Spanish project collateral including a detailed area map, a project fact sheet, a stakeholder PowerPoint presentation, door hangers, construction business cards and signage.
Years of Experience 30 years
Years with the Firm 6 years
Current Location Remote
Firm: Connect & Company
Current Assignment and Level of
Commitment
All projects, as needed
Availability for this Assignment
As needed
Education
B.S. Applied Art and Design
Cal Poly San Luis Obispo
Licenses/Certifications
Former Adjunct Professor of Graphic
Design, Santa Barbara City College
Agreements for Professional Services to perform As-Needed Professional C... Page 1304 of 2161 Appendix: Resumes | Page 26
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Christine Feldman Resume
Connect & Company, March 2024
2 Rancho Los Coyotes Drive Pavement Improvement Project Owner: City of Indio, completed in December, 2023.
Location: Indio, CA
Project Description The City of lndio's Rancho Los Coyotes Drive pavement improvement project removed and replaced existing roadway pavement; removed and replaced the existing concrete driveways, curb, gutter and cross-gutters in the right of way; and replaced them with concrete wedge curbs and curb transitions, driveway tie-ins and concrete cross gutters. The project also constructed a water well drainage system to improve drainage on the street.
Role and Responsibility Christine developed bilingual English and Spanish project collateral using the brand she created for the Herbert Hoover Sidewalk Improvement project. Collateral included a branded project fact sheet, event invitation and project boards and construction business cards.
Dune Palms Road Bridge Improvement Project
Owner: City of La Quinta, estimated completion early 2025 Location: Dune Palms Road in La Quinta, CA
Project Description The project will construct an all-weather access bridge across the Coachella Valley Storm Water Channel in La Quinta. The new, 480-foot-long bridge will address flooding and excess debris on the existing roadway during storms and will provide Coachella Valley motorists, pedestrians and emergency services with a safe and reliable crossing, regardless of adverse weather.
Role and Responsibility Christine, as the art director on this project, developed a project brand reflective of La Quinta’s image and incorporated existing architectural details into the project logo. Christine implemented the brand and developed bilingual English and Spanish project collateral including a fact sheet, groundbreaking signage and project boards, illustrated project schematics, a program, invitations, presentations, fact sheet, maps, website graphics, door hangers, flyers and construction alerts and all other project related collateral.
RCTD Road & Drainage projects
Owner: Riverside County Transportation Department
Location: Throughout Riverside County, CA
Project Description Multiple projects from 2019 through present.
Role and Responsibility Christine is the Art Director and Graphic Designer for Connect’s RCTD projects. She developed a distinct brand that Connect repurposes for all RCTD On-Call projects to promote consistency and establish a professional and visually pleasing template for RCTD collateral materials. Christine applies this brand to project specific materials including: website design; detailed maps; fact sheets in English and Spanish; PowerPoint presentations; flyers; door hangers; and construction cards.
Projects Include
• Idyllwild roadway improvement and retaining wall project on nearly 5 miles of roadway in town. Under construction.
• Sycamore Canyon roadway reconstruction; under construction. • Stetson and Girard roadway reconstruction project near Hemet, completed in 2023. • Ramona Expressway median project including nighttime lane closures on 9.5 miles of roadway; coordinated with businesses, residents, dairies, emergency services and neighboring communities.
Completed in 2023.
Agreements for Professional Services to perform As-Needed Professional C... Page 1305 of 2161 Appendix: Resumes | Page 27
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Maité Sandoval Resume
Connect & Company, March 2024
1 Maite´Sandoval
Community Outreach Specialist
Maité seamlessly contributes to Connect's daily community outreach and media operations, encompassing grassroots Spanish outreach, strategic social media planning, website support, and adept account monitoring. Her expertise extends to specialized services such as stakeholder research, social media analytics, and meticulous event planning.
EXPERIENCE
W.E. O’Neil Construction, Rancho Cucamonga, CA
Marketing Intern, June 2022 through February 2023
• Created and scheduled social media content for LinkedIn and Instagram featuring corporate events and new acquisitions. • Planned and organized stakeholder meetings.
• Developed a corporate internal 411 directory for easy access to employee contact information and an FAQ for new employees.
Connect & Company, Community Outreach Specialist, Murrieta Office, February 2024-current Maité is the Community Outreach Specialist for Connect’s transportation infrastructure projects including:
Dune Palms Bridge Project, La Quinta, CA | Owner: City of La Quinta Jurupa Road Grade Separation Project, Jurupa Valley, CA. | Owner: City of Jurupa Valley/RCTD Hamner Avenue Bridge and Widening Project, Norco, CA. | Owner: City of Norco/RCTD RCTD Road & Drainage projects, throughout Riverside County | Owner: Riverside County Transportation Department
SKILLS
Community Outreach: Maité provides bilingual (English/Spanish) grass roots stakeholder outreach at community pop-up events and directly to businesses and residents. During outreach events, Maité compiles contact information to add to the project database for future notification.
Social Media: Capitalizing on her interest to stay current on social media trends and plan social media strategies, Maité collaborates on social media plans and develops social media posts. She also monitors Connect’s dedicated project social media channels to improve engagement and to track and respond to comments as necessary. Maité also develops monthly website and social media analytics reports for Connect’s large projects.
Website Operations Support: Maité provides website operations support for the company’s active dedicated project websites to ensure the sites are accurate and updated.
Event Planning and Staffing: Maité is directly involved in planning and executing events for Connect’s projects from large groundbreaking and ribbon cutting events to smaller community outreach pop-up events.
She procures event needs, tracks expenses and helps with logistics and event flow. She also staffs events and provides Spanish translation if necessary.
Years of Experience 1 year
Years with the Firm New employee
Current Location Murrieta office
Firm: Connect & Company
Availability for On-Call projects 50%
Education
B.A. English,
California State Polytechnic
University, Pomona
Bilingual English/Spanish
Agreements for Professional Services to perform As-Needed Professional C... Page 1306 of 2161 Appendix: Resumes | Page 29
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
GUIDA
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1307 of 2161 Appendix: Resumes | Page 30
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Tim Fettig, PLS
Survey Project Manager
Tim brings over 36 years of surveying exper5se as a project manager and as a licensed party chief. He has managed a mul5tude of projects throughout Southern California, overseeing staff members, workload, and scheduling. He engages in both field and office support, when required, and is knowledgeable about the latest equipment, technology, and product development.
Highly skilled in all aspects of both design and construc5on surveying, Tim is a wellrounded professional. He has overseen control survey networks aerial photogrammetry, and topographic design surveys; right of way and boundary surveys and mapping, ALTA surveys, preliminary 5tle reports, 5tle research, ploKng exis5ng encumbrances, records of research, dedica5ons and vaca5ons, prepara5on of legal descrip5ons and plats, Record of Surveys, parcel maps, tract maps, lot-line adjustments, other land surveyor seal/stamp documents and map checking QA/QC. He has also provided construc5on survey support and construc5on staking, including perpetua5on, pre- and post-construc5on corner records/records of survey, constructability review, construc5on staking, as-built surveys, and earthwork calcula5ons.
RELEVANT PROJECT EXPERIENCE
PRINCIPAL IN CHARGE | City of Moreno Valley, On-Call Land Surveying Services, Moreno Valley, CA | ConstrucFon Value: $117,933 to date | DuraFon on the Project: 06/2019 – Ongoing
Scope of work under this contract includes design, construc5on, as-built surveys, prepara5on of legal descrip5on and plat maps, monument preserva5on/recorda5on and other surveying services. Some of the task orders on which GUIDA has worked under this contract include the Moreno-Alessandro Interim Facility Storm Drain Line H-2 Alessandro Boulevard at Oliver Street.
PRINCIPAL IN CHARGE | City of Moreno Valley, Moreno-Alessandro Interim Facility Storm Drain Line H-2 Alessandro Boulevard at Oliver Street, Moreno Valley, CA | ConstrucFon Value: $15,732 to date | DuraFon on the Project:
07/2020 – Ongoing
For this task order under GUIDA’s on-call contract with the City, we are providing construc5on staking services to support the construc5on of a graded swale, inlet structure, underground storm drain pipeline, outlet structure and an ±1, 1750-foot earthen trapezoidal channel. GUIDA’s work included project management and coordina5on with the City’s construc5on team, verifica5on and establishment of horizontal and ver5cal controls, construc5on staking for street and drainage improvements, and monument preserva5on.
QA/QC MANAGER | City of Menifee, Menifee Amphitheater, Menifee, CA | ConstrucFon Value: $43K | DuraFon on the Project: 08/2021 – Ongoing The City of Menifee required land surveying and mapping services to support the design and construc5on of the Menifee Amphitheater located in Central Park at the Menifee Towne Center. The project is focused on the installa5on of a shade structure for the Firm
GUIDA
Years with Firm/Total
28 / 36
Educa5on
• Santa Ana College and
San5ago Canyon College,
Surveying/Mapping
• San5ago Canyon College,
Comple5on of the Southern
California Surveyors Joint
Appren5ceship Commibee
Surveyor Appren5ce
Program
Cer5fica5ons/Registra5ons
• Professional Land Surveyor
#7542/CA/1999
• IUOE Local 12, Licensed
Party Chief
Professional Associa5ons
• California Land Surveyors
Associa5on (CLSA), Orange
County Chapter
Exper5se
• project management
• local projects
• construc5on surveys
Benefits to the City of Indio
• project management
• QA/QC
Agreements for Professional Services to perform As-Needed Professional C... Page 1308 of 2161 Appendix: Resumes | Page 31
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
amphitheater as well as a pedestrian bridge from the amphitheater to the Menifee Towne Center. During the design phase, GUIDA provided horizontal and ver5cal control surveys and topographic surveys. Currently, GUIDA is providing construc5on staking services for this ongoing project.
OFFICE SURVEY LEAD | County of San Bernardino, On-Call Land Surveying Services, San Bernardino, CA | ConstrucFon Value: $1M | DuraFon on the Project: 03/2021 – 03/2024 GUIDA’s tasks under this contract may include, but are not limited to, providing control, boundary, topographic surveys, construc5on staking, quality control surveys, topographic, planimetric and volumetric surveys using UAV technology, analysis and determina5on of property boundaries, road alignments and rights-of-way, installing temporary and/or permanent monumenta5on for road alignments, rights of way, or property lines as needed, providing survey data in an AutoCAD Civil 3D format and datum, conduc5ng monument preserva5on surveys, survey research, legal descrip5ons, plats, records of survey, corner records, and right-of-way mapping.
PROJECT MANAGER | City of Irvine, On-Call Professional Land Surveying Services, Irvine, CA | ConstrucFon Value: $300K | DuraFon on the Project: 2021 – Ongoing
GUIDA’s scope of services includes field and office surveying services for the construc5on of municipal improvements, such as facili5es, streets, traffic signals, walls, bridges, bike trails, storm drains and channels, and u5li5es. Related services include, but are not limited to, perpetua5on of controlling monumenta5on in compliance with the Professional Land Surveyors Act Sec5on 8771, GPS and other control surveys, topographic and preliminary design surveys, construc5on survey stakeout—including limits of removal, new improvements and grade cer5fica5ons —as-built surveys of constructed improvements, earthwork quan5ty calcula5ons, boundary surveys, 5tle and records research for right-of-way engineering, legal descrip5ons, and other professional land surveying documents.
PROJECT MANAGER | Orange County TransportaFon Authority (OCTA), SR-55 Improvement Project Between Interstate 405 and Interstate 5 (CM), Santa Ana, CA | ConstrucFon Value: $1,935,703 | DuraFon on the Project:
10/2021 – 09/2025
OCTA, in coopera5on with Caltrans, is widening SR-55 in both direc5ons from just north of the Interstate 405/SR-55 Interchange to just south of the Interstate 5/SR-55 Interchange in the ci5es of Santa Ana, Tus5n, and Irvine. This project will add another regular lane and a carpool lane in each direc5on, as well as addi5onal merge lanes which will improve traffic flow and reduce travel 5me on SR-55, and augment safety by making merging easier. As part of the construc5on management team, GUIDA is currently providing construc5on surveying services including survey calcula5ons and adjustments, right of way surveys, horizontal and ver5cal control surveys, topographic surveys, and monumenta5on. All survey work performed will conform to the safety provisions of the Caltrans Construc5on and Survey Manuals.
PROJECT MANAGER | Orange County Transporta9on Authority (OCTA), I-5 HOV Between SR-55 and SR-57 Project, Orange County, CA | Construc9on Value: $216K | Dura9on on the Project: 2018 – Ongoing This 6.4-mile corridor project will add a second HOV lane in each direc5on, reconstruct the median barrier and demolish the exis5ng I-5 HOV drop ramp at Main Street in Santa Ana. As a member of the construc5on management team, GUIDA is providing horizontal and ver5cal controls, construc5on computa5ons, construc5on staking, plan checking, as-built surveys, monument preserva5on and other related surveys as requested by the construc5on management team and resident engineer. GUIDA will provide all construc5on services in accordance to Caltrans Survey standards.
OFFICE LEAD | City of Lake Elsinore, Temescal Canyon Bridge Over Temescal Wash Replacement Project PS&E | Lake Elsinore, CA | ConstrucFon Value: $175,731 | DuraFon of the Project: 11/2018 – Ongoing For this contract, GUIDA provides surveying and topographic mapping services for the final design phase for a new 4-lane, 98- foot-wide, 375-foot-long bridge at the new alignment, along the realigned por5on of exis5ng Temescal Canyon Road. GUIDA’s scope of work includes performing topographic surveys and providing cross-sec5ons every 100 feet in the channel that covers the proposed wash grading, roadway realignment and connec5on points to exis5ng Temescal Canyon Roadway. GUIDA’s scope also includes upda5ng the survey to cover the recently graded areas westerly of Lake Street; addi5onal topography to support the design of the channel grading, slope protec5on, and storm drain facili5es; providing an updated u5lity base plan based on informa5on provided by the u5lity coordina5on subconsultant; and filing corner records and/or record of survey as required.
Agreements for Professional Services to perform As-Needed Professional C... Page 1309 of 2161 Appendix: Resumes | Page 32
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Adam D’Alvia, PLS, FAA
Licensed Party Chief
Adam has 28 years of survey and mapping experience with an emphasis on construc9on staking, right of way and boundary surveying, topographic/design surveys, and GPS surveys. He is extremely efficient with field to office automa9on and has provided construc9on staking for several large infrastructure projects to Caltrans standard and specifica9ons throughout Southern California.
RELEVANT PROJECT EXPERIENCE
LICENSED PARTY CHIEF | Caltrans District 8, Contract No. 08A3230, On-Call Land Surveying Support Services, San Bernardino, CA | ConstrucMon Value: $3.4M | DuraMon on the Project: 2021 – Ongoing
Projects under this contract are of varying scope and size and include roadway rehabilita9on, widening and/or realignment of exis9ng facili9es, reloca9on of exis9ng facili9es, and construc9on of new facili9es. GUIDA’s scope of work includes control surveys, topographic design surveys, terrestrial and mobile LiDAR surveys, land net surveys, monument preserva9on and perpetua9on and construc9on surveys in accordance with the Caltrans Surveys Manual, the Caltrans Survey Asset Collec9on System and other Caltrans technical guidelines. Currently, GUIDA is suppor9ng Caltrans on several task orders by providing control surveys and mobile LiDAR, topographic design surveys and monument preserva9on surveys. All services under this contract are at the direc9on of the Caltrans Contract Manager and Caltrans Task Order Manager.
LICENSED PARTY CHIEF | County of San Bernardino, On-Call Land Surveying Services, San Bernardino, CA | ConstrucMon Value: $1M | DuraMon on the Project: 03/2021 – 03/2024
GUIDA’s tasks under this contract may include, but are not limited to, providing control, boundary, topographic surveys, construc9on staking, quality control surveys, topographic, planimetric and volumetric surveys using UAV technology, analysis and determina9on of property boundaries, road alignments and rights-of-way, installing temporary and/or permanent monumenta9on for road alignments, rights of way, or property lines as needed, providing survey data in an AutoCAD Civil 3D format and datum, conduc9ng monument preserva9on surveys, survey research, legal descrip9ons, plats, records of survey, corner records, and right-of-way mapping.
Licensed Party Chief | Riverside County TransportaMon Commission (RCTC), I-15 Railroad Canyon Interchange, Lake Elsinore, CA | ConstrucMon Value: $301,135 | DuraMon on the Project: 10/2019 – 05/2022
GUIDA provided construc9on surveying services for this $41M project, which provided several major changes to the exis9ng interchange to improve safety and reduce conges9on. This included two new lanes on Railroad Canyon Road through the interchange, reconstruc9on of the northbound diamond ramps to hook ramps to connect to Grape Street, construc9on of auxiliary and decelera9on lanes on I-15, and construc9on of improved pedestrian and bicycle facili9es through the interchange. GUIDA’s scope of work included control, construc9on computa9ons, construc9on staking, monument preserva9on, right of way surveys, monumenta9on, and as-built surveys.
Firm
GUIDA
Years with Firm/Total
28 / 28
Educa5on
• San9ago Canyon College,
Survey Courses
• San9ago Canyon College,
Comple9on of the Southern
California Surveyors Joint
Appren9ceship Commi[ee
Chainman and Party Chief
Programs
Cer5fica5ons/Registra5ons
• Professional Land Surveyor
##8141/CA/2005
• FAA-107 UAV Pilot 3974275
• Transporta9on Workers
Iden9fica9on Card (TWIC)
Professional Associa5ons
• California Land Surveyors
Associa9on (CLSA), State
and Local
Exper5se
• construc9on staking
• right of way
• boundary surveying
• GPS surveys
Benefits to the City of Indio
• Caltrans Knowledge
• Local knowledge
Agreements for Professional Services to perform As-Needed Professional C... Page 1310 of 2161 Appendix: Resumes | Page 33
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
LICENSED PARTY CHIEF | Riverside County TransportaMon Commission (RCTC), SR-91/I-15 Express Lanes Connector, Riverside, CA | ConstrucMon Value: $350K | DuraMon on the Project: 04/2019 – 12/2023 GUIDA provided the design-build team with control and surveying services to support the design of the connector and other improvements. This included mobile LiDAR and terrestrial LiDAR surveys, topographic and u9lity surveys, and some right of way engineering to support easements within the railroad and flood control right of way. GUIDA provided the design build team with construc9on surveys including construc9on calcula9ons, construc9on layout, constructability reviews, earthwork surveys, monitoring, and as-built surveys.
LICENSED PARTY CHIEF | San Bernardino County TransportaMon Authority (SBCTA), West Valley Connector BRT System Project, Phase 1, San Bernardino, CA | ConstrucMon Value: $195,568| DuraMon on the Project: 08/2022 - 07/2026
SBCTA, along with the public transit operator Omnitrans, are implemen9ng Phase 1 of the West Valley Connector Project, a 100% zero-emission Bus Rapid Transit (BRT) system, which will link the City of Pomona in Los Angeles County with the ci9es of Montclair, Ontario, and Rancho Cucamonga, in San Bernardino County, California. As a subconsultant to the Construc9on Contractor, GUIDA is providing QA/QC land surveying and mapping services for this project. GUIDA’s services on the project include, but are not limited to, verifying project layout and controls, performing survey checks of line and grade, construc9on staking, benchmark surveys, spot checking reference points, and verifying loca9on and preserva9on of the cri9cal baseline survey points prior to and aier construc9on.
LICENSED PARTY CHIEF | City of Irvine, On-Call Professional Land Surveying Services, Irvine, CA | ConstrucMon Value: $300K | DuraMon on the Project: 2021 – Ongoing
GUIDA’s scope of services includes field and office surveying services for the construc9on of municipal improvements, such as facili9es, streets, traffic signals, walls, bridges, bike trails, storm drains and channels, and u9li9es. Related services include, but are not limited to, perpetua9on of controlling monumenta9on in compliance with the Professional Land Surveyors Act Sec9on 8771, GPS and other control surveys, topographic and preliminary design surveys, construc9on survey stakeout—including limits of removal, new improvements and grade cer9fica9ons —as-built surveys of constructed improvements, earthwork quan9ty calcula9ons, boundary surveys, 9tle and records research for right of way engineering, legal descrip9ons, and other professional land surveying documents.
LICENSED PARTY CHIEF | Caltrans D7, SR-210 ADA Curb Ramp Upgrades (Design-Build), Los Angeles, CA | ConstrucMon Value: $572,795 to date | DuraMon on the Project: 03/2022 – Ongoing The Caltrans D7 State Route 210 ADA Curb Ramp Upgrades project will improve accessibility, enhance safety and mobility for pedestrians with disabili9es at various loca9ons within the project limits in order to comply with current Federal and State regula9ons and the Department’s guidance on pedestrian accessibility for public use. The project also includes replacing push-bu[on assemblies to current Accessible Pedestrian Signals (APS) system standards. As a subconsultant to the prime, GUIDA is performing supplemental horizontal and ver9cal control surveys, subsequent mapping and topographic surveys, u9lity surveys, construc9on surveys, right of way surveys, and all other land surveying services necessary to complete the project.
LICENSED PARTY CHIEF | Orange County TransportaMon Authority (OCTA), SR-55 Improvement Project Between Interstate 405 and Interstate 5 (CM), Santa Ana, CA | ConstrucMon Value: $1,935,703 | DuraMon on the Project:
10/2021 – 09/2025
OCTA, in coopera9on with Caltrans, is widening SR-55 in both direc9ons from just north of the Interstate 405/SR-55 Interchange to just south of the Interstate 5/SR-55 Interchange in the ci9es of Santa Ana, Tus9n, and Irvine. This project will add another regular lane and a carpool lane in each direc9on, as well as addi9onal merge lanes which will improve traffic flow and reduce travel 9me on SR-55, and augment safety by making merging easier. As part of the construc9on management team, GUIDA is currently providing construc9on surveying services including survey calcula9ons and adjustments, right of way surveys, horizontal and ver9cal control surveys, topographic surveys, and monumenta9on. All survey work performed will conform to the safety provisions of the Caltrans Construc9on and Survey Manuals.
Agreements for Professional Services to perform As-Needed Professional C... Page 1311 of 2161 Appendix: Resumes | Page 34
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Jack Knauer
Cer$fied Field Chainman
Jack has 28 years of field surveying experience as a chainman providing survey services for both public and private clients. He is proficient in construc>on surveying, design surveys and control surveys. He has worked on large transporta>on and interchange projects throughout Southern California and has provided survey services in accordance with Caltrans standards and specifica>ons.
