Agreements for Professional Services to perform As-Needed Professional C... Page 1696 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 35
AREZO GHIAM, PE, QSD
Assistant Project Manager
EDUCATION
BS, Civil Engineering,
California State Polytechnic
University, Pomona, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 86359
Qualified SWPPP
Developer
Mrs. Ghiam has 12 years of experience in transportation construction projects with both private and public entities where she performed cost estimating, construction inspection, surveying, labor compliance, and project record keeping. More specifically she has been cross trained to perform construction management services as an inspector, office engineer, and resident engineer on freeway and structure construction projects. She has initiated project documentation controls, performed engineering administrative duties, coordinated material testing, inspected bridge widenings, bridge retrofits, new bridge construction, Cast-in-Drilled-Hole (CIDH) piles, pile driving, retaining walls, sound walls, paving, traffic control, drainage, and Storm Water Pollution Prevention Plans (SWPPP).
RELEVANT PROJECT EXPERIENCE
City of Whittier, State Highway 72 / Whittier Blvd. Widening, Whittier, CA Resident Engineer: Responsible for widening Whittier Blvd, including roadway section, traffic signals, and ADA ramps with Caltrans oversite. Responsible for all aspects of contract administration including review of concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, source inspection, assuring compliance with project plans and specifications, and Contract Change Orders. Point of contact and coordination between Caltrans, City, and Developer. Project Cost: $3Million.
Rancho Mission Viejo Development / Orange County Public Works (OCPW), LPP Roadway Improvements/Repairs, Rancho Mission Viejo, CA
Resident Engineer: Responsible for all identifying and administering roadway improvements and repairs due to storm damage. Repairs included: v-ditch, trapezoidal channel, storm drain, curb & gutter, sidewalk, ADA ramp, AC paving, and basins. Performed quantity calculations and was themain point of contact between the developer and OCPW. Project Cost: $5 Million.
Caltrans District 12, On-Call Roadway Construction Inspection Services, Orange County, CA Assistant Resident Engineer / Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, labor compliance, interviews, traffic control reviews, and assuring compliance with project plans and specifications. Duties include identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner, maintaining awareness of safety and health requirements, and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.
City of Rialto, On Call Construction Management, Rialto, CA Project Manager / Construction Manager. Performs project management and CM services for Cactus Trail Improvement, J&K Auto Body Demolition, Willow Avenue and San Bernardino Ave Traffic Signal and Lighting, and Downtown Parking Lot Improvements Projects. Elements include paving, electrical, irrigation, landscape, removals, drainage, sidewalk, curb and gutter, ADA ramps, and fencing. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1697 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 36
Arezo Ghiam, PE, QSD
Caltrans District 7, On-Call Roadway Construction Inspection Services, Ventura, CA Assistant Resident Engineer / Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, labor compliance interviews, traffic control review, and assuring compliance with project plans and specifications. Duties include identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner, maintaining awareness of safety and health requirements, and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.
Rancho Mission Viejo Development, Cow Camp Road, 2B, Rancho Mission Viejo, CA Resident Engineer. The Cow Camp Road 2B Roadway & SMWD Improvements project is a new roadway construction that includes underground sewer, CMLC, and PVC waterlines, RCP storm drain and structures, dry utilities, concrete curb and sidewalk, street lighting, and asphalt paving. Arezo served as the main point of contact to verify the integrity of project elements. Arezo was responsible for verifying compliance with relevant specifications, codes, and regulations, ensuring monthly progress payments were accurate by performing quantity calculations, surveying critical project elements, and managing and preparing contract change orders. Project Cost: $37 Million.
Rancho Mission Viejo Development, Los Patrones Parkway, Rancho Mission Viejo, CA Resident Engineer. Provided technical and contract administrative expertise to enforce contract plans and specifications.
Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. Project Cost: $90 Million.
Orange County Transportation Authority (OCTA), I-5 HOV Improvement Project, San Juan Capistrano, CA Structures Inspector. Served as the main point of contact to verify the structural integrity of multiple elements including bridges, retaining walls, and sound walls per Caltrans standards and specifications. She was responsible for verifying compliance with relevant specifications, codes, and regulations, ensuring monthly progress payments were accurate by performing quantity calculations, surveying critical project elements, and managing and preparing contract change orders (CCO). Project Cost: $30 Million.
City of Riverside, Iowa Grade Separation, Riverside, CA Inspector provided technical and administrative support to make certain the work complied with relevant engineering standards, codes, specifications, and design instructions. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and obtained permits Processed and checked the monthly progress payments and performed field construction inspection. Project Cost: $24 Million.
City of Anaheim, I-5 / Gene Autry Way Project, Anaheim, CA Construction Inspector responsible for construction inspection duties of both road and structure (bridge) works. Inspected soil conditions, depth of footings and observed the pouring of foundations, and ensured monthly progress payments were accurate by performing quantity calculations. Collaborated with the Resident Engineer to prepare construction documents, calculations, project logs, meeting minutes, and requests for information (RFIs). Project Cost: $66 Million.
Rancho Mission Viejo Development, Gobernadora Canyon Bridge, Rancho Mission Viejo, CA Resident Engineer / Structure Representative. Responsible for construction of a seven span, 1340-foot long cast-inplace/prestressed concrete box girder bridge. Responsible for all aspects of contract administration including analyzing and approving structural support systems, shoring, concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, assuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures; drainage systems; and utility relocation. Project Cost: $32 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1698 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 37
JAVIER SOTO, PE, QSD/P
Construction Manager / Resident Engineer
EDUCATION
BS Civil Engineering,
University of Southern
California, Irvine, CA
MS, Civil Engineering,
University of Southern
California, Irvine, CA
REGISTRATION
CA, Professional Civil
Engineer, No. C56938
Qualified Stormwater
Developer (QSD), No.
22301
Qualified Stormwater
Practitioner (QSP), No.
20899
ProjectManagement
Professional (PMP), No.
1862750
Javier is a highly skilled public works engineer with over 25 years of experience in public works including over 15 years with design of roadway and bridges and over 10 years in construction as a Resident Engineer. Javier is well versed with both Greenbook and Caltrans Specifications and Standard Plans and has served as the Greenbook Surface Committee Chairman. He especially emphasizes on attention to quality control, project safety and NPDES requirements.
His expertise includes AC and PCC paving, traffic control, roadway excavation, flood control, sewers, drainage, soils testing, steel inspection and major public works projects. Javier is responsible for contract administration ensuring that complete, accurate and timely contract records were maintained in accordance with required regulations and guidelines. He prepares reports and monitors construction budgets and schedules, maintains records, prepares and processes change orders and field design changes and attends pre-construction meetings. He is also experienced in monitoring project status, contract expenditures, conducting meetings, communicating with contractors and monitoring permit requirements of all the project agencies about environmental impacts and concerns. In addition, prepared and maintained project documents including labor and equipment records and labor compliance reports.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7, On-Call Construction Engineering, Los Angeles, CA Lead Assistant Resident Engineer. Project included PN 0800000628; EA 08-368504: I-15 California Highway Patrol (CHP) Commercial Vehicle Enforcement Facility (CVEF), CaliforniaNevada State Line; PN 0800020458; EA 0Q7604: I-10 Rehabilitation, from Los Angeles County Line to I-10/ SR 38 (PM 0.0/30.9). Responsibilities included creating, updating and maintaining project submittal log and all other project specific quality control reports. Performed / supervised inspection of work in various disciplines as required. Verified and documented that all materials received for the project are in conformance with the approved submittal, handled and stored appropriately and are acceptable for use in the project. Assisted in resolution of nonconformance reports and coordinate quality assurance program with contractors. Maintained the project "as-built" drawings daily. Assembled and forwarded project closeout documents that include O&M manuals. Project Cost: $47.8 Million.
City of Rialto Riverside, Avenue Central Segment Improvement Project, Rialto CA Construction Manager. The Riverside Avenue Project spans approximately 1.5 miles. The limits of the project are 0.6 miles north of Route 10 and 2.8 miles south of Route 210. The project includes new asphalt pavement and striping along Riverside Avenue and pavement in adjacent streets. The project includes various curbs & gutters replacement / reconstruction, various driveways replacement, and all ramps and driveways will comply with current federal mandated ADA requirements. The new roadway is cement stabilized pulverized base (CSPB), hot mix asphalt-type A(HMA-A) and rubberized hot mix asphalt-gap graded (RHMA-G) per plans, specifications, and special provisions. Responsible for constructability reviews and change orders.
City of Yorba Linda, FY 22/23 Annual Pavement Preservation Project, Yorba Linda CA Construction Manager. The project covers a large area (Zone 5 and 6B) of Yorba Linda consisting of residential streets, local collectors, and arterial roadways. The work on this project consists of cold milling, micro-milling, asphalt concrete overlay of over 50,000 tons, asphalt concrete dugouts, slurry seals, construction of over 200 curb ramps (Caltrans standard plan A88A / A88B), construction of curb and gutter, drainage system, manholes/valve covers adjust to grade, installation of 30 loop detectors, pavement striping/markings. Coordination with various utility companies relating to the adjustment to the grade of their utilities. Project Cost: $11 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1699 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 38
Javier Soto, PE, QSD/P
County of San Bernardino, Redwood Avenue and Other Roads Overlay, Rialto, CA Lead Construction Inspector overseeing a $3 million roadway overlay project within the unincorporated County area of San Bernardino adjacent to the City of Fontana . The project consisted of 4.7 miles of mill and overlay with 1.64 miles of GlassPave 50 interlayer, localized asphalt roadway edge repairs, reconstruction of AC Dikes, concrete sidewalk and curb & gutter repairs and striping. Provided pre-constructions services such as a constructability review in verifying the bid quantities by conducting field measurements, reviewing project specifications to address outstanding items prior to start of work. Managed the QA Material Testing subconsultant contract and submitted/coordinated all materials testing for the project. Reviewed contractor submittals and RFI’s during the project and maintained an open line of communication with Contractor to address field issues and identify potential conflict issues or deficiencies to the appropriate parties. Provided onsite asphalt paving inspection, concrete pour inspection, asphalt dike placement and verified all work was completed in conformance with project plans and specifications. Coordinate with the contractor foreman, construction crew staff, soils technicians, maintained daily activity logs and daily inspection reports including project photos, prepared quantity calculation sheets and monthly pay estimates, supported and promoted a safe work environment while complying with safety rules, maintained project files and records. Project Cost: $3 Million.
County of Orange Public Works Department, Antonio Parkway Grind and Overlay North and South in Unincorporate Ladera Ranch, Ladera Ranch, CA
Resident Engineer. Projects consisted of lowering the utilities (manholes, water valves, etc.) prior to grind, Glasspave 25 install prior to overlay, 2” grind and overlay with ARHM with rock dust blotter application prior to opening traffic to prevent tracking and tire adhesion delamination, and 2 coats of striping. Oversaw the project schedule, progress payments to contractor, Request For Information (RFI) submittals, project close out acceptance. Ensured proper traffic control, appropriate NPDES BMPs installed and maintained, reviewed Quality Assurance materials testing for compliance with project specifications. Worked with internal Public Information Officer to ensure proper notification to the public, local civic committee and local schools for proper notification and avoid any potential upcoming events within the community. Project Cost: $3.3 Million.
County of Orange Public Works Department, Various Projects, Orange CA Construction Manager. The Construction Management Division consists of twenty-eight staff members; under my direction are resident engineers, inspectors and administrative staff. The Construction Management division provides construction inspection for road, bridges, flood control channels and various public works facilities with an annual capital improvement project budget cost over $100 million. As the construction manager, my main function is to coordinate with the resident engineers to resolve any outstanding items that could not be reached with the contractor or stake holders. In addition, he review / approve Contract Change Orders for adherence to contract documents. Also, on a monthly basis, review / approve progress payments in accord.
County of Orange Public Works Department, Special Projects Division, Orange, CA Resident Engineer. Implementation of Job Ordering Contract (JOC) construction maintenance projects. JOC entails in negotiating construction task orders, provide quality assurance inspection and collaborate with clients to refine scope of work and file all necessary paperwork at project completion. Manage the pavement maintenance program for the county with annual asphalt overlay and slurry seal projects of over $14 million annually. Construction work performed ranged from Asphalt grind and overlays utilizing Asphalt Concrete (AC) Type III and/or Asphalt Rubber Hot Mix (ARHM) to slurry seals, microsurface, seal coats, cape seals with Asphalt-Rubber Aggregate Membrane (ARAM). Also familiar with the utilization of Tensar Glasspave on asphalt overlays and geogrid on R&R stabilization for improve asphalt pavement longevity.
Experience with contract change orders, submittal reviews, constructability review, review/approve monthly progress payments and quantity concurrence with contractor, public relations collaboration with project stakeholders and outside agencies. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1700 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 39
VICTOR VALDOVINOS, PE, QSD/P
Construction Manager / Resident Engineer
EDUCATION
MBA California State
University, Pomona, CA
BS, Civil Engineering,
California State
University, Pomona, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 54687
Qualified SWPPP
Developer
Mr. Valdovinos brings over 28 years of extensive professional engineering and project delivery experience in government infrastructure. Having worked directly for the County of Orange for eight years, directly for the California Department of Transportation (Caltrans) for 14 years, and as a consultant for Orange County Transportation Authority (OCTA) for three years, Victor understands State, various agencies, County and City expectations and brings insider knowledge of government and Caltrans policies and procedures. Victor’s management background includes multi-discipline Construction management using state-ofthe-art technical design and tracking processes, developing effective working relationships with internal clients and regional funding agencies, as well as local municipalities. Victor combines his knowledge and experience with strong leadership, management, and technical skills to meet and exceed client standards set for the constituents they represent.
As a Project Manager / Resident Engineer for Orange County Transportation Authority (OCTA) for three years, Victor understands State, County, City, and funding agency expectations and brings insider knowledge of government and Caltrans policies and procedures to the project.
RELEVANT PROJECT EXPERIENCE
San Diego Association of Governments (SANDAG), San Diego River Double Track (SDARDAT) (CMGC), San Diego, CA
Project Manager / Resident Engineer This project includes the replacement of the existing San Diego River Bridge Track Bridge with a double track; the project added a second main track from Tecolote Road to just north of the Old Town Transit Center. The new 0.9-mile track connects to existing double track at each end, resulting in a continuous seven-mile double track segment for the southernmost portion of the LOSSAN coastal rail corridor from Garnet Avenue/Balboa Avenue to the Santa Fe Depot. The project includes the construction of a 7-span double track bridge over the San Diego River. The bridge is place on 6-bents that are constructed on deep pile foundation via the installation of 6- 11ft diameter CIDH- 150 ft deep.
Construction also included 1,000 ft of MSE wall, and drainage improvements. Victor’s responsibilities included managing the complete project CM staff and contract execution and overall quality assurance and related documentation for the construction project. He was the single point of contact for the contractor on all issues, including the evaluation and resolution of potential and active change orders pertaining to project construction. Project Cost: $64 Million.
Caltrans District 7, I-10 Widening from the SR-57 Interchange to Indian Hills Boulevard, Pomona, CA Senior Resident Engineer. Victor was responsible for $50 million constructed five bridges and 6 miles of freeway widening, five bridges: 11-miles of Retaining Wall / Soundwall. Responsible for coordinating with third-party entities such as the public, adjacent projects, local agencies, utility companies, consultants and other stakeholders. Project Cost: $50 Million.
Caltrans District 7, SR-57/SR-60 Interchange, Diamond Bar and City of Walnut, CA Senior Resident Engineer. This $60 million project constructed 2.4 miles of direct-connect high occupancy vehicle (HOV) lanes (one lane in both direction) from the SR-57 to the SR-60 using 11-foot diameter, 100-feet-long CIDH (wet hole) piles with the slurry displacement method, two CIP/post-tension box girder bridges and 29 span bridges. The project also used soil cements, soil nail walls, retaining walls, MSE walls and sound walls and installed wick drains. Responsible for construction administration, inspection and infrastructure, including roadway rehabilitation and reconstruction, grading, staging and detour design, pavement delineation, storm drainage, utility evaluation, structure construction, landscape coordination, construction cost estimating, technical report preparation and specifications. Project Cost: $60 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1701 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 40
Victor Valdovinos
OCTA, Tustin / Rose Grade Separation, Anaheim and Placentia, CA Construction Manager / Resident Engineer This $38 million project includes raising arterial Tustin/Rose Avenue over the existing dual Burlington Northern and Santa Fe (BNSF) railroad tracks, Attwood Channel, and Orangethorpe Drive by constructing one 450-foot-long, four-span, eight-lane-wide bridge founded on 10 96-inch CIDH piles and driven concrete piles.
It also merges a box girder bridge with pre-stressed concrete girders over the BNSF tracks. One 450-foot-long, four-span, eight-lane-wide bridge; 10 96-inch CIDH and driven concrete piles. Victor was responsible for contract execution and overall quality of work and related documentation. He is the single point of contact for the contractor on all issues, including the evaluation and resolution of potential and active change orders pertaining to project construction. Project Cost: $38 Million.
Caltrans District 12, I-5 Reconstruction from Katella to State College, Anaheim, CA Resident Engineer Responsible for this $60 million, one mile of complete freeway reconstruction. This project included the I-5 freeway reconstruction in a major urban setting adjacent to Disneyland, from Katella Avenue to State College Boulevard. He was responsible for construction administration and inspection. He was the single point of contact for all public outreach aspects of construction, reconstruction, grading, staging detour design, pavement delineation, storm drainage, utility evaluation, relocation and design, landscape coordination, cost estimating, and specifications. Project Cost: $60 Million.
Caltrans District 12, SR-55 Construction Project, City of Tustin and City of Orange, CA Resident Engineer for the $62 million SR-55 construction project within the Cities of Tustin and Orange. Constructed three bridges over the SR-55 freeway and placed two miles of sound walls, installed six signalized intersections placed over three miles of storm drains including RCP, HDP, and drainage inlets. Assure contract compliance with plans and specifications, permits, and design standards. Project Cost: $62 Million.
Orange County Public Works and Engineering Services, Various Projects, Santa Ana, CA Construction Manager. Responsible for the Construction Program for the County of Orange which included a variety of capital improvement projects for both road and flood facilities. These projects widened Ortega Highway, constructed the Los Alamitos Pump Station, and widening of the Fullerton Creek Channel. Responsible for processing monthly progress payments and contract change orders to the contractor, making recommendations to the county Board of Supervisors, reviewing and approving construction project schedules, authorizing expenditures of public funds and ,overseeing the Public Works Construction Division activities, operating policies, construction of projects and staffing. Project Cost: $300 Million.
Rancho Mission Viejo Development, Cow Camp Road 2A, Rancho Mission Viejo, CA Resident Engineer. Responsible for ensuring compliance with plans and specifications on all phases of construction improvements and contract administration including CCOs and scheduling analysis. This $32 million construction project includes a 1,400 ft long, 8-span, cast-in-place concrete box girder bridge. The project consists of constructing a new bridge; drainage systems; and utility relocations over the Gobernadora Creek that connects to the San Juan Creek in the County of Orange. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and obtained permits. Processed and checked the monthly progress payments and performed field construction. Project Cost: $32 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1702 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 41
JAVID SHARIFI, PE, QSD
Construction Manager / Resident Engineer
EDUCATION
MS, Civil Engineering
University of California
Berkeley, CA
BS, Civil Engineering,
University of
Massachusetts, MA
REGISTRATION
CA, Professional Civil
Engineer, No. 60926
Qualified SWPPP
Developer
Javid has 21 years of experience in construction management and project management, including 12 years with Caltrans and 3 years as Capital Projects manager for the Orange County Public Works, and 4 years of infrastructure construction management in the private sector. he has worked on new bridge construction, bridge widening, seismic retrofits, retaining walls, sound walls, roadway improvements, freeway widening with JPCP and AC pavements. He can analyze and approve structural support systems, shoring, concrete mix designs and various shop drawings; determine vertical elevations for various structures; train and supervise personnel in numerous aspects of contract administration; and coordinate various traffic control systems with other projects within the project location.
Javid’s experience includes verifying monthly progress pay estimates, extra work reports, contract change orders, labor and equipment records, correspondence, personnel records, verifying SWPPP compliance, processing submittals of RFI’s weekly statement of working days, change orders, punch-list, and as-builts. He ensures that materials and completed work comply with plans, specifications, and design criteria, ensuring that the maintenance of project records complies with the Caltrans manual, ensuring the performance of all safety-related activities, implements security procedures, coordinates survey and materials testing, as well as processes control documents, submittals, RFI’s, weekly statement of working days, change orders, work change directives, daily construction reports, and compliance with NPDES and Caltrans encroachment permit requirements. Javid is intimately familiar with Caltrans standards, policies and procedures, and Construction Technical Manuals. He has been involved with numerous projects that were built to Caltrans standards. Javid prepares daily diaries, reviews submittals, responds to RFI’s, and enforces the contract plans and specifications. He has excellent oral and written communication skills and is well versed with Microsoft office software along with various other engineering software generally used in construction management.
RELEVANT PROJECT EXPERIENCE
Orange County Public Works, La Canada Prima Deshecha Canada Channel, MO 1, San Clemente, CA Resident Engineer. Project involves the rehabilitation of the Prima Deshecha Canada Channel double box culvert by adding reinforced concrete lining in both cells for approximately 160 feet. Elements involve structure excavation and backfill, reinforced structural concrete, falsework/roof slab grading and inspection. Responsibilities include ensuring compliance with the contract requirements, field verification inspections, daily documentation of construction activities, review of submittals, quantity calculations, assisting in preparation of change orders and progress pay estimates, scheduling materials testing, monitoring safety, SWPPP, and preparing as-built plans and final punch lists and project closeout documents. Project Cost:
$4 Million.
SANDAG, Mid-Coast Corridor Improvement Projects, San Diego Resident Engineer. The Mid-Coast Corridor Improvement Projects Segments 1 & amp; 2 is to construct a double track for MTS light rail transit which included construction of 3 CIP/PS box girder bridges, a PC/PS overhead, and removing and replacing heavy rail steel bridge over the San Diego river; MSE, CIP retaining walls, ground anchor and soil nail walls; drainage systems; large diameter wet CIDH piles; reconstruction of NB I-5 off-ramp to Balboa Avenue, reconstruction of Rose Creek Channel at SR-52, compaction grouting and rigid inclusion ground improvements, coordination with North County Transit District, San Diego MTS, Caltrans and City of San Diego. Responsible for reviewing submittals including but not limited to shoring, slope stability, falsework, pile placement plan, and welding quality control plan. Project Cost: $500 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1703 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 42
Javid Sharifi, PE, QSD
Orange County Public Works, Job Order Contracting Construction Inspection, Orange County, CA Resident Engineer. Responsibilities include review of baseline schedule, submittal reviews, construction inspection, preparation of daily reports, item quantities, NDPES reports, and closeout documents for structure rehabilitation of various task orders including: Crown Valley Pkwy Bridge polyester overlay and joint seal assembly replacement, Segerstrom Ave.
Bridge joint seal replacement and concrete barrier repair, and Phase I Rehabilitation of Various Bridges over Santa Ana River to enhance public safety at bridge abutments adjacent to trail and maintenance road by constructing shotcrete barriers, steel security fencing, and installing steel gates.
Orange County Transportation Authority (OCTA), Tustin/Rose Grade Separation, Anaheim and Placentia, CA Resident Engineer. This Federally funded project included construction of a 3-span hybrid bridge, CIP/PS box girderprecast/prestressed girder over double tracks and Atwood Channel;MSE retaining walls; CIP retaining walls; large diameter wet CIDH piles; architectural treated railing with streetlight pilasters; drainage systems including inlets, BMPs. Coordination with cities of Anaheim and Placentia along with Orange County Flood Control District, Caltrans, and BNSF. Responsible for reviewing submittals including but not limited to shoring, slope stability, falsework, pile placement plan, and welding quality control plan. Project also included construction of pavement, sidewalk, ADA curb ramps, curb and gutter, drainage systems including inlets, BMPs, sewermanholes, striping and traffic signals. Coordination with cities of Anaheim and Placentia along with Orange County Flood Control District and BNSF rail. Construction Cost: $31 Million.
Orange County Public Works, Lincoln Avenue Widening over Santa Ana River, Anaheim and Orange, CA Resident Engineer. This project provided for widening the Lincoln Ave. Bridge with CIP concrete box girder bridges, improving the road from a 4-lane primary highway to a six-lane arterial highway to allow for ultimate capacity and construction sidewalk gap closures to allow for pedestrian access. Responsible for developing plans, specifications and estimates, advertisement, and the award of a construction contract along with providing construction support by reviewing a steel pile placement plan, falsework shop drawings, and excavation safety plans. Project Cost: $9 Million.
Orange County Public Works, Edinger Avenue Bridge Widening over Santa Ana River, Santa Ana / Fountain Valley Resident Engineer. This project provided for widening the Edinger Ave. Bridge from a 4-lane primary highway to a six-lane arterial highway to allow for ultimate capacity. Responsible for developing plans, specifications and estimates, advertisement and award of the construction contract along with providing oversight review of and construction support for steel pile driving, falsework shop drawings, PC/PS girder shop drawings, excavation safety plans, and girder erection and placement plan.
Project Cost: $7 Million.
Caltrans District 7, SR-47 / SR-103 Schuler Heim Bridge Replacement, Long Beach and Los Angeles, CA Senior Area Bridge Engineer. Project provided for replacement of the existing main span and approaches steel bridges with CIP/PS box girder with post-tensioned deck on large diameter pile shafts with permanent casing over the Cerritos Channel.
The Project included soil-cement mixing, MSE’s, and removal of the existing bridge in multiple phases. Responsible for constructability review and assisting with development of the risk plan/register. Project Cost: $180 Million.