RELEVANT PROJECT EXPERIENCE
CERTIFIED CHAINMAN | Caltrans District 8, Contract No. 08A3230, On-Call Land Surveying Support Services, San Bernardino, CA | ConstrucMon Value: $3.4M | DuraMon on the Project: 2021 – Ongoing
Projects under this contract are of varying scope and size and include roadway rehabilita>on, widening and/or realignment of exis>ng facili>es, reloca>on of exis>ng facili>es, and construc>on of new facili>es. GUIDA’s scope of work includes control surveys, topographic design surveys, terrestrial and mobile LiDAR surveys, land net surveys, monument preserva>on and perpetua>on and construc>on surveys in accordance with the Caltrans Surveys Manual, the Caltrans Survey Asset Collec>on System and other Caltrans technical guidelines. Currently, GUIDA is suppor>ng Caltrans on several task orders by providing control surveys and mobile LiDAR, topographic design surveys and monument preserva>on surveys. All services under this contract are at the direc>on of the Caltrans Contract Manager and Caltrans Task Order Manager.
CERTIFIED CHAINMAN | Riverside County TransportaMon Commission (RCTC), SR-91/I-15 Express Lanes Connector, Riverside, CA | ConstrucMon Value: $350K | DuraMon on the Project: 04/2019 – 12/2023
GUIDA provided the design-build team with control and surveying services to support the design of the connector and other improvements. This included mobile LiDAR and terrestrial LiDAR surveys, topographic and u>lity surveys, and some right of way engineering to support easements within the railroad and flood control right of way.
GUIDA provided the design build team with construc>on surveys including construc>on calcula>ons, construc>on layout, constructability reviews, earthwork surveys, monitoring, and as-built surveys.
CERTIFIED CHAINMAN | Caltrans District 8, I-15 Norco Curb Ramp As-Built Surveys | Corona, CA | ConstrucEon Value: $32K | DuraEon on the Project: 09/2021 – 11/2022 GUIDA provided as-built surveying services to the Myers & Sons construc>on team for 25 curb ramps along the I-15 corridor in the City of Corona. As-built surveys were performed aWer each ramp was formed and aWer each ramp was poured to verify it met ADA standards. The as-built data was then compared to design plans and the ADA checklists completed and provided back to the resident engineer.
Firm
GUIDA
Years with Firm/Total
7 / 28
EducaEon
• Comple>on of the Southern
California Surveyors Joint
Appren>ceship CommiYee
Chainman Program
CerEficaEons/RegistraEons
• N/A
Professional AssociaEons
• N/A
ExperEse
• construc>on surveys
• control surveys
• local experience
Benefits to the City of Indio
• Caltrans Knowledge
• Local knowledge
Agreements for Professional Services to perform As-Needed Professional C... Page 1312 of 2161 Appendix: Resumes | Page 35
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
CERTIFIED CHAINMAN | Orange County TransportaEon Authority (OCTA), SR-55 Improvement Project Between Interstate 405 and Interstate 5 (CM), Santa Ana, CA | ConstrucEon Value: $1,935,703 | DuraEon on the Project: 10/2021 – 09/2025 OCTA, in coopera>on with Caltrans, is widening SR-55 in both direc>ons from just north of the Interstate 405/SR-55 Interchange to just south of the Interstate 5/SR-55 Interchange in the ci>es of Santa Ana, Tus>n, and Irvine. This project will add another regular lane and a carpool lane in each direc>on, as well as addi>onal merge lanes which will improve traffic flow and reduce travel >me on SR-55, and augment safety by making merging easier. As part of the construc>on management team, GUIDA is currently providing construc>on surveying services including survey calcula>ons and adjustments, right of way surveys, horizontal and ver>cal control surveys, topographic surveys, and monumenta>on. All survey work performed will conform to the safety provisions of the Caltrans Construc>on and Survey Manuals.
CERTIFIED CHAINMAN | Orange County TransportaEon Authority (OCTA), I-5 HOV Between SR-55 and SR-57 Project, Orange County, CA | ConstrucEon Value: $216K | DuraEon on the Project: 2018 – Ongoing This 6.4-mile corridor project will add a second HOV lane in each direc>on, reconstruct the median barrier and demolish the exis>ng I-5 HOV drop ramp at Main Street in Santa Ana. As a member of the construc>on management team, GUIDA is providing horizontal and ver>cal controls, construc>on computa>ons, construc>on staking, plan checking, as-built surveys, monument preserva>on and other related surveys as requested by the construc>on management team and resident engineer. GUIDA will provide all construc>on services in accordance to Caltrans Survey standards.
CERTIFIED CHAINMAN | Alameda Corridor-East ConstrucEon Authority (ACE), Fairway Drive Grade SeparaEon ConstrucEon Management Support, Walnut, CA | ConstrucEon Value: $198K | DuraEon on the Project: 06/2018 – 2020 GUIDA is providing QA/QC construc>on survey services for the Fairway Drive Grade Separa>on project. This project will lower Fairway Drive under the two exis>ng Union Pacific Railroad (UPRR) and Metrolink tracks in the City of Industry, an unincorporated area of Los Angeles County, immediately north of the 60 Freeway. Plans call for construc>on of a four-lane roadway underpass and a new four-track railroad bridge, and Business Parkway and Walnut Drive North will be lowered at their intersec>ons with Fairway Drive. GUIDA’s work for this project includes verifica>on of horizontal and ver>cal control, wall layout verifica>ons, earth work quan>les, office calcula>ons and support, as-built survey, and drainage layout verifica>on. All work adheres to Caltrans’ standards.
CERTIFIED CHAINMAN | San Gabriel Valley Council of Governments (SGVCOG), Fullerton Road Grade SeparaEon, City of Industry, CA | ConstrucEon Value: $258,636 to date | DuraEon on the Project: 09/2021 – Ongoing GUIDA is providing land surveying support services for the construc>on management phase of SGVCOG’s Fullerton Road Grade Separa>on project. GUIDA’s services on this project include providing surveying compliance monitoring (especially preplacement surveys), verifying layouts and controls, spot checking reference points and finished work, and monitoring seYlement or movement of exis>ng facili>es, if required. GUIDA is also responsible for providing quality assurance of all surveying work as it pertains to construc>on control survey points. Lastly, GUIDA is providing survey for u>lity reloca>ons, as required by various u>lity companies.
Agreements for Professional Services to perform As-Needed Professional C... Page 1313 of 2161 Appendix: Resumes | Page 36
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Michael Baker International
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1314 of 2161 Appendix: Resumes | Page 37
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Andrew A Lewis, PE
Construction/Roadway Inspector
With a B.S. degree in Civil Engineering with an emphasis in traffic engineering, structural analysis, and urban planning, Mr. Lewis has extensive experience in civil transportation infrastructure. Specifically, his expertise includes bridge rehabilitation, municipal storm drainage projects, urban street scape and ADA compliance, utility easements and right-of-way, deep drilled structural foundation shafts, permanent and temporary vehicular traffic staging, land use and traffic generation, various pavement types including LEED pervious pavements, USGS clean water permit and stormwater pollution prevention program inspections, and commuter high speed rail upgrade initiative projects. He has working knowledge of traffic capacity requirements, freeway interchange behavior and operations, and the integration of alternative modes of transport within a greater metropolitan settlement. Mr. Lewis also has professional experience with renewal, re-use and conversion of under-utilized easements and right-of-way easements to eco-friendly, community-based transportation. Mr. Lewis has worked on LEED urban renewal pilot projects that re-used and repurposed existing right-of-way and easements to render community benefit and development with municipalities and transportation departments nationwide. Mr. Lewis has considerable experience in the department of transportation highway and toll road projects ranging from plan/design reviews to field contractor construction guidance and project management. Mr. Lewis has experience with CALTRANS design-build freeway managed lane improvement projects.
RELEVANT PROJECT EXPERIENCE
Technical Assistant | Archibald Avenue Improvement Project | City of Ontario
Provided technical assistance to project lead. Michael Baker provided design and environmental services for proposed improvements on Archibald Avenue between East Oak Hill Drive and Monticello Place near the S.R. 60 interchange. For the project, Michael Baker developed the Project Study Report/Project Development Support deliverable, the Project Approval/Environmental Document, and a full plans, specifications, and estimates package for the proposed improvements. It also provided utility coordination and construction support.
Technical Assistant | I-10 Cherry Blvd. Interchange Project | City of Responsible for providing assistance to the project manager in the development of this deliverable which included basic drafting tasks for exhibits, preliminary layouts and development of Caltrans Design Decision Documents.
Michael Baker is providing environmental services for the Riverside County Transportation Department (RCTD) with the preparation of an initial study/environmental assessment (IS/EA) and a full suite of technical studies.
Michael Baker has coordinated extensively with Caltrans District 8 in its role as the lead agency under the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). Key environmental issues associated with the project include biological resources, noise, cultural resources, and air quality. Michael Baker obtained and approved a project study report/project development support (PSR-PDS) and is delivering the project approval/environmental document (PA/ED) phase.
Firm
Michael Baker International
Years with Firm/Total
3/19
Education
• B.S., Civil Engineering,
Marquette University
Certifications/Registrations
• Professional Engineer - Civil,
California, 81680
• Professional Engineer - Civil,
Arizona, 63082
• Professional Engineer - Civil,
Nevada, 024182
Expertise
• Experienced in Primavera P6,
Microsoft Project, SAP, TM1,
Geographic Information
System (GIS), Primavera
Contract Manager
• Strong communication and
presentation skills, Bilingual
(Spanish)
Agreements for Professional Services to perform As-Needed Professional C... Page 1315 of 2161 Appendix: Resumes | Page 38
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Project Engineer | I-10 Corridor Express Lanes Project | SBCTA| Construction Responsible for serving as a design document quality control manager within the I-10 SBCTA Design-Build process. Michael Baker provided design and engineering services as the lead designer on the Interstate 10 Corridor Express Lanes project. This design-build project aimed to reduce traffic congestion, increase throughput, and enhance regional mobility. It involved the design and construction of two express lanes in each direction of I-10 from the Los Angeles/San Bernardino County line to the I-10/I-15 interchange. It also included the reconstruction or modification of existing ramps at 10 interchanges and 20 bridge structures. As part of the project, Michael Baker performed roadway design, structural engineering, drainage, and maintenance of traffic (MOT) for two of the four design segments, as well as intelligent transportation systems services, tolling design, signals, lighting, landscape architecture, and survey activities for the entire corridor. In all, the project proposed to add 10.5 lane miles of new roadway and restripe 11.5 miles of existing roadway in each direction. To accommodate the added express lanes, the project widened or replaced 20 bridge structures, including six overcrossing replacements, two undercrossing replacements, seven undercrossing widenings, and five bridge widenings over channels. The project also added approximately 81 retaining walls of various types, including sub-horizontal ground anchor walls, soldier pile walls, soil nail walls, standard walls, and sound wall barriers.
Agreements for Professional Services to perform As-Needed Professional C... Page 1316 of 2161 Appendix: Resumes | Page 39
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Joseph Gonzalez, EIT
Construction/Roadway Inspector
Mr. Gonzalez has an extensive background in Construction and is currently providing project controls for Michael Baker. His responsibilities include supporting the Project team in developing, updating, and tracking the costs and schedule, producing reports, as well as maintaining associated systems and tools. His work outside of Michael Baker providing project management, project controls and field support in the public utility, construction, and transportation sectors has prepared him with a solid foundation for construction management and resident engineering work.
RELEVANT PROJECT EXPERIENCE
Project Manager | Multiple Transmission Pipeline
Construction/Repair Projects | Southern California Gas Company (Sempra Energy) | Duration on the Project: 2015-2019
Managed and oversaw the planning, execution, and closeout of multiple Transmission Pipeline Construction/Repair Projects within company service territory.
Assigned Department: Transmission Technical Services- Pipeline Planning • Managed and coordinated all activities leading to the successful completion of projects, including project scopes, timelines, cost estimates, and design.
• Developed and maintained project parameters for project requirements.
Provided direction to contractors, consultants, and project team. • Prepared, negotiated, and approved contracts for contractors or consultants.
• Researched and evaluated available contractors and consultants.
Prepared, negotiated, and approved or recommended approval of contracts. Negotiated contract changes.
• Analyzed and determined regulatory impacts and requirements of the project.
• Managed resource planning, budget analysis, and prepared budget forecasts for assigned projects.
• Prepared supporting documentation for CPUC and other government agencies concerning cost estimates.
Project Controls Scheduler & Cost Engineer | Tehachapi Renewable Transmission | Southern California Edison | Duration on the Project: 2013-2015:
Tehachapi Renewable Transmission Project (Southern California): The Tehachapi Renewable Transmission Project (TRTP) is a series of new and upgraded high-voltage electric transmission lines and substations capable of carrying 4,500 megawatts of electricity from renewable and other generators in Kern County south to San Bernardino County.
Firm
Michael Baker International
Years with Firm/Total
5/17
Education
• B.S., 2009, Civil Engineering,
California State University at
Fullerton
• Certificate, 2017, Project
Management, California
Institute of Technology
Certifications/Registrations
• Engineer-In-Training,
California, 2010
• Certificate, 2017, Project
Management, California
Institute of Technology
Expertise
• Strong communication and
presentation skills, Bilingual
(Spanish)
• Strong Construction
background, in both the
transportation and utility
disciplines
Agreements for Professional Services to perform As-Needed Professional C... Page 1317 of 2161 Appendix: Resumes | Page 40
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Project Controls Scheduler & Cost Engineer | NERC Mitigation Programs | Pacific Gas & Electric Company | Duration on the Project: 2013-2015:
In response to the North American Electrical Reliability Corp. (NERC) recommendation to Industry, PG&E developed a strategy for the compliance of more than 12,000 miles of its transmission system with voltages greater than 100-kV. The scope of the program covers mitigation projects on 500-kV, 230-kV, and 115-kV circuits within PG&E territory.
• Provided Management with key analytical support during scoping, budget, schedule, execution plan, and risk management planning.
• Managed multiple cost and resource loaded schedules through SAP and Primavera P6 interfacing software. Included is running multiple reports that informed Senior Management of Milestones, Critical Path, Earned Value, Cost, Commodity Curves, and Contractor Performance. • Managed cradle-to-grave master schedules that required interfacing with all departments on Project Manager’s behalf. This included working with Environmental, Land, Permitting, Public Affairs, Surveying, Supply Management, Engineering, and Construction to assure a timely completion of project and mitigate any potential impacts between department interactions.
• Development of Scoping, Bid, and Baseline Schedules while working independently off of Bid Contract documentation and RFPs. Additionally, was responsible for response to contractor cost or scheduling related RFIs through the direct application of contractual commitments. • Manage construction contractor invoicing and working with QA/QC inspectors to assure approval for payment and completion reports.
On-site resident project controls expert for critical cost and scheduling assignments where utility company was under strict government deadlines. Assignments ranged from technical database issues to working with Project Managers to resource and cost loading Region-based Portfolios (approximately 70 project Schedules)
Agreements for Professional Services to perform As-Needed Professional C... Page 1318 of 2161 Appendix: Resumes | Page 41
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Kieler W. Smith, PE, CCM, QSD,
Assoc. DBIA
Assistant Resident Engineer
Mr. Smith's typical duties include performing Construction Management, Field Resident Engineering; daily inspections; administering contract documents; upholding code requirements; attending weekly progress meetings; processing submittable, requests for information and clarification, change orders, and progress payments; coordinating with various agencies, utility companies, material testers, surveyors, business owners, and residents; monitoring traffic control, site safety, and the contractor's schedule; maintaining public relations; generating the final punch list; and documenting the work via daily reports and digital photography.
His field experience encompasses engineering, contract administration, construction management, construction inspection, water treatment plants, steel reservoirs, well equipping, well rehabilitation, SCADA instrumentation construction, constructability reviews, roadways, traffic signals, street lighting, bus pads, ADA ramps, paving, slurry seals, overlays, asphalt rehabilitation, pavement management programs, AC, PCC, sidewalks, curb and gutter, water and sewer lines, wells, channels, chlorine conversion, RCB's, valves, tie-ins, electrical work, switchgear replacement, underground conversion, utilities, walls, and park and recreational projects.
RELEVANT PROJECT EXPERIENCE
Construction Manager | On-Call Engineering and Construction Management Services | Santa Clarita Valley Water Agency
On-Call Engineering and Construction Management Services, Santa Clarita, California. Santa Clarita Valley Water Agency. Construction Manager. Responsible for various constructability reviews for the water district's plans. Since 2010, Michael Baker has provided engineering and construction management services for facilities evaluation and design improvements for the Santa Clarita Valley Water Agency. The agency is a public water wholesaler that provides half of the water to Santa Clarita households and businesses. Michael Baker services have included RV-2 replacement and vault modifications; Castaic Conduit - Streambank Erosion Protection; recycled water tank siting study; Honby Well PFAS Treatment Preliminary Design; evaluation of perchlorate treatment chemical injection facility; annual cathodic test station survey and evaluation; emergency operation storage facility study; Magic Mountain Reservoir preliminary design, pump station preliminary design, and Phase 6 pipeline design; ESFP Clearwell CT Improvement Project and filter effluent valve evaluation; Newhall lateral-reach 2A pipeline modifications; Castaic Conduit Parallel Constructability Review; and Sand Canyon Pump Station backup generator construction management and inspection.
Construction Inspector | On-Call Public Works Construction Management and Inspection Services | City of Cypress
Responsible for interim construction inspection. Michael Baker provided on-call construction management and inspection services to the City of Cypress. Tasks included: City Hall remodeling, sewer relocations, slurry seals, overlays, pavement management and replacement, street improvements, water line upgrades, SCE system upgrades, and ADA ramps. Michael Baker's duties encompassed performing biddability and constructability Firm
Michael Baker International
Years with Firm/Total
17/17
Education
• B.S., Civil Engineering, Loyola
Marymount University
Certifications/Registrations
• Professional Engineer - Civil,
California, No. 82523
• Associate Design-Build
Professional, 2022, AS-3656
• Qualified SWPPP Developer
(QSD), California, 2014,
82523
• Certified Construction
Manager, 2019, 6273
Agreements for Professional Services to perform As-Needed Professional C... Page 1319 of 2161 Appendix: Resumes | Page 42
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
reviews; administering the contract; inspecting the work of the various contractors; documenting the work via daily construction reports and digital photography; ensuring quality control; verifying quantities; conducting weekly progress meetings; processing control documents such as RFI's, submittals, change orders, progress payments, certified payrolls; monitoring construction schedules and the contractor's safety program; maintaining public relations and community outreach; and facilitating federal and state funding.
Construction Inspector | Moody Street Sewer Relocation Project | City of Cypress Moody Street Sewer Relocations, Cypress, California. City of Cypress. Construction Inspector. Responsible for interim construction inspection. Michael Baker provided construction management and inspection services to the City of Cypress on this slurry seal project. The work encompassed grinding, crack sealing, asphalt removal and replacement, slurry sealing with 2.5-percent polymer modified (rubber latex), and thermoplastic traffic striping and marking. Michael Baker's duties included calculating quantities, preparing daily reports, and taking digital photos.
Construction Inspector | Asphalt Pavement Rehabilitation Projects | City of Lake Forest Responsible for construction management and inspection. Michael Baker performed construction management and inspection services on a street resurfacing, railroad access road surfacing, and slurry seal improvement project.
The work included crack sealing; 26,900 square yards of rubberized slurry sealing; 529,500 square feet of cold milling; 14,900 tons of ARHM; adjusting valve boxes, manhole frames, and sewer cleanouts to grade; fire hydrants; loops; pavement markers; and striping. Michael Baker provided contract administration; construction management; inspection; quality control and quantity verification; site safety, public relations, construction schedule, and material testing monitoring; utility coordination; and processing of control documents, such as submittals, progress payments, change order, daily reports, digital photos, and the final punch list.
Agreements for Professional Services to perform As-Needed Professional C... Page 1320 of 2161 Appendix: Resumes | Page 43
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
William Seitz, PE
Assistant Resident Engineer
Mr. Seitz has many years of experience and has been responsible for contract administration, construction management and inspection of numerous public works and capital improvement projects throughout southern California. Other responsibilities have included value engineering, constructability reviews, claims analysis, utility coordination, quality control and assurance, and construction safety. His experience encompasses highways, roadways, traffic signals, grading, paving, ARHM, lime treatment, slurry seals, striping, park and recreational areas, landscaping, retaining walls, reservoirs, water lines, sanitary sewers, lift stations, storm drains, drainage channels, wells, and other infrastructure projects. Many of these projects have been federally and/or state-funded and have required ISTEA and DLAE documentation and reporting. He is well versed in Greenbook specifications, as well as Caltrans and ADA standards, and local regulations. This vast knowledge and experience combined with his proficiency in managing the daily activities of contractors, inspectors, designers, utility representatives, and field survey crews will ensure continuity between design and construction.
RELEVANT PROJECT EXPERIENCE
Construction Manager | Highway 111 Widening and Improvement Project | City of Indio
Responsible for construction management. Michael Baker performed construction management and inspection services for the City of Indio's Highway 111 widening and improvement project. Located between Monroe and Rubidoux streets, the project involved the removal of curb and gutter, concrete cross-gutter, and sidewalk and asphalt pavement and the construction of curb and gutter, asphalt pavement, sidewalk ramps, storm drain, catch basins, and a pre-cast concrete water fountain, along with landscaping and irrigation and traffic signal installation. The city pre-purchased the traffic signal gear and equipment to expedite and facilitate an extremely compressed construction schedule. The Michael Baker team worked closely with Caltrans representatives, especially during the permitting process, to ensure a successful project.
Construction Manager | Facilities Upgrade at Plant No. 1 |City of Indio, Indio Water Authority Responsible for construction management. Michael Baker provided construction management, inspection, and contract administration services for this $10.6 million project that involves the demolition of an existing 2-million gallon (MG) steel tank, construction of a 5 MG cast-in-place reinforced concrete reservoir consisting of approximately 7,000 cubic yards of concrete, booster pump station with three 200 hp motors and pumps with 1,200 gpm capacity, chlorine treatment facilities, motor controls, electrical improvements, solar panels, paving, grading, drainage facilities, 5-foot of over-excavation, and re-compacted fill. Michael Baker verified quantities and ensured quality control; provided community relations and monitoring site safety; coordinated survey, material testing, and removal of hazardous materials; conducted weekly progress meetings and preparing minutes; monitored project schedules; and prepared and processed control documents.
Firm
Michael Baker International
Years with Firm/Total
24/34
Education
• B.S., Engineering, California
State Polytechnic University,
Pomona
• B.A., Social Sciences,
University of California, Irvine
Certifications/Registrations
• Professional Engineer - Civil,
California, No. 76356
• Hazardous Waste Operations
and Emergency Response,
2015, 14461266
• OSHA 8-Hour HAZWOPER
Refresher Training, 2018,
24107316
• Safety Assessment Program
Evaluator, California, 2011,
68236
Agreements for Professional Services to perform As-Needed Professional C... Page 1321 of 2161 Appendix: Resumes | Page 44
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Construction Manager | Interstate 10/Avenue 50 Interchange | City of Coachella | Responsible for construction management. Michael Baker, as the prime consultant, prepared a project study report and provided state and federal environmental documentation for the I-10/Avenue 50 Interchange Project. The purpose of the project is to relieve forecasted congestion on I-10 and S.R. 86, including the Dillon Road interchanges. The interchange improvements will provide a new gateway into the city and improve access to I-10 for vehicles traveling in and out of the city. Michael Baker prepared the project report; new connection report; environmental documentation; geometric approval drawings; design exceptions fact sheets; and plans, specifications, and estimates (PS&E).