Caltrans District 7, I-110 Widening from the Washington Boulevard to Wilshire Boulevard, Los Angeles, CA Senior Area Bridge Engineer. This project provided for construction of auxiliary lanes and modification of ramps which included bridge replacement and widenings on the South I-110 to the West I-10 viaduct, Olympic Boulevard, Ninth Street and Eleventh Street. Responsibilities included but not limited to quality assurance review of falsework shop drawings, SWPPP, and CPM schedule. Project Cost: $10 Million.
Orange County Public Works, Midway City Street and Drainage Improvements Phase III, Orange County Area Resident Engineer. Project included subgrade stabilization,monitoring storm water compliance, permanent BMPs; drainage systems, pavement reconstruction and rehabilitation, ADA curb ramps, curb /gutter and sidewalks. Construction Cost: $7 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1704 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 43
TYRONE TAYLOR, PE, QSD
Construction Manager / Resident Engineer
EDUCATION
BS, Civil Engineering
California State University
Long Beach, CA
Bridge Design Academy,
Caltrans, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 66867
Qualified SWPPP
Developer
Mr. Taylor has a 20-year record of intensive civil engineering experience with Public Works projects overseeing all phases of multimillion-dollar construction and infrastructure for public agencies. He is responsible for the day-to-day communication with the Contractor, including addressing and resolving project issues that impede progress, coordinating with the City39 Design Consultant in addressing RFls and resolving plan discrepancies, and directing and coordinating the field staff to ensure that the Contractor is complying with the contract documents. He is familiar and experienced with using, developing, and reviewing large and complex CPM construction schedules, and Excel spreadsheets. His experience on projects includes contract administration, field supervision, procurement, and interacting with all project team members including the owner, designers, consultants, regulatory agencies, and contractors. Mr. Taylor’s experience includes planned residential and commercial developments and major drainage systems with large box culverts, open channels detention basins, CIDH piling systems, and driven piles (H-piles, CISS, and PCPS Concrete pile). addition Tyrone has worked on new bridge construction, bridge widening, seismic retrofits, retaining walls, sound walls, roadway improvements, and freeway widening with JPCP and AC pavements. He has an in-depth knowledge of Caltrans design and construction manuals in highway and structures disciplines, Caltrans standard filing system, materials inspection and certification procedures and documentation, falsework, shoring, and prestressing shopdrawing and calculations review, concrete mix designs, special RSC mixes and application, PCPS piles and girders fabrication plans, bridge removal plans. He has a thorough knowledge of public works construction practices and the ability to read and interpret plans and specifications. He analyzes and approves structural support systems, shoring, concrete mix designs and various shop drawings; determine vertical elevations for various structures; train and supervise personnel in numerous aspects of contract administration; and coordinate various traffic control systems with other projects within the project location.
RELEVANT PROJECT EXPERIENCE
City of Newport Beach, Park Avenue Bridge Replacement – Newport Beach, CA Resident Engineer. This project consisted of the replacement of a 110-foot long, 3 span, pre-cast pre-stressed girder bridge with 2 abutments founded on 24-inch secant CIDH piles and two 4-column piers founded on 30-inch CIDH piles.
Responsibilities include all aspects of contract administration including analyzing and approving temporary structural support systems, shoring, concrete mix designs, and various shop drawings; developing structure grades from 4-scale drawings; quantity calculations; materials sampling and control; ensuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures; drainage systems; and utility relocation. Project Cost: $9 Million.
Cadanera Development, Construction of Domestic Water Facilities Suburban Water District, West Covina, CA Resident Engineer. Responsible for inspection to ensure compliance with Water District plans, specifications and policies; prepared progress pay estimates, change orders and other documentation related to the constructionmanagement of Water District 39 projects; maintained and enforced schedules; prepares daily inspection reports. Compiled and reported information for and quote; as-built and quote; plans; reviewed preliminary plans and shop drawings to avoid construction problems and conflicts. Tyrone made recommendations to the Construction Services Manager regarding the solution of special construction problems and conditions. Coordinated construction surveys, soils and materials testing and other testing services. In addition, coordinated construction and inspection services with other agencies and other concerned parties; met and conferred with representatives of utility companies, contractors, public agencies and the public; answers citizen complaints and requests for information.
Agreements for Professional Services to perform As-Needed Professional C... Page 1705 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 44
Tyrone Taylor, PE, QSD/P
City of Placentia, Bradford Avenue Overcrossing, Placentia CA Resident Engineer / Structures Representative. Responsible for constructing a steel truss pedestrian bridge over Metro rail line and BNSF rail lines. Project Cost: $19 Million.
Rancho Mission Viejo Development, Gobernadora Canyon Bridge, Rancho Mission Viejo, CA Resident Engineer / Structures Representative. Responsible for construction of a seven span, 1340-foot-long cast-inplace/prestressed concrete box girder bridge. Responsible for all aspects of contract administration including analyzing and approving structural support systems, shoring, concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, assuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures; drainage systems; and utility relocation. Project Cost: $32 Million.
The Lakes Development, Construction of Domestic Water Facilities Suburban Water District, West Covina, CA Resident Engineer. Responsible for inspection to ensure compliance with Water District plans, specifications and policies; prepared progress pay estimates, change orders and other documentation related to the constructionmanagement of Water District & No. 39’s projects; maintained and enforced schedules; prepares daily inspection reports. Compiled and reported information for "e as-built and quote; plans; reviewed preliminary plans and shop drawings to avoid construction problems and conflicts. Made recommendations to the Construction Services Manager regarding the solution of special construction problems and conditions. Coordinated construction surveys, soils and materials testing and other testing services.
Caltrans District 12, I-5 Widening SR-73 to Crown Valley Parkway, Mission Viejo / Laguna Niguel, CA Principal Assistant Resident Engineer. Responsible for ensuring compliance with specifications and plans on all phases of roadway construction. Reconstruct and improve the Avery Parkway Interchange; Crown Valley Parkway on and off ramps; and widen the I-5 between SR-73 to Crown Valley Parkway. Major elements of work included the construction of jointed plane concrete pavement (JPCP); HMA pavement; storm drain systems; bridge & retaining walls; storm drain systems; concrete barrier; mid-west guardrail systems; and electrical systems modifications Project Cost: $108 Million.
Caltrans District 7, Commodore Schuyler Heim Drawbridge Rehabilitation, Terminal Island, CA Assistant Structures Representative responsible for all aspects of contract administration including the inspection, documentation of bridge construction and addressing field changes; analyzing, review and application of falsework drawings, paint quality work plans, and welding quality control plans, to ensure compliance with contract plans / specifications and local/environmental requirements. Duties included the coordination with the Ports of Long Beach / Los Angeles, US Coast Guard, SCAQMD, Caltrans Maintenance, utility owners and local residents. Project Cost: $3 Million.
City of El Segundo / Caltrans District 7 Oversight, Douglas Street Grade Separation, El Segundo, CA Resident Engineer. Responsible for constructing two bridges (a railroad bridge and a pedestrian bridge) to separate the grade on Douglas Street between Park Place and Alaska Avenue. Responsible for all aspects of contract administration including analyzing and approving structural support systems, shoring, concrete mix designs and various shop drawings. Services included providing constructability review and scheduling, comprehensive construction management, inspection services, contract administration and document control, surveying, testing, claims management, scheduling and public relations for the City of El Segundo, Metropolitan Transportation Authority and Caltrans District 7 Douglas Street Grade Separation in El Segundo, CA. Project Cost: $19 Million.
Rancho Mission Viejo Development, Cow Camp Road, Rancho Mission Viejo, CA Lead Inspector. Performed all required engineering inspection of structural, mechanical, architectural, shoring and trenching work and conducting progress meetings, construction administration.
Agreements for Professional Services to perform As-Needed Professional C... Page 1706 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 45
AZIN SADEGHI, PE
Construction Manager / Resident Engineer
EDUCATION
MS, Civil Engineering /
Construction
Management, California
State University,
Fullerton, CA
BS, Civil & Architectural
Engineering, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 88293
Ms. Sadeghi’s experienced in inspection of roadways. Her experience includes field inspection for concrete pavement, roadway excavation, trench excavation, culverts, gutter, asphalt surfacing, traffic control, and concrete pour for ADA Ramps. She verifies that contractors and sub-contractors work is in compliance with Standard Specifications and Special Provisions. She has also coordinated material testing, surveying, and utility installations. She has reviewed submittals and RFI's, processed change order calculations and modification to plans to optimize construction.
Experienced in closing out the projects, finalizing quantities, processing last payment.
Attends weekly crew safety meeting and maintains good working relationship with government agencies, subcontractors and field personnel. She has successfully partnered with multiple government agencies: County of Orange, County of LA, City of LA, LADBS, LABOE, Metro, Caltrans (Partnership Award), OCTA, City of Anaheim, City of Carson, City of San Mateo, City of San Francisco, NFS, LAWA, and BART. She has also prepared as-built plans, and final punch lists. Her effective communication skills enable her to promote cooperation between all project stakeholders. She is experienced in document control, computer software, analyses and modeling the project for constructability review. Software experience includes AutoCAD, Sure Trak, MATLAB, Microsoft Office, and Word. She is multilingual in English, Farsi, and Arabic.
RELEVANT PROJECT EXPERIENCE
City of Pasadena, Pasadena Bridge Seismic Retrofit, Pasadena, CA Construction Manager. Conducted field surveying and performed field layout for roadway work. Coordinated conflicts with design engineers and government agencies to deliver successful project. Reviewed submittals, RFI’s, Traffic Control Request, and extra work. Reviewed and approved daily timesheets, updated quantities (Material / Labor). Calculated quantities for progress payments, percentage complete per work item. Project Cost: $7 Million City of Anaheim, Lakeview Separation, Anaheim, CA
Construction Manager. Constantly, collaborated with City of Anaheim, OCTA and BNFS to build Lakeview Overhead Bridge at Orangethorpe railroad crossing to widen the east side of Lakeview Avenue, north of Mira Loma Avenue, to alleviate the current bottle-neck and provide consistent transition to the proposed Grade Separation on Lakeview Avenue. Conducted field surveying and performed field layout for roadway work. Coordinated conflicts with design engineers and government agencies to deliver successful project. Reviewed submittals, RFI’s, Traffic Control Request, and extra work. Reviewed and approved daily timesheets, updated quantities (Material / Labor). Calculated quantities for progress payments, percentage complete per work item. Project Cost: $20 Million.
City of Carson, I-405 / Wilmington Avenue Interchange, Carson, CA Construction Manager. Project included I-405 Widening at the Dominguez Channel and auxiliary lane, new Northbound I-405 On-Ramp at Wilmington Avenue, Ramp modifications, widening of Wilmington Avenue from E. 223rd Street to E. 220th Street, bridge retrofit over Dominguez Channel, and Traffic Signal Synchronization Conducted field surveying and performed field layout for district work. Prepared and managed submittals, RFI’s, and Traffic Control Request, Reviewed and approved daily timesheets, and updated quantities (Material / Labor).
Calculated progress payments, percent completed per work item. Project Cost: $15 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1707 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 46
Azin Sadeghi
Caltrans District 12, SR 91 / SR-55 Widening, Anaheim, CA Construction Manager. Project widen and make operational improvements, including reconstructing ramps, bridges, and connectors on State Route 91 (SR-91), from west of State College Boulevard to east of Lakeview Avenue, Post Mile (PM) 4.8 to PM R10.4, SR-57 from PM 15.6 to 16.1, and SR-55 from PM 17.5 to R17.9 in the cities of Anaheim, Fullerton, Orange, and Placentia in Orange County. This segment of SR-91 crosses the Santa Ana River and the OCTA/SCRRA Railroad.) Conducted field surveying and performed field layout for district work. Coordinated permit requirements with government agencies to deliver successful project. Prepared and managed submittals, RFI’s, Traffic Control Request, processed extra work payments. Reviewed and approved daily diaries, with quantities (Material / Labor). Submitted monthly pay estimate, calculated material and work quantity requirements; reviewed progress pay application, percentage complete per work item. Performed CPM schedule review, schedule reports, and Time Impact Analysis. Project Cost: $9 Million.
County of Orange, Orange, CA
Construction Manager. Project widen and make operational improvements, including reconstructing ramps, bridges, and connectors. Responsible for coordinating and monitoring construction activities and miscellaneous A-E procurement contracts and proposals. Collaborated with cross functional departments within County of Orange to accommodate project changes updates. Updated project management reporting tools and tracked schedule using MS Project. Monitored and updated budget spreadsheets for managerial authorization Microsoft Excel. In addition, he performed construction stakeout for landfill development and established G.P.S controls and performed surveys for road construction, landfill drainage, and map creation. Project Cost: Various.
BART, San Francisco, CA
Project Manager. Responsible for monitoring the scope, schedule and budget on daily basis. Provided senior leadership, andmentoring engineering staff to resolve construction issues on daily basis to accomplish the work in an efficient, profitable and safe manner. Managed all contractual commitments with subcontractors to ensure that work is being delivered in accordance with the contract requirements. Demonstrated creative, foresight and mature engineering judgment in anticipating and solving unprecedented construction problems. cost-effectiveness of plans and interprets the design and application of the adopted construction methods. Developed positive relationship with client to manage scope changes and negotiate change orders in timely manner. Responsible for overall forecasting, cost management, contingency planning and claim project quantities on Viewpoint to meet profitability goals.
Updated project progress schedule, creating long- and short-term plans andmilestones.Managed TIA (Time Impact Analysis) as needed tominimize negative impact. The project included reconfiguring and reopening the station's restrooms, installing LED lighting on the BART platform and the installation of five-foot-tall glass barriers and the relocation of existing fare gates to help improve passenger flow; as well as moving ticket vendingmachines to the middle of the concourse near the Westfield San Francisco Centre's entrance. Project Cost: $14 Million.
LAWA, LAX LAMP / LULEP Design-Build Project JV – Los Angeles, CA Managed Design/Build project; oversaw all aspects of design, procurement, contracts and construction. Performed constructability review on drawings from early design stages to RFC (Release for Construction) drawings within different task orders to support design team. Coordinated with City of LA and LAWA to satisfy the client permit requirements. Implemented construction input into the bid packages and participated in bid review/closing to ensure the bid accuracy. Identified design/construction risks in early design stages to support procurement team to finalize the cost proposal; Negotiated the Component Guaranteed Maximum Price (CGMP) with LAWA Executives.
Provided professional environment, prioritized workload for my team to maintain transmitting/submitting project reports and documents. Provided dynamic technical supervision and guidance to resolve construction issues.
Managed over 10 subcontractors to ensure quality control measurement implemented. Generated baseline schedule, Updated 4 Week look ahead on weekly basis to deliver project on time. Project Cost: $17 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1708 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 47
JAIME ENGLER, PE, QSD/P
Construction Manager / Resident Engineer
EDUCATION
MS, Civil
Engineering/Construction
Management, California
State University, Fullerton,
CA
BS, Civil Engineering,
California State University,
Fullerton, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 69858
Qualified SWPPP Developer /
Practitioner
Mr. Engler has more than 16 years of Design, Project Management, Construction Management, and Field Inspection experience in public works construction. His project experience includes performing as Project Manager, Construction Manager, Lead Assistant Resident Engineer, and Office Engineer. He has also worked on a large variety of public works project including but not limited to: highway widening and improvements, bridge widening and reconstruction, HMA and JPCP pavement, drainage construction, utility construction and relocation, water/wastewater, land and commercial development, and private housing and track developments. He has extensive experience with Structural Concrete,Minor Concrete, Paving, Traffic Control, MBGR, Drainage, Water and Sewer Lines, Electrical, Landscape, Safety, Labor Compliance, and SWPPP. Duties include but not limited to construction management and engineering, construction inspection and Quality Control, daily reports and quantities take-offs, review and monitor schedule of work, compliance enforcement of plans and specifications and certificates, review shop drawings, review change orders, review submittals and RFI’s, safety compliance, preparing and reviewing asbuilt plans, preparing final punch list, and project closeout. Mr. Engler has extensive experience with Caltrans Standard Plans and Specifications, Caltrans Construction Manual, Caltrans Structures Manual, Caltrans Safety Manual, Caltrans Design Manual, OSHA Safety Manual, Traffic Control Manual, WATCH Manual, Green Book, and APWA Standards.
RELEVANT PROJECT EXPERIENCE
San Bernardino County Public Works, Heaps Peak Transfer Station, Running Springs, CA Construction Structure Engineer. Project includes construction of 70-feet and 40-feet scales, scale house and civil improvements. Responsibilities includes reviewing of submittals, shop drawings, welding procedure specifications, and concrete mix designs; documentation tracking, updating logs, coordination with County staff, maintaining the project quality control (QC) and QA documents, progress payments, attending progress meetings and monitoring safety. Construction Cost: $2.9 Million.
Caltrans District 8, SR 58 Realignment & New Construction, Barstow CA Resident Engineer The project included the realignment and new construction on the SR-58 for a 10-mile expressway in Hinkley. Responsible for Traffic Control, Striping, HMA removals and paving, JPCP removal and paving, slab replacement, shoulder backing, shoulder paving, drainage, K-Rail, concrete barriers, water carrying barriers, clean-outs, Falsework, bridge foundations and footings, Soil Nail Walls, Tie Back Walls, MSE Walls, Retaining Walls, Sound Walls, ADL removals, Safety, SWPPP, and striping Work also included producing daily diaries and photos, monitor contractor progress and pay estimate, review and assist in responding to correspondence, review and assist in responding to RFI’s, review and assist in change orders, review and assist in submittals, review and respond to CPM Schedule updates, and assisted in filing project documents.
Caltrans District 8, SR 58 Realignment & New Construction, Barstow CA Resident Engineer. Project consisted of JPCP and HMA pavement rehabilitation and widening of roadway and shoulders on I-5 in Gorman, CA. Duties included but not limited to inspection of Traffic Control, Striping, HMA removal and paving, JPCP removal and paving, slab replacement, shoulder backing, shoulder paving, drainage, KRail, concrete barriers, water carrying barriers, clean-outs, ADL removals, Safety, and SWPPP. Work also included assisting the Resident Engineer with office procedures, construction inspection, field verification, produce daily diaries and photos, monitor contractor progress and produce pay estimate quantities, perform safety inspections, perform SWPPP inspections, conduct employee interviews, review and prepare Change Orders, assist in responding to correspondences, assist in reviewing RFI’s, assist in reviewing submittals, review CPM Schedule updates, assist in responding to claims, and filing project documents. Project Cost: $150 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1709 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 48
Jaime Engler
Caltrans District 12, SR 22 Design Build Highway Widening Project, Orange County Transportation Authority, Orange County, CA
Resident Engineer. Project consisted of widening and rehab improvements on SR-22. Duties included but not limited to inspection Traffic Control, Striping, HMA removals and paving, JPCP removal and paving, slab replacement, shoulder backing, shoulder paving, drainage, K-Rail, concrete barriers, water carrying barriers, clean-outs, Falsework, bridge foundations and footings, Soil Nail Walls, Tie Back Walls, MSE Walls, Retaining Walls, Sound Walls, ADL removals, Safety, SWPPP, and striping Work also included producing daily diaries and photos, monitor contractor progress and pay estimate, review and assist in responding to correspondence, review and assist in responding to RFI’s, review and assist in change orders, review and assist in submittals, review and respond to CPM Schedule updates, and assisted in filing project documents. Project Cost: $900 Million.
Caltrans District 12 and City of Newport Beach, NB Jamboree Road Bridge Widening, Newport Beach CA Lead Resident Engineer Project consisted of widening of NB Jamboree Road in Newport Beach, CA. Duties included but not limited to inspection of Traffic Control, Striping, HMA removal and paving, JPCP removal and paving, bridge widening, drainage, K-Rail, retaining walls, piles, soil nail walls, concrete barriers, water carrying barriers, clean-outs, ADL removals, Safety, and SWPPP. Duties also included assisting the Resident Engineer with office procedures.
Project Cost: $3.5 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1710 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 49
NICHOLAS HADDAD, PE, QSD
Construction Manager / Resident Engineer
EDUCATION
MS, Civil Engineering,
Geotechnical
Engineering University of
Colorado, Denver, CO
BS, Civil Engineering,
California State
University, Long Beach,
CA
REGISTRATION
CA, Professional Civil
Engineer, No. 80737
Qualified SWPPP
Developer
Mr. Haddad has 33 years of experience in Caltrans highway construction. He has served as a Lead Inspector for 14 years. He is experienced in construction inspection and office engineering and is an effective, experienced and strong supervisor who can communicate clearly with clients, staff, team members, and other Stakeholders. Mr. Haddad’s extensive experience encompasses planning, site development, design, construction and management of infrastructure projects, including roadways, highways, bridges, storm drainage, sewer and water, underground utilities and geotechnical investigations. Nick has knowledge of current Caltrans processes and procedures, civil engineering procedures, state and federal transportation practices, and regulatory laws, ordinances, and codes. He is experienced in assisting the Resident Engineer in all aspects of construction management from review of shop drawings, to monitoring and documenting progress, ensuring safe practices are followed, writing Daily Progress Reports, Quality Assurance/ Quality Control (QA/QC), tracking potential issues, analyzing Contract Change Orders (CCOs) and progress payments, In addition, he assist in claim analysis and resolution. He is experienced with generating and analyzing Critical Path Method (CPM) schedules with respect to time, resources and costs, monitoring as-built work, and performing Time Impact Analysis (TIA). He has also been the lead in assuring safety.
Provided compliance on projects where he was responsible for safety plans, compliance, oversight, and all safety related issues on projects. He is proficient in the use of software programs such as MS Office and scheduling software including Primavera P6 and Sure Trak. Most importantly, Nick is an expert in Caltrans requirements, which has helped him deliver multiple projects on schedule and within budget.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7, LA Metro I-5 NCEP Project, Santa Clarita, CA Resident Engineer. Responsible for overseeing daily inspection, assigning in inspector duties. Coordinate night shifts with contractor. Review and approve closures. Submit COZEEP requests. Responsible for pay estimate and review quantities and keeping track. Request plant and field tests and coordinate with contractor. Utility Relocations, Reviewing quantities and monthly estimates. Utilizing Headlight for Diaries and Unifier for Document Control.
Overseeing all Roadway inspectors CPM base line and updates. Also, responsible for responding to RFI’s, reviewing Submittals and writing change orders. In addition, involved in conducting weekly meetings and coordination with the city, Caltrans, County and OHL.
Inland Valley Development Agency (IVDA), Mountain Avenue Widening, San Bernardino, CA Resident Engineer. Responsible for overseeing daily inspection, utilities relocations, reviewing monthly estimate CPM base line and updates. Also, responsible for responding to RFI’s and writing change orders. In addition, involved in conducting weekly meetings and coordination with the City of Redlands and San Bernardino. Project Cost: $400 Million.
Caltrans District 8 (EA 08347704), On-Call Construction Engineering Services, San Bernardino, CA Lead Assistant Resident Engineer. Realign Highway 58 from San Bernardino County Line 6 miles East of Kramer Junction. Responsible for creating, updating and maintaining the project submittal log and all other project specific quality control reports. Performed and supervised inspection of work in various disciplines as required. Verified document that all materials received for the project were in conformance with the approved submittal, handled and stored appropriately and were acceptable for use in the project. Assisted in resolution of non-conformance reports, coordinated quality assurance program with contractors. Maintained project "as-built" drawings daily. Assembled and forwarded project. Project Cost: $47.7 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1711 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 50
Nicholas Haddad
Caltrans District 7, On-Call Construction Engineering, Los Angeles, CA Lead Assistant Resident Engineer. Project included EA 07302904 and EA 07-302104 Pavement Rehabilitation on I-5 Truck Route. Responsibilities included creating, updating and maintaining the project submittal log and all other project specific quality control reports, Performed and supervised inspection of work in various disciplines as required. Verified and documented all materials received for the project are in conformance with the approved submittal, handled and stored appropriately and are acceptable for use in the project. Project Cost: $15 Million.
Caltrans District 7, On-Call Construction Engineering, Los Angeles, CA Lead Assistant Resident Engineer. Project included PN 0800000628; EA 08-368504: I-15 California Highway Patrol (CHP) Commercial Vehicle Enforcement Facility (CVEF), California-Nevada State Line; PN 0800020458; EA 0Q7604: I-10 Rehabilitation, from Los Angeles County Line to I-10/ SR 38. Responsibilities included creating, updating and maintaining project submittal log and all other project specific quality control reports. Performed / supervised inspection of work in various disciplines as required. Verified and documented that all materials received for the project are in conformance with the approved submittal, handled and stored appropriately and are acceptable for use in the project. Assisted in resolution of non-conformance reports and coordinate quality assurance program with contractors. Maintained the project "as-built" drawings daily. Assembled and forwarded project closeout documents that include O&M manuals, and As-Builds. Assisted Resident Engineers and Structure Representatives to draft CCOs and supporting cost estimates. Reviewed Notices of Potential Claims (NOPCs) and drafting response position papers. Project Cost: $47.8 Million.
Orange County Transportation Authority, SR-57 Northbound Improvements, Orange County, CA Lead Assistant Resident Engineer. The SR 57 Northbound Widening was from Orangethorpe Avenue to Yorba Linda Boulevard and included adding a fifth mixed use lane and provided highway and bridge improvements such as auxiliary lanes, several sounds and retaining walls, 2 mechanically stabilized embankments, 1 tieback wall, pavement rehabilitation, slab replacement, replace bridge railing and approach slabs, salvaging and installation of Metal Beam Guard Rail (MBGR), and the widening of 7 bridges. Responsibilities included creating, updating and maintaining project submittal log and all other project specific quality control reports. Performed / supervised inspection of work in various disciplines as required. Verified and documented that all materials received for the project were in conformance with the approved submittal, handled and stored appropriately and were acceptable for use in the project. Assisted in resolution of non-conformance reports. Monitored and documented daily project tasks and field worker personnel. Prepared project progress payment / pay estimates and check and balance of quantity measurements and calculations with Inspector Daily Dairies, existing field conditions, and certificates of compliance.
Inspected bridge and roadway widening, soundwalls, retaining walls, drainage system, paving, electrical work, signing and striping. Prepared, analyzed, and reviewed CCOs and coordinated with the city, Caltrans and the Contractor. Enforced Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs).
Enforced labor compliance, prevailing wage laws and regulations and performed employee interviews. Checked traffic control system during lane and ramp closures for traffic handling plans compliance. Project Cost: $53.5 Million.
Caltrans District 7 (07A2593), I-5 North Corridor Improvements, Los Angeles County, CA Lead Construction Inspector. Key features included the replacement of two outside (No. 3 and No. 4) lanes and outside shoulder, damage slab replacement, and other upgrades. Coordinated between Caltrans and utility companies, cities and local agencies. Reviewed all submittals including SWPPP, CPM schedule, and other project documents. Conducted constructability reviews and responded to Requests for Information (RFIs) and correspondence. Prepared, analyzed, and reviewed CCOs. Project Cost: $100 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1712 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 51
JESSICA HARVEY, PE
Construction Inspector
EDUCATION
BS, Civil Engineering,
California Polytechnic
University, Pomona, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 92007
HOURLY RATE: $160
Mrs. Harvey’s construction office engineering experience includes Federal and Caltrans filing and documentation systems and is familiar with the field and office construction methods, practices and procedures. Ms. Harvey is responsible for setting up and maintaining project files, preparing meeting minutes, processing required documents and progress payments. Her duties included maintaining incoming / outgoing correspondence, RFI, staking and submittal logs. Her experience also involves public information management of traffic control, road closures, and detours. Her effective communication skills enable her to promote cooperation between client and its internal and external customers. Ms. Harvey is hard working, reliable, and a fast learner. She is familiar with computers, computer applications and computer software programs such as Microsoft Word, Excel, PowerPoint, and Adobe Photoshop. Her experience also includes Micro Station, AutoCAD, and Inroads.
RELEVANT PROJECT EXPERIENCE
Orange County Transportation Authority, I-405 Improvements, Orange County, CA Assistant Resident Engineer. This project consists of the reconfiguration of interchanges, ramps, and roadway widening, which is comprised of 23 CIP/PS reinforced concrete replacement bridges, one pre-cast/pre-stressed box pedestrian bridge, 17 pre-cast/pre-stressed girder bridge widenings, and a minimum of 12 miles of roadway widening. Responsibilities include assisting in analyzing and approving temporary structural support systems, shoring, concrete mix designs, and various shop drawings; developing structure grades from 4-scale drawings; quantity calculations; materials sampling and control; inspection of driven and drilled piles; reinforcement and concrete placement; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures. Project Cost: $1.5 billion.
Orange County Public Works, Gobernadora Creek, Rancho Mission Viejo, CA Assistant Resident Engineer. The $22 million project tis located in an environmentally sensitive area.
Responsibilities include assisting in analyzing and approving temporary structural support systems, shoring, concrete mix designs, and various shop drawings; quantity calculations; materials sampling and control; inspection of driven and drilled piles; reinforcement and concrete placement; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures. Project Cost: $22 million.
Caltrans District 12 Oversight / OC Public Works, Los Patrones Parkway, Rancho Mission Viejo, CA Construction Inspector. Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFIs and all other required construction documentation per Orange County Document Control requirements. Processed Contract Change Orders and pay estimates. Project Cost: $23 million.
Rancho Mission Viejo Development, Los Patrones Parkway / Chiquita Canyon Drive Overcrossing, Rancho Mission Viejo, CA
Construction Inspector. Responsible for construction of a two span, 256 foot long cast-in-place / pre-stress concrete box girder bridge, Responsible for all aspects of contract administration including analyzing and approving structural support systems, shoring, concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, assuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures; drainage systems; and utility relocation. Project Cost: $22 million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1713 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 52
Jessica Harvey, PE,
Caltrans District 12 Oversight / County of Orange, Cow Camp Road, Rancho Mission Viejo, CA Construction Inspector responsible for assisting the Resident Engineer inmaintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s, and all other required construction documentation per Orange County Document Control requirements. Processed Contract Change Orders and Pay Estimates. Project Cost: $22 Million.
Orange County Public Works Department, Cow Camp Road, Rancho Mission Viejo, CA Construction Inspector responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s, and all construction documentation per Orange County Document Control and Rancho Santa Margarita Water District.
City of Newport Beach, Park Avenue Bridge Replacement, Newport Beach, CA Construction Inspector responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s, and all other required construction documentation per Orange County Document Control requirements. She processed Contract Change Orders and Pay Estimates. The Park Avenue Bridge superstructure will be 110ft long, 36 ft-4 inches wide, and contain three spans of precast pre-stressed concrete girders for a total of 36 girders over the Grand Canal. The superstructure will be supported by piers 2 & 3 and Abutments 1 & 4. Piers 2 & 3 will each contain four 30- in diameter Cast-in-Drilled-Hole concrete pile columns approximately 57ft long. Abutments 1 and 4 will each be supported by 31 - 24in diameter secant piles with a concrete facing. 15 - Type 1 secant piles will be approximately 38-ft long and 16, Type 2 secant piles will be approximately 18-ft long. Project Cost: $8 Million.
Rancho Mission Viejo Planning Area 2, Rancho Mission Viejo, CA Construction Inspector / Office Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s, and all other required construction documentation per Orange County Document Control requirements.
In addition, she processes Contract Change Orders and Pay Estimates. The development was staged in 4 phases and included grading, retaining walls, storm drain, water infrastructure, dry utilities, street improvements, and landscape. To date 2 the 4 phases have been completed including the excavation of 24 million cubic yards of dirt, 40 million square feet of finish grading, 39,500 linear feet of storm drainpipe, 55,825 linear feet of domestic waterline pipe, 35,660 linear feet of reclaimed waterline pipe, and 39,560 linear feet of sewer pipe. Coordination with The Gas Company, SDG & amp; E, Cox, AT& amp; T, and OCPW was required in order to install 35,120 linear feet of joint trench, 194,100 linear feet of SDG & amp; Conduit, and 99,867 tons of asphalt.
City of Anaheim, Gene Autry Way (West) / I-5 HOV Interchange & Highway Improvement Project, Anaheim, CA Construction Inspector / Office Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Federal and Local Assistance Procedures Manual requirements. She was responsible for processing Contract Change Orders and Pay Estimates. Project Cost: $16 Million.
Inland Valley Development Agency, Mountain View Avenue Bridge and Roadway Reconstruction Project, San Bernardino, CA
Construction Inspector / Office Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Caltrans construction manual requirements.
Processed contract change order and pay estimates. Project Cost: $6 million.
Imperial County, Drew Road At New River, Imperial County, CA Construction Inspector / Office Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Caltrans Construction Manual and Local Assistance Procedures Manual requirements. Project Cost: $1 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1714 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 53
ALEJANDRO CONTRERAS, PE
Construction Inspector
EDUCATION
MBA Los Andres
University, DC
BS, Civil Engineering,
LaSalle University, PA
REGISTRATION
CA, Professional Civil
Engineer, No. 91131
HOURLY RATE: $160
Mr. Contreras is a professional civil engineer with over 20 years of demonstrated project management experience. He is experienced in overseeing and training engineers in structural and CMT areas. His experience also includes field inspections and assessments. In addition, Alejandro has directed and managed the operations of two recognized testing labs, including, but not limited to writing and reviewing lab and field test protocols and reports, implementing a Quality Control Management system, and managing and training test lab technicians and engineers.
Alejandro is intimately familiar with Caltrans standards, policies and procedures, and Construction Technical Manuals. He has been involved with numerous projects that were built to Caltrans standards. His projects experience includes scheduling and claims. Mr. Contreras has prepared claim reports, DRB presentations and generally enforced the contract plans and specifications as an Engineer. Additionally, he is well versed withMicrosoft office (Excel, Access, Word, and PowerPoint); CAD applications.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7, I-405 Improvements, Los Angeles, CA Assistant Resident Engineer. Responsible for field inspection and professional development plan for the Test Lab team and provided them with training and resources to achieve their goals. Oversight the Testing Lab functions and its team. Conducts annual reviews, determine compensation, establish, and monitor chargeability. Assigns work and job tasks to ProjectManagers, Lab Manager and subsequently lab technicians. Monitors the Laboratories’ Quality Standards ISO 17025 and Quality Control. Project Cost: $1.2 Million.
Orange County Transportation Authority (OCTA) / Caltrans District 12 Oversight, Tustin / Rose Grade Separation, Anaheim and Placentia, CA
Construction Inspector. Assigned laboratory tests, analyze, and prepare reports. Oversight of the Testing Lab functions and its team. Prepared test proposals and cost breakdowns. Project Cost: $38 Million.
Los Angeles World Airports, Tom Bradley International Terminal Renovation, Apron & Concourse Demolition, Los Angeles, CA
Assistant Project Manager. Conducted structural steel inspections according to AWS standards. Performed structural special inspections (ICC) including Non-Destructive Testing (NDT.) Performed on-site evaluation and testing. Project Cost: Various
Office of Statewide Health Planning and Development (OSHPD), Non-Structural Evaluation and Testing, La Mirada, CA
Construction Inspector. Responsible for testing protocols, assigning, and overseeing lab testing, analyzed results and prepared reports. Attended project meetings as test procedure consultant. Assisted with ICC-ES evaluation reports.
Oversight of the Testing Lab functions and its team. Implemented QA/QC training to engineers and test technicians.
Prepared elaborate test proposals and cost breakdowns. Reported to Vice Presidents lab costs and results. Project Cost: $2 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1715 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 54
JASON TORRES
Construction Inspector
EDUCATION
BS, Industrial
Engineering, Cal Poly
Pomona, CA
AS, Mathematics &
Science, Mount SAC
College, CA
AA Natural Science &
Math, Mount SAC
College, CA
HOURLY RATE: $145
Mr. Torres has eight years of experience working in construction inspection of various transportation projects including roadways and highways for Caltrans. Inspecting installation of MBGR, tortoise fence, construction area signs, traffic control, temporary stripes, channelizers, flashing beacons, pavement markers, metal beam guardrail, removal of strip, remove pipe, removal of down drain, reconstruct barb wire fence, roadway excavation. Also, inspecting Cold Plane, Grinding, and AC paving, concrete paving, fiber optic installation. Currently working as the Lead Night Shift Assistant Resident Engineer/Construction Lead Inspector providing inspection at the Downey office assisting resident engineer and transportation engineers in and out of the field for inspections and project file auditing. Experienced in using Inertial Profiler, GPS Rover, CADB, SWPPP, and estimate protocols, Microsoft Office Suite with particular emphasis on Excel within the Microsoft suite of programs, particularly with data analysis, linear programming, regression analysis, and Anova testing. LEAN and Six Sigma training as well as multiple years of time study analysis. Experienced in computer hardware and software, daily invoicing, record keeping, advanced troubleshooting along with network administration.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7, Construction State Highway, Los Angeles, CA Lead Night Shift Assistant Resident Engineer / Construction Inspector. Worked for and alongside Resident Engineer and other transportation engineers for the removal and installation of RCP & JPCP pavement at multiple locations along with installation and removal of median barrier, import borrow, transition railing and other related guardrail procedures. SWPPP protocols in place during work and on-site inspection at every location in project. 2020 Partnering Success in Motion Gold Award awarded for this project. Project Cost: $85 Million.
Caltrans District 8, Construction I 15 Construction State Highway, San Bernardino, CA Assistant Resident Engineer / Construction Inspector. Project is for the building of the new agricultural station project. Inspected installation of tortoise fence, construction area signs, traffic control, temporary stripes, channelizers, flashing beacons, pavement markers, metal beam guardrail, removal of stripes, SWPPP protocols, checking import borrow grade with GPS rover, well drilling inspection, inertial profiler systems, paving operations, EWB system, Cad B, and various paperwork tasks. Excellence in Partnering Award Winning 2010-2020 Silver Award awarded for this project.
Caltrans District 8, Route 62 Construction State Highway, San Bernardino, CA Inspector. Worked for and alongside Resident Engineer and other transportation engineers. Assisted the RE in and out of the field and office. Inspecting installation of tortoise fence, construction area signs, traffic control, temporary stripes, channelizers, pavement markers, and electrical installation. Project Cost: $3 Million.
Caltrans District 8, California Bridge Replacements and Improvements I-40 Needles, San Bernardino, CA Inspector and Office Engineer. Worked for and alongside Resident Engineer and other transportation engineers to widen roadway construct new bridge. Assisted the R.E. in and out of the field and office. Inspected installation of tortoise fence, construction area signs, traffic control, temporary stripes, channelizers, pavement markers, metal beam guardrail, removal of stripes, reconstruct barb wire fence, roadway excavation, and HMA paving. Multiple project file audits including but not limited to diary’s, Construction safety reports, CCO’s, and COZEEP. Removing of asphalt concrete, placing concrete overlay, and replacement of joint seals. Project Cost: $10 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1716 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 55
SALVADOR VALDOVINOS
Construction Inspector
EDUCATION
General Coursework, Mt.
San Antonio College,
Walnut, CA
Safety Trainer
Supervisor Certification,
Council on Certification
of Health, Environmental
and Safety Technology
HOURLY RATE: $145
Mr. Valdovinos over 19 years of experience in constructing projects and performing construction inspection of bridge and highway projects built in accordance with Caltrans Standard Plans and Specifications. Salvador is well-versed in Caltrans Specifications regarding bridge and construction. His experience includes positions as a structure’s inspector, contracts inspector, encroachment permit inspector, construction general foreman, and structures construction foreman. Responsibilities include performing inspection in conformance to the plans and specifications, performing inspection of bridge demolition, falsework construction, structure excavation, concrete and reinforcing steel placement, prestressing operations, pile driving, cast-in-drilled-hole (CIDH) pile installation, construction of various retaining walls, sound walls, barrier rail, traffic control, structure excavation and backfill. He has worked on bridge maintenance projects for Caltrans where he was responsible for replacing and installing type A and B joint seals, joint seal assemblies, approach slabs, and bridge deck treatments. He has vast experience in inspecting cast-inplace/pre-stressed (CIP/PS) box girder and pre-cast girder bridges. He provides construction documentation in accordance with Caltrans procedure requirements. Salvador worked his way up to an inspector after receiving an Appreciation Award from Caltrans for wall construction in District 4 where he worked from October 2009 and February 2010.
RELEVANT PROJECT EXPERIENCE
Orange County Public Works, Orange County, CA
Public Works Inspector. This on-call contract involves the construction of various concrete box culverts and concrete-lined channels. Responsibilities include ensuring compliance with contract requirements, field verification inspections, daily documentation of construction activities, field surveys, preparing quantity calculations, assisting in the preparation of change orders and progress pay estimates, scheduling materials testing, labor compliance interviews; preparing as-built plans along with final punch lists; monitoring safety and environmental compliance.
Project Cost: $8 Million.
Caltrans District 12, I-5 Segment 4 Roadway Widening, Norwalk, CA Construction Inspector. The project consisted of the construction of 8 various bridge widenings mostly consisting of pre-stressed/pre-cast girders with abutments and column/caps founded on a 30-inch CIDH pile: retaining walls and overhead sign structures. Responsibilities included working alongside Caltrans personnel, prime contractor, and subcontractor monitoring inspection (concrete pile placement and steel pile placement; inspecting box girder bridge reinforcement, concrete placement, and pre-cast girders installation; assisting with performing various types of concrete barrier steel placement, formwork, and concrete placement; casting concrete cylinders during concrete pours; and performing inspections for Americans with Disabilities Act (ADA) ramps on the surface. streets next to State right of way which involved monitoring traffic control); maintaining accurate records on quantities; and providing monthly estimates and daily documentation. Project Cost: $12 Million.
Caltrans District 7, Methacrylate Bridge Deck and Joint Seals Spall Repairs, Los Angeles, CA Construction Inspector. This project involved the maintenance of highway surfaces which included the replacement of damaged type A and B joint seals; construction of approach slabs; bridge deck surface rehabilitation; and methacrylate treatment of bridge decks. Responsibilities included ensuring compliance with the contract requirements, and field. verification inspections, daily documentation of construction activities, field surveys, reviewing submittals, preparing quantity calculations, assisting in preparation of change orders and progress pay estimates, scheduling materials testing monitoring environmental compliance, and preparing as-built plans and final punch lists. Project Cost: $8 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1717 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 56
Salvador Valdovinos
Caltrans District 7, State Routes 2, 110 & 134 Repairs, Los Angeles, CA Construction Inspector. This project consisted of replacing damaged joint seals at various bridges. Responsibilities included ensuring compliance with the contract requirements, field verification inspections, daily documentation of construction activities, field surveys, reviewing submittals, preparing quantity calculations, assisting in the preparation of change orders and progress pay estimates, scheduling materials testing, labor compliance interviews, monitoring environmental compliance, and preparing as-built plans and final punch lists. Project Cost: $6 Million.
Caltrans District 12, Roadway Construction Inspection Services, Orange County, CA Construction Inspector. This on-call contract involved the construction of widening roadways, AC structural section, drainage, slope reconstruction, backfill and compaction, MGS upgrades, and monitoring traffic control.
Responsibilities include ensuring compliance with contract requirements, field verification inspections, daily documentation of construction activities, field surveys, preparing quantity calculations, assisting in preparation of change orders and progress pay estimates, scheduling materials testing, labor compliance interviews; preparing asbuilt plans along with final punch lists; monitoring safety and environmental compliance. Project Cost: Various.
Caltrans District 7, Roadway Widening, Segment 4, Los Angeles County From South of San Antonio Drive Undercrossing to Pioneer Blvd., Norwalk, CA
Assistant Resident Engineer / Construction Inspector. Responsible for providing monthly estimates and daily documentation. Working alongside Caltrans personnel, prime contractor, and sub-contractor in monitoring concrete pile placement, monitoring steel pile placement. Duties also included Inspection of box girder bridge reinforcement, concrete placement, and inspection of pre-cast girders installation. Assisted in performing various types of concrete barrier steel placement, formwork, and concrete placement, casting concrete cylinders during concrete pours, and performing inspections for ADA ramps on surface streets next to State right of way, which involved monitoring traffic control, maintaining good records on quantities. Project Cost: $12 Million.
Inyo County Public Work, North Round Valley Road Bridge (No. 48C0044) over Pine Creek, Inyo, CA Construction Inspector. The $3.2 million project includes construction of an 85-feet single-span, pre-cast/pre-stressed wide flange girder superstructure on high cantilever seat abutments founded on 32 24-inch diameter cast-in-drilledhole concrete piles that are 45-feet in length within the ground water table. The cast-in-place deck concrete will be placed on precast/prestressed deck panels. The California ST-75 bridge railings enhance the visibility of the scenic surroundings. The existing horizontal and vertical alignments of North Round Valley Road were maintained.
Construction of the replacement bridge required installation of a temporary platform over the water diversion system within the creek. Responsibilities include ensuring compliance with contract requirements, field verification inspections, daily documentation of construction activities, field surveys, preparing quantity calculations, assisting in preparation of change orders and progress pay estimates, scheduling materials testing, labor compliance interviews; preparing as-built plans along with final punch lists; monitoring safety and environmental compliance. Project Cost:
$3.2 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1718 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 57
MAYTHAM ALI
Construction Inspector
EDUCATION
BS, Business
Management,
Almustansirya University
CA, USA for Civil
Engineering
(Equivalency Certificate
from International
Education Research
Foundation IERF). /S13-
04022
HOURLY RATE: $145
Maytham has more than 15 years of experience in construction inspection and supervision, construction management and site development in the field of Major Roads, highways, bridges, infrastructure and underground utilities, stormwater facilities, drainage systems, water quality compliance, commercial and residential buildings, processing and healthcare projects with reputed engineering and construction corporations. He is familiar with maintaining records, retrieval, transferring and disposal of records. He is familiar with archiving and indexing the test results along with pay estimates. Maytham has in depth experience of quantity calculation. His experience also includes inspection of structures, sewer lines (using TV Sewer Camera), catch basins and underground storm drainpipes for conformity to plans, specifications, and permits. His duties also include inspection and investigation of all possible illicit drains, and assistance of all persons who qualify to obtain permits for any possible illicit drains. Mr. Ali’s experienced also includes technical report preparation, third party review of plans and specifications for code compliance, QA/QC and value engineering. repares daily construction report and other writes reports and notes of constriction activities. Attended project meetings, pre-construction, construction progress meetings.
RELEVANT PROJECT EXPERIENCE
Caltrans District 8, I-15 / SR-91 Express Lane Connector, Riverside, CA Construction Inspector for the I-15 / SR-91 Express Lane Connector project. The 15/91 Express Lanes Connector is designed to provide a seamless transition between these Riverside County tolling systems for reliable, convenient travel for residents of Corona, Norco, Jurupa Valley, Eastvale, and points north in San Bernardino County, as well as express buses. The project also will extend both the eastbound 91 outside general purpose lane and the eastern end of the 91 Express Lanes approximately one-half mile east to Promenade Avenue to help with vehicle merging in this area. Performed all the calculations, prepared reports, payments and change orders works. Duties included reviewing the contractor-prepared SWPPP and amendments for completeness and accuracy, conducting weekly site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring the contractor complied with the Construction General Permit, monitored construction dewatering operations and assured they conformed to CGP and amendments. Project Cost: $270 Million.
Caltrans District 8, SR-60 SWARM Pavement Rehabilitation, Riverside, CA Construction Inspector for the SR-60 Swarm Pavement Rehabilitation project from the county line to SR-60 / SR91 / SR-215 Junction. Performed all the calculations, prepared reports, payments and change orders works. Duties included reviewing the contractor-prepared SWPPP and amendments for completeness and accuracy, conducting weekly site inspections independently and with the contractor, weather monitoring, inspecting temporary BMP installation, and ensuring the contractor complied with the Construction General Permit, monitored construction dewatering operations and assured they conformed to CGP and amendments. Responsibilities include SWPPP review, NPDES reports, and monitoring contractor’s CMP maintenance program wide. Also reviews contractor’s SWPPP and NPDES reports, leads SWPPP meetings, conducts field inspections, and files reviews to advise of SWPPP deficiencies. Project Cost: Various.
Charter Sewer Pump Station, City of Irwindale, Irwindale, CA Construction Inspector for the excavation and backfilling of main sewer line for DI pipes thickness testing.
Responsible for inspection for asphalt cutting and trench excavation and shoring for 3 trenches, locating of sewer pipe, conducting pipe thickness testing, backfilling 3 trenches and compacting in layers, then tak coat applying and asphalt overlying and rolling. Witness and inspection for sewer pipe testing and backfilling. Monitored safety, traffic control with barricades, cones with tape around and detour activities. Project Cost: $1 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1719 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 58
Maythem Ali
City of Irwindale, Metro Gold Line Foothill Extension Phase 2A, Irwindale, CA Construction Inspection for the installation of 3- 210 freeway signs at Irwindale Avenue and south Foothill Avenue.
Responsible for the inspection of saw cut, trench excavation (15 feet deep), placing concrete for 210 freeway signs foundation (12`x14`x15`). Inspected rectifying and filling the cracks, asphalt cold milling and new asphalt overlaying at Irwindale Avenue, placing new curbs; abandon 4 inches gas service pipe including saw cut , excavating trench, pouring concrete, backfilling, then tiles paving and placing new curbs at Live Oak Avenue; and inspection for traffic signal improvement at Longden Avenue and Myrtle Avenue by removing old traffic signal poles and installs new traffic signal poles no. 1 and 2 with master arms and headlight as shown on approved plans then energize them. Monitored safety, traffic control with barricades, cones with tape around and detour activities. Prepared daily construction report and other written reports and notes of constriction activities. Attended project meetings, pre-construction, construction progress meetings. Observe various tests of raw materials and finished products as required by the approved plans and specifications, including to: concrete test cylinders, concrete slump tests, sand equivalent and graduation tests, soil compaction test. Read and interpret plans and specifications proficiently. Project Cost: $1.8 Million.
City of Santa Fe Springs, Rosecrans / Marquardt Avenues Section 130 Grade Crossing Improvements, Santa Fe Springs, CA
Construction Inspector responsible for improvement and widening of existing streets intersection in City of Santa Fe Springs at Rosecrans and Marquardt avenues sections. Inspected raising/lowering and relocation of existing services; removing the old traffic signal and poles then installing a new traffic signals poles, master arms and head lighting and energize them; and placing new pull boxes and conduits and control cabinets. Also responsible for construction inspection for excavation and backfilling trenches, placing new curbs, concrete and asphalt overlaying in accordance to approved plans and specification. Monitored safety and traffic control activities. Maytham prepares daily construction report and other written reports and notes of constriction activities. Witness of soil testing and samples as per project specification. Attended project meetings, pre-construction, construction progress meetings. Observe various tests of raw materials and finished products as required by the approved plans and specifications, including to: concrete test cylinders, concrete slump tests, sand equivalent and graduation tests, soil compaction test. Read and interpret plans and specifications proficiently. Project Cost: $2 Million.
Allen & Shariff Corporation, Mafraq Hospital, Abu Dhabi, UAE Construction Project Engineer. Maytham was responsible for construction supervision and inspection for infrastructure and road works of Almafraq Hospital project from commencement to acceptance as per project plans and specifications.