Construction Manager | Rancho Parkway Street Improvements | City of Lake Forest Responsible for construction management. Michael Baker provided construction management and inspection services for the rehabilitation of this arterial roadway from Hermana Circle to Portola Parkway. Duties included contract administration; construction management; inspection; quality control and quantity verification; monitoring the contractor's construction schedule, safety plan, and traffic control plan; public relations; material testing monitoring; utility and survey coordination; and control document processing, including submittals, progress payments, change orders, daily and weekly reports, digital photos, and the final punch list.
Construction Manager | Avenida Pico Rehabilitation and Widening Improvements | City of San Clemente Mr. Seitz served as Public Works Inspector and was responsible for quality control, daily reports, contract administration, dry utility coordination, construction phasing, traffic control, as-builts, photography, public concerns, and the final punch list. Michael Baker provided engineering and design services for street widening, I-5 freeway ramp modifications, a 140-meter keystone retaining wall, demolition, mass grading, trenching, boring, grinding, AC overlay, PCC street improvements, storm drains, catch basins, manholes, fencing, medians, irrigation, landscaping, curb and gutter, sidewalks, driveways, site work, traffic signalization, and signing and striping.
Agreements for Professional Services to perform As-Needed Professional C... Page 1322 of 2161 Appendix: Resumes | Page 45
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
SYRUSA Engineering, Inc.
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1323 of 2161 Appendix: Resumes | Page 46
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Faisal Zahlout, PE, QSD
Structure Representative
Mr. Zahlout has over 30 years of civil engineering experience in Structure Construction, design, construction management and inspection of heavy civil projects. Mr. Zahlout served as Caltrans Senior Bridge Engineer for the I-10 and I-215 corridors in San Bernardino. Mr. Zahlout served the Riverside, San Bernardino, and Bishop Counties as Senior Bridge Engineer Specialist for Caltrans District 8 and 9 where he provided training and guidance for the office of structure construction and conducted record reviews for all projects regarding the structures. He served as vocal point for constructability review related to structures for district 8 and 9. He coordinated and participated in value analysis study for structure related aspects and served as contact structure engineer for encroachment permits in district 8 and 9. He also specializes in falsework for all temporary structures and shoring review. Mr. Zahlout was an instructor for the 2003 Winter Training regarding trenching and shoring for the office of Structure Construction in Caltrans. Mr. Zahlout was a member of the Substructure Committee for the office of structure construction. Also, he is a former faculty member at CSUF, where taught construction classes. Faisal has current certifications of 10 hours Cal/OSHA safety training and current Defensive Driving.
RELEVANT PROJECT EXPERIENCE
STRUCTURES REP | I-10 Truck Climbing Lanes | SBCTA|
Construction Value: $39.5 M |Duration on the Project: 01/2024 – current
This project is adding a truck climbing lane along eastbound I-10 in the City of Yucaipa from the 16th Overcrossing Bridge to 0.2 mile east of the County Line Road Undercrossing Bridge by paving the existing I-10 median. The project will replace the existing center barrier in the center median, restripe EB I-10 to accommodate shifting the existing three eastbound general-purpose lanes to the inside so that the number one lane will be located along the improved median and the existing outside lane will provide continuation for the truck climbing lane that currently ends at the eastbound Live Oak Canyon off-ramp. Mr. Zahlout’ s responsibilities includes reviewing and approving all submittals, monitoring daily activities, RFIs.
CLAIMS SUPPORT | I-10 Design Build Express Lanes | SBCTA| Construction Value: $679 M |Duration on the Project: 04/2020 – current
Project includes 8 replacement bridges and widening 16 existing bridges, 20 miles of new retaining walls, update existing storm drain systems, adding two express lanes, improving existing on and off ramps, enhance traffic striping to accommodate new car technologies. Retaining walls types are type one, soil nails walls, soldier pile walls, tie back walls. Mr. Zahlout is providing claims resolution support.
Firm
SYRUSA Engineering, Inc.
Years with Firm/Total
31/14
Education
• M.S., Civil Engineering,
California State University
Fullerton, CA - January
1997
Certifications/Registrations
• Civil Engineer in California,
No. C60920
• Qualified SWPPP
Developer, No. 21767
Professional Associations
• Member ASCE
Expertise
• Structure Experience
• Qualified SWPPP
QSP/QSD
• California State University
– Fullerton adjunct
professor Civil Engineering
• Provided technical training
for Caltrans and OCPW
Benefits to the City of Indio
• Caltrans Senior
Specialist
• Bridge Expert
Agreements for Professional Services to perform As-Needed Professional C... Page 1324 of 2161 Appendix: Resumes | Page 47
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
STRUCTURE REP/RE | Mountain Pass Bridge Replacement | Caltrans District 8| Construction Value: $11 M |Duration on the Project: 03/2016 – 08/2017 The Mountain Pass Project which included replacement of Cenda Ditch Bridge Left and widening of Wheaton Wash Bridge Left. Project is located within environmentally sensitive area.
Mr. Zahlout responsibilities include but not limited to monitoring the bridge construction, review, and approval all submittals and RFIs including concrete mix design, temporary shoring, falsework plans, reviewed prestressing shop drawings, fiber concrete for bridge deck and prepared CCO for it. Faisal monitored and inspected the following on daily basis the following: field survey, foundation construction, concrete pour, prestressing, and grouting operation, profilograph and grinding operations, joint seal type B installation, concrete barrier, construction of CISS piles, SWPPP monitoring, reviewed and prepared VECPs, monitored and ensured safety at the job site, prepared final project records and files, final submittal to HQ in Sacramento.
ASSISTANT STRUCTURE REP | Barton Road OC Bridge Replacement | Caltrans District 8| Construction Value: $55 M |Duration on the Project: 05/2018 – 09/2018 CM/CG project consists of replacing Barton Rd OC with new and higher bridge, multiple retaining walls and barriers, improvement to surrounding streets to improve traffic movement, utility upgrades, on and off ramp improvements to enhance movement of travelers on I-215. Faisal was responsible for reviewing submittals, RFIs, supervising field inspectors, agency/contractor/utility coordination, and managing daily activities.
STRUCTURE REP | Kramer Junction Expressway | Caltrans District 8| Construction Value: $191 M |Duration on the Project: 10/2017 – 07/2018
This CM/GC project widens SR-58 expressway to 4 lanes, realigns roadway, provides grade separation at railroad crossing, includes new pavement, widens median, improve traffic safety, and increase volume of oversized vehicles. Mr. Zahlout’ s responsibilities included review and approval of all submittals, monitoring daily activities, supervising field inspectors, RFIs.
Agreements for Professional Services to perform As-Needed Professional C... Page 1325 of 2161 Appendix: Resumes | Page 48
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Luis Negrete, PE
Structure Representative
Mr. Negrete has 24 years of experience on infrastructure construction projects.
His experience brings strong technical skills and engineering judgement to all projects, helping to deliver on time and on budget, as well as the ability to manage multiple projects simultaneously. He also has excellent leadership qualities and communication skills. Luis works well as part of a team or independently, as required of him. Luis’s experience includes excavation, backfill, drainage system, retaining walls, survey, concrete pour monitoring, falsework erection and removal, trenching and shoring, stressing operation, CIDH piles and driven piles construction, profliograph and grinding, joint seals installation, SWPPP, daily reports, field sampling, and monthly pay estimate calculation. Luis is ACI certified and has current certifications of 10 hours Cal/OSHA safety training, Defensive Driving, Confined Spaces, Temporary Pedestrian Access, CTM and First Aid.
RELEVANT PROJECT EXPERIENCE
STRUCTURE SUPPORT ASSISTANT | I-10 Design Build Express Lanes | SBCTA| Construction Value: $679 M |Duration on the Project:
02/2023 – current
Project includes 8 replacement bridges and widening 16 existing bridges, 20 miles of new retaining walls, update existing storm drain systems, adding two express lanes, improving existing on and off ramps, enhance traffic striping to accommodate new car technologies. Retaining wall types are type one, soil nails walls, soldier pile walls, tie back walls. Mr. Negrete assists with construction submittals, RFIs, supervised field inspectors, project audit, monitor testing, coordinate between Caltrans structure design.
STRUCTURE REP | SR-91/I-15 Express Connect | Caltrans District 8 | Construction Value: $165 M |Duration on the Project: 08/2021 – 06/2022
Project included landscaping, utilities, multiple sound walls, various type of retaining walls, HMA and PCC pavement, traffic signals, street improvement, drainage systems, multiple ramps realignments, multiple flyovers, and bridge replacement. As Structure Representative Luis’s duties included but not limited to reviewing submittals, RFI review and response, project oversight.
STRUCTURE REP | Ortega Highway Safety Improvements | Caltrans District 8 | Construction Value: $39 M |Duration on the Project: 09/2021 – 06/2022 The Safety Project included multiple types of retaining walls, required night and weekend work, heavy traffic control, staging, SWPPP, work in environmentally sensitive areas, and multiple retaining walls. Responsible for traffic coordination, daily inspection monitoring, SWPPP.
Firm
SYRUSA Engineering, Inc.
Years with Firm/Total
24/2
Education
• BS, Civil Engineering, Cal
State Sacramento, 1998
Certifications/Registrations
• CA, Civil Engineer, No.
64949
• Defensive Driving Training
Certified
• 8 hr. Construction Safety
Orientation Class
• Current Driver’s License
• ACI, CTM, First Aid
Professional Associations
• N/A
Expertise
• Structure Experience
• Multiple agency
coordination
• Retaining Wall Expert
• ACI certified
• CTM
• Temporary Pedestrian
Training
Benefits to the City of Indio
• Familiar with Riverside
County
Agreements for Professional Services to perform As-Needed Professional C... Page 1326 of 2161 Appendix: Resumes | Page 49
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
STRUCTURE REP | Pachappa Union Pacific Railroad Tie In | Caltrans District 8 | Construction Value: $8 M |Duration on the Project: 12/2020 – 01/2022 Projects included multiple types of retaining walls, required night and weekend work, heavy traffic control, staging, SWPPP, work in environmentally sensitive areas, and multiple retaining walls. As Structure Representative Luis’s duties included but not limited to falsework review, submittals review, structure reviews and inspection.
STRUCTURE REP | I-15 Express Lanes Design Build | Caltrans District 59| Construction Value:
$255 M |Duration on the Project: 10/2018 – 08/2021
Project consist of 21 bridges and 16 sign structures. Adds toll lane and improvements, tolling system, subgrade preparation, drainage systems installation, concrete barriers, traffic signs, HMA/PCC pavement, striping, and traffic control. Responsible for monitoring daily activities, traffic control, SWPPP, jobsite safety, and preparing daily reports.
Agreements for Professional Services to perform As-Needed Professional C... Page 1327 of 2161 Appendix: Resumes | Page 50
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Noura Alayyan
Roadway/Structure Inspector
Ms. Alayyan has more than 4 years of construction inspection experience of transportation projects, storm drain systems, sewer lines, potable water line, reclaimed water lines, sidewalks, ADA ramps, concrete barrier, MSE walls, retaining walls type one, grading roads and HWYs, HMA and PCC Pavement, embankment construction, and bridge construction. Ms. Alayyan is experienced with construction inspection, quantity calculations, checking grade and alignment, falsework erection and removal, trenching and shoring, soffit and stems concrete pour, deck construction and concrete pour, profiliograph and grinding, joint seals installation, material sampling and control, safeguarding, and assuring compliance with project plans and specifications, preparing calculations, records, reports, correspondence related to construction project activities, AS Built Plans.
Noura had performed, reviewed, and analyzed critical path schedule (CPM) and time impact analysis (TIA) submittals, prepared recommendations, and presentations to the local agencies for possible mitigation plans to overcome the issues of delay. Noura had prepared NOPCs and resolutions for NOPCs..
RELEVANT PROJECT EXPERIENCE
ROADWAY/STRUCTURE INSPECTOR | SR-71 Extension Project | Caltrans District 7| Construction Value: $110 M |Duration on the Project: 02/2022 – current
Present This project extends 71 FWY from 60 FWY to I-10 FWY and includes multiple retaining walls including soil nail walls, SHGA walls, type one walls, box culverts, drainage systems, and other improvement to this segment. This improvement project is considered as stage one to be followed by stage two which will include all bridges to complete the extension of the freeway. Noura’s responsibilities include, but are not limited to, field survey, field inspection for compliance with the plans and specifications, preparing daily reports, daily quantity sheets calculation, rebar inspection, concrete pour monitoring, CIDH piles under slurry displacement method inspection, inspection for drilling soil nails, inspection of installation of soil nails rods and tie back strands, monitor stressing tie backs and strands, and preparing inspection reports and stressing results.
ASST RE/OFFICE ENGINEER | Laguna Niguel Track Siding Train Station Project Design-Build | OCTA| Construction Value: $55 M |Duration on the Project: 05/2019 – 01/2021
This project includes multiple retaining walls, adding new Railroad track, multiple storms drain system, improvement to loading area, and improvements to the parking lot. As an Assistant Resident Engineer/Office Engineer, Noura’s responsibilities include document control, maintaining meeting minutes, maintaining, and updating submittal logs, maintaining and updating RFI logs, maintaining the testing log, and expediting testing so that there is no delay to the contractor. She also performs occasional field inspections.
Firm
SYRUSA Engineering, Inc.
Years with Firm/Total
6/5
Education
• Bachelor of Science Civil
Engineering, Cal Poly
Pomona
Certifications/Registrations
• Cal/OSHA Confined Space
Entry
• Temporary Pedestrian
Access
• ACI Concrete Field Testing
• OSHA 10-Hour
Construction
• First Aid/CPR
• Defensive Driving
Professional Associations
• N/A
Expertise
• Office engineer on award
winning Barton Rd Bridge
Replacement
• Force account analysis
experience
• As additional asset has
field inspection experience.
Benefits to the City of Indio
• Structures inspection
experience
Agreements for Professional Services to perform As-Needed Professional C... Page 1328 of 2161 Appendix: Resumes | Page 51
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
ASST STRUCTURE REP/OFFICE ENGINEER | Barton Road OC Bridge Replacement Design-Build | Caltrans District 8| Construction Value: $35 M |Duration on the Project: 01/2018 – 05/2019 This project included replacing the existing bridge with new a PS/CIP box girder bridge over I-215, retaining walls and barriers, new on and off ramps, and improvements to the surrounding streets and other utilities. The project was constructed under Caltrans specifications. As Asst Structure Representative/Office Engineer, Noura’s responsibilities included document control and construction inspection. She was responsible for maintaining all files, monitoring submittals and RFls, indexing all records, and maintaining hard copies and electronic copies on district server. Noura worked closely with the material lab for all testing requirements, monitored subgrade construction to ensure full compliance with specifications, actively monitored the buy America clause to ensure compliance with federal guidelines, prepared weekly progress meeting minutes, and inspected the site for SWPPP compliance and prepared weekly SWPPP reports.
Agreements for Professional Services to perform As-Needed Professional C... Page 1329 of 2161 Appendix: Resumes | Page 52
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Robert Bersbach, PE, QSD/QSP
Roadway/Structure Inspector
Mr. Bersbach has a BS and MS in Civil Engineering from an ABET accredited university. Robert has PE and seven years of experience in construction. Robert is experienced in roadway and structure construction inspection, quantity calculations, checking grades and alignments, materials sampling, and control.
Robert has the ability to identify actual and potential problems associated with the construction project and recommend sound engineering solutions, maintain an awareness of safety and health requirements and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel, and preparing calculations, records, reports, and correspondence related to construction project activities.
Robert has experience with document control and office engineer works, field survey, grade checking, storm drain construction, submittals review, falsework erection and removal, temporary shoring, jacking and receiving pits, prestressing and grouting operations, profilograph and grinding operation, joint seals installation, JPCP, HMA, Midwest Guardrail System, concrete barrier, traffic control, striping, building inspection, quantity sheets calculation, pay estimate preparation, CCOs, force account analysis, extra work preparation, daily field inspection, SWPPP inspection, and As-Built and final records.
Mr. Bersbach is ACI certified and has current certifications of 10 hours Cal/OSHA safety training, current Defensive Driving, and Covid-19 Safety Training.
RELEVANT PROJECT EXPERIENCE
LEAD CONSTRUCTION INSPECTOR/ARE | I-210 Improvement
Project | Caltrans District 7| Construction Value: $135.5 M |Duration on the Project: 06/2020 – 02/2024
Project includes replacement of joint seals for 14 bridges, upgrade concrete barrier for 8 bridges, widening multiple bridges, upgrade existing storm drains, and adding Midwest Guard Rails to multiple area.
Responsibilities: included but not limited to field daily inspection, field survey, concrete pour inspection, falsework erection and removal monitoring, trenching and shoring, SWPPP inspection and reporting.
CONSTRUCTION INSPECTOR/ARE | I-5 Improvement Project |
Caltrans District 7| Construction Value: $138 M |Duration on the Project: 08/2019 – 01/2020
The Interstate 5 roadway improvement project located in Santa Clarita. Project includes full lane replacement with JPCP, individual slab replacement, stage construction striping, traffic control, HMA shoulders and ramps, upgrade existing storm drains, and adding Midwest Guard Rails to multiple area.
Responsibilities: include but not limited to field daily inspection, field survey, concrete pour inspection, trenching and shoring, SWPPP inspection and reporting.
Firm
SYRUSA Engineering, Inc.
Years with Firm/Total
10/9
Education
• M.S., Civil Engineering,
California State University
Fullerton, CA - January
2016
Certifications/Registrations
Professional Engineer (Civil),
CA # C89852
• Qualified SWPPP
Developer (QSD) &
Qualified SWPPP
Practitioner (QSP)
CA Certificate # 27339
• Cal/OSHA Confined Space
Entry
• Temporary Pedestrian
Access
• ACI Concrete Field Testing
OSHA 10-Hour Construction
First Aid/CPR
Defensive Driving
Professional Associations
• N/A
Expertise
•
Benefits to the City of Indio
• Roadway Experience
• Structure Experience
• Qualified SWPPP
QSP/QSD
• Utility Coordination
Experience
• ACI certified
• Temporary Pedestrian
Training
Agreements for Professional Services to perform As-Needed Professional C... Page 1330 of 2161 Appendix: Resumes | Page 53
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
CONSTRUCTION/STRUCTURE INSPECTOR | CV Kane Rest Area | Caltrans District 8| Construction Value: $13 M |Duration on the Project: 08/2018 – 08/2019 Project included two building, three picnic area, one information center, two water tanks, sidewalks and ADA ramps, new parking lots, streetlights, drainage systems, and other new improvements.
Mr. Bersbach responsibilities include but not limited to make sure the work is in conformance with the plans and specification and completed the project safely on time and budget, field inspection, field survey, submittal of daily reports, quantity sheets calculation, monthly pay estimates, SWPPP inspection, and monitoring extra work and prepared extra work bills, worked on project files. Robert reviewed and commented on concrete mix design, prepared project documents, final files and As-Built plans.
CONSTRUCTION/STRUCTURE INSPECTOR | Mountain Pass Bridge Replacement | Caltrans District 8| Construction Value: $11 M |Duration on the Project: 03/2017 – 08/2018 The Mountain Pass Project which included replacement of Cenda Ditch Bridge Left and widening of Wheaton Wash Bridge Left. Project is located within environmentally sensitive area.
Mr. Bersbach responsibilities include but not limited to monitoring the bridge construction, HMA pavement, field survey, foundation construction, concrete pour, prestressing and grouting operation, profilograph and grinding operations, joint seal type B installation, concrete barrier, construction of CISS piles, SWPPP monitoring, monitored and ensured safety at the job site.
ASST STRUCTURE REP/ARE | I-14 Bridge Replacement | Caltrans District 8| Construction Value:
$35 M |Duration on the Project: 02/2016 – 09/2017
Project included the demolition and reconstruction of six bridges at the east and west bound of I-40.
Responsibilities included verifying contractor follows plans and specifications, assisting structures representative with contract project administration, verifying and documenting construction activities.
Robert’s Duties included but are not limited to the following: field survey, grades sheets preparation from 4-scale, concrete pour inspection, reviewed and prepared contact change orders and claims for the projects, supported and assist with monitoring construction sites for safety and SWPPP violations, maintained daily activity logs and daily inspection reports including project photos, supported and assisted with reviewing submitted shop drawings, assisted with reviewing and prepared quantity calculation sheets and monthly pay estimates, supported and assisted with material sampling including concrete testing, supported and assisted with approving construction materials, assisted and promoted a safe work environment while complying with Caltrans safety rules, assisted in coordinating services with outside agencies, maintained project files and records including hard copies and electronic copies.
Agreements for Professional Services to perform As-Needed Professional C... Page 1331 of 2161 Appendix: Resumes | Page 54
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Ryan Vantine, PE
Structure Inspector
Ryan has experience in construction management, inspection and maintenance of highways, roadway bridges, and tunnels. His experience includes Massachusetts DOT where he inspected various roadways and other structures.
Also, Ryan worked with Caltrans as construction inspector for District 7 and 8 inspecting highways and bridges as well as grade separation. Mr. Vantine is wellversed with all Caltrans construction manuals and structure construction manuals. Ryan field inspection experience includes excavation, backfill, drainage system, retaining walls, survey, concrete pour monitoring, falsework erection and removal, trenching and shoring, stressing operation, CIDH piles and driven piles construction, profliograph and grinding, joint seals installation, SWPPP, daily reports, field sampling, and monthly pay estimate calculation. Ryan is ACI certified and has current certifications of 10 hours Cal/OSHA safety training, Defensive Driving, Confined Spaces, Temporary Pedestrian Access and First Aid.
RELEVANT PROJECT EXPERIENCE
STRUCTURE REP | SR-71 Freeway Conversion Project, Phase 1| Caltrans District 59 (7)| Construction Value: $174 M| Duration on the Project: 05/2021 – current
This project is phase 1 of two phases to extend the existing 71 freeway between the 60 freeway and the 57 freeway. Phase 1 includes construction on all retaining walls that include soil nails wall, ground anchors walls, type one walls, and soldier pile system walls. Major Work includes: 18” and 24” CIDH piles totaling over 42000 LF. Dry Piles and Wet Piles via Slurry Displacement Method, Over 1 Mile of Reinforced Concrete Box Culvert (from 6’x4’ to double 10’x6’), Major utility relocation during project. Required working with various Caltrans departments, SoCal Edison, and OHL to re-align high voltage overhead power lines. Work involved re-staging contractor’s CPM schedule to minimize delays and 15 OH sign structures with CIDH foundations. Mr. Vantine is working as Structure Rep for a team of 6 Assist SRs.