The infrastructure works included sewer system, storm water drainage systems and potable water networks, district cooling and irrigation networks. Supervised civil works for Telecommunication, BMS/CCTV, power networks (LV & MV) and street lighting. Construction supervision and inspection of earthworks and road works including embankment, sub grade preparation, sub base and base layers, concrete and asphalt paving, concrete curb and gutter, reinforced concrete, retaining walls, striping and road signs installation. His duties included monitoring quality assurance testing, smoothness verification in accordance with project specifications. Also supervised and witnessed manufacturers quality control testing of construction material. Maytham supervised waterproofing operations and epoxy coating of chambers, gullies and manholes. He also performed constructability reviews of all utility installation, roadway works, landscaping and irrigation systems. Project Cost: $700 Million.
Neutrogena Johnson & Johnson Wastewater and Industrial Water Networks Upgrading Los Angeles, CA Construction Supervisor for the underground wastewater pipes and connection with main sewer line, industrial water networks, upgrading platform and structure pads, freestanding columns and pipe racks and pipe supports. Maytham reviewed and commented on contractor shop drawings and material submittals in accordance to project plans, specification and J&J guidelines. Project Cost: $2.4 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1720 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 59
ARMANDO SALAZAR
Construction Inspector
EDUCATION
Caltrans Office Engineer
Course
Caltrans Resident
Engineering Academy
Fire Direction Control
Man for Field Artillery
with Surveys Training,
United States Marine
Corps
Rapid Set Concrete
Course
Rubberized Asphalt
Course
Concrete Paving Course
SWPPP Training
Confined Space Training
Course
CIPP Training Course
CERTIFICATIONS
Caltrans Test Method:
105, 125, 201, 202, 216
217, 226, 227, 231, 504,
518, 523, 524, 533, 539,
540
Cure-In-Place Pipe, No.
CIPP-0521-401687
HOURLY RATE: $145
Armando Salazar has 33 years of highway transportation, construction inspection, and electrical construction experience on. His experience includes knowledge of residential, commercial, industrial projects, roadway, foundations, paving procedures, field instrumentation procedures, aggregate, and soil sampling.
Additionally, his experience includes field engineering on a variety of construction projects including roadway construction, emergency repair, highway rehabilitation and capital improvement projects. He has worked on transportation infrastructure projects for Caltrans, as well as projects involving various Counties and Cities. His experience also includes stormwater facilities, drainage systems and water quality compliance. Experience includes water / wastewater, storm drainage systems, pipelines, highway and bridge construction administration on various projects. His experience includes major drainage systems with large box culverts, open channels, and detention basins.
RELEVANTPROJECT EXPERIENCE
City of Whittier, Nelles at the Grove in Whittier (WUA18-027), Whittier, CA Field Inspector. The project includes demolition of the 68 buildings and new construction of 561 homes, 189 apartments and 150,000 square feet of retail and restaurant space. Four historic buildings are preserved. Project also includes for new neighborhood parks and open space areas. Responsibilities include field inspection of water mail, pipelines, water systems, sewer systems, electrical, dry utilities, concrete structure, structural pavement, landscaping, irrigation, asphalt concrete, grading, traffic signals, street lights, and traffic control, concrete drainage pools and overseeing testing. Project included water quality compliance, sewer and storm drains systems and structures. Project Cost: $42 Million.
City of Whittier, The Groves Development, Tract 72953, Nov.2018 to July 2021 Whittier, CA
Assistant Roadway Senior Field Inspector. Responsibilities include field inspection, asphalt paving, traffic control, striping, street lighting, grinding, concrete, curb & gutter, catch basins, storm drains, sewer, water mains and overseeing testing.
Perform field inspections and/or laboratory analysis for materials being used in construction transportation and public works projects. Project Cost: $14 million.
John Wayne Airport, Irvine, CA
Senior Field Inspector. Responsibilities include field inspection, traffic control, striping, electrical, grinding, concrete drainage pools and overseeing testing. He performed field inspections and laboratory analysis for materials used in construction projects. Responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input; monitoring, documenting and implementing requirements for installation of electrical systems as per contract items. Project Cost: $3 Million.
Blue Jay Assemblies of God Retreat Campground Water Supply Pipeline Project, Big Bear, CA Lead Inspector. Installed over 4000’ flu. Of 8” PVC water pipe line through Mountainous terrain, worked as Lead Laborer checking grade, stabbing pipe, making sure that joints were lubricated properly, stabbing to the required depth, digging out the areas for thrust blocks at direction changes, pouring the thrust blocks with concrete, upon completion assisting in the testing for leaks, assisting in purifying the water system. Project Cost $1 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1721 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 60
Armando Salazar
City of Whittier, Sorensen Avenue Water Pipeline, Whittier, CA Senior Field Inspector. The project entailed structure construction, using reinforced PCC (bridges, retaining walls, MSE walls, highways, bridge anchor blocks, bridge decks, curb and gutter, sidewalks, driveways, ADA handicap ramps, exit ramp termini's); concrete pavement, traffic signals, street lighting, and red-light cameras, grinding the old pavement; subgrade preparation; placing new HMA; and new striping; signage, shoulder widening; Metal Guard Rail Beam (MGRB) installation, traffic overhead signs, concrete barrier; asphalt dike curbs. Responsible for field inspection of roadway rehabilitation; traffic signal installation; sewer and other underground utility lines installation; sidewalk and ADA Ramp construction. Project included water quality compliance, sewer and storm drains systems and structures. Responsible for performing various duties involved in the day to day construction activities for the night shift including field inspection of Traffic Control, Cozeep Coordination, JPCP, CCO work, LCB, SWPPP, street sweeping, striping, PCC Pavement, Lean Concrete Base, Cleaning and Grubbing, Dirt work. Project Cost: $4 Million.
Caltrans District 12, I-5 / Pacific Coast Highway Interchange / HOV Project, Dana Point, CA Field Inspector responsible for performing various duties involved in the day-to-day construction activities for the night shift. Including Field Inspection of Traffic Control, Cozeep Coordination, JPCP, CCO work, LCB, SWPPP, Street Sweeping, Striping, PCC Pavement, Lean Concrete Base, Cleaning and Grubbing, Dirt work. Perform field inspections and/or laboratory analysis for materials being used in construction transportation and public works projects. Additionally, he was responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input Project Cost: $10 million.
Caltrans District 8, Route 215 Realignment, Van Buren to D Street, Perris, CA Assistant Resident Engineer. Armando periodically observed completed work performance to determine general compliance with plans, specifications, design criteria, and planning concepts. Additionally, he was responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input. He prepared design changes for contract change orders and determined the safety of shoring false work and other temporary structures for realignment and widening of project. He computed pay quantities and prepared progress pay estimates. He also trained field procedures to personnel and oversee COZEEP Project Cost: $70 million.
Caltrans District 8, Route 10, Re-Surfacing, Colton / Fontana, CA Assistant Resident Engineer. Armando was responsible for field inspection of grinding operation, daily lane closures, and striping. He prepared design changes for contract change orders and determined the safety of shoring false work and other temporary structures for realignment and widening of project. Additionally, he was responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input. He computed pay quantities and prepared progress pay estimates. He also trained field procedures to personnel and oversee COZEEP. Project Cost: $5 million.
Caltrans District 8, SR-58 Realignment, San Bernardino, CA Field inspector responsible for the tortoise fence installation, roadway construction from sub grade to finished pavement. Also responsible for coordinating with the State Biologist. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1722 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 61
RICHARD HENNINGS, EIT
Construction Inspector
EDUCATION
BS, Civil Engineering,
California State
Polytechnic University,
Pomona, CA
REGISTRATION
CA, Engineerin Training
No.141463
CA, Fundamentals of
Engineering, No. 12-558-
68 HOURLY RATE: $145
Mr. Henning has over 12 years of experience in managing Caltrans, Public Works construction projects. He has a proven track record of leading projects to completion on time and within budget. His experience includes field inspection for concrete pavement, roadway excavation, trench excavation, culverts, gutter, asphalt surfacing, traffic control, and concrete pour for ADA Ramps. He verifies that the contractor and subcontractors’ work is in compliance with Standard Specifications and Special Provisions. He has also coordinated material testing, surveying, and utility installations. He has reviewed submittals and RFI’s, processed change order calculations and modifications to plans to optimize construction. Attends weekly crew safety meetings and maintains a good working relationship with government agencies, subcontractors, and field personnel. Richard has been involved with projects that were built to Caltrans standards. He is experienced in document control, computer software, analyses, and modeling the project for constructability review. His effective communication skills enable him to promote cooperation between all project stakeholders. Software experience includes AutoCAD, Primavera P6, Bluebeam, Revu, Microsoft Office, Word, PowerPoint, Excel, and Teams. He is familiar with Caltrans Standard Plans and Specifications, Caltrans Construction Manual, Greenbook Standards, and Safety requirements during construction activities. He has excellent written and verbal communication skills and can work independently and collaboratively.
RELEVANT PROJECT EXPERIENCE
City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA Construction Inspector for the $4 million Riverside Avenue project includes various side streets intersecting Riverside Avenue. The scope of construction spans approximately 6780 feet (1.28 miles). Project limits are Metro tracks to the North and San Bernardino Street to the South. The limits of the project are 0.6 miles north of Route 10 and 2.8 miles south of Route 210. Riverside Avenue consists of two lanes in each direction and a median.
Responsibilities include roadway widening and paving (HMA, cold plane AC Pavement and traffic stripe tape), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications.
Project Cost: $4 Million.
City of Rialto, Cactus Trail Improvements, Rialto, CA
Construction Inspector for the $2 million Cactus Trail Improvement Project. The project includes the construction of a
1.49- mile-long path that is 8-foot-wide for bicycles and 5-foot-wide for pedestrian use along the west side of Cactus Avenue between Rialto Avenue and Baseline Road. The project also includes the removal of the existing AC trail, PCC/AC driveway, and railroad tracks. New improvements include a PCC sidewalk, PCC driveway, Three Rail PVC Fence, Asphalt Concrete, Decomposed Granite, Concrete Cutoff Wall, Cable Guard Rail, Yellow Detectable Warning Surface, and 2” PVC Pipe for future landscaping, signing, and striping. Adjacent to the trail is the Rialto Channel, therefore coordination is required with San Bernardino County Flood Control District (SBCFCD).
Responsibilities include roadway widening and paving (HMA, cold plane AC Pavement and traffic stripe tape), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications.
Project Cost: $2 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1723 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 62
Richard Hennings, EIT
Powell Constructors, Inc., Fontana, CA
Project Engineer. Worked with Foreman, Designers, and Owners to coordinate all phases of work throughout the project. Reviews and assembles submittals for review by Owner and Designers. Compiles and verify Change Order pricing that is submitted to the Owner for payment. Identify issues within the field and provide solutions to mitigate them. If the solution requires redesign or change in scope of work, RFI is submitted to the Owner for a response.
Inspect the work of crews and subcontractors to ensure that it conforms to the project plans and specifications.
Actively run weekly Owner meetings to provide updates on the project. Use scheduling programs to provide the Owner with weekly and overall CPM schedules. Prepare Closeout documents such as as-builts and O&M manuals.
Project Cost: Various.
Pacific Empire Builders, Glendale, CA
Project Engineer. Observe conditions within the field and inform consultants of any issues in order to mitigate them.
Analyze information and evaluate results to choose the best solution and solve problems. Developed specific goals and plans to prioritize, organize, and accomplish work. Provides information to supervisors, co-workers, and subordinates by telephone, in written form, e-mail, or in person in order to maintain the schedule. Inspected the work of subcontractors to ensure that it conforms to specifications and adheres to the project schedule. Ensured occupational health and safety regulations were being complied. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1724 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 63
AYCAN KARA, EIT
Construction Inspector
EDUCATION
MS, Construction
Engineering &
Management, California
State University,
Fullerton, CA
MS, Civil Engineering
Anadolu University,
Eskisehir, TRKY
BS, Civil Engineering
Eskihsehir Osmangazi
University Eskisehir,
Turkey
REGISTRATION
CA, Engineer in Training,
No. 176428
HOURLY RATE: $145
Ms. Kara has over 7 years of experience in transportation engineering and project management. She understands the inner workings of public work and private projects, experience in project management. She is knowledgeable of mechanically stabilized earth (MSE) walls, various types of retaining walls, soil nail walls, tie back walls, roadway rehabilitation, new roadway construction, drainage and sewer systems. Her responsibilities also include coordinating with discipline leads to schedule resources to ensure project schedule and budget are both met; driving the safety and quality culture of the project; scheduling work assignments; and coordinating design changes that are needed to allow stage construction that is needed for critical traffic switches. Aycan’s responsibilities included construction inspection and Quality Control, daily reports and quantities take-offs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, preparing and reviewing as-built plans, and preparing final punch list. She performs calculations (stress and deflection) of temporary structures in construction of bridges (falsework, temporary shoring, working platforms, temporary supports). She is also knowledgeable and experience in design and construction of temporary and permanent structures. Aycan reviews and analyzes critical path method (CPM) schedules, monitors safety and quality assurance programs. She is knowledgeable of Cost Estimates for materials, equipment, and labor, and proficient in reading blueprints. Experienced in AutoCAD, Civil 3D, Primavera P6, MS Project, Bluebeam Revu, Procore, MS Office Suite: Word, Excel, PowerPoint.
RELEVANT PROJECT EXPERIENCE
Caltrans District 12 (EA 12-19000036), Laguna Beach Roadway Improvements, Irvine, CA Construction Manager. Responsible for implementing $10 million worth of Public Roadway Project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Coordinate LCS Closures, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost:
$10 Million.
Atabir Construction Co., Ihlamur Kent Homes, Eskisehir, Turkey Project Manager. Accomplished in 2 high-end residential projects an average budget of $20 million on time and under budget. Coordinated subcontractors and executed daily construction site visits in order to ensure quality control, safety, and schedule. Measured driving factors in projects and ensured project impacts, changes, and delays are added into the schedule to evaluate true project impact. Coordinated with project members to identify and quickly address problems during execution. Project Cost: $2 Million.
Atabir Construction Co., Nova City High End Luxury Homes, Retail Stores & Gymnasium Facility, Eskisehir, Turkey
Project Manager. Accomplished in 2 high-end residential projects an average budget of $20 million on time and under budget. Coordinated subcontractors and executed daily construction site visits in order to ensure quality control, safety, and schedule. Measured driving factors in projects and ensured project impacts, changes, and delays are added into the schedule to evaluate true project impact. Execution. Project Cost: $20 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1725 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 64
BADIH MOUSSA
Construction Inspector
EDUCATION
MS, Civil Engineering,
Bernel University,
London, England
BS, Civil Engineering,
University of Balamand
HOURLY RATE: $145
Badih Moussa has more than six years of experience managing and inspecting construction projects. He brings expertise in construction management, safety oversight and other critical factors of construction projects. Badih focuses on these elements by monitoring site conditions, facilitating regular project site meetings to identify conflicts or delays, conveying vital information to key decision-makers and addressing any other outstanding issues. In addition, Badih emphasizes safety on all of his projects, coordinating with field personnel and carefully reviewing contractor safety plans. Badih has experience in civil, infrastructure, commercial/residential general building construction projects. He makes certain projects are delivered on-time and within budget. Badih monitors safety, manages schedules and budgets and performs QA/QC to attain project objectives. Badih has specialized in construction material quality control review, testing and inspection. His experience entails oversight of daily construction operations; supervision of the daily schedule of quality control testing and inspections; observation and inspection of materials to help confirm compliance with contract plans and specifications. Badih also leverages his expertise to review of all test results submitted by the contractor’s quality control group. He also reviewed and prepared project submittals as required by project construction drawings and specifications.
RELEVANT PROJECT EXPERIENCE
City of Rialto, Building 200 Inspection & Support Services, Rialto, CA Field Inspector responsible for construction inspection of various street paving, drainage, lighting, fencing, and landscaping. Responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety.
Project Cost: Various.
Caltrans District 8, SR-60 Bridges Replacement Project, Chino, CA Roadway Inspector. Responsible for monitoring day-to-day operation, ensuring compliance with contract plans and specifications, monitoring contractor work, coordination with Structures, responding to RFI and Submittals, reviewing daily reports and quantity take off, negotiating and drafting change orders, processing extra work bills and progress payments. The bridge replacement project includes replacing three bridges along SR-60 at Pipeline Avenue, Monte Vista Avenue and Benson Avenue in San Bernardino County. The vertical clearances on these bridges are nonstandard and the structures continue to be struck by oversize vehicles, which causes significant damage. Project Cost: $23 Million.
City of Camarillo, On-Call Construction Inspection Services, Camarillo, CA Construction Inspector. Responsible for monitoring day-to-day operation, ensuring compliance with contract plans and specifications, monitoring contractor work, coordination with Structures, responding to RFI and Submittals, reviewing daily reports and quantity take off, negotiating and drafting change orders, processing extra work bills and progress payments. Project Cost: Various.
Sewage Water Treatment Plans and Lines, Batroun, North Lebanon Construction Inspection / Office Engineer. This project created the layout for the entire system to transport sewage and restructured outdated sewage systems to achieve the sustainable and eco-friendly fulfillment of water and health-environmental needs of the population of Batroun. This project built the infrastructure building of the plant, and the excavation, installation of the pipes, and backfilling. Mr. Moussa was responsible for inspection, processing RFI’s, Submittals, progress payments, traffic closures, perform SWPPP inspections and prepare reports on construction activities. Project Cost: $25 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1726 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 65
Badih Moussa
Greater Beirut Water Supply Project, Beirut, Lebanon
Construction Inspection / Office Engineer. This project proposes to relocate and replace existing water, sewer, storm water system and manholes. It also relocates existing telephone and fiber lines. Mr. Moussa is responsible for coordinating with utility companies for relocation of facilities. Coordinate with local agencies the preparation of Freeway and Freeway Maintenance agreements. In addition, he also coordinated the relinquishment of right of way to and with local agencies. Responsibilities included field inspection such as excavation of trench, installation of twin pipe line, and backfilling. Coordinate preconstruction meetings; review submittals from contractor and prepare responses to contractor's RFI. Review contractor’s lane closure request. Prepare daily quantities and monthly progress pay estimates, daily reports, SWPP reports, review extra work bills, and Prepare closeout documents. Project Cost: $55 Million.
Rehabilitation of North Lebanon Freeway, Chekka, North Lebanon Construction Inspection / Office Engineer. This project proposes to rehabilitate two general purpose lanes in NB and SB direction. Duties included field inspection of roadway excavation, drainage structures, Jack and Bore Sewer, LCB, PCC and AC placements, traffic control, and SWPPP and safety compliance. Coordinated with various utility companies and cities to perform relocation and/or installation of utilities. Attended bi-weekly safety meetings with the owner staff; managed document control process and project records; reviewed and processed requests for information and submittals; Processed progress payments and maintained project files in accordance with local construction manual. Project Cost: $80 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1727 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 66
CYRUS RAVAEI, PE, QSD/P
Building Inspector
EDUCATION
MS, Civil Engineering,
University of Texas,
Austin
BS, Civil Engineering
Purdue University, West
Lafayette, IN
REGISTRATION
CA, Professional Civil
Engineer, No. 42826
Qualified SWPPP
Developer / Practitioner
Mr. Ravaei has more than 30 years of experience in project and construction management, structural and civil engineering and construction inspection. His experience includes, but is not limited to commercial buildings, parks, community centers stormwater facilities, drainage systems, bridges, structures, and water quality compliance. Cyrus was assigned to high-profile projects on which he administered the contract, supervised contractors and construction teams, responded to requests for information (RFIs), processed contract change orders, and performed cost estimating. He has been responsible for project coordination between owners, designers, contractors, subcontractors, suppliers and local agencies. Cyrus’ responsibilities have included construction inspection of excavation/fill; concrete; aggregate base; AC paving; SWPPP management; pavement reinforcing fabric; drainage systems; utilities; underground electrical; curb, gutter and sidewalk; medians; traffic signals, ramp metering and traffic loops; lighting; striping; erosion control; signage; and fencing. Cyrus also participated in public hearings for community information and outreach programs. Cyrus reviews and analyzes critical path method (CPM) schedules, monitored safety and quality assurance programs, and provided claims resolution services.
RELEVANT PROJECT EXPERIENCE
City of Fontana, Fontana Park and Jessie Turner Community Center, Various Public Works Projects, Fontana, CA Resident Engineer. Project included a 35-acre Fontana Park comprised the 43,500 SF Jessie Turner Community Center, an aquatic complex for college and high school competition with dual water slides, a zero-depth water play area and a recreational pool. There was also a corporate pavilion, a 25,000 SF skate park with street course design, open space with a trail system, a formal park area with children’s play area, a colonnade with a Spanish fountain and a terraced viewing area. Projects included trails and landscaping; design-build retail developments oversight, infrastructure and street widening improvements such as, under and above ground utilities, sewer and storm drains, grading, AC and concrete paving, landscaping and hardscape, streetlights, traffic signals and signing and striping per Greenbook and Caltrans Standards.
Responsible for contract administration, quality assurance, and contract close outs. His duties included day to day construction management, reviewing submittals, responding to RFI’s, reviewing/negotiating and writing change orders, progress pay estimates, daily inspection and diaries, traffic control checks, manage and execute safety meetings, weekly meetings and weekly statements of working days. Project Cost: Various.
City of Fontana, Falcon Ridge Town Center, Fontana, CA
Construction Manager provided the oversight on the design and construction of a design-build retail development within the City of Fontana public right-of-way. The scope of work included improvements to area streets, utilities, and public facilities. Project included water quality compliance, sewer and storm drains systems and structures.
City of Los Angeles, Fire Station 21, Los Angeles, CA
Construction Manager responsible for managing the construction of a two-story building with exterior CMU walls; a steel column and beam framing system and interior metal studs; and partition walls and ceiling. Project included water quality compliance, sewer and storm drains systems and structures. He also oversaw the erection of a onestory maintenance building.
City of Fontana, Fire Station 79, Fontana, CA
Project Manager participated in the planning and design of a fire station building by developing contract documents and specifications. The facility was constructed using concrete masonry unit (CMU) exterior walls, steel trusses, and interior metal stud walls. Project included water quality compliance, sewer and storm drains systems and structures.
Agreements for Professional Services to perform As-Needed Professional C... Page 1728 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 67
Cyrus Ravaei, PE, QSD/P
City of Fontana, Robert W. Weddle Capital Improvement Program (CIP), Program Management, Fontana, CA Construction Manager for this $200 million project. Responsible for managing construction inspection for more than 15 facilities and infrastructure projects. His duties included inspection of major arterial roadway widening and reconstruction, storm drains, sewers mainlines and interchange projects. His duties also included review and verification of design consultants’ scope of work, monthly expenditures and invoices as well as contractor invoices related to materials, labor and equipment. Cyrus also managed various infrastructure and street widening improvements such as, under and above ground utilities, sewer and storm drains, grading, AC and concrete paving, landscaping and hardscape, street lights, traffic signals and signing and striping per Greenbook and Caltrans Standards. Responsible for contract administration, quality assurance, and contract close outs. His duties included day to day construction management, reviewing submittals, responding to RFI’s, reviewing/negotiating and writing change orders, progress pay estimates, daily inspection and diaries, traffic control checks, manage and execute safety meetings, weekly meetings and weekly statements of working days. Project Cost: $200 Million.
City of Fontana, Summit Avenue Street Widening and Improvements, Juniper Avenue Improvements Project, Foothill Boulevard Widening and Improvements Project, Miller Avenue Improvements Project, Fontana, CA Construction Manager / Resident Engineer. Project included water quality compliance, sewer and storm drains systems and structures. Project Cost: Various.
City of Fontana, Summit Avenue Storm Drain Improvements & Summit Avenue Storm Drain Phase 4A, Fontana Construction Manager. Project included water quality compliance, sewer and storm drains systems and structures. Project Cost: Various.
Caltrans District 7, SR-138 / Pear Blossom Pavement Rehabilitation East of 121 Street to Longview Road, Palmdale Assistant Resident Engineer. Responsible for providing resident engineering and inspection services for the SR-138 / Pear blossom Pavement Rehab and roadway widening project. The work widened the two lane project to four lanes and encompassed installation and coordination for various utilities such as gas, water, cable, communication and power lines, Coordination with LA County and community stakeholders, installation of storm drains lines and manholes, as well as drainage V-ditch, inlets, outlets and detention basins. Project included curbs and gutters, sidewalks and ADA ramps placement, subgrade preparation, geogrid, base, lean concrete, AC and concrete paving placement, signing and striping, streetlights and traffic signals installation. The SR-138 is a major thoroughfare, serving commuters between Los Angeles and San Bernardino counties. As a result of heavy use, the road has experienced extensive wear. The SR-138 is being rehabilitated in both directions, East of 121st Street to Longview Road. Project Cost: $11.1 Million.
City of Carson, Wilmington Avenue Interchange / 223rd Street Bridge Retrofit Over the Dominguez Channel Resident Engineer / Structures Representative for this $24 million project. The Wilmington Avenue interchange at the I405 had significant congestion due to the high volume of trucks and vehicles accessing the freeway and associated with nearby businesses and the automobile dealerships located in the Carson Auto Row. The Wilmington Avenue Interchange Modification included: two bridge widenings over the Dominguez Channel; an 8-span bridge and a 5-span bridge both are supported on 24” and 48” driven CISS piles, including dynamic monitoring of the driven piles; numerous retaining walls, new utilities and utilities relocations; and environmental monitoring. This project also involved retrofit of the 223rd bridge over the Dominguez Channel. Two types of falsework were used on this project: 1) Conventional falsework for the Dominguez Channel Bridge Widening; 2) and innovative falsework using friction collars to utilize it as platform for the falsework. Cyrus managed field work on behalf of the City of Carson. Project Cost: $24 Million.