ASST STRUCTURE REP | Hobart Yard Bridge Widening/I-710 Rehab Project | Caltrans District 7| Construction Value: $150 M |Duration on the Project: 11/2020 – 04/2021
This project from Slauson Avenue to SR-60 is part of $150 million federal and state funded improvements to I-710, including widening Hobart Yard Bridge which spans over multiple BNSF tracks removing existing OH barrier , building a bridge widening and deck closure pour, and building a temporary platform to catch debris to avoid damage to the tracks working closely with BNSF staff, as well as improvements to existing storm drainage systems, pavement rehabilitation, and new signage. Mr. Vantine was responsible for drafting 4-scale models, running profilograph to identify must-grinds.
Firm
SYRUSA Engineering, Inc.
Years with Firm/Total
10/9
Education
• M.S., Civil Engineering,
University of California Los
Angeles, CA - June 2014
Certifications/Registrations
• Civil Engineer in California,
No. C94427
• Cal/OSHA Confined Space
Entry
• Temporary Pedestrian
Access
• ACI Concrete Field Testing
• OSHA 10-Hour
Construction
• First Aid/CPR
• Defensive Driving
Professional Associations
• N/A
Expertise
• Structure Experience
• Multiple agency
coordination
• Retaining Wall Expert
• ACI certified
• Temporary Pedestrian
Training
Benefits to the City of Indio
• Structure Rep
Experience - Caltrans
Agreements for Professional Services to perform As-Needed Professional C... Page 1332 of 2161 Appendix: Resumes | Page 55
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
FIELD INSPECTOR | Clay Avenue Grade Separation | RCTD| Construction Value: $17 M |Duration on the Project: 11/2017 – 12/2018
$17 million grade separation involved lowering the street 20 below the UPPR tracks. Temporary shoefly was constructed to move trains to avoid disruption to the line and Clay Avenue traffic, which is a collector road connecting two major roads, new precast girders bridge was constructed, trains were returned to normal activity.
Ryan’s responsibilities included field survey, field inspection for compliance with plans and specifications, daily reports, quantity sheets calculations.
ASST STRUCTURE REP | LA-110-405 Interchange Improvement | Caltrans District 7| Construction Value: $25 M |Duration on the Project: 09/2019 – 10/2020 Project includes multiple retaining walls types one, tie-back walls, and soil nail walls. Ryan responsibilities include but not limited to field survey, field inspection for compliance with the plans and specifications, prepare daily reports, daily quantity sheets calculation, rebar inspection, concrete pour monitoring, drilling for tie back anchors inspections, inspection for drilling soil nails, inspection of installation of soil nails rods and tie back strands, monitor stressing tie backs and strands and preparing inspection reports and stressing results. Ryan’s responsibilities included field survey, field inspection for compliance with plans and specifications, daily reports, quantity sheets calculations, rebar inspection, concrete pour monitoring.
ASST STRUCTURE REP | Tie Back Wall | Caltrans District 7| Construction Value: $11 M |Duration on the Project: 12/2018 – 09/2019
Project included construction of tie back wall to support the slope from sliding under Pacific Coast Highway in Malibu. Ryan’s Duties included but are not limited to the following: field survey, grades sheets preparation, concrete pour inspection, drilling for tie back inspection, monitored installation of the stressing strands, monitored stressing operation, inspected concrete pour, maintained daily activity logs and daily inspection reports including project photos, supported and assisted with reviewing submitted shop drawings, assisted with reviewing and prepared quantity calculation sheets and monthly pay estimates, supported and assisted with material sampling including concrete testing, assisted and promoted a safe work environment while complying with Caltrans safety rules, maintained project files and records.
Agreements for Professional Services to perform As-Needed Professional C... Page 1333 of 2161 Appendix: Resumes | Page 56
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
Twining, Inc.
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1334 of 2161 Appendix: Resumes | Page 57
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
Amir Ghavibazoo
QA Manager
Dr. Amir Ghavibazoo is Twining’s Director of Asphalt Engineering and Pavement Design. He directs and works on pavement design, highway design, and engineering specificaCons. He joined Twining in 2014 aIer compleCng graduate studies focusing on Pavement Management Systems (MicroPaver), pavement evaluaCon, and pavement rehabilitaCon strategies. He is experienced in calculaCng the Pavement CondiCon Index (PCI) through visual inspecCon following the United States Army Corps of Engineers’ methodology, as well as conducCng Life Cycle Cost Analysis (LCCA) rehabilitaCon strategies for pavements.
AddiConally, he has extensive experience with advanced performance tesCng of asphalt binders, including Dynamic Shear Rheometer (DSR), Bending Beam Rheometer (BBR), and other asphalt binder quality control tests. He works closely with ciCes and government agencies to develop unique and specialized mix designs, pavement inspecCons, and pavement design soluCons. Amir also serves on several technical commiWees in California, helping to create new specificaCons and update exisCng ones. He has worked on many projects, such as asphalt rubber projects, Superpave, invesCgaCons of pavement distress, and green technologies in pavement construcCon.
RELEVANT PROJECT EXPERIENCE
Project Manager | Los Gatos, Almond Grove Street ReconstrucCon Project Phase One and Phase Two |Los Gatos| ConstrucCon Value: $3M |DuraCon on the Project: 06/2020 – 11/2021
The project consists of a mulC-phased rehabilitaCon of a roadway in a historic neighborhood.
The rehabilitaCon consists of removal and replacement of all sidewalks, curb, guWer, driveways and accessibility ramps, and the removal and replacement of the concrete in secCons. Twining provided pavement evaluaCon and recommendaCons for rehabilitaCon, as well as geotechnical services during construcCon. Amir served as Senior Pavement Engineer.
Senior Pavement Engineer | Santa Clarita Street Improvements | Santa Clarita| ConstrucCon Value: $6M |DuraCon on the Project: 11/21 – Current The project consists of removal and replacement of failed pavement areas, construcCon of new ADA-compliant curb ramps, installaCon of hot mix asphalt, applicaCon of slurry seal surface treatments, and replacement of pavement markings. Some streets that will receive slurry seal and/or new asphalt are in the City's downtown area, City Hall vicinity, north of Stevens Creek Boulevard between Winchester Boulevard and Saratoga Avenue, north of Pruneridge Avenue between Woodhams Road and Pomeroy Avenue, north of El Camino Real between Kiely Boulevard and Calabazas Boulevard, and Montague Expressway/ De La Cruz Boulevard.
Firm
Twining Inc.
Years with Firm/Total
9/9
Educa5on
Ph.D., Civil and
Environmental Engineering,
North Dakota State
University, Fargo, ND, 2014
MS, Railways Engineering,
Iran University of Science
and Technology, Tehran,
Iran, 2009
Exper5se
Pavement Engineering
Benefits to the City of
Indio
Amir has extensive pracCcal
experience in asphalt
pavement engineering
including pavement
design, rehabilitaCon,
preservaCon, pavement
management, materials
and construcCon.
Agreements for Professional Services to perform As-Needed Professional C... Page 1335 of 2161 Appendix: Resumes | Page 58
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Senior Pavement Engineer | Long Beach Airport LGB Taxiway C Improvements| City of Long Beach| ConstrucCon Value: $25M |DuraCon on the Project: 12/21-8/22
The Long Beach Airport (LGB) Taxiway C project included the reconstrucCon of the pavement, and update of Taxiway C and associated taxiways in accordance with the airfield geometry study. This included the demoliCon of exisCng runway and taxiway pavements, reconstrucCon of the exisCng pavement for use as Taxiway C, incorporaCon of exisCng Taxiway C into the terminal ramp area, associated drainage improvements, and new LED electrical designs. Twining provided material tesCng and inspecCon services, as well as geotechnical services. The firm’s scope included the tesCng and inspecCon of soils, asphalt pavement, and concrete pavement. Amir reviewed all field and laboratory material tesCng and field inspecCon related to the new asphalt pavement. Amir served as the Pavement Engineer for the project.. Amir served as Senior Pavement Engineer.
Pavement Engineer | Long Beach Airport LGB Taxiway D Rehabilitation| Long Beach| ConstrucCon Value: $16M |DuraCon on the Project: 11/19 – 12/20
The 2020 taxiway rehabilitaCon project consisted of the grinding of the exisCng asphalt concrete surfaces, performing necessary excavaCon and grading, installing pavement markings and striping, taxiway edge lighCng and signs, runway guard lights, and construcCng asphalt concrete pavement secCons P-401 and P-420 of Taxiway D. Twining provided laboratory and field quality assurance material tesCng and inspecCon. Amir reviewed all field and laboratory material tesCng and field inspecCon related to the new asphalt pavement. Amir served as the Pavement Engineer for the project..
Project Manager | 3rd Street Roadway and Infrastructure Improvements| San Bernardino| ConstrucCon Value:
$4M|DuraCon on the Project: 09/19 – 05/20
Twining performed pavement evaluaCon on approximately 4 lane miles of 3rd Street in the City of San Bernardino to recommend repair and rehabilitaCon strategies for the pavement at project level. Amir served as Senior Pavement Engineer coordinaCng the required tesCng and preparing the final recommendaCon and design. He coordinated the required tesCng and prepared the final recommendaCons and designs. Several alternaCve opCons were provided to the city including mill and overlay, Cold in-place recycling, reconstrucCon, and soil stabilizaCon. AddiConally, Twining and Amir were selected to perform quality control field density tesCng of soil and laboratory tesCng inspecCon of paving.
Project Manager | Municipal Urban Stormwater Treatment (MUST)| Long Beach| ConstrucCon Value: $44M |DuraCon on the Project: 07/22– 10/23
The project consists of improving the drainage faciliCes along the Los Angeles River and construcCng a treatment facility adjacent to the river. The project objecCve is to provide faciliCes that treat stormwater prior to its release into the Los Angeles River’s new managed wetland areas. The facility will be open to the public and serve as a marquis project with respect to improving the water quality in the river and the water that ulCmately drains to the ocean. Amir serves as project manager and pavement engineer. His role includes providing project management services, as well as geotechnical pavement evaluaCons to the City.
Agreements for Professional Services to perform As-Needed Professional C... Page 1336 of 2161 Appendix: Resumes | Page 59
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
Brandon Schroeder
HMA & JPCP Inspector
Brandon Schroeder brings over 18 years of industry experience to Twining. His experience encompasses all aspects of tes?ng and inspec?on with special emphasis in soils, asphalt, and concrete inspec?on. He has extensive experience serving on Caltrans projects and is in?mately familiar with Caltrans Test Methods, Green Book Standards, and various City and County requirements.
RELEVANT PROJECT EXPERIENCE
Infrastructure Inspector | Acrisure Arena Parking | Coachella Valley| ConstrucAon Value: $290M |DuraAon on the Project: 06/21 – 11/22
Acrisure Arena is a mul?-purpose indoor arena in the unincorporated community of Thousand Palms in Riverside County, California. The arena opened in December 2022 on
43.35 acres (17.54 ha) of land in the Coachella Valley near the city of Palm Desert, between Interstate 10 and the Classic Club golf course. It is the home arena for the American Hockey League's Coachella Valley Firebirds, and is a primary venue for events in the Greater Palm Springs Area. Brandon provided his services as a field inspector.
Infrastructure Inspector | Arrow Highway Pavement RehabilitaAon & UAliAes |City Of Upland| ConstrucAon Value: $12M |DuraAon on the Project: 10/22 – 05/23
The City of Upland is making improvements to Arrow Highway between Benson Avenue and San Antonio Avenue. Twining provided geotechnical evalua?on services. This included providing asphalt concrete pavement coring, iden?fica?on of subsurface condi?ons, geotechnical engineering recommenda?ons, and pavement structural design recommenda?ons. Brandon provided soils inspec?on
Infrastructure Inspector | Green Tree Blvd Extension | Victorville| ConstrucAon Value: $15M |DuraAon on the Project: 04/21 – 05/23
This mul?-million-dollar project in Victorville will extend Green Tree Boulevard to provide an addi?onal east-west route to Interstate 15 via the Yucca Loma Bridge. This involves the construc?on of approximately 1.5 miles of roadway and a 600-footlong bridge over two natural drainage courses and the BNSF Railroad. Twining is providing geotechnical engineering, pile driving inspec?on, source inspec?on laboratory tes?ng, and quality assurance materials tes?ng and inspec?on services of soils, asphalt, concrete, and CWI welding inspec?on. Brandon provided soils and concrete inspec?on Firm
Twining Inc
Years with Firm/Total
7/18
Educa5on
High School Diploma
Cer5fica5ons/Registra5ons
ACI, Cal Trans, ICC
Exper5se
Infrastructure
Benefits to the City of
Indio
• Brings years of
experience in QA/QC
Opera?ons
Agreements for Professional Services to perform As-Needed Professional C... Page 1337 of 2161 Appendix: Resumes | Page 60
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Bryan Dorsch
HMA & JPCP Inspector
Bryan Dorsch has over 8 years of inspection experience. His experience encompasses providing substantial asphalt, concrete, and soils inspection, along with a strong understanding of Caltrans specifications. Brian also has a background and training in Americans with Disabilities Act (ADA) ramp inspection and plan reading. As a multi-certified technician, Bryan can cover a variety of public works inspection scopes in a single site visit. This ability facilitates project continuity and cost-savings.
RELEVANT PROJECT EXPERIENCE
Infrastructure Inspector| SBCTA, SR 60/Central Avenue Interchange Improvement Project | Chino/ SBCTA | ConstrucHon Value: $36M|DuraHon on the Project:
March 2021 – October 2023
In an effort to improve traffic flow along Central Avenue and access to State Route (SR) 60, the SBCTA and the City of Chino, in cooperaEon with the Caltrans District 8, is in the process of widening the Central Avenue interchange at the SR 60 bridge to accommodate three through-lanes and double leJ-turn lanes in both direcEons and will widen the exisEng eastbound and westbound on-ramps to SR 60 from one lane to two through lanes and a carpool lane. Twining provided quality assurance. Our scope of work includes concrete, soils, and asphalt. Bryan is an approved SBCTA-inspector for this project and provided soils inspecEon and tesEng for this project.
Infrastructure Inspector | Town of Apple Valley, CM for Route 18 West End Widening Phase 1 | Apple Valley| ConstrucHon Value: $9.6M |DuraHon on the Project: May 2020 – November 2021 This City of Apple Valley $9.6 million project is widening Route 18 from four to six lanes. AddiEonally, the project will realign Apple Valley Road, reduce the slope approaching the intersecEon from the north, modify the drainage system, replace traffic signals, add sidewalks with ADA improvements and retaining walls in both direcEons of Highway 18. Twining provided public works quality assurance material tesEng as a subconsultant to the project’s construcEon manager. Bryan is an inspector, provided soils inspecEon and compacEon tesEng for this project.
Infrastructure | Santa Clarita Street Improvements | Santa Clarita| Construction Value: $6M |Duration on the Project: 11/21 – Current
The City’s annual overlay and slurry seal project is an integral part of its pavement management program. The project provides asphalt overlay, micro-surfacing, and slurry seal treatments in various areas of the city. For over a decade, the city has turned to Twining to provide quality assurance, perform construcEon inspecEons, and conduct field and laboratory tesEng. Bryan served as a field infrastructure inspector. .
Firm
Twining Inc
Years with Firm/Total
8/8
Educa5on
• High School Diploma
Cer5fica5ons/Registra5ons
• ACI, Cal Trans
Exper5se
• Infrastructure
Benefits to the City of
Indio
• Brings years of
experience in QA/QC
OperaEons
Agreements for Professional Services to perform As-Needed Professional C... Page 1338 of 2161 Appendix: Resumes | Page 61
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
Lee Bainer
Assistant QA Manager
Lee Bainer has over 21 years of technical exper6se in public works inspec6on and laboratory tes6ng. Lee is the firm’s Inland Empire Laboratory Manager overseeing all the laboratory’s tes6ng and repor6ng, including soils, concrete, asphalt, and steel. He has extensive ACI and Caltrans cer6fica6ons and manages laboratory personnel to complete all tests within alloHed 6me frames and keeps all records and proficiency samples up to date and completed as required. Lee also assists project managers to ensure dispatch, report distribu6on and budge6ng are completed.
RELEVANT PROJECT EXPERIENCE
Laboratory Manager| SBCTA, SR 60/Central Avenue Interchange Improvement Project | Chino/ SBCTA | ConstrucJon Value: $36M|DuraJon on the Project:
March 2021 – October 2023
In an effort to improve traffic flow along Central Avenue and access to State Route (SR) 60, the SBCTA and the City of Chino, in coopera6on with the Caltrans District 8, is in the process of widening the Central Avenue interchange at the SR 60 bridge to accommodate three through-lanes and double leX-turn lanes in both direc6ons and will widen the exis6ng eastbound and westbound on-ramps to SR 60 from one lane to two through lanes and a carpool lane. Twining provided quality assurance. Our scope of work includes concrete, soils, and asphalt. Lee was the laboratory manager for this project.
Assistant Project Manager | Green Tree Blvd Extension | Victorville| ConstrucJon Value: $15M |DuraJon on the Project: 04/21 – 05/23
This mul6-million-dollar project in Victorville will extend Green Tree Boulevard to provide an addi6onal east-west route to Interstate 15 via the Yucca Loma Bridge. This involves the construc6on of approximately 1.5 miles of roadway and a 600-footlong bridge over two natural drainage courses and the BNSF Railroad. Twining provided geotechnical engineering, pile driving inspec6on, source inspec6on laboratory tes6ng, and quality assurance materials tes6ng and inspec6on services of soils, asphalt, concrete, and CWI welding inspec6on. Lee served as the Assistant Project Manager. The City of Victorville’s Green Tree Extension was named the 2023 B.E.S.T. Transporta6on Project of the Year by the American Public Works Associa6on of Southern California
Laboratory Manager | Santa Clarita Street Improvements | Santa Clarita| Construction Value: $6M |Duration on the Project: 11/21 – Current
The City’s annual overlay and slurry seal project is an integral part of its pavement management program. The project provides asphalt overlay, micro-surfacing, and slurry seal treatments in various areas of the city. For over a decade, the city has turned to Twining to provide quality assurance, perform construc6on inspec6ons, and conduct field and laboratory tes6ng. Lee is serving as the laboratory manager.
Firm
Twining Inc.
Years with Firm/Total
4/21
Educa5on
• Long Beach City College –
General Educa6on
Cer6ficate
• Long Beach Polytechnic –
High School Diploma
Cer5fica5ons/Registra5ons
• ACI / ICC / Caltrans
Exper5se
• Material Tes6ng and
Inspec6ons
Benefits to the City of
Indio
• Brings years of field,
laboratory and
management skills to
every project.
Agreements for Professional Services to perform As-Needed Professional C... Page 1339 of 2161 Appendix: Resumes | Page 62
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Laboratory Manager | Arrow Highway Pavement RehabilitaJon & UJliJes |City Of Upland| ConstrucJon Value:
$12M |DuraJon on the Project: 10/22 – 05/23
The City of Upland is making improvements to Arrow Highway between Benson Avenue and San Antonio Avenue. Twining provided geotechnical evalua6on services. This included providing asphalt concrete pavement coring, iden6fica6on of subsurface condi6ons, geotechnical engineering recommenda6ons, and pavement structural design recommenda6ons. Lee served as the Laboratory manager.
Assistant Project Manager | Acrisure Arena Parking | Coachella Valley| ConstrucJon Value: $290M |DuraJon on the Project: 06/21 – 11/22
Acrisure Arena is a mul6-purpose indoor arena in the unincorporated community of Thousand Palms in Riverside County, California. The arena opened in December 2022 on 43.35 acres (17.54 ha) of land in the Coachella Valley near the city of Palm Desert, between Interstate 10 and the Classic Club golf course. It is the home arena for the American Hockey League's Coachella Valley Firebirds, and is a primary venue for events in the Greater Palm Springs Area. Lee served as the Assistant Project Manager for this project.
Laboratory Manager | Town of Apple Valley, CM for Route 18 West End Widening Phase 1 | Apple Valley| ConstrucJon Value: $9.6M |DuraJon on the Project: May 2020 – November 2021 This City of Apple Valley $9.6 million project is widening Route 18 from four to six lanes. Addi6onally, the project will realign Apple Valley Road, reduce the slope approaching the intersec6on from the north, modify the drainage system, replace traffic signals, add sidewalks with ADA improvements and retaining walls in both direc6ons of Highway 18. Twining is providing public works quality assurance material tes6ng as a subconsultant to the project’s construc6on manager. Lee Served as the Laboratory Manager for this project.
Agreements for Professional Services to perform As-Needed Professional C... Page 1340 of 2161 Appendix: Resumes | Page 63
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
Paul Soltis, PE, GE
Geotechnical Engineer
Paul Sol(s’ experience includes geotechnical inves(ga(ons and analyses rela(ve to the development of roadways, bridges, high-rise buildings, mixed-use facili(es, DSA- and HCAIpermiCed buildings, and other essen(al facili(es. Paul’s experience includes assuming the role as Geotechnical Engineer of Record during the construc(on phase of numerous highprofile projects throughout Southern California. He has extensive experience working under the jurisdic(on of the City of LA Department of Building and Safety, County of Los Angeles GMED, DSA, and HCAI, County of Riverside and the County of San Bernardino. Paul is responsible for the technical oversight of Twining’s geotechnical engineering projects and management of the firm’s geotechnical personnel.
RELEVANT PROJECT EXPERIENCE
Geotechnical Engineer | Safe Routes to School Infrastructure ImplementaBon | Twentynine Palms| ConstrucBon Value: $1.3M |DuraBon on the Project: 12/22 – 11/23
Paul served as Project Execu(ve for this project. The City’s goal was to install bike facili(es along parts of El Paseo Dr. and to widen the street along Two Mile Rd in the City Twentynine Palms. Twining provided asphalt concrete pavement coring, iden(fica(on of sub-surface condi(ons, geotechnical engineering recommenda(ons and pavement structural design recommenda(ons.
Geotechnical Engineer | Beach Boulevard Sewer Replacement | HunBngton Beach| ConstrucBon Value: $18M|DuraBon on the Project: 03/22 – 07/23 This project consisted of installa(on of a new sewer line and pavement replacement along Beach Boulevard in Hun(ngton Beach. The limits of the project extended between Ellis Avenue and Slater Avenue along Beach Boulevard. Twining performed the geotechnical explora(on consis(ng of several borings in Beach Boulevard. Twining provided geotechnical engineering recommenda(ons for design and construc(on of the sewer, including shoring, backfill, and new pavement recommenda(ons. Twining also provided materials tes(ng services during construc(on for this project. These services included field density tes(ng of soil, base, and asphalt, and laboratory tes(ng of soil materials. Paul served as the Geotechnical Engineer of Record for this project and provided a signed final report to the City upon comple(on of construc(on
Principal Geotechnical Engineer | Arrow Highway Pavement RehabilitaBon & UBliBes |City Of Upland| ConstrucBon Value: $12M |DuraBon on the Project:
10/22 – 05/23
The City of Upland is making improvements to Arrow Highway between Benson Avenue and San Antonio Avenue. Twining provided geotechnical evalua(on services. This included providing asphalt concrete pavement coring, iden(fica(on of sub-surface condi(ons, geotechnical engineering recommenda(ons, and pavement structural design recommenda(ons. Paul served as the Principal Geotechnical Engineer.
Firm
Twining Inc.
Years with Firm/Total
18/30
Educa5on
• MS, Geotechnical
Engineering, University of
Colorado, Boulder,
Colorado, 2000
• BS, Civil Engineering,
California Polytechnic
State University, San Luis
Obispo, California, 1993
Cer5fica5ons/Registra5ons
Professional Engineer, Civil,
CA 56140
Registered Geotechnical
Engineer, CA GE 2606
Exper5se
Geotechnical Engineering
Benefits to the City of
Indio
Paul Sol(s, PE, GE, brings
more than 31 years of
technical exper(se to
Twining. His experience
includes geotechnical
inves(ga(ons and
analyses rela(ve to roads,
bridges, highways, and
other California
infrastructure projects.
Paul has extensive on-call
contract management
experience and the
proven ability to
simultaneously maintain
and manage mul(ple
projects.
Agreements for Professional Services to perform As-Needed Professional C... Page 1341 of 2161 Appendix: Resumes | Page 64
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Sammy Daghighi, P.E.
QA Manager
Sammy Daghighi, PE, has over31 years of professional exper9se in civil engineering, geotechnical engineering, and construc9on management. His background includes extensive experience in construc9on quality assurance, quality control, and deep founda9on specialty engineering.
RELEVANT PROJECT EXPERIENCE
Project Manager | Green Tree Blvd Extension | Victorville| ConstrucCon Value:
$15M |DuraCon on the Project: 04/21 – 05/23
This mul9-million-dollar project in Victorville will extend Green Tree Boulevard to provide an addi9onal east-west route to Interstate 15 via the Yucca Loma Bridge. This involves the construc9on of approximately 1.5 miles of roadway and a 600-foot-long bridge over two natural drainage courses and the BNSF Railroad. Twining provided geotechnical engineering, pile driving inspec9on, source inspec9on laboratory tes9ng, and quality assurance materials tes9ng and inspec9on services of soils, asphalt, concrete, and CWI welding inspec9on.
Sammy served as the Project Manager. The City of Victorville’s Green Tree Extension was named the 2023 B.E.S.T. Transporta9on Project of the Year by the American Public Works Associa9on of Southern California
Project Manager| SR 60/Central Avenue Interchange Improvement Project | Chino/ SBCTA | ConstrucCon Value: $36M|DuraCon on the Project: March 2021 – October 2023
In an effort to improve traffic flow along Central Avenue and access to State Route (SR) 60, the SBCTA and the City of Chino, in coopera9on with the Caltrans District 8, is in the process of widening the Central Avenue interchange at the SR 60 bridge to accommodate three through-lanes and double le_-turn lanes in both direc9ons and will widen the exis9ng eastbound and westbound on-ramps to SR 60 from one lane to two through lanes and a carpool lane. Twining provided quality assurance. Our scope of work includes concrete, soils, and asphalt. Sammy was the Project Manager.
Project Manager | Eucalyptus Avenue Line Extension | Moreno Valley| ConstrucCon Value: $1M|DuraCon on the Project: 05/21 – 02/22 This project features the construc9on of the Eucalyptus Avenue Line Extension project, which will extend the City’s electrical distribu9on along Eucalyptus Avenue from Day Street to Memorial Way and Memorial Way from Eucalyptus Avenue to 283 north of Eucalyptus Avenue. Twining provided materials tes9ng and geotechnical observa9on services. Sammy served as the Project Manager.
Firm
Twining
Years with Firm/Total
5/30
Educa5on
• Bachelor of Science, Civil
Engineering, Azad
University, Iran
Cer5fica5ons/Registra5ons
• Registered Civil Engineer,
California PE 80840
Exper5se
• civil engineering
• construc9on
management
Benefits to the City of
Indio
• Sammy has worked on
a broad range project
types from K-12 and
community colleges to
public works and
infrastructure projects
for agencies such as
municipal water
systems, bridges,
roadways and ports,
built to a wide range of
specifica9ons including
FHWA, USACE,
Caltrans, and DSA.
Agreements for Professional Services to perform As-Needed Professional C... Page 1342 of 2161 Appendix: Resumes | Page 65
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Project Manager | S1 Wastewater Treatment Plant | Rialto Water Services| ConstrucCon Value: $41M|DuraCon on the Project: 10/19 – 03/21
The project consists of the design-build construc9on of a cugng-edge wastewater treatment plant (WWTP) to service the City’s residents and the surrounding area. The new WWTP will replace Rialto’s four exis9ng treatment facili9es and consolidate their services into the S1 plant. Twining provided quality control services including material tes9ng and special inspec9ons. Sammy served as the project manager.
Project Manager | Riverside, Parking Structure 1| UCR| ConstrucCon Value: $20M |DuraCon on the Project:
05/20 – 09/22
The project consists of the new construc9on of a four-level, semi-subterranean, 1,079 stall, 348,726-square-foot parking structure. It incorporates a retaining wall with the en9rety of the structure supported by the proprietary Geopier, rammed aggregate pier founda9on system and reinforced concrete foo9ngs, grade beams and structural slab. Twining provided TIO services, including quality control services for reinforced masonry, soils, reinforced concrete, prestressed concrete, field visual and non-destruct structural steel/welding tes9ng, and epoxy anchors and pull tes9ng. Twining provides material tes9ng and inspec9on services. Sammy served as the Project Manager.
Project Manager | Town of Apple Valley, CM for Route 18 West End Widening Phase 1 | Apple Valley| ConstrucCon Value: $9.6M |DuraCon on the Project: May 2020 – November 2021 This $9.6 million City of Apple Valley project widens Route 18 from four to six lanes. Addi9onally, the project will realign Apple Valley Road, reduce the slope approaching the intersec9on from the north, modify the drainage system, replace traffic signals, add sidewalks with ADA improvements, and erect retaining walls in both direc9ons of Highway 18. Twining provided public works quality assurance material tes9ng as a sub-consultant to the project’s construc9on manager. Sammy served as the Project Manager.
Project Manager | Acrisure Arena Parking | Coachella Valley| ConstrucCon Value: $290M |DuraCon on the Project: 06/21 – 11/22
Acrisure Arena is a mul9-purpose indoor arena in the unincorporated community of Thousand Palms in Riverside County, California. The arena opened in December 2022 on 43.35 acres (17.54 ha) of land in the Coachella Valley near the city of Palm Desert, between Interstate 10 and the Classic Club golf course. It is the home arena for the American Hockey League's Coachella Valley Firebirds and is a primary venue for events in the Greater Palm Springs Area. Sammy served as the Project Manager for this project.
Agreements for Professional Services to perform As-Needed Professional C... Page 1343 of 2161 Appendix: Resumes | Page 66
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Shawn Snowdale
HMA & JPCP Inspector
Shawn Snowdale brings more than 9 years of technical experience to Twining. He specializes in asphalt, concrete, and soil inspection and testing. His experience encompasses significate horizontal construction on Caltrans and local roadways, grade separations, runways, heavy rail, light rail, bridges, and ports. He has also performed field work for grading and other quality control/quality assurance activities on DSA projects, parking structures, hotels, and office vertical construction.
RELEVANT PROJECT EXPERIENCE
Infrastructure Inspector | Green Tree Blvd Extension | Victorville| ConstrucBon Value: $15M |DuraBon on the Project: 04/21 – 05/23
This mul)-million-dollar project in Victorville will extend Green Tree Boulevard to provide an addi)onal east-west route to Interstate 15 via the Yucca Loma Bridge. This involves the construc)on of approximately 1.5 miles of roadway and a 600-foot-long bridge over two natural drainage courses and the BNSF Railroad. Twining i provided geotechnical engineering, pile driving inspec)on, source inspec)on laboratory tes)ng, and quality assurance materials tes)ng and inspec)on services of soils, asphalt, concrete, and CWI welding inspec)on. Shawn served as field inspector.
Infrastructure Inspector | SBCTA, SR 60/Central Avenue Interchange Improvement Project | Chino/ SBCTA | ConstrucBon Value: $36M|DuraBon on the Project: March 2021 – October 2023
In an effort to improve traffic flow along Central Avenue and access to State Route (SR) 60, the SBCTA and the City of Chino, in coopera)on with the Caltrans District 8, is in the process of widening the Central Avenue interchange at the SR 60 bridge to accommodate three through-lanes and double leX-turn lanes in both direc)ons and will widen the exis)ng eastbound and westbound on-ramps to SR 60 from one lane to two through lanes and a carpool lane. Twining provided quality assurance. Brando provided soils inspec)on.
Project Manager | Acrisure Arena Parking | Coachella Valley| ConstrucBon Value: $290M |DuraBon on the Project: 06/21 – 11/22
Acrisure Arena is a mul)-purpose indoor arena in the unincorporated community of Thousand Palms in Riverside County, California. The arena opened in December 2022 on
43.35 acres (17.54 ha) of land in the Coachella Valley near the city of Palm Desert, between Interstate 10 and the Classic Club golf course. It is the home arena for the American Hockey League's Coachella Valley Firebirds, and is a primary venue for events in the Greater Palm Springs Area. Shawn provided asphalt and soils inspec)on Firm
Twining Inc
Years with Firm/Total
9/12
Educa5on
• AA Business
• High School Diploma
Cer5fica5ons/Registra5ons
• ICC, Cal Trans, ACI
Exper5se
• Infrastructure
Benefits to the City of Indio
• Brings years of experience
in QA/QC Opera)ons
Agreements for Professional Services to perform As-Needed Professional C... Page 1344 of 2161 Appendix: Resumes | Page 67
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
T.Y. Lin International
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1345 of 2161 Appendix: Resumes | Page 68
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Abigail Manriquez
Office Engineer
Abigail Manriquez is a dynamic profession with a unique blend of exper;se in engineering and business administra;on that has consistently demonstrated a remarkable ability to excel in diverse roles. With a passion for innova;on and a relentless pursuit of excellence, Abigail has carved a dis;nguished career path leaving a las;ng impact on the projects she has undertaken.
RELEVANT PROJECT EXPERIENCE
OFFICE ENGINEER | Dune Palms Road Bridge Improvement, La Quinta, CA | City of La Quinta| ConstrucHon Value: $21M |DuraHon on the Project: 11/2022 – Ongoing
The Dune Palms Road Bridge Improvement Project is an extensive infrastructure undertaking that involves replacing an exis;ng low water crossing with a 480-foot long, 4- span, cast-in-place, pre-stressed concrete box girder bridge. This remarkable bridge, spanning over a vital waterway, will be 86 feet wide to accommodate four lanes of traffic, sidewalks, shoulders, and a raised median. The project is divided into two stages to keep Dune Palms Road open, with a closure pour planned later to connect the two bridge sec;ons seamlessly. In addi;on to the bridge construc;on, the project includes various ancillary works such as the construc;on and removal of a bypass road, water main and sewer reloca;ons, storm drain lines, catch basins, dry wells, channel slope paving, roadway improvements, sidewalks, driveways, curb and guNer, retaining walls, as well as the demoli;on of two mobile homes and one abandoned house with asbestos removal.
As an Office Engineer, Abigail plays a cri;cal role in inspec;ng construc;on procedures, ensuring adherence to contract specifica;ons, coordina;ng stakeholders, managing project documenta;on, assis;ng in the submiNal review process, preparing change orders, and me;culously tracking material inspec;on, cer;fica;on, and acceptance. Her exper;se and coordina;on are instrumental in delivering a successful project that enhances infrastructure and facilitates safer transporta;on for the community.
OFFICE ENGINEER | Citracado Parkway Extension, Escondido, CA | City of Escondido| ConstrucHon Value: $30M|on the Project: 11/2022 – 01/2023 The Citracado Parkway Extension Project encompasses the extension of the parkway by approximately 2,100 feet, providing four lanes of travel on an elevated roadbed. A significant aspect of the project involves the construc;on of a 260-foot two-span, cast-inplace, pre-stressed concrete box girder structure supported by a pier adjacent to the Escondido creek. Addi;onally, the project includes the construc;on of a 185-foot soil nail wall and 4,200 feet of sound wall, supported on CIDH foo;ngs. Exis;ng roadway sec;ons will be improved by reducing the median from 35 feet to 14 feet, resul;ng in a four-lane roadway, and the installa;on of two new signalized intersec;ons. Adjacent surface streets and sidewalks will also undergo improvements.
As an Office Engineer, Abigail assisted in the submiNal review process and me;culously track material inspec;on, cer;fica;on, and acceptance, contribu;ng to the project's smooth execu;on and adherence to quality standards. She also managed project submiNals, RFIs, material test reports, and correspondence.
Firm
TYLin Interna;onal
Years with Firm/Total
2/3
Educa5on
• MBA Management,
California State University,
San Bernadino
• BS, Structural Engineering,
University of California,
San Diego
Cer5fica5ons/Registra5ons
• OSHA 30-Hour
Construc;on Safety &
Health, #21-602048238
• Competent Person for
Trench & Excava;on,
28649372
• eRailSafe Cer;fied,
#1043259
Professional Associa5ons
• APWA Coachella Valley
Exper5se
• Office Engineering
• Construc;on Inspec;on
Benefits to the City of Indio
• Lives in Coachella, close
to project loca;ons
• Former heavy/civil
contractor employee
Agreements for Professional Services to perform As-Needed Professional C... Page 1346 of 2161 Appendix: Resumes | Page 69
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
CONTRACTOR PROJECT ENGINEER | Jurupa Grade SeparaHon, Riverside County, CA | County of Riverside| ConstrucHon Value: $64M|DuraHon on the Project: 07/2021 – 11/2022 The Jurupa Road Grade Separa;on Project aims to construct a new grade separa;on to replace the exis;ng Union Pacific Railroad (UPRR) at-grade crossing on Jurupa Road, just east of Van Buren Boulevard. Jurupa Road serves as a crucial four-lane arterial highway, providing access to various commercial, industrial, and residen;al areas. The project entails the construc;on of an underpass that will grade separate Jurupa Road and the UPRR mainline tracks.
As one of the Contractor’s Project Engineer, Abigail assisted the Project Manager and Project Superintendent in implemen;ng effec;ve job controls to ensure compliance with the contract, budget, schedule, forecas;ng, and job cos;ng. She played a vital role in interpre;ng design drawings, ensuring adherence to specifica;ons during the installa;on process, and developing comprehensive work plans. Addi;onally, Abigail contributed to the project's success by preparing essen;al job data, including accurate es;mates of take-offs, material price lists, labor costs, and equipment requirements. Her exper;se in documenta;on control and database management facilitates efficient project tracking, ensuring seamless communica;on and the ;mely comple;on of project ac;vi;es.
Agreements for Professional Services to perform As-Needed Professional C... Page 1347 of 2161 Appendix: Resumes | Page 70
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Curtis Musashi, EIT
Construc)on Inspector
Mr. Cur's Musashi has 10 years of experience in the construc'on industry. His responsibili'es have included construc'on inspec'on, crea'ng daily diaries, photo documenta'on of work performed, reviewing concrete mix designs, office engineering, quan'ty take-offs, monthly progress es'mates, responses to RFIs, and budget tracking.
Mr. Musashi is well-versed in all aspects of construc'on contract administra'on as prac'ced by Caltrans and is familiar with Caltrans specifica'ons and standard plans. He also is proficient in numerous soIware including HCSS HeavyJob, PlanGrid, JD Edwards EnterpriseOne, and BlueBeam.
RELEVANT PROJECT EXPERIENCE
CONSTRUCTION INSPECTOR | Jackson Street Bridge over the Coachella Valley Stormwater Channel (Whitewater River) | City of Indio| ConstrucJon Value:
$2.5M |DuraJon on the Project: 02/2020 – 03/2021 The project added cast-indrilled-hole piles to the exis3ng abutments, bolstered the exis3ng abutments, installed steel column casings for the exis3ng piers.
Responsibili'es also included daily reports for manpower and verifying daily 'me & materials (T&M) sheets, conformance with project specifica'ons, environmental conformance, progress pay es'mate, safety, and SWPPP elements.
CONTRACTOR ASSISTANT PROJECT ENGINEER | Madison Street Canal Improvement | City of Indio| ConstrucJon Value: $3.3M |07/2016 – 03/2017 The Madison Street Canal Improvements is part of a mul'-phase plan to widen Madison Street to accommodate growth in the area. This phase of the project included reloca'on of irriga'on laterals and sewer force main and construc'on of a temporary diversion channel to allow for the construc'on of a double box culvert that accommodated the widening of Madison Street at Avenue 50. Contractor Assistant Project Engineer responsible for monitoring safety, progress, and quality of the project, providing construc'on schedules, suppor'ng Project Engineer with submiZals, RFIs, daily materials tracking, CCOs and budget.
CONTRACTOR ASSISTANT PROJECT ENGINEER | Andrew Jackson Elementary Pedestrian Improvements | City of Indio| ConstrucJon Value: $2.3M |11/2017 – 04/2019 The mul3-faceted project improved the community surrounding Andrew Jackson Elementary School by adding sidewalks on the local streets within a 0.5 mile of the school and by encouraging the students to walk to school and make safer routes for pedestrians. The project included the construc3on of sidewalk along several streets within the City of Indio. The general items of work included clearing and grubbing; construc3ng sidewalk, driveways, and curb ramps; installing modified crosswalks with concrete bulb-outs, surveying, signing and striping, asphalt paving, landscaping and irriga3on, fence work, tree removal and speed feedback signs. All concrete improvements were constructed to current Americans with Disabili3es Act (ADA) standards. Contractor Assistant Project Engineer responsible for monitoring safety, progress, and quality of the project, providing construc3on schedules, suppor3ng Project Engineer with submiNals, RFIs, daily materials tracking, CCOs and budget.
Firm
TYLin Interna'onal
Years with Firm/Total
6/11
Educa5on
• BS, Civil Engineering,
California Polytechnic State
University, San Luis Obispo,
2013
Cer5fica5ons/Registra5ons
• Engineer-in-Training,
California #148903
• OSHA 30-Hour Training
Professional Associa5ons
• ASCE, Associate Member,
No. 926089
Exper5se
• Construc'on Engineering
• Construc'on Inspec'on
Benefits to the City of Indio
• Worked on mul'ple
projects for the City of
Indio
• Worked on mul'ple
projects in Coachella
Valley
• Former heavy/civil
contractor engineer
Agreements for Professional Services to perform As-Needed Professional C... Page 1348 of 2161 Appendix: Resumes | Page 71
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
CONSTRUCTION INSPECTOR | Jackson Street Bridge over the Coachella Valley Stormwater Channel (Whitewater River) | City of Indio | ConstrucJon Value $2.5M | 02/2020 - 03/2021 Project included retrofihng the exis'ng bridge by strengthening both abutments and installing full length column casings at each column. Project required coordina'ng with CVWD to gain access to the Coachella Valley Stormwater Channel. Responsibili'es included daily reports for manpower and verifying daily 'me & materials (T&M) sheets, conformance with project specifica'ons, environmental conformance, progress pay es'mate, safety, and SWPPP elements. The project added cast-in-drilled-hole piles to the exis'ng abutments, bolstered the exis'ng abutments, installed steel column casings for the exis'ng piers.
CONSTRUCTION INSPECTOR | Channel Lining and Earthquake Retrofit of Bridge, Eastbound and Westbound Bridge across Coachella Valley Stormwater Channel at Indio Boulevard | City of Indio| ConstrucJon Value:
$3.7M |DuraJon on the Project: 01/2022 – 10/2022 The project included installing pile shaR casings at twelve piers, isola3on casing at one pier, hinge retrofits with pipe and cable restrainers, pile founda3on retrofits with grade beams at twelve piers, removing and restoring slope paving, and installing channel lining. The specific scope of work for the Eastbound Bridge, includes installing channel lining. Responsibili3es included daily reports for manpower and verifying daily 3me & materials (T&M) sheets, conformance with project specifica3ons, environmental conformance, progress pay es3mate, safety, SWPPP elements, and change order nego3a3ons and draRing.
SUBMITTAL REVIEWER | Jurupa Road Grade SeparaJon | Riverside County TransportaJon Department (RCTD)| ConstrucJon Value: $100M |DuraJon on the Project: 08/2021 – ongoing Railroad grade separa3on of the exis3ng UPRR line at the crossing of Jurupa Road. The depression of Jurupa Road under the exis3ng UPRR Mainline will result in lowering Felspar Street to the east of Jurupa Road. The project also involves the construc3on of a roadway bridge for Van Buren Boulevard, a railroad bridge for UPRR tracks, a temporary railroad shoofly, temporary shoring systems, retaining walls, storm drainage system, pump sta3on, landscaping, roadway improvements, traffic signals, street ligh3ng, and u3lity reloca3ons along with associated removals and protec3on of exis3ng facili3es. Responsibili3es included RFI reviews, submiNal reviews, and independent cost es3mates for poten3al change orders.
RESIDENT ENGINEER/ CONSTRUCTION INSPECTOR | Box Canyon Road Emergency Repair | Riverside County TransportaJon Department| ConstrucJon Value: $3M |DuraJon on the Project: 03/2019 – 05/2019 This $3 million emergency roadway repair job on an 8-mile stretch of Box Canyon Road included demolishing washed-out roadway, removing unsuitable material, placing subgrade, grading, paving and striping. Responsible for daily reports for manpower and verifying daily 'me & materials (T&M) sheets, conformance with project specifica'ons, safety, and SWPPP elements.
CONSTRUCTION INSPECTOR | Avenue 70 Bridge Emergency Repair, North Shore, CA | Riverside County TransportaJon Department| ConstrucJon Value: $700,000 |DuraJon on the Project: 04/2019 – 07/2019 This $700,000 emergency bridge/roadway repair project over the CVWD wasteway included repairing/for'fying exposed founda'on piles, replacing washed-out embankment and concrete channel, and paving approaches.