Caltrans District 7, Bridge Earthquake Retrofits at I-5, I-210, and Highway 14, San Fernando, CA Bridge Representative/Principal Assistant responsible for quality assurance and inspection of bridge earthquake retrofit work for 14 bridges located at the intersections of the I-5, I-210 and Highway 14 freeways. The scope of work consisted of building foundations and shear walls, trenching and shoring, column widening. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1729 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 68
FRED ALIPANAH, PE
Building Inspector
EDUCATION
BS, Civil Engineering,
University of Maryland
Port & Harbor
Engineering, Post
Graduate Scholarship,
Tokyo, Japan
REGISTRATION
CA, Professional Civil
Engineer, No. 64521
Fred is a professional civil engineer with over 30 years of project management, construction management and construction inspection experience which includes 20 years of Caltrans expertise in Districts 7 and 8. His experience includes management of construction inspection staff, providing technical guidance, coordinating with stake holders to mitigate their concern, providing project information to public information officers, ensuring safety, coordinating with utility companies and representing owners throughout project delivery processes. He has managed construction of buildings, facilities, structures, highway rehabilitation and widening projects, ramp improvements, retaining and sound walls, drainage and sewer systems, curb, gutter, sidewalk and ADA curb ramps, various utility works, guardrails upgrade and SWPPP inspection. Fred has been involved with multi-staged projects that included various traffic control systems including weekend closures, short term closures, and total ramp and FWY closures.
RELEVANT PROJECT EXPERIENCE
Ontario International Airport, Northwest Quadrant Demolition Project (NWQD), Ontario, CA Project Manager responsible for coordinating construction activities for Northwest Quadrant Demolition Project (NWQD) and administration of the contract and making sure of the timely completion of the project. The project includes removing 52 acres of parking lot located at the Northwest Quadrant of the airport land side. Removals included asphalt, fencing and electrical appurtenances; stock piling AC and concrete removals; realigned vehicle service road (VSR) in two phases. The phases include cutting the new roadway, placing base material, placing HMA all done per spec including compaction testing throughout the process.
Ontario International Airport Authority, On-Call Project / Construction Management Services, Ontario, CA Construction Manager. Responsible for coordinating construction activities for various projects, including but not limited to Runway 8R-26L Rehabilitation and Connection Taxiways Program, Runway 26R ILS Upgrade, FedEx Building, commercial buildings, roadway widening and paving (HMA, PCCP), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Project Cost: Various.
City of Rialto, Basketball Court Improvements, City Project No. CB 1901, Rialto, CA Construction Manager. The Bud Bender Park Project located at 235 N. Lilac Avenue, Rialto, CA included construction, placement and installation of fencing extension and safety netting for Ballfield 1. This work included extending sideline ND outfield fence posts, constructing steel netting frame, constructing safety netting and all park improvements as shown on the construction plans. Responsible for overseeing day-to-day operation of the work, ensuring compliance with contract plans and specifications, track issues, monitoring contractor work, scheduling, responding to RFI and submittals, reviewing daily reports and quantity take off, help resolve constructability issues, negotiating and drafting change orders, processing extra work bills and progress payments.
City of Rialto, CDRE Holdings 11, LLC, PPD 2018-0021 & Oakmont Development, Rialto CA Construction Manager. Responsible for overseeing day-to-day operation of the work, ensuring compliance with contract plans and specifications, track issues, monitoring contractor work, scheduling, responding to RFI and submittals, reviewing daily reports and quantity take off, help resolve constructability issues, negotiating and drafting change orders, processing extra work bills and progress payments. Project included various specialty disciplines including electrical, landscape, safety and SWPPP inspection, office engineering, labor compliance, CCO desk support and public relations support. Project included a 99,999 square foot industrial warehouse building and associated street paving, drainage, lighting, fencing, ADA parking, striping and signage per regulations, and landscaping. The Oakmont Industry Group’s 156,500 square foot industrial warehouse building and associated street, sidewalk, paving, drainage, lighting, fencing, ADA compliance parking, striping and signage, and landscaping work services on 8.01 gross acres of land located at the northwest comer of Base Line Road and Tamarind Avenue.
Agreements for Professional Services to perform As-Needed Professional C... Page 1730 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 69
Fred Alipanah, PE
City of Rialto, On-Call Project and Construction Management & Inspection Services, Rialto, CA Project Manager responsible for construction inspectors, resident engineers for various capital improvements projects including, but not limited roadway and highway improvements, electrical and dry utilities relocation; structures; landscaping and irrigation; traffic signals and streetlights upgrades; water and sewer systems improvements; and traffic control. Projects include, but not limited Frisbee Park Expansion, Etiwanda Corridor Improvements, Bud Bender Park, Community Center Rehab, Building 200 & 300, Gymnasium Restrooms, Basketball Court Improvements, Fire Station 205, and Land Development Permit Projects Oakmont Development, CDRE Holdings 11, Pacific Ind. (North & South) on Alder.
Riverside South I-10, Baseline Storm Drain Rehabilitation, Bike Share Project, Easton Sidewalk Improvements, and I-10 / Cedar Improvements. Fred made sure the projects budget and completion schedule is monitored. Various.
South Jersey Transportation Authority, Atlantic City Airport Runway Design, Pomona, NJ Project Engineer. Responsible for runway design and capacity calculations services. Managed and coordinated design reviews and plan approvals, identify potential problems in advance, and take corrective action or notify the proper level of authority, prepared documentation, and prepared and maintained project budgets and schedules.
Pacific Industrial Development – North, 2335 West Walnut, Rialto, CA Construction Manager for the 188,712 square foot industrial warehouse distribution facility on 8.84 acres of land located on the southwest comer of Alder Avenue and Walnut Avenue, Rialto, California. Provided grade checking, inspection of contraction of concrete pavement, sidewalks, curb & gutters, curb ramps, ADA compliance parking, striping and signage, V-gutters, drainage and sewer systems, grouted rock strip, landscaping, retaining walls, striping and verification of SWPPP implementation.
City of Rialto, Bud Bender Sideline Fencing Vertical Extension and Safety Netting Improvement Construction Manager. The project comprises of the construction, placement and installation of fencing extension and safety netting for Bud Bender Park Ball Field 1. Work includes extending sideline and outfield fence posts, constructing steel netting frame, constructing safety netting, removal of a tree, remove and construct concrete pavement, remove and reconstruct V-Gutter, remove and reconstruct concrete Mow curb, ADA parking and ramps, and concrete pile foundation.
Responsible for preparing daily reports; quantity take offs; compliance with the City’s Construction Demolition and Recycling Ordinance; tracking the Contractor’s Certified Payroll Reports with monthly progress payment requests and reviewing for compliance with federal and state prevailing wage regulations. Responsible for overseeing day-to-day operation of the work, ensuring compliance with contract plans and specifications, track issues, monitoring contractor work, scheduling, responding to RFI and submittals, reviewing daily reports and quantity take off, help resolve constructability issues, negotiating and drafting change orders, processing extra work bills and progress payments.
City of Rialto, Frisbie Park Expansion, Rialto, CA
Change Order Manager for the expansion of Frisbie Park. The 27.4-acre site is partially developed with six ball fields, two basketball courts, a playground area, a pavilion, field lighting, basketball and volleyball courts, and asphalt concrete paved drive and parking areas. The project included the renovation of some existing elements such as an existing restroom; and an 8.5-acre expansion which feature tennis courts, t-ball fields, two playgrounds, a skatepark, new restroom and concession building. Responsible for reviewing CCOs. Project Cost: $19 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1731 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 70
STEVE HOLT, PE
Building Inspector
EDUCATION
MBA, University of
California Los Angeles, CA
MS, Architecture, University
of California, Berkeley, CA
BS, Environmental Design,
University of California,
Berkeley, CA
REGISTRATION
CA, Architect, 2008
LEED Accredited
Professional
National Council of
Architectural Registration
Boards
American Institute of
Architect
Mr. Holt has extensive experience with municipal facilities, research facilities, seismic retrofit projects, medical facilities, K-12, and historic renovation. His project management experience includes 17 years on projects with costs exceeding $50M, plus 11 years managing the design and construction of OSHPD and DSA approved facilities. Steve’s collaborative management style has kept his projects focused on quality, schedule and budget. Steve’s claims analysis has included review of sub-standard work, schedule delay, code defects, ADA issues, and design flaws. He is listed as an architectural expert witness and has appeared in Owner-Contractor negotiations and legal suits. He was successful on behalf of the LACCD in claim resolution on their Aviation Complex at West Los Angeles College.
Steve’s experience includes design and implementation of energy efficiency and life cycle cost goals. He has implemented LEED and CHPS requirements and monitored point scoring from initial design through final construction and commissioning. He has worked with HVAC and Electrical Engineers to determine the most cost-effective options for meeting energy and environmental requirements. He has written specifications and developed performance standards for specialized design-build items. He works closely with the Owner to achieve project goals.
RELEVANT PROJECT EXPERIENCE
College of the Desert, Hilb Library Renovation, Palm Desert, CA Senior Project Manager for the design renovation of a 38,900 SF building. Project will demo and replace all building systems and comply with LEED silver standards. Senior Project Manager for various design and construction projects, including the renovation of Building C, a new Pottery Canopy, and renovation of the Child Care Center Playground. Project Cost: $20 Million.
Pierce College Performing Arts Building Remodel, Woodland Hills, CA, Senior Construction Manager for the Design-Build Remodel addressing Theatrical and ADA improvements to 30- year-old, 32,635 SF building. His responsibilities included preparing schedules, Project Buy-Out, invoicing, construction RFI / Detail Design. In addition, he was responsible for negotiation of Change Order Proposals, Delay Claim Analysis, Quality Control of the Theatrical Systems, Commissioning Requirements, management of revisions (CCD’s), and Cost Control. Project Cost: $10.9 Million.
Aviation Complex, West Los Angeles College, Culver City, CA, Woodland Hills, CA Construction Project Manager: 55,000-square-foot facility. Work included restart of project stalled by contaminated soils which was discovered at 65% of construction, completion of construction, coordination of FF&E, move-in coordination, mediation of construction delay charges and change order claims. He reduced change order requests by $700,000 and negotiated $300,000 delay claim. Hired in November 1996 / beneficial occupancy in September 1997 / resolution of claims in June1998. Project Cost: $8.7 Million.
Verdugo Hills Hospital Addition and Parking Structure, Glendale, CA Owner’s Representative and Construction ProjectManager for a 132,000-square-foot acute care expansion project.
He met challenging schedule requirements, while maintaining existing hospital operations. Hospital Addition was a GMAX contract with incentives for meeting major delivery milestones. Medical Office Building and Parking Structure were Design-Build contracts.Owner elected to augment MOB quality during construction necessitating rigorous cost control and value received negotiations. Project Cost: $24.4 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1732 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 71
Steve Holt, AIA, LEED AP
Motion Picture Industry Pension and Health Plans, Tenant Improvement, Studio City, CA Senior Project Manager for interior gutting and high-end office upgrade of the third floor. The project included 58,400-square-foot renovation and 16,000-square-foot temporary flex space so that required work flow was unimpeded throughout the phased construction process. Project Cost: $5.8 Million.
Placentia-Yorba Linda Unified School District Bond Measures, Placentia, CA Senior Design Manager for various specialty projects including the new El Dorado HS Theater, 2 theater renovations, and new District Data Center. Work included multiple contract types, including lease-lease back, multi-prime, and traditional design bid-build. He issued over 30 RFP’s and 2 RFQ’s for Theater Lighting and Theater Sound.
City of Los Angeles Library Bond DD, Los Angeles, CA
Program Design Manager for the $183.8 million bond program to design, construct, and install 26 new branch libraries plus 4 library renovations. He developed facility design standards, product specifications, and implemented LEED compliance. In addition, he managed Constructability Review of projects at each design phase submittal. Format of monthly Board Report was selected by the City of Los Angeles as the standard template for project reporting. Project Cost $183.8 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1733 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 72
LAWRENCE TAYLOR
Building Inspector
EDUCATION
AS, Electrical
Engineering National
Education Center,
Anaheim, CA
CERTIFICATION
Cure-In-Place Pipe, No.
CIPP-0221-401577
Mr. Taylor has 17 years of roadway construction inspection and electrical inspection, CADD operation and civil engineering experience. Lawrence's experience includes roadways, state highways, private and public works construction inspection of, AC and PCC paving, Cold Plane & Pave, concrete sidewalks, curbs, curb & gutters, curb ramps, storm drain systems, water and sewer lines installation, dry and wet utilities, grading, excavation, earthwork, and electrical installations, such as Traffic Signal, video Cameras, pedestrian push buttons and underground utilities. His experience also includes ensuring ADA compliance which entails verifying various type ADA ramp compliance with ADA standards including, but not limited to verification of ramp width, longitudinal and cross slope, flare slopes, gutter slopes, road surface slope and condition, landing slopes and dimensions, surface of the roadway in front of the curb ramp, detectable warning surface width, depth, and material compliance, conforming sidewalk slopes, curb ramp surface finish, obstructions, condition of the existing sidewalk and retaining curb backfill, and Pedestrian Push Button height and wheelchair accessibility at a signalized intersection.
Lawrence experienced also includes state highways, and local street improvement construction works, including AC Paving, Cold Plane & Pave, Concrete Paving, storm drain systems, water and sewer lines installation, dry and wet utilities, excavation, grade checking, earthwork, electrical installations, and underground utilities. His experience also includes inspection of RHMA HMA / JCPC / JPCP-RSC / grade checking, curb & gutters, curb ramp, sidewalks, Spandrel V-gutter, drainage and sewer systems, grouted rock strip, landscaping, retaining wall, striping, signalization, SWPPP, traffic control, and safety.
Lawrence coordinates wet and dry utility installations for telephone, electrical, cable television, traffic signalization, gas relocations, landscape and irrigation improvements.
RELEVANT PROJECT EXPERIENCE
City of Whittier, Nelle’s at the Grove in Whittier, CA
Field Inspector. Responsibilities include field inspection of electrical, dry utilities, concrete structure, structural pavement, landscaping, irrigation, asphalt concrete, grading, traffic signals, streetlights, water systems, sewer systems and traffic control, concrete drainage pools and overseeing testing. Perform field and electrical inspections.
The project includes demolition of the 68 buildings and new construction of 561 homes, 189 apartments and 150,000 square feet of retail and restaurant space. Four historic buildings will be preserved. Project also includes for new neighborhood parks and open space, as well as the restoration and reuse of four buildings from the 1920s and 1930s as part of the commercial and residential areas. Project Cost: $42 Million.
Ontario International Airport Authority (OIAA), On Call Construction Management, Ontario, CA Field Engineer / Construction Inspector. Ontario International Airport (ONT) is a medium hub airport serving about four million passengers per year and is a major air-cargo facility in Southern California. The project requires construction management and related services on a regular basis to ensure OIAA projects and various tenant projects are completed. according to their design and construction specifications. The project includes removing 52 acres of parking lot located at the northwest quadrant of the airport land side. Removals included asphalt, fencing and electrical appurtenances; stock piling AC and concrete removals; realigned vehicle service road (VSR) in two phases. The phases include cutting the new roadway, placing base material, placing HMA all done per spec including compaction testing throughout the process. Erecting airport security chain link fencing on top of type K barrier rail. Grading all areas to the satisfaction of the plans and specs. Placing BMP’s before, during and after completion to the satisfaction of the SWPPP. Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1734 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 73
Lawrence Taylor
John Wayne Airport, Irvine, CA
Lead Inspector. Lawrence completed two projects for the airport. First project was a driveway for taxi loading and unloading on the landside lower level which included bollard installation, sidewalk/drive approach, slurry, grading, striping. The second project was the Taxiway Bravo Rehabilitation project which included cold milling, paving, grading, identify unsuitable areas for over x, electrical, striping, comply with FAA specifications, coordination with Air Ops, daily documentation. Responsible for inspection of electrical, dry utilities, concrete structure, structural pavement, landscaping, irrigation, asphalt concrete, grading, traffic signals, streetlights, water systems, sewer systems and traffic control. Drainage. Project Cost: Various.
Caltrans District 8, On Call Construction Engineering and Inspection and CPM Scheduling, San Bernardino, CA
Assistant Resident Engineer / Inspector. Lawrence's assignment includes the 1-15 Corridor Avenue D Widening Mojave River / Victorville to reconstruct 3 interchanges, construct 2 new bridges and widen 3 bridges. His responsibilities include roadway widening and paving (HMA, PCCP), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Coordinating with material testing and sampling and maintain local detours with signalized intersection work. Project Cost: Various.
Caltrans District 7, On Call Professional and Technical Construction Engineering Services, Los Angeles, CA Inspector. Lawrence provided as-needed services for the support and development of proposed State transportation facilities in Los Angeles County for Routes 1, 23, 27, 33, 47, 90, 91, 103, 105, 107, 405, 605, 710 and State Route 5 Projects. The projects, varying in different sizes, involved electrical inspection, construction inspection, SWPPP compliance and office engineering, and has provided complete services for preparing and processing all documentation required. Lawrence provided construction inspection services. Project Cost: $250 Million.
Caltrans District 7, On Call Repairs, Ventura County, CA Assistant Resident Engineer / Construction Inspector. Lawrence worked out of the Thousand Oaks office on an emergency contract to replace burned appurtenances in Ventura County under force account. He was responsible for the Midwest Guardrail Systemplacement, fencing/barbed wire, traffic control, hazardous waste documentation, daily documentation. He was also responsible for SR-34 which included paint removal, hazardous paint removal, dig outs, paving, type III slurry seal, striping, shoulder backing, traffic control, daily documentation. Project Cost: Various.
City of Carson, I-405 / Wilmington Bridge Improvement, Carson, CA Lead Inspector. The project entails working on Interstate 405, a major North-South corridor and the busiest freeway in the United States. Administered by the City of Carson, the project will modify the I-405 Freeway & Wilmington Avenue Interchange. The project will add a new on-ramp to the 405 freeway, build retaining walls and sound walls, widen the 405 Freeway over the Dominguez Channel, retrofit and widen the bridge at 223rd Street, rebuild the roadway and intersections along Wilmington Avenue, and include other miscellaneous site improvements such as landscaping. Lawrence was responsible for the placement of JPCP, joint seal, striping, electrical, polyester paving, striping, roadway excavation, and daily documentation. Project Cost: $27 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1735 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 74
JESSE MAREZ
Building Inspector
EDUCATION
BS, Civil Engineering,
California State
Polytechnic University,
Pomona
CERTIFICTIONS
NABCEP Certified
SCE Advance
Contractor, CSI training
Pasadena City College
Electricity & Photovoltaic
Santa Monica College
Sustainable &
Renewable & Industry
Trainer
College of the Canyons,
Sustainable
Technologies
Southwest City College:
Industry Trainer
Instructor, Renewables &
Solar Energy Industry
Jesse brings 30 years of utility-related experience and knowledge as a renewable energy consultant in comprehensive services on all utilities for efficiency, generation, storage, and conservation. He has developed an intricate knowledge of municipality governance and policy implementation. He has a strong foundation in sustainable energy and utility-related products and has worked on numerous residential, industrial, commercial, and public agency projects with values of up to $750 Million. His experience includes public agencies, municipalities, developers, and forward-thinking clients from all industry sectors. He provided utility rate analysis, electrical services design, feasibility studies, marketing, and sales with an emphasis on energy efficiency, and alternative and renewable energy, which included but was not limited to solar, energy storage, fuel cells, and geothermal. As an electrical engineer, Jesse worked for the Los Angeles Department of Water and Power (LADWP) for a decade in a variety of departments specifically relating to the services to Major Executive Accounts within the DWP’s service area, where he was the liaison to incorporate all programs to support the clients with efficiency and conservation efforts.
While at LADWP, he played a key role in developing LADWP’s Power Marketing and Sales Team using non-traditionalmethods of selling excess energy for additional revenue.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7 (EA 297703), Route 110, between Route 101 and Route 5– Modifying Existing Electrical System, Los Angeles, CA
Electrical Inspector the Project is to modify the existing light poles to new Type 30 and 31 on busy Route 110 near downtown Los Angeles. Responsible for overseeing the construction, installation, and commissioning of 65 light poles at various locations. The duty includes verifying each existing location, inspecting the utility relocation, traffic control, pole assembly, monitor SWPPP. Monitor the inspection with Caltrans Standard Plans and Specifications, special provisions, and contract plans. Project Cost: $1.9 Million.
Caltrans District 7, Route 210 Roadway Rehabilitation Project, Pasadena, CA Electrical Inspector Inspecting and monitoring all fieldwork and progress of the contractor and subcontractor(s) as they installed and tested system equipment valued at $130Million. Ensured all installationsmeet contract documents and adhere to Caltrans, City, State, and Local applicable codes, Standard Plans, and Specifications. Inspecting the traffic control operation, SWPPP Compliance, drainage, electrical installation of ramp metering, streetlights, upgrade conduits, LED tunnel lighting, CCTV Cameras, and associate equipment, traffic loops and associated cabling, electrical cabinets, underground utility relocation, preparing monthly estimates, review Change Orders.
Project Cost: $130 Million.
Caltrans District 7 (07A4568), On-Call Construction Electrical Inspection, Los Angeles, CA Electrical Inspector for various projects in Caltrans District 7 during the construction phase of Caltrans District 7 transportation facilities in Los Angeles. He enforces compliance with engineering plans and specifications and determined the acceptability of work, labor, and materials. Electrical work consisted of freeway lighting, traffic signals, pull boxes, LED upgrades, conduit, cabinet, and conductor installations. He prepares documentation for electrical item progress payments coordinated with COZEEP and enforces traffic control. Responsible for electrical engineering construction inspection, quantity calculations, checking grade and alignment, labor compliance interviews, and safeguarding. The project, assuring compliance with project plans and specifications, identifies actual and potential problems associated with the construction project work and recommends engineering solutions.
Project Cost: $10 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1736 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 75
Jesse Marez
Exposition LRT Project Phase II, Los Angeles, CA
Onsite Quality Control daily inspecting and witnessing the testing of equipment connections and commissioning along the Expo Line Route and all New Stations connecting Downtown Los Angeles to the City of Santa Monica 4th Street. This includes but is not limited to traffic street crossing signals and bike trail lighting, manhole conduit, cables, communication wiring, CCTV, fire alarm communication equipment, and public PA systems for passenger safety.
Port of Long Beach, Infrastructure Projects, Long Beach, CA Electrical Inspector responsible for overseeing the construction, installation, and commissioning of underground utilities, drainage, pipelines, and concrete work (pier repairs and replacement of deck). My role included the preparation of inspection reports, field engineering services, and weekly progress presentations to the team and Port management. Project Cost: $7 Million.
Los Angeles Metro, I-110 Express Lanes Project, Los Angeles, CA Electrical Inspector inspected and monitored all fieldwork and progress of the contractor and subcontractor(s) as they installed and tested system equipment valued at $10 Million. Ensured all installations met contract documents and adhered to the Caltrans, city, state, and local applicable specifications. Inspected the installation of all CCTV cameras, EarthCam, and associate equipment, traffic loops, and signals. Project Cost: $11 Million.
Various Public Agencies in Los Angeles, San Gabriel, and Inland Empire, LEED and Solar Projects, Various Los Angeles Locations, CA
Project Manager developed the processes for business development, project analysis, electrical design, and installation of solar energy systems for residential, commercial, industrial, and public agencies. Oversaw all marketing and sales in the greater San Gabriel and San Fernando Valleys and helped the company surpass its goals for solar installations while providing clients and partners with energy efficiency services, solar energy, and alternative fuel resources. He was the Project Manager of the first LEED public works project for the City of Beverly Hills. Project Cost: $65,000 to $3 Million.
Eco Point Energy Services
Project Manager. Provided engineering professional services as the Los Angeles Project Manager and Utility Liaison to all Southern California Public Power Authority (SCPPA) members for the purchase of some or all the energy generated from the Nevada 300MW Development project in Boulder City, Nevada. Responsible for the preparation & submission of the Beacon Solar Proposal to SCPPA and its member LADWP.
SunEdison Inc.
Associated Partner for Perma City and project operations management to determine the services and requirements that are needed to complete the LADWP Fit-50 Rooftop Solar Program projects, which are key for the City of Los Angeles and the success of the Beacon Solar Project. Provided the support and the liaison of sales and support to Perma City, the EPC, all city agencies, and subcontractors involved to complete the LADWP Fit 50. Project benchmark, design, installation, and completion of systems submitted to LADWP and all City Departments to include but not limited to the following: LA City permits and Inspections, Building & Safety, LADWP Interconnections process, LADWP Service Area Capacity, development and update all property lists on leases & procedures by LADWP Service areas, along with weekly progress reports.
Exposition LRT Project Phase II (Steiny-Skanska), Power Tech Engineers, Inc., Los Angeles, CA Onsite Quality Control daily inspecting & witnessing the testing of equipment connections and commissioning along the Expo Line Route and all New Stations connecting Downtown LA to the City of Santa Monica 4th Street. This includes but is not limited to Traffic Street Crossing Signals & Bike Trail Lighting, Manhole Conduit, cables & communication wiring, CCTV, Fire Alarm Communication Equipment, and Public PA systems for passenger safety.