Responsible for daily reports of manpower, preparing monthly quan'ty sheets for es'mates, prevailing wage monitoring/labor compliance enforcement, ensuring conformance with project specifica'ons, reviewing change order requests, safety, and SWPPP elements.
CONSTRUCTION INSPECTOR | I-215/Scoe Road Interchange Improvements, Menifee, CA | Riverside County TransportaJon Department| ConstrucJon Value: $32.5M |DuraJon on the Project: 11/2018 – 12/2020 The project included construc'on of a new two-span, cast-in-place post-tensioned concrete box girder bridge on CIDH piles, construc'on of retaining walls, box culverts and demoli'on of the exis'ng bridge crossing over the 215 freeway.
Mr. Musashi was responsible for daily quality assurance inspec'ons reviewing conformance to project plans and specifica'ons, enforcing approved contractor submiZals and shop drawings, and comple'ng project closeout documents for Caltrans. He prepared daily reports documen'ng contractor manpower and produc'on and monthly quan'ty sheets awarding contractor payment for completed work. Addi'onally, Mr. Musashi monitored traffic control, SWPPP elements, and overall project safety for conformance to project requirements.
Agreements for Professional Services to perform As-Needed Professional C... Page 1349 of 2161 Appendix: Resumes | Page 72
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
VCS Environmental
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1350 of 2161 Appendix: Resumes | Page 73
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Julie Beeman
Project Manager
Julie Vandermost Beeman is President and founder of Vandermost Consul4ng Services, Inc., doing business as VCS Environmental, a full-service environmental firm headquartered in San Juan Capistrano. VCS was founded in 1996 and specializes in CEQA/NEPA, biology, regulatory, and cultural services services. Julie leads a 28-member team that serves private sector and public agencies throughout Southern California. VCS focuses on infrastructure projects with an emphasis on transporta4on as well as commercial, industrial and residen4al projects across Southern California.
RELEVANT PROJECT EXPERIENCE
PROJECT OVERSIGHT | Indio HSIP Cycle 9 Project [HSIPL-5275(036)] | City of Indio Public Works Department | ConstrucTon Value: $1,402,200 | DuraTon on the Project: 01/2021 – 06/2021
The purpose of the project was to make improvements to the City’s transporta4on infrastructure to meet the City’s mobility needs and to address severe traffic conges4on at the I-15 intersec4on. The proposed improvements at the project intersec4ons included the addi4on of dilemma zone detec4on systems to all approaches as well as replacement of outdated controller and controller equipment. These improvements were funded through the HSIP and were subject to Caltrans Local Assistance requirements (Caltrans District 8). Julie oversaw the prepara4on of the Preliminary Environmental Study (PES) Form and Categorical Exemp4on (CE) in order to obtain environmental clearance for the HSIP Cycle 9 Project.
PROJECT OVERSIGHT | Palm Springs SignalizaTon Project [HSIP7-08-015] | City of Palm Springs Department of Public Works| $3,325,200 | DuraTon on the Project: 05/2017 – 12/2018
This project proposed to modify 19 exis4ng signalized intersec4ons in the City of Palm Springs to upgrade exis4ng traffic control devices, improve signal visibility, install advance dilemma zone detectors, and reconstruct exis4ng Americans with Disabili4es Act (ADA) noncompliant curbs. Julie oversaw the prepara4on of the Preliminary Environmental Study (PES) Form and Categorical Exemp4on (CE) in order to obtain environmental clearance for the HSIP Cycle 7 Project.
Firm
VCS Environmental
Years with Firm/Total
27/34
Educa5on
• B.A., Sociology, Minor in
Criminal Jus4ce, California
State University, Fullerton
Professional Associa5ons
• Associa4on of
Environmental Professionals
• Associa4on of State
Wetlands Managers
• Building Industry
Associa4on
• Ecological
Restora4on Business
Associa4on (Mi4ga4on
Banking)
• Women
Transporta4on Seminar (WTS)
Exper5se
• Caltrans Local
Assistance
• Caltrans Standard
Environmental Reference
• Caltrans District 8
Transporta4on Projects as
SBCTA lead as well as local
assistance projects
Benefits to the City of Indio
• 13 years of experience
working with Caltrans
District 8 on behalf of
SBCTA
• Coachella Valley experience
Agreements for Professional Services to perform As-Needed Professional C... Page 1351 of 2161 Appendix: Resumes | Page 74
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
PROJECT MANAGER | SBCTA On-Call | San Bernardino County TransportaTon Authority (SBCTA) | ConstrucTon Value: $9M | DuraTon on the Project: 01/2009 – Ongoing
VCS is in its third five-year contract to provide staffing services on an as-needed basis for major transporta4on projects throughout San Bernardino County. VCS has assisted with dozens of projects. Highlights include:
I-15 EXPRESS LANES | SAN BERNARDINO COUNTY, CA
Julie oversaw the environmental team for the I-15 Express Lanes Project. This 15-mile project adds an express lane from the Riverside County line to the SR-210 Freeway. The project qualified for an Ini4al Study/Mi4gated Nega4ve Declara4on/Environmental Assessment. The project impacts San Bernardino County kangaroo rat and two State endangered plants, as well as waters of the U.S. and State, requiring permits from the State and Federal wildlife agencies.
I-10 EXPRESS LANES | DEVORE, CA
Julie oversaw the environmental documenta4on and permieng for the 33-mile, $1.8 Billion I-10 Express Lanes Project. This project required an Environmental Impact Report/Environmental Impact Statement. The project impacted the Delhi Sands Flower Loving Fly, requiring a Federal permit from the U.S. Fish & Wildlife Service (USFWS), as well as waters permits from State and Federal agencies. It also required extensive outreach as the first express lane in the County.
I-15/I-215 “DEVORE” INTERCHANGE | SAN BERNARDINO, CA
The I-15/I-215 Devore Interchange was one of SBCTA’s priority projects and had an immovable schedule for funding. The project included the addi4on of truck by-pass lanes as well as the re-construc4on of Cajon Boulevard (Route 66). Julie managed the environmental tasks for this project. In addi4on to managing the comple4on of the CEQA/NEPA document, VCS was asked to assist Caltrans in securing regulatory permits. The project impacted over 50 drainages, over 20 acres of San Bernardino Kangaroo Rat habitat, and Route 66, a cultural resource. Julie was instrumental in advising the project team on avoidance measures as well as project permieng strategy in order to advance the project to Design-Build.
MEASURE I MASTER REGULATORY INVENTORY | SAN BERNARDINO, CA Measure I is the half-cent sales tax for transporta4on projects in San Bernardino. VCS prepared biological and environmental inventories of over 40 Measure I projects including freeway widening, interchanges and grade separa4ons planned over the next 40 years. Julie worked with SBCTA staff to iden4fy the methodology to define design footprints in order to evaluate the projects. VCS prepared a comprehensive report to help SBCTA and Caltrans iden4fy key environmental/biological issues early in the project phase to minimize impacts and avoid costly redesign expenses.
SANTA FE DEPOT | SAN BERNARDINO, CA
Julie successfully identified a strategy to respond to a rejection by the State Historic Preservation Office regarding SBCTA’s request to repair and repaint the historic Santa Fe Depot, which houses their office. A revised plan was prepared by a consultant team led by VCS and received approval by SHPO. The repairs have now been completed.
PROJECT MANAGER | I-15 Express Lanes | Riverside County TransportaTon Commission (RCTC) | ConstrucTon Value: $550-650M | DuraTon on the Project: 06/2017 – 06/2019 The project included construc4on of Express Lanes in each direc4on on I-15 in Riverside County, approximately 14.6 miles, through the ci4es of Corona, Norco, Eastvale, and Jurupa Valley, and por4ons of unincorporated Riverside County, California.
VCS assisted the Design Build team with biological and cultural surveying of the I-15 Express Lanes project, including prepara4on of a Burrowing Owl Management Plan, Habitat Mi4ga4on and Monitoring Plan, Nes4ng Bird Management Plan, Wildlife Corridor Management Plan, compliance with the regulatory permits and Environmental Commitments Record and resource agency coordina4on. VCS conducted nes4ng bird surveys and burrowing owl surveys for the roadway project. Julie was the Project Manager.
Agreements for Professional Services to perform As-Needed Professional C... Page 1352 of 2161 Appendix: Resumes | Page 75
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
Wade Caffrey
Biological Resources/Regulatory Permi3ng Lead
Wade Caffrey is the Vice President of VCS Environmental. Wade oversees the Biological Resources and Regulatory Permi>ng Departments. Wade manages the biological surveys, biological technical reports, regulatory permi>ng, and habitat miCgaCon work at VCS. His field work includes monitoring miCgaCon sites and conducCng biological surveys and assessments of onsite resources, such as special status species, jurisdicConal waters, and other sensiCve resources. Wade manages the preparaCon of biological reports and planning documents such as Habitat MiCgaCon and Monitoring Plans (HMMPs), MiCgaCon Monitoring Reports (MMRs), California Rapid Assessment Method (CRAM) analysis reports, CEQA, species survey reports, jurisdicConal delineaCons, and habitat conservaCon plan compliance documents. Wade has extensive experCse in regulatory services, such as the preparaCon of United States Army Corps of Engineers (USACE) SecCon 404 Permits, United States Fish and Wildlife Service SecCon 7 and SecCon 10 permits, California Department of Fish and Wildlife (CDFW) SecCon 1602 Streambed AlteraCon Agreements, and Regional Water Quality Control Board (RWQCB) SecCon 401 Water Quality CerCficaCons and Waste Discharge Requirements. Wade plays a key role in coordinaCng with regulatory agencies to secure permits and meet permit compliance requirements.
RELEVANT PROJECT EXPERIENCE
BIOLOGICAL RESOURCES/REGULATORY PERMITTING LEAD | SBCTA On-Call | San Bernardino County TransportaFon Authority (SBCTA) | ConstrucFon Value: $9M | DuraFon on the Project: 01/2009 – Ongoing
VCS is in its third five-year contract to provide staffing services on an as-needed basis for major transportaCon projects throughout San Bernardino County. Highlights include:
I-15/I-215 DEVORE INTERCHANGE | SBCTA | DEVORE, CA
The I-15/I-215 Devore Interchange Improvements Project added truck bypass lanes and travel lanes to one of the most heavily used goods-movement interchanges in the western United States. Wade processed the U.S. Army Corps of Engineers (USACE) 404 Permit, Regional Water Quality Control Board (RWQCB) 401 Permit, and California Department of Fish and Wildlife (CDFW) 1600 Agreement for over 60 drainages.
I-215 HIGH OCCUPANCY VEHICLE LANE (HOV) | SBCTA | GRAND
TERRACE/COLTON, CA
The I-215 HOV Gap Closure Project is located in San Bernardino between the Riverside County line and 2nd Street. The project impacted mulCple drainages.
Wade processed the U.S. Army Corps of Engineers (USACE) SecCon 404 NaConwide Permit, California Department of Fish and Wildlife (CDFW) SecCon 1602 Streambed AlteraCon Agreement and Regional Water Quality Control Board (RWQCB) SecCon 401 Water Quality CerCficaCon for this 7.5-mile project. The project included the crossing of the Santa Ana River and 19 addiConal drainages. Wade also coordinated with the regulatory agencies, Caltrans, and San Bernardino County TransportaCon Authority (SBCTA) to obtain the final permits.
Firm
VCS Environmental
Years with Firm/Total
12/14
EducaLon
• B.S. Biology, San Diego State
University, San Diego, CA
CerLficaLons/RegistraLons
• Crotch Bumble Bee Training
with Ken Osborne, August
2023
• SEATAC CerCfied Biologist,
August 2022
• CRAM CerCfied, 2013
• Wetland Training InsCtute
CerCfied, July 2011
Professional AssociaLons
• AssociaCon of
Environmental Professionals
ExperLse
• Senior Biological monitor
familiar with Habitat
ConservaCon Plans
• Experienced regulatory
permi>ng specialist
Benefits to the City of Indio
• Common sense approach
to compliance with
biological & regulatory
requirements
Agreements for Professional Services to perform As-Needed Professional C... Page 1353 of 2161 Appendix: Resumes | Page 76
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
NEWPORT AVENUE BRIDGE | SBCTA | GRAND TERRACE, CA
The project included demoliCon and reconstrucCon of the Newport Avenue Overcrossing Bridge. The reconstructed Newport Avenue Overcrossing Bridge is approximately 51 feet wide and consists of two 12-foot wide vehicle lanes, standard 6-foot shoulders, and 6-foot sidewalks in each direcCon. Wade prepared the U.S. Army Corps of Engineers (USACE) SecCon 404 NaConwide Permit, California Department of Fish and Wildlife (CDFW) SecCon 1602 Streambed AlteraCon Agreement and Regional Water Quality Control Board (RWQCB) SecCon 401 Water Quality CerCficaCon for the Newport Avenue reconstrucCon over the I-215. His responsibiliCes included coordinaCng with the regulatory agencies, Caltrans, and San Bernardino County TransportaCon Authority (SBCTA).
US-395 WIDENING PROJECT | ADELANTO, CA
The US-395 Widening Project consisted of widening the existing US-395 facility from one to two lanes, provided two-way left turn lanes and standardized shoulders along a 5.5-mile stretch of the highway in Adelanto, San Bernardino County.
Caltrans proposed to widen the existing roadbed of US-395 in western San Bernardino County, along a 17.7-mile section, to accommodate the addition of one standard lane in each direction, a median, and standardize the shoulders. Wade conducted pre-construction nesting bird and burrowing owl surveys and assisted with permit compliance.
BIOLOGICAL RESOURCES LEAD | Trabuco/Remington Traffic Signal CIP No. 331802 | City of Irvine | ConstrucFon Value: $2,875,000 | DuraFon on the Project: 01/2018 – 12/2019 The project involved installation of a signal at a previously unsignalized intersection, roadway and intersection improvements, ADA upgrades, streetlight system modifications, traffic striping and signage modifications, landscaping and irrigation modifications, utility coordination and mapping and Orange County Flood Control channel improvements and modifications.
The City of Irvine project was a Caltrans Local Assistance Project.
Wade prepared the jurisdicConal delineaCon and biological technical report. He also prepared and processed a Regional Water Quality Control Board (RWQCB) 401 Permit, U.S. Army Corps of Engineers (USACE) 404 Permit, and California Department of Fish and Wildlife (CDFW) 1600 Agreement. Wade also assisted with permit compliance by facilitaCng the purchase of miCgaCon credits from a miCgaCon bank.
BIOLOGICAL RESOURCES/REGULATORY PERMITTING | Jurupa Road Grade SeparaFon Project | Riverside County TransportaFon Department (RCTD) | ConstrucFon Value: $27,500,000 | DuraFon on the Project: 03/2018 – 10/2023
The Riverside County TransportaCon Department (RCTD) in cooperaCon with the City of Jurupa Valley and the Riverside County TransportaCon Commission (RCTC) desire to construct a new grade separaCon to replace the exisCng Union Pacific Railroad (UPRR) at grade crossing located on Jurupa Road in the City of Jurupa Valley, just east of Van Buren Boulevard.
As a subconsultant to HNTB, Wade conducted a JurisdicConal DelineaCon to determine impacts to waters of the State and waters of the U.S. Wade also prepared and processed a Regional Water Quality Control Board (RWQCB) 401 Permit, U.S. Army Corps of Engineers (USACE) 404 Permit, and California Department of Fish and Wildlife (CDFW) 1600 Agreement. He assisted with the preparaCon and processing of a Western Riverside MulCple Species Habitat ConservaCon Plan Consistency Analysis, Consistency DeterminaCon, and DeterminaCon of Biologically Equivalent or Superior PreservaCon. When the project footprint expanded, he assisted in reauthorizing and amending the permits and biological reports, including focus surveys for burrowing owl and least Bell’s vireo.
Agreements for Professional Services to perform As-Needed Professional C... Page 1354 of 2161 Appendix: Resumes | Page 77
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
City of Indio
Patrick Maxon, M.A., RPA
Cultural Resources Lead
Patrick Maxon is a Registered Professional Archaeologist (RPA) who meets the Secretary of Interior’s standards for historic preserva@on programs for archaeology and is cer@fied as an archaeologist by the Coun@es of Riverside and Orange. Patrick has 30 years of experience in all aspects of cultural resources management, including prehistoric and historic archaeology, paleontology, ethnography, and tribal consulta@on. He has exper@se in compliance with CEQA and NEPA, the Na@onal Historic Preserva@on Act (NHPA), the Archaeological Resources Protec@on Act, and the Clean Water Act, among others. Patrick has completed hundreds of cultural resources projects that have involved (1) agency, client, Na@ve American, and subcontractor coordina@on; (2) treatment plans and research design development; (3) archival research; (4) field reconnaissance; (5) site tes@ng; (6) data recovery excava@on; (7) construc@on monitoring; (8) site recorda@on; (9) site protec@on/preserva@on; (10) mapping/ cartography; (11) laboratory analysis; and (12) report produc@on. He has managed many projects within the jurisdic@on of the U.S. Army Corps of Engineers (USACE), the Bureau of Land Management, the Bureau of Reclama@on, and other federal agencies that require compliance with Sec@on 106 of the NHPA, as well as with numerous state lead agencies under CEQA. Patrick has worked his en@re career in southern California, comple@ng cultural resources projects throughout the region, including many projects in the California deserts and the Coachella Valley in par@cular. He also has decades of experience working with and managing qualified paleontologists in the full range of their du@es, including assessments, monitoring plans, iden@fica@on and salvage of fossils, and cura@on.
RELEVANT PROJECT EXPERIENCE
CULTURAL RESOURCES LEAD | Palm Springs Signaliza=on Project [HSIP7- 08-015] | City of Palm Springs Department of Public Works| $3,325,200 | Dura=on on the Project: 05/2017 – 12/2018
This project proposed to modify 19 exis@ng signalized intersec@ons in the City of Palm Springs to upgrade exis@ng traffic control devices, improve signal visibility, install advance dilemma zone detectors, and reconstruct exis@ng Americans with Disabili@es Act (ADA) non-compliant curbs. Pat oversaw the prepara@on of an Area of Poten@al Effects (APE) map; comple@on of a cultural resources literature review of the APE at the Eastern Informa@on Center (EIC) located at the University of California, Riverside. Pat completed a field survey of the APE and prepara@on of an Archaeological Survey Report (ASR) and Historic Property Survey Report (HPSR).
Discussions with the Agua Caliente Band of Cahuilla Indians were ongoing throughout the project and resulted in a minor change to the project to avoid a culturally sensi@ve area.
Firm
VCS Environmental
Years with Firm/Total
6/29
/Educa5on
• M.A., Anthropology, California
State University, Fullerton, CA 1994
• B.A., Psychology/Sociology, Towson
State University, Towson, MD
Cer5fica5ons/Registra5ons
• Riverside County Transporta@on
and Land Management Agency
Cer@fied Archaeologist/ Riverside
County
Professional Associa5ons
• Pacific Coast Archaeological
Society (board member)
• Society of California Archaeology
• Society of American Archaeology
• Associa@on of Environmental
Professionals (board member)
Exper5se
• Project management
• Assessments
• Monitoring
• Ar@fact iden@fica@on
• Tribal rela@ons
• Cura@on
Benefits to the City of Indio
Experienced Cultural Resources
Manager who understands the
regulatory environment and work in
tandem with clients to ensure the
protec@on of cultural resources from
a team perspec@ve
Agreements for Professional Services to perform As-Needed Professional C... Page 1355 of 2161 Appendix: Resumes | Page 78
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION City of Indio
CULTURAL RESOURCES LEAD | SBCTA On-Call | San Bernardino County Transporta=on Authority (SBCTA) | Construc=on Value: $9M | Dura=on on the Project: 01/2009 – Ongoing VCS is in its third five-year contract to provide staffing services on an as-needed basis for major transporta@on projects throughout San Bernardino County. VCS has assisted with dozens of projects. Highlights include:
STATE ROUTE 210 MIXED FLOW LANE ADDITION FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE PROJECT | CITIES
OF HIGHLAND, SAN BERNARDINO, AND REDLANDS, CA
The San Bernardino County Transporta@on Authority (SBCTA), in coopera@on with the California Department of Transporta@on (Caltrans) District 8 and the City of Highland, proposes to widen State Route 210 (SR-210) from Sterling Avenue to San Bernardino Avenue in the ci@es of Highland, San Bernardino, and Redlands, as well as a por@on of unincorporated San Bernardino County, California. The land uses surrounding the proposed project corridor are urban and moderately densely developed primarily with residen@al, public facili@es, open space, and general commercial uses. The total length of the proposed project limits is approximately 8.2 miles (PM R25.0 to R33.2), which includes transi@on striping and signage. The purpose of the proposed project is to reduce conges@on and improve opera@onal efficiency by providing lane con@nuity with an exis@ng segment of the freeway west and east of the proposed project limits. Pat managed the paleontological monitoring of project grading and trenching for nearly two years. Nega@ve findings. Pat manages all aspects of cultural resources for this on-call.
CULTURAL RESOURCES LEAD | Mt. Vernon Avenue Bridge Seismic Retrofit | City of Colton | Construc=on Value:
$3M |Dura=on on the Project: 03/2022 – Ongoing
The City of Colton, in coopera@on with Caltrans District 8, proposes to retrofit the Mt. Vernon Avenue Bridge over the Santa Ana River (Bridge No 54C-0100), located 0.6 miles south of Interstate 10 in the City of Colton, San Bernardino County. The exis@ng bridge is a 12-span cast-in-place (CIP) tee girder bridge with 11 piers. The bridge is approximately 982 feet long and 34 feet wide, with span lengths of approximately 67 to 87 feet. A water pipeline and a telephone conduit pass through the superstructure girders along the bridge. The areas within and immediately adjacent to the Project site are predominately developed and generally consist of commercial/retail land uses. The exis@ng bridge serves as a main point of access for vehicular traffic crossing northwest to southeast across the Santa Ana River. The seismic retrofigng would serve the purpose of reinforcing the exis@ng bridge to ensure the structure meets the no collapse performance standard and protect the exis@ng piers from flows in the Santa Ana River. One vehicle lane in each direc@on is currently present. No addi@onal vehicle lanes or vehicle capacity is proposed. Pat completed an Historic Property Survey Report (HPSR)/Archaeological Survey Report (ASR) for Caltrans District 8 for this ongoing project consis@ng of the prepara@on of an Area of Poten@al Effects (APE) map, records searches, Tribal and public scoping, field surveys, and prepara@on of the document to determine any adverse effects to resources.
CULTURAL RESOURCES LEAD | Laguna Niguel to San Juan Capistrano Passing Siding Project | Orange County Transporta=on Authority (OCTA) | Construc=on Value: $36.3M |Dura=on on the Project: 06/2018 – 10/2021 The Orange County Transportation Authority (OCTA), in coordination with Metrolink and the cities of Laguna Niguel and San Juan Capistrano, added 1.8 miles of passing siding railroad track between the Laguna Niguel/Mission Viejo Metrolink Station and Trabuco Creek in San Juan Capistrano. The passing siding track runs adjacent to the main track, connecting to it at each end, which will allow trains traveling in opposite directions to pass each other without stopping. The project reduces delays, increases safety and provide more reliable rail service. Pat initiated the cultural resources effort by leading Southern California Regional Rail Authority (SCRRA) Safety training and Worker Environmental Awareness Program (WEAP) Training for project personnel. This was followed by monitoring of ground disturbing activities in conjunction with the Juaneño Band of Mission Indians, Acjachemen Nation. The final report described the numerous historic-era artifacts and tribal cultural resources recovered. Tribal Cultural Resources were transferred to the Juaneño Band of Mission Indians, Acjachemen Nation and all historic-era artifacts were offered to Orange County Transportation Authority (OCTA).
Agreements for Professional Services to perform As-Needed Professional C... Page 1356 of 2161 Appendix: Resumes | Page 79
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
ZT Consulting Group Inc.
Resumes
Agreements for Professional Services to perform As-Needed Professional C... Page 1357 of 2161 Appendix: Resumes | Page 80
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
ANDREW SORIA ACI I, PCI III, CWI, NACE 2
Lead Precast/ Coating QA
Andrew is an experienced precast and steel inspector with about 18 years of experience in mix design, concrete placing, sampling, testing, and inspection of precast prestressed concrete girders and steel structures. He is a Precast Concrete Institute Certified Quality Control Level III (PCI III), which is the highest precast inspection certification that an inspector can achieve. He was the Quality Control Manager (QCM) and the lab manager for a large precast fabricator in Highlands, CA. He has managed and performed daily quality control inspections of precast fabrication. He was responsible for developing the concrete mix designs, preparing precast quality control plans (PCQCP), meeting with Caltrans and other public agency’s Structural Material Representatives (SMRs) to address their questions, scheduling daily Quality Assurance (QA) inspections, generating RFIs, and resolving non-conformance reports (NCRs) both internal (QC) and from agencies (QA). He is a Certified Weld Inspector (CWI) and has vast knowledge of steel welding inspection and NACE level 2 coating inspections.
RELEVANT PROJECT EXPERIENCE
Quality Assurance Inspector for ICTC Calexico East Port of Entry Bridge Widening, Calexico, CA |03/2021 – Ongoing| $25M
The Imperial County Transportation Commission (ICTC), Federal Highway Administration (FHWA), and California Department of Transportation (Caltrans) along with the U.S. General Services Administration (GSA) are proposing to widen the existing Calexico East Port of Entry Bridge over the All-American Canal near the U.S./Mexico border to improve access to the existing inspection booths. The project proposes to widen the existing structure over the All-American Canal near the U.S./Mexico border approximately 0.7 miles South of State Route 7 (SR 7). The project will add four northbound lanes; two commercial vehicle lanes and two passenger vehicle lanes. The existing northbound pedestrian walkway will be shifted to the west to facilitate the addition of the two new northbound passenger vehicle lanes. As Quality Assurance (QA) Inspector, Andrew is responsible for performing in-process welding inspection of steel girders.
QA Inspector for RCTD Jurupa Road Grade Separation, Jurupa Valley, CA |07/2021 – Ongoing| $78M The project will include a railroad grade separation of the existing Union Pacific Railroad (UPRR) line at the crossing of Jurupa Road. The depression of Jurupa Road under the existing UPRR Mainline will result in lowering Felspar Street to the east of Jurupa Road. The improvement will include the construction of a roadway bridge for Van Buren Boulevard, a railroad bridge for UPRR tracks, a temporary railroad shoofly, temporary shoring systems, retaining walls, storm drainage system, pump station, landscaping, roadway improvements, traffic signals, street lighting, utility relocations along with associated removals and protection of existing facilities. A portion of the roadway along Jurupa Road will be waterproofed and dewatering is expected to be necessary for its construction as well as the construction of the bridge As Quality Assurance (QA) Inspector, Andrew is responsible for observing project status and performing in-process welding inspection of steel girders.
QA Inspector for City of Corona, McKinley Street Grade Separation, Corona, CA |05/2022 – Ongoing| $105M The McKinley Street Grade Separation is located in the City of Corona at the intersection of McKinley Street and the Burlington Northern Santa Fe (BNSF) Railway, south of State Route (SR) 91 and east of Interstate (I) 15. This intersection will be grade-separated by elevating McKinley Street over the BNSF Railway, Sampson Avenue, and the Arlington Channel. As Quality Assurance (QA) Inspector, Andrew is responsible for observing in-process coating.
Education
-High School Diploma,
Redlands East Valley High
School, 2004
- OSHA 10
Registration /
Certification
- PCI Level III, #14594
- ACI I, #1260809
- CWI, #20022691
- NACE 2, #102266
Years with ZTC
6 Total Years of Experience
19
Agreements for Professional Services to perform As-Needed Professional C... Page 1358 of 2161 Appendix: Resumes | Page 81
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
QA Inspector for SBCTA SR-210 & Base Line Road San Bernardino County, CA |01/2020 to Present| $150M
This project consists of making improvements to a portion of SR-210 0.1 mile east of Del Rosa Avenue to Lugonia Ave.
These improvements consist of widening inside and outside lanes, the addition of one mixed flow lane in each direction in median, adding auxiliary lanes and acceleration/deceleration lanes at selected locations and improving Base Line Interchange at SR 210 from Sterling Ave to Lugonia Ave in cities San Bernardino, Highland and Redlands. As Quality Assurance (QA) Inspector, Andrew is responsible for the sampling and release of various materials.
QA Inspector, Soundwall Package 11, LACMTA, Los Angeles, CA |03/2017 to 10/2021 | $56M The project is constructing sound walls along the State Route 170 and Interstate 405 Freeways in the City of Los Angeles and the County of Los Angeles. There are to be eight bridge widenings and 28,592 linear feet of sound wall and retaining walls. Andrew is the project lead QA inspector responsible for column casing welding and coating at jobsite. He performed in-process steel inspection for various column retrofits during course of column assembly for about 6 months. He is supporting other QA inspector in precast concrete inspection of precast prestressed girders.
QA Inspector for SBCTA SR-60 Archibald Ave Interchange Ontario, CA |06/2019 to 08/2021| $13M The project features new right-turn pockets, additional left-turn pockets onto ramps from Archibald Ave., widening of ramps to accommodate additional lanes and the enhancement of sidewalks, crosswalks, and curb ramps. As Quality Assurance (QA) Inspector, Andrew is responsible for the sampling and release of various materials.
QA Inspector for RCTC SR-60 Truck Climbing Lanes Moreno Valley, CA |05/2019 to 05/2020 | $113M The project consists of the construction of a truck climbing and truck descending lanes, as well as inside and outside shoulders in both eastbound and westbound directions of the State Route 60. As Quality Assurance (QA) Inspector, Andrew is responsible for the sampling and release of various materials.
QA Inspector for City of San Diego SR-94 & Euclid Ave Interchange San Diego, CA |02/2018 to 01/2019 | $4M The project consisted of squaring the eastbound SR-94 exit ramp to Euclid Avenue and the westbound SR- 94 entrance ramp from Euclid Avenue. Two new traffic signals at each of the ramp intersections and new ADA compliant pedestrian ramps on the West side of Euclid Avenue were installed. As Quality Assurance (QA) Inspector, Andrew was responsible for the inspection and release of various materials such as electrical poles and service cabinets.
QA Inspector for City of Beaumont Potrero Road, Beaumont, CA|10/2017 to 01/2019 | $25M Project construction includes a new 6-lane Potrero Boulevard overcrossing, HOV lanes, realignment of Western Knolls Avenue and removal of connections to SR-60 from Western Knolls. Andrew was the QA Inspector for precast prestressed pile fabrication and inspected a total of 172 piles. He also sampled and tested strands and performed concrete verification.
QA Inspector for SANDAG Mid-Coast Corridor Transit Project, Sequoia, CA| 05/2017 to 07/2019 | $2.17B The project construction extended the Trolley Blue Line service from Santa Fe depot to Downtown San Diego in City of San Diego, CA. Andrew was the QC/QA precast Inspector for 144 precast prestressed post-tensioned Tub girders of unique design at Oldcastle Precast in Perris CA. He was responsible for observing and verifying the precast prestressed fabrication of Tub girders both straight and curved with post-tension ducts and prestressed strand. Curved girders designed with only PT. Andrew inspected and released a total of 144 girders. He also sampled and tested strands, as well as verified concrete quality. Andrew worked closely with MCTC QCM to address all the specifications requirements (PCQCP, Mix Design, Repair Procedures, etc.) and issues that arose during the precast concrete fabrication.
Agreements for Professional Services to perform As-Needed Professional C... Page 1359 of 2161 Appendix: Resumes | Page 82
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
ERIC SANABRIA CWI, NDT UT/PT/MT, NACE 1
QA Inspector
Eric Sanabria is an experienced Non-Destructive Testing (NDT) Technician. Eric has nearly a decade of NDT experience across multiple industries and methods. From 2013 to 2020, he worked as Lead NDT Technician for Team Industrial Services at numerous locations throughout the United States for major Oil Refineries like Valero, Chevron and Marathon. He continued his career at SpaceX. where contributed to over 25 launches by performing various inspections including Phased Array Ultrasonic Testing, Fluorescent Penetrant and Visual inspections on 1st Stage and 2nd Stage Falcon 9 Boosters. Previous Level II certifications include PAUT, UTSW, PT, MT, VT and PMI.
RELEVANT PROJECT EXPERIENCE
Quality Assurance Inspector for RCTC, SR-71/91 Interchange Improvement, Riverside, CA |11/2022 – Ongoing| $115M
The Riverside County Transportation Commission (RCTC), in partnership with Caltrans, is preparing to Realign and widen the existing connector from South Bound SR 71 to East Bound SR
91. The project consists of replacing the existing single lane loop connector with the construction of new overcrossing structure from East Bound SR 91 to North Bound SR 71, realigning the East Bound SR 91 entrance ramp from Green River Road including the construction of new Green River entrance ramp overhead structure, and constructing new East Bound auxiliary lane from Green River Road to east of the SR 71/91 Interchange. As Quality Assurance (QA) Inspector Eric is responsible for verification and release of anchor bolts.
QA Inspector for City of Corona, McKinley Street Grade Separation, Corona, CA |05/2022 – Ongoing| $105M
The McKinley Street Grade Separation is located in the City of Corona at the intersection of McKinley Street and the Burlington Northern Santa Fe (BNSF) Railway, south of State Route (SR) 91 and east of Interstate (I) 15. This intersection will be grade-separated by elevating McKinley Street over the BNSF Railway, Sampson Avenue, and the Arlington Channel. As Quality Assurance (QA) Inspector Eric is responsible for the release of poles.
QA Inspector for Alameda Corridor East, Fullerton Road Grade Separation, City of Industry, CA |01/2022 – Ongoing| $250M
The Fullerton Road Grade Separation Project would lower Fullerton Road under the existing Union Pacific railroad tracks in the City of Industry and unincorporated area of Los Angeles County, between Rowland Street and State Route 60 (SR-60). Plans call for constructing a six-lane roadway underpass on Fullerton Road, four-track railroad bridge and bridge for Railroad Street spanning Fullerton Road. Gale Avenue would be lowered at the intersection with Fullerton Road. As Quality Assurance (QA) Inspector, Eric is responsible for monitoring fastener installation and performing final tensioning verification between Bent 2 and Abutment 3.
QA Inspector for SBCTA SR-60 & Central Interchange, Ontario, CA | 06/2019 to Present | $26M The project will widen Central Avenue to accommodate three through-lanes with provisions for a future lane, two left-turn lanes, standard shoulders, bike path, and sidewalk in both the northbound and southbound directions; and, Education
San Joaquin Valley College,
Rancho Cucamonga CA
-AS Business Administration
Certification
- TWIC
- Ultrasonic Inspection / Shear
Wave (SNT-TC 1A Level 2)
- Dye Penetrant Inspection
(SNT-TC 1A Level 2)
- Magnetic Particle Inspection
(SNT-TC 1A Level 2)
- CWI # 22072381
- NACE 1 #108951
Years with ZTC
3 Total Years of Experience
12
Agreements for Professional Services to perform As-Needed Professional C... Page 1360 of 2161 Appendix: Resumes | Page 83
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
widening the of the existing eastbound and westbound entrance ramps to accommodate two general purpose lanes and one high occupancy vehicle (HOV) preferential lane. As Quality Assurance (QA) Inspector, Eric is responsible for the sampling and verification of various materials.
QA Inspector for RCTD Hamner Avenue Bridge, Norco, CA |12/2020 to Present | $52.6M The project proposes to replace the existing Hamner Avenue Bridge and widen the roadway from Detroit Street to Citrus Street. The new bridge will include three 12-foot lanes and a 4-foot shoulder in each direction (northbound and southbound) that will be separated by a 4-foot curbed median. A 12-foot, barrier-separated multipurpose trail will be constructed on the east side of the bridge. A trail ramp will be constructed at the southeast end of the bridge that will connect the planned Regional Santa Ana River Trail to the barrier-separated multipurpose trail on the new Hamner Avenue Bridge. This proposed project will also include relocating utilities, either into or outside the new bridge, as needed, constructing retaining walls, installing signage and 2 signal modifications. As Quality Assurance (QA) Inspector, Eric is responsible for the sampling and verification of various materials.
NDT II Technician for Alky First Quarter Outage, Marathon Wilmington Refinery, CA |02/2020 – 04/2020 | The project was an overhaul of outdated piping circuits and material upgrades located in the alkylation unit at Marathon Wilmington Refinery. Eric was responsible for the coordination of NDT activities and liaison between inspection companies and the client, Marathon Refinery. Eric oversaw verification of newly installed alloy piping.
NDT II Technician for HTU4 Fourth Quarter Outage, Marathon Wilmington Refinery, CA |09/2019 – 12/2019| The project was an upgrade and add-on to existing piping circuits and pressure vessels located in the hydro-treater at Marathon Wilmington Refinery. Eric was responsible for performing P.M.I. (Positive Material Identification) on existing piping, created master spreadsheets which dictated change orders. Eric also performed other non-destructive testing (UT, PT, MT, & VT) in accordance with B.31.3 and ASME section 8.
NDT II Technician for TK-2007 Effluent Rebuild, Marathon Carson Refinery, CA |07/2019 – 08-2019| The project was a complete tank rebuild in accordance with API 653 located in the wastewater unit of the Marathon Carson Refinery. As NDT II Technician, Eric was responsible for non-destructive drafting all the isometric drawings and P&IDs (Piping and Instrumentation Diagrams).
NDT II Technician for Onstream inspection, Marathon Refinery, both locations in CA |2017 – 2019| Eric performed non-destructive testing at scheduled intervals or as required for leaks and emergency repairs on small bore piping, pressure vessels, storage tanks, structural steel members, and pump casings (UTPA, PT, VT, MT, & PMI) for various locations and projects throughout Eric’s employment.
Agreements for Professional Services to perform As-Needed Professional C... Page 1361 of 2161 Appendix: Resumes | Page 84
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
FARZAD TASBIHGOO PE, CQA, CWI, ACI I, PCI III
Structural Material Representative
Farzad is a registered civil engineer with the State of California, Certified Weld Inspector (CWI), and Certified Quality Auditor (CQA) with American Society for Quality (ASQ) with about 21 years of work experience in design, structure construction, and QC/QA on public transportation projects.
He has a strong engineering design background with extensive experience in verification inspection, surveillance audits, and quality assurance services. He has assisted numerous local agencies in the design and construction of their public projects. He has developed and implemented QMP, SIQMP, and construction QC/QA specifications on numerous projects. Farzad has a well-earned reputation for his knowledge of Caltrans Standard Specifications and Greenbook specifications within Caltrans METS, District, and Structure Construction. He has extensive working knowledge of welding codes (AWS), weld inspection, and steel fabrication with railroad code (AREMA). He assisted Caltrans steel committee in implementing Electroslag Welding (ESW) requirements in one of the first Caltrans projects utilizing ESW in District 8.
RELEVANT PROJECT EXPERIENCE
Structural Material Representative for RCTC SR-71/91 Interchange Improvement, Riverside, CA |11/2022 to Ongoing | $115M
The Riverside County Transportation Commission (RCTC), in partnership with Caltrans, is preparing to Realign and widen the existing connector from South Bound SR 71 to East Bound SR 91. The project consists of replacing the existing single lane loop connector with the construction of new overcrossing structure from East Bound SR 91 to North Bound SR 71, realigning the East Bound SR 91 entrance ramp from Green River Road including the construction of new Green River entrance ramp overhead structure, and constructing new East Bound auxiliary lane from Green River Road to east of the SR 71/91 Interchange. As the Structural Material Representative, Farzad is preparing the Source Inspection Quality Management Plan (SIQMP) for Caltrans Oversight SMR, implementing the SIQMP, reviewing shop drawings for multiple materials, and coordinating and managing source fabrication, structural material and electrical verification and testing.
SMR for RCTD Jurupa Road Grade Separation, Jurupa Valley, CA | 07/2021 – Ongoing | $78M The project will include a railroad grade separation of the existing Union Pacific Railroad (UPRR) line at the crossing of Jurupa Road. The depression of Jurupa Road under the existing UPRR Mainline will result in lowering Felspar Street to the east of Jurupa Road. As the Structural Material Representative, Farzad is preparing the Source Inspection Quality Management Plan (SIQMP) for Caltrans Oversight SMR, implementing the SIQMP, reviewing shop drawings for multiple materials, and coordinating and managing source fabrication, structural material and electrical verification and testing.
SMR for City of Corona, McKinley Street Grade Separation, Corona, CA | 05/2022 – Ongoing | $105M
The McKinley Street Grade Separation is located in the City of Corona at the intersection of McKinley Street and the Burlington Northern Santa Fe (BNSF) Railway, south of State Route (SR) 91 and east of Interstate (I) 15. This intersection will be grade-separated by elevating McKinley Street over the BNSF Railway, Sampson Avenue, and the Education
University of Southern
California, Los Angeles, CA
-PhD Civil Engineering,
2006
-M.S. Structural
Engineering, 2001
Iran University of Science
and Technology, Iran
-B.S. Civil Engineering,
1995
Registration /
Certification
-Registered Civil Engineer,
State of California, License
# C71403, 2007
- CWI (FCM), #11081291
- ACI I, #1226819
- ASQ CQA, # 67819
- PCI Level III, #14342
- UPRR Safety Training,
2016/2017
- State of California - Safety
Assessment Program -
DSW Evaluator ID 64449
Years with ZTC
10 Total Years of Experience
21
Agreements for Professional Services to perform As-Needed Professional C... Page 1362 of 2161 Appendix: Resumes | Page 85
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
PAUL MORTSOLF ACI I, PCI II, NACE 2
QA Inspector
Paul was the Quality Control Manager (QCM) at Pro-Cast Products for a period of 10 years. He oversaw day to day production, helped keep projects on schedule and sees that everything is produced to the project and state specifications. Job duties included capping and testing cylinders, making test cylinders, testing concrete, keeping track of production and making inspection reports. He also worked with QA Inspectors and engineers from Cities and State agencies, such as Caltrans. He has reviewed and made corrections to shop drawings. He has performed QC on various precast components such as lagging panels, MSE wall panels, sound walls, box culverts, septic tanks, holding tanks, grease interceptors, clarifiers, drainage inlets, and prestressed pavement panels. He was responsible for preparing PCQPC, submitting QC reports to contractors, and managing all precast product releases to the jobsite. He worked closely with Caltrans during their facility audit process. He has worked on numerous projects, here are few relevant projects:
• Precast MSE Panels for Caltrans SR-91 Widening (EA:08-448404 $125 Million) • Precast Box Culverts for OCTA SR-91 Widening (EA: 12-0C5704 $36 Million) • Precast Prestressed Pavement Panels for Caltrans (EA: 07-295504 $18 Million)
RELEVANT PROJECT EXPERIENCE
Quality Assurance Inspector for RCTC, SR-71/91 Interchange Improvement, Riverside, CA |11/2022 – Ongoing| $115M
The Riverside County Transportation Commission (RCTC), in partnership with Caltrans, is preparing to Realign and widen the existing connector from South Bound SR 71 to East Bound SR
91. The project consists of replacing the existing single lane loop connector with the construction of new overcrossing structure from East Bound SR 91 to North Bound SR 71, realigning the East Bound SR 91 entrance ramp from Green River Road including the construction of new Green River entrance ramp overhead structure, and constructing new East Bound auxiliary lane from Green River Road to east of the SR 71/91 Interchange. As Quality Assurance (QA) Inspector, Paul is responsible for performing in-process inspection of MSE panel production.
QA Inspector for City of Temecula I-15 French Valley Parkway Improvements Phase II, Temecula, CA |04/2023 – Ongoing| $101M
The City of Temecula, in cooperation with the California State Department of Transportation (Caltrans), proposes to construct a two-lane northbound collector/distributor system along I-15 from the Winchester Road/I-15 interchange northerly on-ramps to just north of the I-15/I-215 junction, providing connectors to I-15 and I-215 in the cities of Murrieta and Temecula. As the Quality Assurance Inspector, Paul isresponsible for verification of materials at Sumiden Wire, Stockton, CA.
QA Inspector for LACMTA (Metro), I-5 North Enhancements, North County, CA |01/2021 – Ongoing| $627M The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway. The improvements include the addition of HOV (carpool) lanes along the median, extension of northbound truck lane and addition of auxiliary lanes. Based on the outcome of the remaining sound studies, additional soundwalls may be constructed. As Quality Assurance (QA) Inspector, Paul is responsible for providing QA/QC selection of samples for test acceptance of ultimate butt splice welded hoops from No.# 5/16mm A706 reinforcing bars from Lots # 1 through # 9.
Education
- New York Film Academy
Universal Studios, Los
Angeles, CA, 2009
- Riverside Adult Education
Center, Riverside, CA, 1998
Registration /
Certification
- ACI Concrete Field
Testing Grade I
- ACI Strength Testing
Technician
- PCI Level I & II #13901
- NACE 2, #105231
Years with ZTC
5 Total Years of Experience
17 Location
San Bernardino County
Agreements for Professional Services to perform As-Needed Professional C... Page 1363 of 2161 Appendix: Resumes | Page 86
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
QA Inspector for SBCTA SR-210 & Base Line Road San Bernardino County, CA |01/2020 to Ongoing| $150M
This project consists of making improvements to a portion of SR-210 0.1 mile east of Del Rosa Avenue to Lugonia Ave.