Agreements for Professional Services to perform As-Needed Professional C... Page 1737 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 76
CESAR CERDA
Electrical Inspector
CERTIFICATIONS
IBEW Local Union 11
Cal OSHA 10 Hour
Certification
Traffic Signal and Street
Lighting
Journeyman Electrical
Training Trust
National Electrical Code
Electrical Training Trust
Conduit Bending
Electrical Training Trust
Mr. Cerda has more than 32 years of construction experience and is cross trained in Civil and Electrical inspection work. He has worked as an assistant resident engineer, construction lead inspector, and General Superintendent for several large electrical construction companies specializing in various fields including but not limited to highway widening and improvements, bridge widening and reconstruction, transmission pipeline construction and relocation, wastewater treatment facilities, commercial construction, and development construction. He is experienced with traffic control system compliance, an assistant to the resident engineer by preparing CCO and force account analysis. His field inspection experience includes streetlights, excavation, subgrade preparation, culverts, gutter, asphalt surfacing, HMA pavement, sampling of HMA in the field, retaining walls, sound walls, and concrete pour. Cesar is responsible for ensuring ADA compliance which entails verifying various types of ADA ramp compliance with ADA standards including, but not limited to verification of ramp width, longitudinal and cross slope, flare slopes, gutter slopes, road surface slope and condition, landing slopes and dimensions, surface of the roadway in front of the curb ramp, detectable warning surface width, depth, and material compliance, conforming sidewalk slopes, curb ramp surface finish, obstructions, condition of the existing sidewalk and retaining curb backfill, and Pedestrian Push Button height and wheelchair accessibility at a signalized intersection. Mr. Cerda has extensive knowledge and experience verifying electrical work is in compliance with local codes and NEC, NESC and ANSI standards. His responsibilities included construction inspection and Quality Control, daily reports and quantities take- offs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, preparing and reviewing as-built plans, and preparing final punch list.
He can interpret contract specifications and has extensive knowledge of the Caltrans Standard Plans and Specifications, Caltrans Construction Manual, OSHA Manual, MUTCD, Traffic Control Manual, and Green Book.
RELEVANT PROJECT EXPERIENCE
Caltrans District 4, Highway 101 Widening, Santa Rosa, CA Electrical Inspector. First segment of widening project to add HOV lanes from Santa Rosa in Sonoma County to the Main County Line as part of VC&A’s on-call contract. The 400 working day contract included 12 new or upgraded street signals, structures work (bridge widening and new bridge at Santa Rosa Avenue), 4.4 miles of machine slip formed Type 3 60 concrete barrier in the center median and 8.5 miles of salvaged and reconstructed Tri Beam Barrier and MBGR. This was the first project in District 4 to use the Electronic Mobile Daily Diary Computer System Data Delivery (e-Peg). Project Cost: $2 Million.
City of South Gate, Traffic Signal Modifications Project and ADA Ramps, South Gate, CA Senior Electrical Inspector responsible for inspection of 5 traffic signal intersections with new sidewalk handicap ramps to be installed throughout the City. He was responsible for ensuring ADA compliance, verifying various type ADA ramp. compliance with ADA standards including, but not limited to surface of the roadway in front of the curb ramp, detectable warning surface width, depth, and material compliance, conforming sidewalk slopes, curb ramp surface finish, obstructions, verification of ramp width, longitudinal and cross slope, flare slopes, gutter slopes, road surface slope and condition, landing slopes and dimensions, condition of the existing sidewalk and retaining curb backfill, and Pedestrian Push Button height and wheelchair accessibility at a signalized intersection. Work also includes coordination with contractor on all closures, traffic control, and all safety aspects Project Cost: $800,000.
Agreements for Professional Services to perform As-Needed Professional C... Page 1738 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 77
Cesar Cerda
Caltrans District 8 (08A3068), I-10 Corridor Improvement Project, Montclair, CA Electrical Inspector / ARE. Responsibilities include roadway widening and paving (HMA, PCCP), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Project Cost: $929 million.
Caltrans District 8 (08A3068), On-Call Construction Inspection, I-15 from San Diego County to SR-91 Interchange, Riverside County, CA & I-10 Corridor Improvement Project, Montclair, CA Electrical Inspector / ARE. Project consists of 38 miles from the San Diego County border to one-mile North of the SR-91 Interchange. Project includes bridge demolition and construction, roadway widening, sound walls, retaining walls, MSE Walls, Cesar is responsible for performing electrical inspection, upgrading of service cabinets and controllers, installation of battery backup systems, new pedestrian heads and video detection systems and upgrading the traffic signal heads and luminaires to Light Emitting Diodes (LED). Work also includes coordination with contractor on all closures, traffic control, and all safety aspects Project Cost: $929 million.
City of Rialto, CDRE Holdings 11, LLC, PPD 2018-0021, Rialto, CA Electrical / Construction Inspector responsible for construction inspection services for a 99,999 square foot industrial warehouse building and associated paving, drainage, lighting, fencing, and landscaping on 4.63 gross acres of land (APNs: 0240-181-32 & -33) located on the north side of Base Line Road approximately 315 feet east of Palmetto Avenue within the Employment (EMP) zone of the Renaissance Specific Plan. He is responsible for ADA compliance, verifying various type ADA ramp compliance with ADA standards including, verification of ramp width, longitudinal and cross slope, flare slopes, gutter slopes, road surface slope and condition, landing slopes and dimensions, surface of the roadway in front of the curb ramp, detectable warning surface width, depth, and material compliance, conforming sidewalk slopes, curb ramp surface finish, obstructions, condition of the existing sidewalk and retaining curb backfill, and Pedestrian Push Button height and wheelchair accessibility at a signalized intersection. He is also responsible for grade checking, inspection of construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation.
Responsibilities also includes roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, drainage structures, slope paving; MBGR installation, and other various items.
Oakmont Development, City of Rialto
Electrical / Construction Inspector for the Oakmont Industry Group’s 156,500 square foot industrial warehouse building and associated paving, drainage, lighting, fencing, and landscaping services on 8.01 gross acres of land located at the northwest comer of Base Line Road and Tamarind Avenue. Responsible for grade checking, inspection of construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation. Cesar ensured ADA compliance, verifying various type ADA ramp compliance with ADA standards including, but not limited to verification of ramp width, surface of the roadway in front of the curb ramp, material compliance, detectable warning surface width, depth, conforming sidewalk slopes, condition of the existing sidewalk and retaining curb backfill, longitudinal and cross slope, flare slopes, gutter slopes, road surface slope and condition, landing slopes and dimensions, curb ramp surface finish, obstructions, and pedestrian push button height.
Ontario International Airport Authority (OIAA), On-Call Construction Management, Ontario, CA Electrical / Construction Inspector. Ontario International Airport (ONT) is a medium hub airport serving about four million passengers per year and is a major air-cargo facility in Southern California. The project requires construction management and related inspection services on a regular basis to ensure OIAA projects and various tenant projects are completed according to their design and construction specifications. The project includes Runway 8R-26L Rehabilitation and Connection Taxiways Program, Runway 26R ILS Upgrade, removing 52 acres of parking lot located at the northwest quadrant of the airport land side. Responsible for inspection of asphalt, fencing and electrical appurtenances; stock piling AC and concrete removals; realigned vehicle service road (VSR) in two phases. Placing BMP’s before, during and after completion to the satisfaction of the SWPPP. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1739 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 78
GABRIEL FLORES
Electrical Inspector
EDUCATION
Electrical Training
Institute Certificate
CERTIFICATIONS
CA, Electrician, No.
C6680587
Mr. Flores is a Certified Electrician with 30 years + of experience. Areas of expertise include electrical inspection, construction inspection and quality assurance and quality control (QA/QC). He has delivered numerous projects, including roads and highways, bridges, airports, light rail, heavy rail, landscape, power distribution facilities, Port of Long Beach Electric Vehicle Charging Stations in conjunction with SCE oversight inspection.
His experience includes traffic signal inspection, NEMA controller foundation and cabinet construction, and programing, boring inspection, fiber optic cable and conduit construction, fiber optic termination and testing and roadway construction inspection.
Gabriel was responsible for inspecting electrical lighting, closed circuit television (CCTV) and ramp metering systems; traffic monitoring stations; traffic signals; street and highway safety lighting; fiber-optics; and electrical conduit systems. In addition to training apprentices on behalf of the International Brotherhood of Electrical Workers (IBEW) Local 11, and Caltrans employees, Gabriel is familiar with the followings: Caltrans Standard Plans and Specifications, City of Los Angles Standard Plans and Specifications, County of Los Angles Standard Plans and Specifications as well California Code of Regulations, National Electrical code as they relate to electrical requirements.
RELEVANT PROJECT EXPERIENCE
Caltrans District 12 (Contract No. 12A1736), On-Call Electrical Inspection Services, Orange County, CA Lead Electrical Inspector. Inspecting and monitoring of all fieldwork and progress of the contractor and subcontractor(s) as they installed and tested system equipment. Ensured all installations meet contract documents and adhere to Caltrans, City, State and Local applicable codes, Standard Plans and Specifications. Inspecting the traffic control operation, SWPPP Compliance, drainage, electrical installation of ramp metering, street lights, upgrade conduits, LED tunnel lighting, CCTV Cameras, and associate equipment, traffic loops and associated cabling, electrical cabinets, underground utility relocation, prepare monthly estimate, review Change Orders. Project Cost: Various.
San Bernardino County Transportation Authority, US HWY 395 Widening, Cities of Victorville & Adelanto, CA
Lead Electrical Inspector. Gabriel’s responsibility on the project includes the following:
on-site operations coordination, facilitating decisions for installation, Traffic Signal, Hwy Lighting, payments, monthly progress payments. submittal review, RFI’s contract change order review and coordination with other construction divisions within Caltrans and serving utility companies. Components of the work include the installation of underground electrical conduit by directional bore and or open trenching method, CIDH foundations for signals and lighting, utility coordination. Project Cost: Various.
Caltrans District 7, I-405 San Fernando Valley Improvement Project Senior Electrical Inspector. As a lead inspector, Gabriel was responsible for the following: on-site operations coordination, facilitating decisions for installation, traffic control, payments, contract change orders, monthly progress payments and coordination with other construction divisions within Caltrans. Components of the work include the installation of precast, pre-stressed concrete panels and a metal beam guard railing, traffic stripes, water retention basin (Austin vault), dowel bar installation, profile grinding, AC paving/grind and overlay and RSC slab replacement. Gabriel was also involved with electrical work comprising approval of equipment locations, installation of highway lighting, modify ramp meter installation, and modify traffic monitoring systems, and installation of MVDS systems.
Agreements for Professional Services to perform As-Needed Professional C... Page 1740 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 79
Gabriel Flores
City of Santa Monica, Various Projects, Santa Monica, CA Electrical Inspector. As Electrical Inspector for multiple City projects, Gabriel’s duties included overseeing installation, providing construction management, interfacing with city officials, meeting delivery dates and planning and scheduling for multiple projects. Projects included 3rd Street Promenade Lighting, Downtown Signalization / Modification, Pio Boulevard Streetscape / Signalization, Olympic Boulevard Streetscape/Signalization, Pier Lighting Modifications, Parking Lot Lighting Projects (public libraries and beach parking lots), Street Lighting Conversion Projects (from series to multiple throughout the City of Santa Monica) and Santa Monica Airport Lighting. Project Cost: Various.
Caltrans District 7, On-Call Construction Inspection & SR-60 Construction Inspection, Los Angeles, CA Principle Resident Engineer. Gabriel’s responsibility on the project includes the following: on-site operations coordination, facilitating decisions for installation, Traffic Signal, Hwy Lighting, payments, monthly progress payments. submittal review, RFI’s contract change order review and coordination with other construction divisions within Caltrans and serving utility companies. Components of the work include the installation of underground electrical conduit by directional bore and or open trenching method, CIDH foundations for signals and lighting, utility coordination. Project Cost: Various.
Orange County Transportation Authority (OCTA) / Caltrans EA#12-0F96C and 12-0F96E4, I-5 HOV Improvement Project, San Juan Capistrano, CA
Assistant Resident Engineer.Gabriel provides electrical inspection support for the OCTA I-5 HOV improvement project from PCH to San Juan Creek Road. The project will reduce traffic congestion on the I-5 within the project limits by providing more capacity and by reducing the volume of traffic in the other lanes, provide an extension of the existing I-5 mainline HOV network to the north within the proposed project limits, provide improvements to auxiliary lanes to relieve congestion at diverge and merge locations, and increase operational efficiency within the interchange areas by providing additional lanes on several ramps and by extending the existing auxiliary lanes. The project construction will be in accordance with the approved Project PS&E. Project Cost: Various.
City of Carson, I-405 / Wilmington Interchange, Carson, CA Constructability Reviewer. Performing constructability review of electric submittals for the Wilmington Avenue and I-405 interchange modification project. Works consist of the reconfiguration of existing ramps and the widening of a two-lane roadway to eliminate the existing bottleneck, increase capacity and improve safety. Hill’s scope of work comprised surveying, pavement, sidewalks, drainage facilities, traffic signals, construction inspection, critical path method (CPM) scheduling and facilitating and attending public meetings and preconstruction meetings with stakeholders Caltrans District 7, Various Projects, Los Angeles, CA
Electrical Inspector. Gabriel was responsible for inspecting electrical lighting, closed circuit television (CCTV), ramp metering systems, traffic monitoring stations, traffic signals Pump House, power distribution. Vincent Thomas Bridge power up grades i.e., new motor control room, switch broads, switch gear, panel boards. Including new installation of AVC station.
WIM systems, HAR systems, CMS.
Port of Long Beach
Senior Electrical Inspector. As part of Port of Long Beach inspection team, Senior Electrical inspector for new charging stations for UTR’s, top handler container lifts, overhead cranes, modifications to existing equipment charging stations, modifications to pump houses and sewer lift stations overseeing Utility company installation, new / modifications to electrical work installations. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1741 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 80
JESSE VARGAS
Electrical Inspector
EDUCATION
Construction
Management, California
Polytechnic Extended
University, CA
CERTIFICATIONS
CA, Certified General
Electrician, No 110368
Mr. Vargas is a Certified Electrician with more than 20 years of experience in the construction industry. Jesse has expertise in inspection, transportation engineering and construction management. His projects include technology and communications systems, lighting, roads, highways, rail and transit. Jesse has planned, organized and supervised public works and private construction projects from inception to completion.
He was responsible for presenting bid packages and awarding contracts; coordinating personnel, materials and equipment; and interpreting and ensuring compliance with specifications. In addition to designing and managing installations, he liaised with vendors, subcontractors, contractors and government agencies; monitored safety and environmental quality control and read blueprints. He also installed and inspected highmast lighting on freeways, traffic signals, streetlights, fiber-optic and telephone interconnect cables, closed-circuit television cameras, underground electrical systems electrical wiring and vehicle detection systems. Jesse is knowledgeable of Storm Water Pollution Prevention (SWPPP), traffic control, safety, lane closures, contract change orders (CCO) preparation, review and analysis in accordance with Caltrans’ Standards and Requirements. He has extensive experience in construction services performed per Caltrans Construction Manual for Local Agency Resident Engineers, Caltrans Construction Manual, Bridge Records and Procedures Manual, SWPPP (California General Permit) and Green Book, Structure Construction Manual, Caltrans Safety Manual, and various City and County Public Works and Flood Control Standards.
RELEVANT PROJECT EXPERIENCE
Ontario International Airport Authority, On-Call Construction Management & Inspection Services, Ontario Electrical Inspector. The project requires construction management and related services on a regular basis to ensure OIAA projects and various tenant projects are completed according to their design and construction specifications. The project includes Runway 8R-26L Rehabilitation and Connection Taxiways Program, Runway 26R ILS Upgrade, removing 52 acres of parking lot located at the northwest quadrant of the airport land side. Jesse provided electrical inspection services. Project Cost: Various.
Joint Point of Entry 1, CHP Truck Weigh Station and Inspection Facility, Caltrans District 8 Electrical Inspector responsible for inspection of a variety of electrical inspection duties such as the following installations, high mast, canopy, parking lot, sign and highway lighting, WIM stations with piezoelectric and detector loop sensors, CCTV and fiber optic. Duties also included coordinating with electrical design and SCE for the installation of Type 111 CF service cabinets with step up and step-down transformers, building generator for a separately derived system, SCE manholes, SCE transformers and the Main distribution cabinet for the building.
Since the construction site was in the middle of the desert with no utilities, he had to coordinate with SCE planners and AT&T planners to provide their utilities to the building.
Orange County Transportation Authority (OCTA), I-5 HOV Improvement Project, San Juan Capistrano, CA Electrical Inspector responsible for this $44 million project, Jesse serves as Electrical Inspector for the OCTA I-5 HOV improvement project from PCH to San Juan Creek Road, totaling 4.9 miles. The project will reduce traffic congestion on the I-5 within the project limits by providing more capacity and reduce the volume of traffic in the other lanes. Providing an extension of the existing I-5 mainline HOV network to the north within the proposed project limits, provide improvements to auxiliary lanes to relieve congestion at diverge and merge locations, and increase operational efficiency within the interchange areas by providing additional lanes on several ramps and by extending the existing auxiliary lanes. The project construction will be in accordance with the approved project PS&E. Project Cost: $44 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1742 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 81
Jesse Vargas
Construction Management Services for Clay Street Grade Separation, Riverside County Transportation Department (RCTD), Jurupa Valley, CA
Electrical Inspector under a $17 million contract. Jesse oversaw the completion and punch list items for the installation of a traffic signal, vehicle detention system (VDS), flashing beacons (FB), emergency vehicle preemption (EVP) and street lighting. The scope of work comprised construction management services for the Clay Street Grade Separation project, which involved construction of a grade separation for the existing at-grade crossing of Clay Street and the Union Pacific Railroad (UPRR). Project Cost: $17 Million.
City of Santa Monica, Public Works Projects, Santa Monica, CA Electrical Inspector. Jesse electrical inspection services to $5 million worth of public works projects. We adhered to Greenbook Standard Specifications for Public Works Construction; Standard Plans for Public Works Construction; Cal/OSHA Construction Safety Orders and Caltrans Standard Specifications, Standard Plans and Standard Special Provisions. Work included the phased improvement and upgrading of street and park lighting systems in 16 locations. This involved the replacement of streetlights/luminaries and power service, the installation of 120-V multiple circuit wires and conduits, the installation of pull boxes, the installation and upgrading of service cabinets and the restoration of affected street and sidewalk surfaces. Project Cost: $5 Million.
Clyde V. Kane, Caltrans Northbound Safety Roadside Rest Area Building Electrical Inspector responsible for Utility Coordination with Caltrans and the SCE planner to provide power to the 3 phase 480/277 facility for the Main distribution panel from a power pole transformer which provided power to all electrical elements including the SCADA system, well pumps, Reservoir, Plumbing Chase and all other electrical elements. Special duties include coordinating with the SCE planner to provide new underground power from the power pole to the buildings from the Main distribution cabinet. He was also tasked to inspect these systems. Project Cost: $1.2 Million.
Caltrans District 8, On-Call Riverside and San Bernardino Road Projects (Contracts 08A1481, 08A176, 08A2146, 08A2586), Riverside and San Bernardino Counties, CA
Electrical Inspector. Jesse is providing electrical inspection services under construction management support services contract. The work is comprised of electrical inspection, landscape inspection, SWPPP inspection and office engineering support to Caltrans District 8 throughout San Bernardino and Riverside counties. Jesse is responsible for inspecting ramp metering system, CCTV, fiber optic, changeable message signs and electrical services controllers for various Caltrans projects. He also provides inspection for electrical wiring repairs, overhead and ground sign panels as well as other associated tasks.
RCTD / Caltrans District 8, I-15 / California Oaks Road Interchange Improvements Project & Clinton Keith Road Interchange / I-15 Reconstruction, Wildomar, CA
Electrical Inspector Jessie oversaw the completing of the Electrical items for the installation of a traffic signal, vehicle detention system (VDS), flashing beacons (FB), emergency vehicle preemption (EVP) and street lighting. The scope of work comprised construction management and inspection services for I-15 / Clinton Keith Road and I-15/Cal Oaks Road Interchange improvements projects. His responsibilities included, but not limited to inspecting traffic signals, traffic control, lighting system, ramp metering system, traffic monitoring station, highway surveillance system, changeable message sign system and communication system, quality control inspection, planning and scheduling. Project Cost: $17 million.
City of Moreno Valley, Public Works Projects, Moreno Valley, CA Electrical Inspector. Jesse electrical inspection services to $5 million worth of public works projects. He adhered to Greenbook Standard Specifications for Public Works Construction; Standard Plans for Public Works Construction; Cal/OSHA Construction Safety Orders and Caltrans Standard Specifications, Standard Plans and Standard Special Provisions. Work included the phased improvement and upgrading of street and park lighting systems in 16 locations.
Agreements for Professional Services to perform As-Needed Professional C... Page 1743 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 82
MARIO GARCIA
Electrical Inspector
EDUCATION
General Education
Courses Los Angeles
Valley College
REGISTRATIONS
CA, General Electrician
No. 106818
Mr. Garcia has more than 31 years of experience in the electrical industry with over 12 years inspecting Caltrans electrical projects and over 15 years of experience as project management in a lead position responsible for field operations and supervising of over 40 employees. His responsibilities include but not limited to project management responsibilities of various projects with agencies including, Caltrans, Los Angeles Department of Transportation, Los Angeles Bureau of Street Lighting, and various cities. He provides inspection of communication systems, ramp metering systems, lighting systems, traffic signals, service switchboards, electrical equipment, standby generators, lighting pile foundations, and the installation of new Caltrans electrical services; reviews Plans and Specifications for various electrical construction projects; reviews electrical submittals and electrical change orders from the contractor; lays out electrical equipment locations, and resolve issues with the contractor; and provides utility service request fromutility agencies such as SCE, LADWP, and SBC for Caltrans projects. Mr. Garcia’s experience also includes work on electrical Caltrans projects with the following items: fiber optic communication systems, CCTV systems, street lighting and sign illumination systems, vehicle speed feedback system, weather station system, microwave vehicle detection Systems (MVDS), automatic vehicle classification station (AVCS) and new Caltrans electrical services from utility companies. Additional experience includes office Engineering and administration for major highway construction projects, including but not limited to maintaining accurate and complete project records to ensure compliance with Caltrans Policies and Procedures; resolving issues with the project designers, resolutions of CCO’s including verifying quote from contractor, and assist with electrical design CCO’s, preparing new projects folders with category numbers and coordinating pre-construction meetings and agenda.
Mr. Garcia’s experience includes keeping track of monthly pay quantities and estimates; calculating and submitting monthly estimates to Caltrans Estimate Desk; preparing and submitting Weekly Statement of Working Days to Contractor and Caltrans. He also prepares Labor Compliance Report, Weekly Status Contractor and Sub-Contractors working on the Contract. Contractor and submits to Contractor and Caltrans Labor Compliance. He is able to review and respond to RFI’s and potential claims from contractors. In the project site, his responsibilities include construction inspection, safety compliance, preparing and reviewing as-built plans, and preparing final punch list. In addition, he has extensive experience with Caltrans Construction Manual for Local Agency, Construction Manual, SWPPP and Green Book, Caltrans Safety Manual, and various City and County Public Works and Flood Control Standards. He is versed in the 2010 Federal Highway Administration Manuel on Uniform Traffic Control Devices. He is experienced with computers, computer applications and software programs such as Word, Excel, and CPM scheduling software programs.
RELEVANT PROJECT EXPERIENCE
Caltrans District 7, On-Call Electrical Engineering and Inspection (07A4568), Los Angeles, CA Electrical Inspector for various projects in Caltrans District 7 during the construction phase on Caltrans District 7 transportation facilities in Los Angeles. He enforces compliance with engineering plans and specifications and determined acceptability of work, labor and materials. Electrical work consisted of freeway lighting, traffic signals, pull boxes, LED upgrades, conduit, cabinet, and conductor installations. Mario prepares documentation for electrical item progress payments coordinated with COZEEP and enforces traffic control. Responsible for electrical engineering construction inspection, quantity calculations, checking grade and alignment, labor compliance interviews, safeguarding project, and assuring compliance with project plans and specifications, identifies actual and potential problems associated with the construction project work and recommends engineering solutions. Project Cost: $10 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1744 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 83
Mario Garcia
Caltrans District 7, On-Call Electrical Inspection Services (07-1218W4 & 07-168004), Los Angeles, CA Electrical Inspector. For EA 07-1218W4 realign route 5, HOV Lanes, and Railroad Tracks. Mario responsible to inspect electrical items which include Ramp Metering, Traffic Signal, lighting systems, and communication systems. Project Cost:
$221,8 million. For EA 07-168004 HOV lanes and connectors constructed. Mario responsible to inspect electrical items which included seismic systems, communication systems, lighting systems, AVCS, rampmetering systems, City of Los Angeles Street Lighting, traffic signal, and communication systems. Project Cost: Various.
Caltrans District 7, On-Call Services (07-129974, 07-3X9404, 07-3X9304, & 07-308504), Los Angeles, CA Electrical Inspector / Office Engineer. For multiple Caltrans projects. Responsible administration, which includes estimates, contractor correspondence, material and equipment reviews for specifications, CCO cost analysis, electrical claim reviews, correspondence with Caltrans electrical design group, and other agencies involved with Caltrans projects. Reviewed plans and specifications for various construction projects. Additionally, he provided support for the planning, design, installation and maintenance of intelligent transportation system (ITS) facilities that include control networks, telecommunication systems, and video display systems. In addition, he planned, organized, and lead pre-construction meetings with contractor and other city agencies prior of commencing the electrical work pertaining to different cities that would need to be coordinated with Caltrans projects. For EA 07-129974 Mario is currently responsible of the installation of new fiber optics and CMS which he is assisting Caltrans Senior with to all aspect to administrate the project and work with to resolve issues with Caltrans design group and contractor to minimize delays and/or CCO’s. Project Cost: $5,826,700.00 – Length of time on project: 12/2015 – present. For EA 07-3X9404 which included modifying communication systems throughout Los Angeles County at 39 different locations. Project Cost: $3,910,264.00 – Length of time on project: 12/2014 – 08/2016. EA 07-3X9304 also included installing Theft Resistant Pull Boxes and replace lighting systems). Project Cost: $8,569,369.50 – Length of time on project: 03/2015 – 08/2017. For EA 07-308504 Mario was responsible for upgrading the Ramp Metering Systems and Communication Systems which he assisted the Caltrans Senior and completed the project with no claims and on time. Project Cost: Various.