These improvements consist of widening inside and outside lanes, the addition of one mixed flow lane in each direction in median, adding auxiliary lanes and acceleration/deceleration lanes at selected locations and improving Base Line Interchange at SR 210 from Sterling Ave to Lugonia Ave in cities San Bernardino, Highland and Redlands. As Quality Assurance (QA) Inspector, Paul is responsible for the sampling and release of various materials.
QA Inspector for SBCTA SR-60 Archibald Ave Interchange Ontario, CA |06/2019 to 08/2021 | $13M The project features new right-turn pockets, additional left-turn pockets onto ramps from Archibald Ave., widening of ramps to accommodate additional lanes and the enhancement of sidewalks, crosswalks, and curb ramps. As Quality Assurance (QA) Inspector, Paul is responsible for the sampling and release of various materials.
QA Inspector for RCTC SR-60 Truck Climbing Lanes Moreno Valley, CA |05/2019 to 05/2020| $113M The project consists of the construction of a truck climbing and truck descending lanes, as well as inside and outside shoulders in both eastbound and westbound directions of the State Route 60. As Quality Assurance (QA) Inspector, Paul is responsible for the sampling and release of various materials.
QA Inspector for Guys Gulch Schulmeyer Bridges, Siskiyou County, CA |05/2018 to 09/2018| $1.7M Project construction included the construction of a cast in place, reinforced concrete slab bridge on concrete abutments and driven precast concrete piles. Paul was the QA Inspector for precast prestressed pile fabrication and inspected a total of 16 piles at the Kie-Con facility in Antioch, CA. He also sampled and tested strands and performed concrete verification.
QA Inspector for City of Beaumont SR- 60 Potrero Road, Beaumont, CA|10/2017 to 01/2019 | $25M Project construction included a new 6-lane Potrero Boulevard overcrossing, HOV lanes, realignment of Western Knolls Avenue and removal of connections to SR-60 from Western Knolls. Paul was the QA Inspector for precast prestressed pile fabrication and inspected a total of 172 piles at the Kie-Con facility in Antioch, CA.
QA Inspector for Sierra Highway Pedestrian Bridge, City of Santa Clarita, CA| 11/2017 to 10/2018| $3M Project scope included widening of southbound Sierra Highway to construct a right-turn pocket and construction of a steel pedestrian bridge over Sierra Highway. Paul was the QA Inspector for precast concrete walkway panels, 30ft x 11ft wide panels fabrication and inspected total of 10 panels at the Kie-Con facility in Antioch, CA.
Agreements for Professional Services to perform As-Needed Professional C... Page 1364 of 2161 Appendix: Resumes | Page 87
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
WILLIAM (BILL) KENT ACI I, PCI II, CWI, NDT UT/MT/RT/PT Lead Steel QA
Mr. Kent has more than 37 years of international experience providing Quality Assurance/Quality Control (QA/QC) welding inspection and nondestructive testing (NDT) services on-site and in fabrication facilities for major steel construction projects. Mr. Kent has significant experience performing quality assurance inspection and nondestructive testing during field erection and shop fabrication of major steel bridge projects for various Departments of Transportation and Bridge Authorities. He has experience as the Lead Inspector in the fabrication of Facture Critical (FCM) bridge components in accordance AWS D1.5. He has wide-ranging experience in precast concrete inspection for such items as HOV Interchange improvements, Roadway and Bridge widening, Retaining Walls and Street and Drainage Improvements. He has exemplary supervisory skills serving as a Task Leader on many of the California Department of Transportation (Caltrans) bridge projects that he has been involved in. His qualifications include comprehensive practical experience in specialized applications of nondestructive testing techniques, including Phased Array Ultrasonic Testing and Digital Radiography, to evaluate materials for compliance with codes and standards in the industrial and structural steel arenas. Caltrans major Steel Bridge Project experience includes the San Francisco Oakland Bay Bridge (SFOBB) South-South Detour, Skyway, E2/T1 and SAS, in addition to the Carquinez Bridge Retrofit, New Alfred Zampa Memorial Bridge, and Vincent Thomas Bridge, MacArthur Maze emergency restoration, Wendy Overpass and Parker New Bridge to name a few. Additionally, he served as a member of the Caltrans Source Inspection Committee. Mr. Kent relocated to the Shanghai, China Office in early 2014 to provide guidance and share his leadership abilities as a mentor to the local Chinese staff. In conclusion, Mr. Kent’s litany of supervisory and extensive practical QA/QC inspection experience over his 37 plus year career are too numerous to list and are a testament to his ability to provide the client with the highest professional services.
RELEVANT PROJECT EXPERIENCE
QA Supervisor for RCTD, Jurupa Road Grade Separation, Jurupa Valley, CA |07/2021 – Present| $78M The project will include a railroad grade separation of the existing Union Pacific Railroad (UPRR) line at the crossing of Jurupa Road. As Quality Assurance Supervisor (QAS), Bill is responsible for performing in-process weld inspection of steel girders.
QA Supervisor for ACE, Fullerton Road Grade Separation, City of Industry, CA |01/2022 – Present| $250M The Fullerton Road Grade Separation Project would lower Fullerton Road under the existing Union Pacific railroad tracks in the City of Industry and unincorporated area of Los Angeles County, between Rowland Street and State Route 60 (SR-60). Plans call for constructing a six-lane roadway underpass on Fullerton Road, four-track railroad bridge and bridge for Railroad Street spanning Fullerton Road. Gale Avenue would be lowered at the intersection with Fullerton Road. As Quality Assurance Supervisor (QAS), Bill is responsible for performing a Material on Hand (MOH) inspection of plate and Okay to Cut (OTC).
Education
U.S. Navy (USN)
- USN Nondestructive
Testing of Metals, 1983
- USN Radiographer
Interpretation, 1987
- USN Ultrasonic Inspector,
1983
Registration /
Certification - CWI,
#00090841
- ASNT TC-1A
Nondestructive Testing
(NDT) Level II, MT, PT, RT,
UT
- Advanced NDT
Certifications in Phased
Array Ultrasonic Testing &
Digital Radiography
- PCI II, #21511
- ACI I, #01061449
- Lead Fracture Critical
Member (FCM)
Qualifications
- AWS D1.8 Endorsement
Years with ZTC
02 Total Years of Experience
37+
Agreements for Professional Services to perform As-Needed Professional C... Page 1365 of 2161 Appendix: Resumes | Page 88
On-Call Professional Services for
CONSTRUCTION MANAGEMENT AND INSPECTION
.
QA Supervisor for City of Temecula, I-15 French Valley Parkway Improvements Phase II, Temecula, CA |04/2023 – Present| $110M The City of Temecula, in cooperation with the California State Department of Transportation (Caltrans), proposes to construct a two-lane northbound collector/distributor system along I-15 from the Winchester Road/I-15 interchange northerly on-ramps to just north of the I-15/I-215 junction, providing connectors to I-15 and I-215 in the cities of Murrieta and Temecula. As the Quality Assurance Supervisor (QA), Bill is responsible for inspection of various components for release. QAS reviewed the COC, MTR’s, Testing Lab Reports, in progress welding reports and VT/UT inspection reports.
QA Chief Inspector for LS Power Transmission Poles, Guadalajara, Mexico | 2020 to 2021 Mr. Kent served as a Quality Assurance Chief Inspector. His primary duties were to monitor and supervise in-progress fabrication and NDT inspections, perform visual and NDT inspections of engineering poles for LS Power transmission pole replacement. In addition, review and approve of drawings, specifications, NDT procedures and fabricators manufacturing written instruction.
QA Chief Inspector for Cal Maritime Academy IMOD Persal Ind., Mexicali, Mexico | 02/2020 to 08/2020 Mr. Kent served as Quality Assurance Chief Inspector. Fabrication of steel shipping containers to be used as temporary classroom for various clients through the state of California. His primary duties were monitoring fabricator quality control and NDT inspectors. Secondary duties included performing in process visual and NDT inspections of in process and completed elements of each frame’s sections.
QA Chief Inspector for SDG&E, SDG&E Transmission Poles, San Diego, CA | 2016 to 2020 Mr. Kent served as a Quality Assurance Chief Inspector. His primary duties were to monitor and supervise in-progress fabrication and NDT inspections, perform visual and NDT inspections of SW poles and engineering poles for SDG&E transmission pole replacement. In addition, review and approve of drawings, specifications, NDT procedures and fabricators manufacturing written instruction. Duties will also include monitoring installation of poles at jobsite.
Intermediate QA Inspector for Caltrans District 59, Gerald Desmond Bridge Replacement, Long Beach, CA | 2016 to 2016 Mr. Kent served as Intermediate Quality Assurance Inspector. His primary duties included monitoring fabricator quality control and quality assurance inspectors. Provided review and approval of all submittals, drawings and weld quality control plans for fabrication of components of the Gerald Desmond Bridge. Secondary duties included performing in process visual and NDT inspections of in progress and completed elements of the bridge.
Monitored all blasting, primer coating and final painting operation of bridge components. Reviewed all fabricator and third-party inspection reports prior to being submitted to the engineer of record.
Welding Supervisor for Parkwind/JDN, Noblewind OHVS and Transition Pieces, China | 2016 to 2016 Mr. Kent served as a Welding Supervisor. His primary duties were to monitor in-progress fabrication, visual inspection and NDT inspections of Transition Pieces on ocean windmills for Noblewind. In addition, he was responsible for the construction of the OHVS X-Girder for offshore structures and duties included review and approval of construction drawings, method statements, NDT procedures, and approving fabrication plan and schedule. Monitored all welding / fabrication and visual / NDT inspection, as well as approving and monitoring dimensional verification. Performed as a consultant to CS Wind Engineering staff on fabrication issues that were noted during construction and helped them resolve them.
Lead Concrete Inspector for Caltrans, Midway City Street & Drainage Improvements, San Diego, CA | 2013 to 2013 Mr. Kent served as Lead Concrete Inspector. He provided guidance and technical assistance to QC and QA personnel for pre-pour and post-pour operations. Other duties to include were review and approval of fabrication drawings, review and approval of concrete mix design for Box Culverts and RCP, both designed for over 5,000 psi.
Witness daily breaks of cylinders to ensure proper strength requirements have been achieved prior to striping concrete beds. Perform inspections of rebar, welded wire reinforcement and wire strand under load.
Agreements for Professional Services to perform As-Needed Professional C... Page 1366 of 2161 Daily Report
Example
Agreements for Professional Services to perform As-Needed Professional C... Page 1367 of 2161 Project No.:ST2201
Rancho Los Coyotes Pavement Improvement Project
City of Indio
Assistant Resident Engineer’s Daily Report:
Hour – Item No. Weather:
Equipment and/or Labor:
Remove DrivewayExtraRelocate Fence
AM: Clear - 72 deg.
PM: Sunny - 102 deg.
Description
(Labor Trade)
No.
Men
Description
(Of Equip Or Labor
Name)
9 13 Description
(Equipment Used)
Foreman 1 Benito Hernandez 8 Universal Concrete
Laborer 1 Elicio Zuniga 8 Universal Concrete
Laborer 1 Salvador Molina 8 Universal Concrete
Laborer 1 Augustin Rodriguez 8 Universal Concrete
103 1 Ford F-550 Work Truck 8 Universal Concrete
n/a 1 Trailer 8 Universal Concrete
110 1 Flatbed Truck 8 Universal Concrete
n/a 1 J. Deere 210K Skip Loader 8 Universal Concrete
Laborer 1 Jose Hernandez 8 Universal Concrete
Laborer 1 Israel Sanchez 8 Universal Concrete
n/a 1 Excavator 8 Universal Concrete
Foreman 1 Gregorio Mercado 4 4 Gregario Fencing
Laborer 1 Abel Mercado 4 4 Gregario Fencing
Laborer 1 Juan Corrales 4 4 Gregario Fencing
CITY OF INDIO
RANCHO LOS COYOTES PAVEMENT
IMPROVEMETN PROJECT
PROJECT NO. : ST2201
Report No.: 628
Date: 10/9/2023
Day: M T W Th F S S
x
Shift Hours Start: 0700 Stop: 1530
Agreements for Professional Services to perform As-Needed Professional C... Page 1368 of 2161 Project No.:ST2201
Rancho Los Coyotes Pavement Improvement Project
DESCRIPTION OF WORK
Benito Hernandez’ (Universal Concrete) crew began demoing at Rancho Los Coyotes Street Improvements project. The crew began to demo the existing driveways at properties 38725, 38625, 38555, 38455, and 38405. The crew began sawcut of the existing concrete driveway at property 38725. The crew sawcut the concrete at the right of way line per surveyed stake. The crew used a skid steer with a hydraulic hammer to demo the driveway. The crew then used a mini excavator with a super 10 dump truck to remove and haul the concrete rubble offsite. The crew continued the process for properties 38625, 38555, 38455, and 38405. The crew graded the subgrade and sloped the subgrade for the residents to have access during construction. The crew cleaned the site. The crew also relocated an Olive Tree per the resident’s request at property 38625.
Gregorio Mercado’s (Gregorio Fencing) crew began to align and set the fence posts for properties 38675 and 38625 Rancho Los Coyotes. The crew aligned the fence posts to the right of way line. This work is re-work due to my previous direction. The alignment was shifted to accommodate the owner’s requests at both properties. The crew set the posts for future chain-link material.
Notes- I attended a field meeting with representatives from DESI, City of Indio, Universal Concrete, and the property owner at 38725 Rancho Los Coyotes Dr. We discussed his fencing 3ft into the right of way for the City of Indio. He stated he wanted to preserve his plants around the fence and preferred not to move his fencing. Donn Uyeno (City of Indio), city engineer, discussed several options and stated he would verify with the City Manager. Chia-Chi Wang (DESI), resident engineer, stated to not relocate the fence until the City of Indio has notified the proposed plan to resolve the issue.
Nathaniel Battle 10-09-23
Name Signature Date
QUANTITIES
ITEM # DESCRIPTION LOCATION DAILY QUANTITY UNIT
9 Driveway Demo 38725 288 SF
9 Driveway Demo 38625 122 SF
9 Driveway Demo 38555 198 SF
9 Driveway Demo 38455 107 SF
9 Driveway Demo (2x) 38405 514 SF
Agreements for Professional Services to perform As-Needed Professional C... Page 1369 of 2161 Project No.:ST2201
Rancho Los Coyotes Pavement Improvement Project
DAILY SITE PICTURES
Relocate existing olive tree 38625 Rancho Los Coyotes Demo and remove existing driveway at property 38725 Rancho Los Coyotes
Demo and remove driveway at property 38455 Rancho Los Coyotes Demo and remove driveway at property 38555 Rancho Los Coyotes Extra work- Reset fence posts at Property 38625 Rancho Los Coyotes Extra work- Reset fence posts at Property 38625 Rancho Los Coyotes
Agreements for Professional Services to perform As-Needed Professional C... Page 1370 of 2161 Dynamic Engineering Services, Inc. (DESI)
Point of Contact: Chia-Chi Wang, P.E., PMP, QSD
Principal
Phone: 951-892-1420
E-mail: [email protected]
Agreements for Professional Services to perform As-Needed Professional C... Page 1371 of 2161 IND-PSA rev20221214 Dynamic Engineering Services, Inc.
Exhibit B – Compensation
Page | 1
EXHIBIT “B”
COMPENSATION
Agreements for Professional Services to perform As-Needed Professional C... Page 1372 of 2161 On-Call Professional
Services for Construction
Management and Inspection
B. COST PROPOSAL
6 Latitude Way, Suite 112
Corona, CA 92881
Phone: 951-471-8890
WWW.DYNAMICESI.COM
Submitted by
Agreements for Professional Services to perform As-Needed Professional C... Page 1373 of 2161 Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Chia-Chi Wang Project Manager / Resident
Engineer $85.00 $196.00 $206.00 $216.00 $227.00
Victor Moore Assist PM / Safety Officer $85.00 $196.00 $206.00 $216.00 $227.00 Michael Ervolina Officer Engineer / Document
Control $32.00 $74.00 $78.00 $81.00 $85.00
Nath Battle** Lead Roadway Inspector $70.00 $161.70 $169.79 $$178.27 $187.19 John Kannor** Roadway & Electrical Inspector $73.50 $77.18 $81.03 $85.09 $89.34 Steve Carbajal** Roadway & Electrical Inspector $73.50 $77.18 $81.03 $85.09 $89.34 Phillip Ruiz** Roadway & Electrical Inspector $73.50 $77.18 $81.03 $85.09 $89.34 Craig Soucy** Roadway & Electrical Inspector $73.50 $77.18 $81.03 $85.09 $89.34 Michael Roush** Roadway & Electrical Inspector $70.00 $161.70 $169.79 $$178.27 $187.19 TBD Roadway Inspector $65.00 $150.15 $157.68 $165.54 $173.82 TBD Electrical Inspector $65.00 $150.15 $157.68 $165.54 $173.82
QUANITTY UNIT UNIT COST TOTAL
20,000 Mile $0.625 $ 12,500.00
** Denotes Prevailing Wage Classification
COMPANY: SCOPE OF WORK:
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
Mileage Reimbursement per IRS Rate
BILLING RATES WORKSHEET
Dynamic Engineering Services, Inc. Construction Management & QA Inspection
7/1/24 - 12/31/24
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Tim Fettig, PLS Survey Project Manager $90.00 $308.61 $324.04 $340.25 $357.26 Adam D'Alvia, PLS** PLS Party Chief $71.26 $244.35 $256.57 $269.40 $282.87 Jack Knauer** Chainman $55.28 $189.56 $199.03 $208.99 $219.44 TBD Certified Party Chief** $63.56 $217.95 $228.85 $240.29 $252.30 TBD Party Chief** $61.51 $210.92 $221.47 $232.54 $244.17 TBD Instrumentman** $55.86 $191.55 $201.12 $211.18 $221.73 TBD Apprentice** $44.22 $151.63 $159.21 $167.17 $175.53
QUANITTY UNIT UNIT COST TOTAL
** Denotes Prevailing Wage Classification
7/1/24 - 12/31/24
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
GUIDA Construction Survey
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
BILLING RATES WORKSHEET
COMPANY: SCOPE OF WORK:
Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Andrea Suarez Outreach Director $75 $191.81 $201.40 $211.47 $222.04 TBD Sr. Outreach Specialist $43 $109.97 $115.47 $121.24 $127.30 Maité Sandoval Outreach Specialist $43 $81.84 $85.93 $90.23 $94.74 Christine Feldman Art Director/Graphic Designer $57.50 $147.06 $154.41 $162.13 $170.24 TBD Outreach Coordinator $27 $69.05 $72.50 $76.13 $79.93
QUANITTY UNIT UNIT COST TOTAL
5,000 Mile $0.625 $3,125.00
** Denotes Prevailing Wage Classification
7/1/24 - 12/31/24
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
Mileage Reimbursement per IRS Rate
CONNECT Public & Community Outreach
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
BILLING RATES WORKSHEET
COMPANY: SCOPE OF WORK:
Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Patrick Hanify PM/CM $220.00 $231.00 $242.55 $254.68
William Seitz Construction Manager $220.00 $231.00 $242.55 $254.68 Kieler Smith Construction Manager $220.00 $231.00 $242.55 $254.68 Andrew Lewis Resident Engineer 185 $194.25 $203.96 $214.16 Joe Gonzalez Resident Engineer 185 $194.25 $203.96 $214.16 TBD RE/CM $175 $183.75 $192.94 $202.58
TBD Inspector 170 $178.50 $187.43 $196.80
TBD Field Engineer / Inspector 170 $178.50 $187.43 $196.80
QUANITTY UNIT UNIT COST TOTAL
$0.00
** Denotes Prevailing Wage Classification
7/1/24 - 12/31/24
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
Michael Baker Roadway Inspection and CM Support
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
BILLING RATES WORKSHEET
COMPANY: SCOPE OF WORK:
Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Faisal Zahlout, PE, QSD Structure Rep $140.00 $332.41 $349.03 $366.48 $384.81 Luis Negrete, PE Structure Inspector $95.00 $225.57 $236.85 $248.69 $261.13 Ryan Vantine, PE** Structure Inspector $95.00 $225.57 $236.85 $248.69 $261.13 Robert Bersbach, PE,
QSD** Roadway/Structure Inspector $95.00 $225.57 $236.85 $248.69 $261.13 Noura Alayyan** Roadway/Structure Inspector $78.16 $185.59 $194.87 $204.61 $214.84 TBD Structure Rep $140.00 $332.41 $349.03 $366.48 $384.81 TBD Roadway/Structure Inspector $79.50 $188.76 $198.20 $208.11 $218.51
QUANITTY UNIT UNIT COST TOTAL
5,000 Mile $0.625 $3,125.00
** Denotes Prevailing Wage Classification
7/1/24 - 12/31/24
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
Mileage Reimbursement per IRS Rate
SYRUSA Roadway & Structure Inspection
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
BILLING RATES WORKSHEET
COMPANY: SCOPE OF WORK:
Escalation: Profit: DATE:
5% 10% 4/30/2024
1/1/25 - 12/31/25 1/1/26 - 1/31/26 1/1/27 - 6/30/27
STAFF NAME TITLE/CLASSIFICATIONS Hourly Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Full Burdened Rate Paul Soltis, PE. GE. Registered Geotechnical
Engineer - Lead $103.14 $248.12 $260.53 $273.55 $287.23 Sammy Daghighi, PE. QA Testing Manager -
Registered Civil Engineer- Lead $105.00 $252.60 $265.23 $278.49 $292.42 Lee Bainer Assistant Project Manager $50.01 $120.31 $126.33 $132.64 $139.27 Amir Ghavibazoo, PhD. Technical Advisor - Pavement
Engineering $80.12 $192.74 $202.38 $212.50 $223.12
Shawn Snowdale**
Non-Exempt-Prevailing Lead Inspector $58.51 $140.76 $147.80 $155.19 $162.95 Field Inspector -Group I $56.68 $136.36 $143.18 $150.34 $157.85 Field Inspector -Group II $58.46 $140.64 $147.67 $155.06 $162.81 Field Inspector -Group I $56.68 $136.36 $143.18 $150.34 $157.85 Field Inspector -Group II $58.46 $140.64 $147.67 $155.06 $162.81
QUANITTY UNIT UNIT COST TOTAL
$ -
** Denotes Prevailing Wage Classification
Twining QA Insepction and Material Testing
Cost Proposal
On-Call ProfessionalSerices for Construction Mangaerment and Inspection
BILLING RATES WORKSHEET
COMPANY: SCOPE OF WORK:
7/1/24 - 12/31/24
DIRECT LABORER
OTHER DIRECT COST
ITEM DESCRIPTION
See attached Full ODC for 2023 to 2024
Bryan Dorsch**
Non-Exempt-Prevailing
Wage
Brandon Schroeder**
Non-Exempt-Prevailing
Wage