Caltrans District 7, I-5 / SR-14 Tunnel 07-1X8404 Repair Fire Damage to Truck Tunnel, Los Angeles, CA Lead Electrical Inspector for an emergency project at the I-5 / SR-14 Tunnel a 24-hours a day / 7 days a week schedule.
The project was completed within the client’s two-week time period deadline. Emergency project was completed in 11 days and able to reopen Southbound 5 Truck Route fire damaged tunnel early. Project Cost: $11.5 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1745 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 84
RAY TORRES
Electrical Inspector
EDUCATION
Cuny Boces Trade School
Electrical Construction
Caltrans Storm Water
Pollution and Prevention
Training
REGISTRATIONS
CA, Electrical License, C1
0, No. 668063, 1993
ProjectManagement
Institute/ PMI
CERTIFICATIONS
Caltrans Hot Mix Asphalt
Inspection Seminar, No. G
100528
Mr. Torres has more than 36 years of electrical construction experience on roadway, residential, commercial, and industrial projects for electrical construction; fiber optics; CCTV; changeable message signs, and traffic monitoring equipment Communication ADA compliance requirements; Utility Construction and Relocation; Power Application, Telephone Power Systems; Photovoltaic Systems; NEC and NFPA; Lighting and Power Distribution. His experience also includes roadway construction and stripping, sidewalk and curb and gutter construction, storm drains, drainage systems, concrete box culverts, cold-plane of existing asphalt concrete pavement and various street rehabilitation projects including AC overlays and reconstruction, adjustments of storm drain and sewer manholes, water lines and other miscellaneous utility vaults, ADA improvements and compliance.
Ray’s experience also includes roadway cold plane surface preparation, for HMA, monitoring proper depths according to Caltrans Standard Specifications and placement of Tack Coat. In addition, his experience includes daily tracking and documenting all quantities, for CAD B input. He has a working knowledge of calculations pertaining to grading's and relative Compaction of untreated and treated soils and aggregates and their requirements. Mr. Torres’ experience also includes structure construction, using reinforced PCC (bridges, retaining walls, MSE walls, highways, bridge anchor blocks, bridge decks, curb and gutter, sidewalks, driveways, ADA handicap ramps, exit ramp termini's).
RELEVANT PROJECT EXPERIENCE
City of Indio, Jackson Street Interconnect Electrical & Traffic Signal Project, Indio, CA Electrical / Field Inspector responsible for electrical inspection on various projects. Project includes inspecting 10 new traffic signal intersections that includes new sidewalks and ADA handicap ramps. The project also included traffic signalization and synchronization, street lighting, under conduit placement, cross gutter and spandrel improvements, cold planning and RHMA paving, striping, local business driveways and sidewalks, raised median island with planting and irrigations. Responsibilities includes electrical and dry utilities relocation; traffic signals and streetlights upgrades; water and sewer systems improvements; and traffic control. Also responsible for roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, drainage structures, slope paving; MBGR installation, and other various items. Project Cost: Various.
City of South Gate, 3069 Highway Safety Improvements, South Gate, CA Construction Inspector for this Citywide project in which he was responsible for inspection of earthwork, grading, installing new ADA compliant handicap ramps, and traffic control. Work included traffic coordination, paving, landscaping, concrete sidewalks, concrete aprons, signing and striping. and replacement of existing damaged.
Project Cost: $4 Million.
CDRE Holdings 11, LLC, PPD 2018-0021, City of Rialto, Rialto, CA Field Inspector responsible for construction inspection services for a 99,999 square foot industrial warehouse building in compliance with ADA regulations for associated street paving, drainage, lighting, fencing, and landscaping. Also responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety.
Agreements for Professional Services to perform As-Needed Professional C... Page 1746 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 85
Ray Torres
Pacific Industrial Development (North), 2335 West Walnut, Permit No. ENG 19-0820 & Pacific Industrial South, 2380 Baseline RD. Project ID. PPD2018-0025, Rialto, CA
Construction Inspector. A 188,712 square foot industrial warehouse distribution facility on 8.84 acres of land located in Rialto, California. Provided grade checking, inspection of contraction of concrete pavement, sidewalks, curb & gutters, ADA curb ramps, V-gutters, drainage and sewer systems, grouted rock strip, landscaping, retaining walls, striping and verification of SWPPP implementation.
City of Rialto, Oakmont Development, Rialto, CA
Field Inspector for the Oakmont Industry Group’s 156,500 square foot industrial warehouse building and associated street, sidewalk, paving, drainage, lighting, fencing, and landscaping work services on 8.01 acres. Responsibilities includes roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, drainage structures, slope paving; MBGR installation, drainage and sewer system, landscaping, retaining wall, striping and verification of SWPPP implementation. and various other items. Responsible for inspection of asphalt concrete pavement grade checking, concrete sidewalk, curb, curb & gutter, curb ramp, V-gutter, traffic control, and safety.
City of Desert Hot Springs, Department of Public Works, Desert Hot Springs, CA Public Works Inspector / Electrical Inspector. Responsible for field inspection of all public works projects such as roadway rehabilitation projects; traffic signal installation; sewers and other underground utility lines installation; sidewalk and ADA ramp construction. His responsibilities include processing and issuing all City’s Encroachment Permits for all utilities, residential, commercial and industrial projects; maintain records for all public works projects; scheduling and conducting pre-construction meetings with contractors and their subcontractors; maintaining oversight on all material testing and Implementing City Standard Specifications for Public Works Construction. In addition, he maintains oversight and scheduling maintenance and repair of electrical traffic signal system, street and sign lighting; implementing a Pavement Management Program for all city streets and coordinating PMP for appropriate AC or PCC repair; working with CVAG to implement a Traffic Signal Interconnect Master Plan for the City; Interacting daily with all City’s Departments and staff including Planning, Engineering, Finance, Permits, Human Resources and City Maintenance Division.
Riverside County Transportation Commission with Caltrans Oversight / Caltrans District 8 Oversight, 1-215 Widening Between Murrieta Hot Springs Road and Scott Road, Murrieta, CA Electrical Construction Inspector. Provided electrical inspection for RCTC’s construction of one general purpose lane and one left shoulder in the median in both directions of 1-215. Responsible for electrical inspection; upgrading service cabinets and controllers; installing battery backup systems, new pedestrian heads, video detection systems and upgrading the traffic signal heads and luminaires to Light Emitting Diodes (LED). He also coordinated all the agencies involved with electrical service points, municipal lighting requirements and fiber optic communication agencies that were required to sign off on their systems. Project Cost: $16 Million.
City of Indio, Jefferson Street and Avenue 48 Street Improvements & Jackson Street Interconnect Electrical & Traffic Signal Projects, Indio, CA
Electrical / Construction Inspector. The Jefferson Street and Avenue 48 Street Improvements project is located at the intersection of Jefferson Street and Avenue 48. Improvements include widening Avenue 48 to include a new right-turn only lane from westbound Avenue 48 to northbound Jefferson Street and modifying the traffic signal and installing City furnished signal poles. Improvements also include removing a portion of raised median, reconstruction sidewalk and curb ramps, and striping modifications, reconstructing sidewalk and curb ramps in compliance with ADA requirements, and striping modification. For the Jackson Street Interconnect Electrical & Traffic Signal Project Ray was responsible for electrical inspection on various projects. Project includes inspecting 10 new traffic signal intersections that includes new sidewalks and ADA handicap ramps. The project also included traffic signalization and synchronization, street lighting, under conduit placement, cross gutter and spandrel improvements, cold planning and RHMA paving, striping, local business driveways and sidewalks, raised median island with planting and irrigations. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1747 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 86
FAUSTO REYES, RLA
Electrical / Landscape Inspector
EDUCATION
Landscape Architecture,
University of California
Irvine
Architecture, Orange
Coast College Santa Ana
College
REGISTRATIONS
CA, Landscape Architect,
No. 4175
With more than 29 years of experience, Mr. Reyes has expertise in field inspection, quality assurance/quality control (QA/QC), and document control for landscape work for various public agencies such as Caltrans, the Cities of Riverside, Ontario, and Corona, just to name a few. His landscape inspection work includes landscaping projects on roads and highway, private developments, rail and transit facilities etc. As a construction Inspector, he is accustomed to enforcing plans and specifications, partnering with the contractor, reviewing submittals, and monitoring plant establishment. He is particularly experienced with water and electrical service connections. Mr. Reyes verifies that contractors and sub-contractors work is in compliance with Standard Specifications and Special Provisions. He has also coordinated material testing, surveying, and utility installations. He has reviewed submittals and RFI's, processed change order calculations and modification to plans to optimize construction.
RELEVANT PROJECT EXPERIENCE
City of Corona Dept. of Public Works / Caltrans District 8, Corona, CA Landscape Inspector. Enforced landscape plans and specifications, including installation of irrigation central control systems. Reviewed and approved submittals on city streets and freeway on/off ramps. He verifies that contractors and sub- contractors work is following Standard Specifications and Special Provisions. He has also coordinated material testing, surveying, and utility installations. Project Cost: Various.
City of Corona Planning Department, Corona, CA
Landscape Architect. Planning Department. Plan examiner and Planning Landscape Plan Consultant, review all new development projects, commercial and residential, medians, street-scrapes for city code compliance. He verifies that contractors and sub-contractors work is in compliance with Standard Specifications and Special Provisions. He has also coordinated material testing, surveying, and utility installations. Project Cost: Various.
City of Wildomar Public Works Department, Wildomar, CA
Landscape Inspector. Enforced landscape plans and specifications, including installation of irrigation central control systems. Reviewed and approved submittals on city streets and freeway on/off ramps. Coordinated electrical and water utility service connections. Project Cost: Various.
City of Ontario, Public Works Department, Ontario, CA
Landscape Inspector. Enforced landscape plans and specifications, including installation of irrigation central control systems. Reviewed and approved submittals on city streets and freeway on/off ramps. Coordinated electrical and water utility service connections. Project Cost: Various.
Mission Boulevard Revitalization, Riverside, CA
Landscape Inspector. The Mission Boulevard Streetscape Project consists of a landscaped median and infill sidewalk on Mission Boulevard from 100 feet west of La Rue to Valley Way. This project enhances the safety and pedestrian access in this area. Enforced landscape plans and specifications, including installation of irrigation central control systems, and reviewed and approved submittals on city streets and freeway on/off ramps. Coordinated electrical and water utility service connections. Project Cost: $3 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1748 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 87
RICHARD SHIRLEY, RLA
Landscape Architect
EDUCATION
B.S., Landscape
Architecture, Cal Poly
Pomona, CA 1978 QSP
REGISTRATIONS
CA, Landscape Architect,
No. 2252
Qualified SWPPP
Practitioner
Mr. Shirley is a registered landscape architect with more than 24 years of design and construction experience. He has utilized his skills on a variety of projects, including streets, freeways, single and multi-unit housing facilities, commercial properties, manufacturing facilities, and private estates. He has experience in plant ecology, botany and horticulture. He has been awarded the Montecito Beautification Award and has been recognized in a trade publications. He was also a design coordinator for the Encino Design House in 1992 and 1993. He has extensive city and public works experience including landscape conceptual designs. He has assisted in refining specifications, budgets, estimating and calculations for large landscape projects. Mr. Shirley has reviewed and studied policies and procedures including the Documentation and Construction Manuals and the Standard Plans and Specifications for Roadway and Bridge Construction.
RELEVANT PROJECT EXPERIENCE
Los Penasquitos Lagoon Bridge Replacements North County Transit District – San Diego County, CA Construction Inspector performed as construction management inspector for grading, walls, clearing, drainage, utility services coordinator, street lighting, and all facets of roadway and pedestrian improvements. In addition, conducted the inspection of Landscape features including irrigation plantings, and site furnishings.
Duncan Canyon Overcrossing Fontana Los Angeles County, CA Construction Inspector. Responsible for inspections of erosion control measures in and surrounding the slopes and spaces created by the construction of the revised ramps and the widening of the bridge overcrossing. Also, the onsite SWPPP issues and landscape.
Caltrans District 12, OCTA and City of San Juan Capistrano, I-5 / Ortega Highway Interchange Improvement Project Orange County, CA
Construction Inspector.Mr. Shirley conducted an inspection of night work traffic control during the widening project.
Coordinated work with COZEEP. Project consisted of constructing a new traffic interchange that replaced the existing I5 / Ortega Highway interchange; Reconstructing the existing Ortega Highway bridge over the I-5; Widening existing onand off-ramps; Constructing a new northbound I-5 loop on-ramp from eastbound Ortega Highway; Realigning Ortega Highway to the west of the I-5 interchange to curve into Del Obispo instead of continuing straight into Camino Capistrano.
SANDAG, Gilman Transit Center San Diego, CA
Construction Inspector. Mr. Shirley is responsible the inspection of various construction trades including walls, paving surfaces, site amenities, onsite SWPPP issues, and landscape. The project transformed a university avenue to an intensive transportation hub with attractive elements that accommodate a rapid ridership turnover.
Los Angeles World Airports (LAWA) Los Angeles, CA
Construction Inspector. Mr. Shirley responsible for inspection of re-striping, pavement re-marking and installation of pavement markers in the airfield. This includes runways, taxiways and all terminals within the LAX. All work was performed in round the clock shifts which included many hours of intensive night work with adjacent incoming and outgoing air traffic.
City of Fontana, I-10 Sierra Landscape Beautification Fontana, CA Construction Inspector. Mr. Shirley performed observation of the first landscape phase in the vicinity of on and offramps at the Sierra Avenue Bridge. Responsibilities for this work included observation of installation of irrigation systems including layout of future systems. Also, inspected specimen plant materials at their sources and observed their installation. Planting portion of work included placement of specimen palms and complete mulching of surfaces.
Agreements for Professional Services to perform As-Needed Professional C... Page 1749 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 88
Richard Shirley
City of Fontana, Fernandez Park Fontana, CA
Landscape Inspector. Mr. Shirley responsible for landscape inspection services for the installation and completion of Fernandez Park for the City of Fontana, Public Works Department, under the direction of the park development coordinator. Project included construction of a playground, picnic shelter, restrooms, sidewalk, parking lot, landscaping, storm drain, perimeter block wall, curbs and gutters.
City of Fontana, Fontana Park Fontana, CA
Landscape Inspector. Mr. Shirley was responsible for inspection services, observation of landscape installation and public projects. Project consist of new park construction including pools, a 43,560 square foot community center, skate park, water slides, play areas including an aquatic complex, corporate fountains, axial promenade, pavilions and an aquatic building.
City of Moreno Valley, Water Quality Basins Moreno Valley, CA Construction Inspector. Mr. Shirley responsible for observation of landscape installation including irrigation installation, use of hydro seed materials and installation of special ecologically sustainable planting.
City of Moreno Valley, On-Call Landscape Improvement and Inspection Services Moreno Valley, CA Construction Inspector. Mr. Shirley responsible for data collection on-site and prepared schematic layout for budget / estimating and calculations for public works landscape. Assisted in refining written specifications. Project entailed water line relocations, street widening, curb and gutter, sidewalk, fence and wall construction and landscaping while maintaining full access to mailboxes and driveways.
City of Corona, Landscape Improvements at SR-91 and Main Street Corona, CA Project Inspector. Mr. Shirley responsible for on-site inspection, project administration and coordination with the adjacent Caltrans landscaped ramps for an important gateway freeway interface for the City of Corona at the SR-91 freeway.
Caltrans District 7 (EA 07-312404), On-Call Services, Ventura, CA Construction Inspector. Inspected drainage systems, roadway modifications, and erosion control measures with water capture systems. Performed daily inspection of new onsite mechanical and passive drainage measures designed to capture water into local spreading/recharging basins within runoff of Route 126 in Santa Paula. Inspected the layout of each drainage system with a series of new catch basins replacing the existing structures. Observed and documented Contractor’s operation in demolishing the existing catch basins, and pipe trench – sometimes reached the depths of 8 to 12 feet. Inspected trenching and shoring of new reinforced concrete pipes (RCP) being laid in trenches complying with Cal-OSHA safety ordinances. Richard checked contractor’s evaluation of the existing soils per Cal-OSHA to cut slopes, where necessary. Inspected construction of catch basins that were composed of prefabricated elements and CIP segments. Ensured that all Contractor’s operations were inspected thoroughly and documented in a timely manner especially ensuring that the completed drainage system was functioning. Ensured subsurface mechanical drainage structures directed the collected water through the concrete pipe to spreading recharge basins as designed. Inspected the newly constructed RCP outlets that placed the water onto a field of energy dissipating rock and into the spreading basins.
Observed and documented that these basins were carefully graded with positive fall and when flows or the percolation coefficient does not permit a reasonable recharge rate designed overflows provides controlled dispersion. Appreciation Letter by Project Resident Engineer, Hector Arroyo, PE dated May 20, 2019. Project Cost: $2 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1750 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 89
KEVIN AUSTIN, PE
SWPPP Compliance / Inspector
EDUCATION
BS, Civil Engineering,
California State
Polytechnic University,
Pomona, CA
REGISTRATION
CA, Professional Civil
Engineer, No. 83422
HOURLY RATE: $160
Mr. Austin is a Licensed Profession Civil Engineer with over 12 years of extensive experience in quality control and regulatory compliance. His experience includes construction projects as well as industrial facilities. He has excellent relationships with Contractors as well as public agency personnel. His experience includes Hazard Assessment, Contractor Safety, Emergency Response, PPE practices, Injury Reduction, Facility inspection & auditing, container labeling, materials and waste storage, PCB & asbestos management, and waste manifests and transport. In addition, his experience includes NPDES / SWPPP Compliance, Temporary / Permanent BMPs, domestic water management, groundwater management, and general wastewater treatment.
Kevin has extensive experience with Hot Mix Asphalt pavement, Concrete pavement, signing, striping, drainage systems, traffic control, lighting, Metal Beam Guard Railing, submittal reviews, responding to RFI’s, utility coordination, and SWPPP enforcement. His responsibilities include contract administration, preparing COs, performing construction inspections, daily reports and quantities, reviewing and monitoring the schedule of work, enforcing compliance with plans and specifications and certificates of compliance, safety compliance, preparing and reviewing as-built plans, and preparing punch lists. He also enforces permit requirements and conducts utility coordination, staff, and stakeholder meetings.
RELEVANT PROJECT EXPERIENCE
City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA Construction Inspector / SWPPP Compliance. Responsible for roadway project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: Various.
County of San Bernardino, Redwood Avenue and Other Roads, Fontana, CA Construction Inspector / SWPPP Compliance. The project includes work to be performed on Redwood Avenue, Live Oak Avenue, Elm Avenue and 4 smaller nearby streets. The project included construction spans approximately 4.7 miles of Mill and Overlay with 1.64 miles of leveling course needed only on Redwood Ave. Additionally, damaged sidewalks are repaired as noted in previous discovery efforts. Responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, Vgutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety. Project Cost: $4.5 Million.
City of Rialto, Building 300 Inspection & Support Services, Rialto, CA Construction Inspector / SWPPP Compliance. responsible for inspection of The Community Center Rehab located at 214 North Palm Avenue in Rialto involved the rehabilitation of Building 300’s Day Care Center. The work included renovation, ceiling, flooring, lighting, and windows replacement. It was determined that asbestos containing materials (ACM) existed within the facility. Appropriate measures were required to remediate and dispose of the ACM, per Cal-OSHA and local NESHAPs (South Coast AQMD) regulations as well as other applicable local regulations. Project Cost: Various.
Agreements for Professional Services to perform As-Needed Professional C... Page 1751 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 90
Kevin Austin, PE
City of Rialto, Merrill Avenue Improvements, Rialto, CA Construction Inspector / SWPPP Compliance. Responsible for roadway and sidewalk project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: Various.
Caltrans District 12, On-Call Roadway Construction Inspection Services, Orange County, CA Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, traffic control review, lane closures, and assuring compliance with project plans and specifications. Duties includes identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner; maintains awareness of safety and health requirements and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.
Orange County Public Works, On-Call Roadway Construction Inspection Services, Orange County, CA Public Works Inspector. Responsible for various construction projects including cold milling and asphalt overlay (Rubber Hot Mix Asphalt (RHMA) and pedestrian/bicycle bridge. Coordinated material testing in accordance with project specifications and monitored asphalt temperatures during the paving operations. Daily monitoring of the Erosion Sediment and Chemical Control Plan (ESCCP) BMP’s including effective dust control. Also coordinated with utilities and contractor to preform utilities adjustments in a timely manner, and reestablishing traffic striping in accordance with project plans and Caltrans standards. Monitor daily traffic control to ensure safe vehicle and pedestrian passage thorough construction area. Documented daily construction activities, performed quantity calculations, and establish mutual agreement with Contractor daily for monthly progress payments. Project Cost:
Varies.
Tower Jazz Semiconductor, Newport Beach, CA
EHS Manager / Senior Environmental Engineer. Direct oversight for 2 Safety staff and 2 onsite support vendors, indirect oversight for 40 person ERT. Plan, secure and implement facility EHS program including procedures, budget and document control. Evaluate and mitigate hazards to reduce recordable incident rate and lost-time accidents. Notable achievement: Reduced LTA rate by approx. 50% to meet company objectives.
Oversight on ISO 14001, OHSAS 18000 and ISO 9001 (Quality Management Systems). Primary facility contacts facility audits and inspections including local Public Works departments. Coordination of permitting and reporting deficiencies and closure of related violations. QC/QA oversight on various construction activities: ensuring compliance with relevant standards.
Agreements for Professional Services to perform As-Needed Professional C... Page 1752 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 91
MARK MILLERON, AWA, CWI
Welding Inspection
CERTIFICATIONS
AWA, CWI, No.
95011101, exp.
01/01/2022
ICC, Welding, No.
880703, exp. 11/2026
LA City Welder, No.
P019975, exp.
06/15/2021
CA, C-60 Welding
Contractor, No. 622289,
exp. 06/30/2021
ICC Structural Steel &
Welding, High Strength
Bolting, Spray Applied
Fire Proofing
AWS Certified Welding
Supervisor
Los Angeles City
Certified Welder
Licensed State of
California Welding
Contractor (C60)
AWS D1.1, D1.2, D1.3,
D1.4, D1.5, D1.6 and
D1.8
AWWA C200, C205,
C206, C207, C214 &
D100
API 1104
ASME Sections V, VIII &
IX
OSHPD
DSA
FEMA 353
Mr. Millerton has more than 30 years of metal industry experience, including public works, industrial, commercial and residential projects. Recent accomplishments include the last 23 years working as a certified welding inspector. He extensive experience/background as a certified welder and welding contractor which includes a proven ability to recognize and identify potential problems prior to work being completed; self-motivated individual with track record of completing assignments on time; excellent communication skills with project managers, contractors, design engineers and building inspectors.
Mark has worked with all welding and cutting processes. Quality Assurance welding inspector for Los Angeles County Dept. of Public Works. Performed inspections of bridges, water transmission pipelines, structural shoring, structural soldier piles, inprocess fabrication at pipe manufacturing facilities, structural steel fabrication facilities, water storage tanks and dam projects. He has a well-rounded experience, including numerous types of structures and systems, such as water, chemical and petroleum tanks welding and inspection, pipe systems, structural steel, pressure vessels, marine, aerospace, heavy equipment work. In addition, he is familiar with NDT procedures, including UT, MT, PT, RT, Bubble Leak Test, as well as capable of developing and writing welding procedures and quality control plans. He is knowledgeable of the Cal/OSHA Construction Safety Orders.
RELEVANT EXPERIENCE
City of La Cañada Flintridge, Harrison Elementary School Soundwall, La Cañada Flintridge, CA
Construction Inspector. Project is located on Marengo Street between Ditman Avenue and City Terrace Drive includes remodeling the existing fence by constructing a masonry Soundwall and add acoustic barriers to some of the existing chain link fence to reduce traffic noise at the school; plant vines along the masonry Soundwall; plant new trees; and restore sidewalk and driveway. The soundwall would range in height from approximately 6 foot 7 inches to 7 foot 11 inches (for the mountable noise barriers) to approximately 15 foot 5 inches (for the rigid soundwalls) above local ground. Project Cost: $28 Million.
City of La Cañada Flintridge, Mulholland Soundwall, La Cañada Flintridge, CA Construction Inspector. The scope of work for widening the gaps between the abutment backwalls and the replacing expansion joints; tying trusses across the expansion joint over the piers; replacing some bottom lateral bracings; selective strengthening of connections by replacing existing rivets with high strength bolts, modifying handrails; and installing restrainer cables at the piers. Project Cost: Various.
Los Angeles County Department of Public Works, Poema Bridge, Chatsworth, CA
Quality Assurance Welding and High Strength Bolting Inspector for the $16 million Poema Bridge. Poema road is being graded and the dirt is being conveyed to the north side of the project. The columns have been formed and the abutments are near completion. Water, sewer, storm drain for the phase 1 area will start being installed in August. Project Cost: $16 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1753 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 92
Mark Milleron, AWA, CWI
Los Angeles County Department of Public Works, Pearblossom Highway 12” Water Transmission Line, Los Angeles, CA
Quality Assurance Welding and High Strength Bolting Inspector for the utility relocation to avoid a proposed Caltrans road widening improvement project along Pearblossom State Highway. Project included the relocation of 6,900 lf of steel water main ranging in size from 4 inches to 12 inches, reconnect seven (7) existing fire hydrants, and relocate/ reconnect one service meter and vault. Project located in the County of Los Angeles unincorporated area, Pearblossom — Along Pearblossom Highway between 117th Street East and Longview Road. Project Cost: $10 Million.
Los Angeles County Department of Public Works, Lake Los Angeles Water Tanks, Renovation and Repairs, Los Angeles, CA
Quality Assurance Welding and High Strength Bolting Inspector. Observed the fabrication and assembly of various pipe sections and specials. Duties included surveillance of verification of received materials, mill-produced pipe, rolled plate pipe, cement lining and coating, epoxy lining, hydrostatic testing, X-ray testing, leak testing, and holiday testing. Project Cost: $8 Million.
North Bay Inspection, San Francisco, CA
Surveillance Inspector for six major water transmission projects for the San Francisco PUC. Observed the fabrication and assembly of various pipe sections and specials. Duties included surveillance of verification of received materials, mill-produced pipe, rolled plate pipe, cement lining and coating, epoxy lining, hydrostatic testing, X-ray testing, leak testing, and holiday testing. Project Cost: $49.8 Million.
Los Angeles County Department of Public Works, Marina Del Rey 18’’ Water Transmission Pipelines, Marina Del Rey, CA
Quality Assurance Welding and High Strength Bolting Inspector. Project included installing permanent stormwater best management practices to address water quality in the Marina and enhance the waterfront promenade by adding two new parklets with seating, new bioswale planting and interpretive signage. Replace approximately 5,950 feet of aging and undersized water line with an 18-inch diameter steel pipe to improve water quality, system reliability, and enhance fire flow. Observed the fabrication and assembly of various pipe sections and specials. Duties included surveillance of verification of received materials, mill-produced pipe, rolled plate pipe, cement lining and coating, epoxy lining, hydrostatic testing, X-ray testing, leak testing, and holiday testing. Project Cost: $13 Million.
Los Angeles County Department of Public Works, East Fork Bridge Over North Fork San Gabriel River Bridge Retrofit, San Gabriel Mountain / Los Angeles, CA
Quality Assurance Welding and High Strength Bolting Inspector. The East Fork Road Bridge over North Fork San Gabriel River is a 642-feet long, 4-span steel truss bridge built in 1949. It measures 38-feet in width and carries one 12- foot lane of traffic in each direction plus a 4-feet 6-inch wide sidewalk on each side. The bridge is located in the San Gabriel Mountains National Monument just north of the City of Azusa and provides access to L.A. County firefighting facilities and recreational amenities such as the East Fork Trail that leads to the “Bridge to Nowhere”. The project consisted of seismically retrofitting the bridge to prevent collapse during a maximum credible earthquake. The scope of work for the bridge retrofit included replacing existing bearings with seismic isolation bearings; strengthening diaphragms at the piers and abutments; widening the gaps between the abutment backwalls and the bridge and replacing expansion joints; tying trusses across the expansion joint over the piers; replacing some bottom lateral bracings; selective strengthening of connections by replacing existing rivets with high strength bolts, modifying handrails; and installing restrainer cables at the piers. Project Cost: $15 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1754 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 93
CHETAN SHAN, PE
Project Control / Scheduling
EDUCATION
MBA, General
Management, California
State University Fullerton
MS, Civil Engineering /
Construction
Management North
Carolina State University,
Raleigh, NC
BS, Civil Engineering
(Structures), Gujarat
University, Ahmedabad,
India
REGISTRATIONS
CA, Professional Civil
Engineer, No. C58226
OSHA 40 Hour
HAZWOPPER Trained
Over the last 25 years have been involved with various large to medium sized government, semi-government and private construction projects in Transportation, Education, Office/Institutional, Healthcare, Entertainment, Environmental, Private Development and Heavy Civil sectors. Have worked in progressively more responsible positions (including hands on and managerial oversight roles) assuming varied CPM Scheduling, Cost Control, Change Analysis and Documentation, and Claims Analysis/Mitigation responsibilities. Have extensive experience in the theories, principles and practices of scheduling and cost engineering, document control and filing, processing submittals, change order analysis, and have handled numerous claims analysis and dispute resolution support assignments for public agencies and legal teams. Extremely proficient in the use of various scheduling software’s including Primavera Project Planner (P6), Primavera Contractor, Sure Trak, and Microsoft Project; schedule analysis software’s like Claim Digger and Schedule Analyzer Pro; Graphics/BIM software’s; done extensive interfacing with various spreadsheet and database software’s. Have also been involved with training programs for different clients in project controls, scheduling and claims.
RELEVANT PROJECT EXPERIENCE
LAWA, Tom Bradley West Core Improvements Project, Los Angeles, CA Project Control / Scheduler. The project involved expansion & renovation of the existing Tom Bradley International Terminal (TBIT) central core and west gates, and associated improvement projects. The expansion of the central core included 500,000 sq. ft. of new construction on six (6) levels. In addition, approximately 300,000 sq. ft. of the existing TBIT was extensively renovated. Duties included development and review of the baseline schedule, cost analysis, change order analysis and tracking of delay claims, impact analysis for delay issues.
Federal Rail Authority, California High Speed Rail Oversight Work, Sacramento, CA Project Control / Scheduler. The California High Speed Rail project is a mega multi-phase rail project that plans to connect the Anaheim and Union Station in Downtown LA with San Francisco via the Central Valley, operating on a dedicated grade-separated track for much of the proposed route. As part of oversight agency, duties include review and data manipulation of Construction Packages 1-4.
Orange County Transportation Authority, SR 57 Northbound Widening Project, Fullerton/Placentia, CA Project Control / Scheduler. The SR-57 NB Widening, Orangethorpe Avenue to Yorba Linda Segment, added a fifth mixed-use lane, and provided highway and bridge improvements including auxiliary lanes, several sound walls and retaining walls, 2 MSE walls, a tieback wall, and the widening of 7 bridges. Duties included review of the baseline schedule and updates, document control, Delay issue tracking, prepare WSWD’s, TIA and claims analysis, prepare claims reports and DRB position papers, and assist in claims negotiation and settlement meetings.
San Bernardino County Transportation Authority, I-10/ Cherry Ave & UPRR Bridge Widening, Fontana, CA Project Control / Scheduler. This project replaced the existing 5 lane bridge over I-10 with an 8-lane bridge from Slover Avenue to Valley Boulevard, widened the existing 4 lane bridge over UPRR tracks to an 8-lane bridge, improved onand off-ramps, and had various roadway, loop ramp and intersection improvements. Responsibilities included review of baseline schedules, monthly updates, compiling reports analyzing planned versus actual progress, critical path analysis, respond to delay issues, delay tracking, TIA and claims analysis, prepare claims report, prepare DRB position papers, make DRB presentation.
Agreements for Professional Services to perform As-Needed Professional C... Page 1755 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 94
Chetan Shan, PE
MTA (METRO), Sound Walls 5 & 7, Los Angeles, CA
Project Control / Scheduler. The projects consisted of four miles of sound walls at various locations, including on SR134 in Burbank (Package 7) and on I-405 in Granada Hills/North Hills (Package 5). In addition to sound wall construction, freeway shoulders and existing bridges were widened (projects were designed by Caltrans and managed by (METRO). Duties included review of the baseline schedule and updates, critical path analysis, Delay issue tracking and response, TIA and claims analysis, assist in claims negotiation and settlement meetings.
Anaheim HS District, Anaheim HS New Classroom Building Project, Anaheim, CA Project Control / Scheduler. The project involves construction of a new 2-Story classroombuilding as well as facility upgrade at the AnaheimHigh School site. Duties included review and approval of baseline schedules and monthly updates, compiling reports showing critical path analysis, activity variances, logic revisions and cost and manpower usage analysis. Also analyzed delay issues and created time impact fragments.
Walt Disney, Tower of Terror, California Adventure, Anaheim, CA Project Control / Scheduler. The latest addition to Disney’s new California Adventure theme park, the project involved the construction of the 155 feet Hollywood Tower of Terror, which houses a unique simulated elevator ride through a haunted Hollywood hotel. Also includes merchandise shopping and a fast pass area.
California High Speed Rail Oversight, FRA, Sacramento, CA Project Control / Scheduler. The California High Speed Rail project is a mega multi-phase rail project that plans to connect the Anaheim and Union Station in Downtown LA with San Francisco via the Central Valley, operating on a dedicated grade-separated track for much of the proposed route. As part of oversight agency, duties include review and data manipulation of Construction Packages 1-4. Project Cost: $5 Billion.
MTA (METRO), Walls 5 & 7, Los Angeles, CA
Project Control / Scheduler. The projects consisted of four miles of sound walls at various locations, including on SR134 in Burbank (Package 7) and on I-405 in Granada Hills/North Hills (Package 5). In addition to sound wall construction, freeway shoulders and existing bridges were widened (projects were designed by Caltrans and managed by METRO). Duties included review of the baseline schedule and updates, critical path analysis, Delay issue tracking and response, TIA and claims analysis, assist in claims negotiation and settlement meetings. Project Cost: $26 Million.
SBCTA, I-10/ Cherry Ave & UPRR Bridge, Fontana Los Angeles, CA Project Control / Scheduler. This project replaced the existing 5 lane bridge over I-10 with an 8-lane bridge from Slover Avenue to Valley Boulevard, widened the existing 4 lane bridge over UPRR tracks to an 8-lane bridge, improved on- and off-ramps, and had various roadway, loop ramp and intersection improvements. Responsibilities included review of baseline schedules, monthly updates, compiling reports analyzing planned versus actual progress, critical path analysis, respond to delay issues, delay tracking, TIA and claims analysis, prepare claims report, prepare DRB position papers, make DRB presentation. Project Cost: $50 Million.
Obayashi Corporation, Senior Claims Analyst, UCLA Housing Claims Analysis, Los Angeles, CA Project Control / Scheduler. The assignment involved assisting Obayashi Corporation (general contractor) in claiming for compensation due to delay impacts suffered. Involved reviewing all project records (including daily reports) to produce an accurate summary as-built schedule and identify delay issues.
City of Redlands, Valencia Grove Housing Community, Redlands, CA CPM Scheduler / Claims Reviewer. Valencia Grove Housing Community involved the construction of various residential modular buildings housing 85 residential units, the project also included a playground a community building and a pool. Duties included development of baseline schedules and monthly/weekly updates including, documenting and tracking delay issues, critical path analysis, as planned versus as built and issue delay analysis, delay write-up and presentation. Project Cost: $40 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1756 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 95
ALBERTO MARTINEZ
Project Control/Scheduling
EDUCATION
MBA, Business
Administration,
University of La Verne
BS, Business
Administration, California
State Polytechnic
University, Pomona
Mr. Martinez has over 15 years of Project Controls and CPM Scheduling in the field of construction management, with a strong emphasis in construction claim mitigation, administration, management, and construction scheduling. He is familiar with the major aspects of a construction project and program-wide objectives. He is experienced in developing baseline schedules as well as reviewing contractor baseline schedule and providing recommendations to the clients to minimize risk. He is proactive in his duties and responsibilities through continuous monitoring of the schedule, budget activities, plans, and legal requirements. He is an effective communicator verbally and in writing, leading and supporting his team as necessary.
Mr. Martinez creates and develops CPM baseline schedules and monthly updates, assist public agencies in the development of a Master Schedule, assist in tracking budget costs related to project construction phase, and define work requirements and organizes work plans to include manpower and equipment. In addition, he coordinates work involving subcontractors in all phases of construction, tracks sequence of work and coordination in order to provide feedback on upcoming forecast or change of scope events including time impact analysis, develop work plan consistent with contract documents, and support project managers and estimators with schedule development and work plan narratives. He has led or assist in the development of project plan and schedule in P6, development of functional P6 schedules for engineering, procurement, construction and startup activities, and has assisted with the coordination, reconciliation and integration of functional schedules to create the project control schedule.
RELEVANT PROJECT EXPERIENCE
Ontario International Airport Authority, On-Call Project Management and Support Services, Ontario, CA CPM Scheduling. Duties include review of monthly schedule updates, compiling reports showing critical path analysis, activity variances and logic revisions, performing and reviewing Time Impact analysis for various delay issues, participating in and providing support for the Northwest Quadrant Demolition Project to accommodate the future FedEx new facilities at Ontario International Airport along Airport Driveway as well as assisting in claims negotiations/mitigation. Project Cost: Various.
Los Angeles World Airports – Airport Police Facility, Los Angeles, CA CPM Scheduling. Redevelopment of approximately 12 acres at the northeast corner of Westchester Boulevard and Loyola Boulevard, and will include a new building, a new parking structure, and a series of indoor and outdoor functional spaces for Airport Police Department. Final plans are still in process, but the location may include, but not be limited by, the Office of Operations, Office of Support Services, Office of Homeland Security & Intelligence, Traffic and Security Group, Bomb Disposal Unit, K-9 Unit, a Practice Range, and Emergency Services Unit. Mr.
Martinez managed the schedulers to prepare, layout, code and cost load schedules for this project. He interfaced with subcontractors to ensure that the project was coordinated and that summary level schedules were provided to upper management. Project Cost: $177 Million.
Veterans Sports Park at Tustin Legacy, Tustin, CA
Senior Scheduling Lead. Approximately 31 acres bound by Valencia Avenue on the south, Lansdowne Road on the west, Severyns Road on the east, and Heritage School on the north. Included four Natural Turf Soccer Fields, three Baseball/Softball fields, tennis, basketball, and pickleball courts, Water Feature, Monument to Veterans, Playground and Exercise Equipment, Skateboard Park, Restroom and Storage Facilities, with Musco Lighting, new parking lots, and new fencing. Mr. Martinez managed the schedulers to prepare, lay out, code, and cost load schedules for this project. Project Cost: $19.4 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1757 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 96
Alberto Martinez
Long Beach Polytechnic High School – Track & Field, Long Beach, CA Lead CPM Scheduler. Project included excavation, waterline, drainage, irrigation, electrical, restroom rehabilitation, new Base Rock, asphalt, concrete, synthetic turf and track, fencing, lighting, scoreboard, and relocation of portables. Mr. Martinez managed the schedulers to prepare, layout, code and cost load schedules for this project.
Project Cost: $4.8 Million.
Los Angeles World Airport, Los Angeles, CA
CPM Scheduling. Modernization of terminal one consist of a new 12-lane security screening checkpoint; a fully automated checked-baggage inspection and sortation system; a new and expanded dining and retail collection featuring activated gate hold rooms with lounge-style seating; refurbished arrival/baggage claim area; replacement of the passenger boarding bridges; renovations to airline support office space; modernized aircraft parking/apron pavement and hydrant fueling system; improvements to the building facade; and relocation of the main terminal entrances to the west end of the building to ease traffic congestion. Mr. Martinez managed the schedulers to prepare, layout, code and cost load schedules for this project. He interfaced with subcontractors to ensure that the project was coordinated and that summary level schedules were provided to upper management. Project Cost:
$508 Million.
Los Angeles Unified School District – Belvedere Middle School Lead CPM Scheduler. Provided Baseline Schedule and Monthly Updates. The Project consists of the comprehensive modernization of the Belvedere Middle School Campus. It includes the demolition of 16 buildings (159,025 square feet); modernization of two existing buildings (72,408 sf); construction of new buildings (87,266 sf); and site improvements. Scope includes new physical education/athletic facilities, shared support areas and maintenance and operations buildings; and modernization of the existing Main Administration Building (No. 1) and Classroom and Library Building (No. 2). Other improvements include campus-wide infrastructure, including upgrades to outdated infrastructure such as utilities and irrigation, lighting, fencing gates, CCTV systems, Americans with Disabilities Act (ADA) compliance, landscape, hardscape, and exterior paint. Project Cost: $147 Million.
Tianqiao and Chrissy Chen Neuroscience Research Building Lead CPM Scheduler. Provided weekly / monthly Updates. Vibration mitigated building to foster cross-disciplinary collaboration, the three-story, 150,000-sf facility will provide wet, dry, and computational research labs, a teaching lab, a vivarium, a 150-seat lecture hall, conference rooms, and offices for investigators and staff. Project Cost: $200 Million.
The Culver Studios, Culver City, CA
Lead CPM Scheduler. Provided weekly / monthly Updates. With an estimated project length of 33 months, this massive 280,000-square-foot campus consists of four, four-story office buildings that will serve home to Amazon’s production company, Amazon Studios, as well as their video and advertising departments. It will also include a below grade parking structure that will span the entire footprint of the project site all taking place in the heart of Culver City, California. Project Cost: $250 Million.
Kaiser Irwindale Specialty Medical Office Building and Campus Parking Structure, Baldwin Park, CA CPM Scheduler. Provided weekly / monthly Updates. The Specialty Medical Office Building is the centerpiece of Kaiser Permanente’s new Irwindale Health Hub. It provides specialty medical services delivered in KP’s new collaborative care concept, Reimagining Ambulatory Care Design (RAD), within the context of a healthcare “community” that includes access to wellness education and retail services. Hensel Phelps and CO Architects along with several key trade partners began developing the design for the 90,000SF medical office building and 110,000 SF parking structure to support the near-by Kaiser Permanente Baldwin Park Medical Center in 2015. Project Cost:
$65 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1758 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 97
NICOLE SALEM
Document Control / Labor Compliance Officer
EDUCATION
MBA, Business
Administration, University
of Phoenix
BS, Construction
Engineering Technology,
National University (In
Progress)
BA, Public Relations /
Communications,
California State
University, Fullerton, CA
Nicole Salem has 15 years of experience in the construction and engineering industries, with expertise in contract administration, labor relations, and general administration relating to office engineer work. Working extensively with Caltrans, Nicole has been responsible for office engineering, labor compliance, and public outreach. She is skilled in project and document control and has maintained records per the Caltrans 63 Filing Categories. She is responsible for scheduling, coordinating, facilitating, and documenting various meetings with stakeholders, public officials, contractors and affected third parties or businesses, utility companies, and local agencies.
As an Office Engineer, she coordinates work activities through the resident engineer, inspectors, contractors, and suppliers to confirm minimal contract disruption and impacts of contract compliance work. Nicole also assists with processing change orders and is cognizant of details to avoid potential audits. Her well-organized filing and documentation contribute to a streamlined project closeout.
As a Labor Compliance Officer, Nicole analyzed certified payrolls and fringe benefit statements, conducted contractor audits, and conducted employee interviews to verify prevailing wages. Nicole evaluated adherence to applicable provisions of state labor laws; met with employers, employees, and their representatives to explain labor code sections; and verified that required wage adjustments were made. Nicole’s research analyzes and interprets laws and regulations on behalf of resident engineers or contractors, enabling them to address contractual questions and issues in relation to labor compliance and equal employment opportunity requirements. Nicole also enforces the new laws of SB854 and DIRmonitoring. Nicole communicates effectively with agencies, unions, or the Center for Contract Compliance regarding Public Record Request.
RELEVANT PROJECT EXPERIENCE
City of Indio, As-Needed Professional Services for Construction Management and Inspection, Indio, CA Labor Compliance Officer. Project involves Prop 84 Federal and State funding. Nicole is responsibilities include preparing the labor compliance checklist for review at the preconstruction meeting to inform the contractor and subcontractors of all regulatory obligations for the project. She monitors and reviews certified payrolls to verify the proper DIR prevailing wage rate is being paid. Certified payrolls are crosschecked to inspector dailies to confirm classification and hours are being paid and reported properly.
San Bernardino County Public Works, Arrowhead Regional Medical Center, Labor & Delivery Remodel, Colton, CA
Document Control / Labor Compliance Manager responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Nicole reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. She works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.
City of Rialto, Fire Station 205, Rialto, CA
Document Control / Labor Compliance Officer for Fire Station 205 Phases 1 and 2 work for the 7,000 SF two-bay Fire Station.
Agreements for Professional Services to perform As-Needed Professional C... Page 1759 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 98
Nicole Salem
Imperial County, On-Call Labor Compliance Services, Imperial, CA Labor Compliance Officer responsible for providing Labor Compliance Services for The County, through the Imperial County Workforce & Economic Development (ICWED) for projects funded by the California Department of Housing and Community Development (HCD) and Community Development Block Grant (CDBG) Program, US. Department of Commerce- Economic Development Administration (EDA), State Water Resources Control Board- Clean Water State Revolving Fund (CWSRF), and other grant funding agencies. Projects include, but not limited to Niland Public Safety Facility Project and Imperial County Seely County Water District - Water Distribution System Improvement Project.
Imperial County, On-Call Labor Compliance Services, Imperial, CA Labor Compliance Officer responsible for Labor Compliance Services for Imperial County, through the Imperial County Workforce & Economic Development (ICWED) for projects funded by the California Department of Housing and Community Development (HCD) and Community Development Block Grant (CDBG) Program, US. Department of Commerce- Economic Development Administration (EDA), State Water Resources Control Board- Clean Water State Revolving Fund (CWSRF), Water infrastructure Finance and Innovation Act (WIFIA), and other grant funding agencies. Responsible for assisting the City with activities needed to ensure that workers employed by the City’s contractors and their subcontractors are hired and paid in compliance with all applicable labor standards. Fountainhead serves as the primary contact person for the City’s contractors and their subcontractors for issues related to labor compliance standards. Projects include, but not limited: Niland Public Safety Facility and Imperial County Seely County Water District – Water Distribution System Improvement Project.
City of Murrieta, I-15/Cal Oaks Interchange, Murrieta, CA Labor Compliance Officer. Duties included notifying contractors of outstanding items, distributing meeting minutes, maintaining project files and categorizing documents appropriately. Scheduled material testing and surveying requests, maintained logs for submittals, correspondence, RFIs, surveys, CCOs and material testing. Other duties included reviewing extra work bills for payment, finalizing CCOs and confirming the contractor was abiding by State and Federal prevailing wage laws. Nicole was responsible for the estimate being checked and processed for payment monthly as well. At the close out of the project, Nicole collected all final documentation. All files were boxed and submitted to the agency.
City of Carson, SR-405 / Wilmington Avenue Interchange Modification, Carson, CA Office Engineer / Labor Compliance. Nicole is responsible for project documentation including processing RFIs, CCOs, correspondence and pay estimates. The Caltrans filing methodology of 63 categories is followed on this project. Nicole also monitors labor compliance on the project, tracking federal reimbursement due to apprentice usage, and assists the Resident Engineer in preparing Contract Change Orders or necessary data for the purpose of making alterations, deviations, additions or deletions from the Contract Plans and Specifications. Project Cost: $23 Million.
County of Los Angeles, As-Needed Labor Compliance Consultant Services, Los Angeles, CA Labor Compliance Officer. Nicole analyzed certified payrolls and fringe benefit statements, conducted audits on contractors and interviewed employees to verify prevailing wages. Nicole evaluated adherence to applicable provisions of state labor laws; met with employers, employees, and their representatives to explain labor code sections; and verified that required wage adjustments were made. She researches, analyzes, and interprets laws and regulations on behalf of resident engineers or contractors, enabling them to address contractual questions and issues in relation to labor compliance and equal employment opportunity requirements. She has experience with all types of funding, including Prop 84, CDBG, ARRA, State and more.
Nicole also enforces the new laws of SB854 and DIRmonitoring. Nicole has extensive experience working with LCP Tracker software. She was also in charge of writing source document review manual for Caltrans.
City of Rialto, CDBG Bud Bender Sideline Fencing Vertical Extension & Safety Netting Improvement, Rialto Document Control / Labor Compliance Officer. The project comprises of the construction, placement and installation of fencing extension and safety netting for Bud Bender Park Ball Field 1. Work includes extending sideline and outfield fence posts, constructing steel netting frame, constructing safety netting, removal of a tree, remove and construct concrete pavement, remove and reconstruct V-Gutter, remove and reconstruct concrete Mow curb, ADA parking and ramps, and concrete pile foundation.
Agreements for Professional Services to perform As-Needed Professional C... Page 1760 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 99
SHAYNA KNOWLES, EIT
Office Engineer / Labor Compliance Analyst
EDUCATION
BS, Civil Engineering,
California Polytechnic
University, Pomona, CA
REGISTRATION
CA, Engineer in Training,
No. 173209
Mrs. Knowles is experience in office engineering / administrative services. Her experience includes coordinating material testing, surveying, and utility installations.
She has reviewed submittals and RFI's, processed change order calculations and modification to plans to optimize construction. She is experienced in document control, computer software, analyses and modeling the project for constructability review. Collaborated with both large and small groups on the architectural and construction scopes of the project using Bluebeam and Excel. Presented findings to a panel of over 100 team members. Shayna works closely with the resident engineer and field inspection team to ensure accurate documentation of the project activities is being performed and submitted by the contractor. She is an integral part of the teams he has worked with and has partnered with the contractor to ensure successful delivery. Executed in a group setting using hand calculations and AutoCAD Software experience includes AutoCAD, Sure Trak, MATLAB, Microsoft Office, and Word.
RELEVANT PROJECT EXPERIENCE
City of La Cañada Flintridge, I-210 Soundwall Phase III, La Cañada Flintridge, CA Office Engineer The project will reduce exposure to traffic noise for the residents of the City of La Cañada Flintridge.
The work includes approximately 1,500 linear feet of block soundwall on CIDH piles; 2,400 linear feet of block soundwall on barrier on CIDH piles; and 1,500 linear feet of block soundwall on new bridge barriers. Responsible for assisting the Resident Engineer in maintaining construction documents in Procore including, but not limited to project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, processed Contract Change Orders and Pay Estimates, RFI’s and all other required construction. Project Cost: $22 Million.
Rancho Mission Viejo Development, Cow Camp Road 2B, Rancho Mission Viejo, CA Office Engineer responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Orange County Document Control requirements. Processed Contract Change Orders and Pay Estimates. The Cow Camp Road 2B Roadway & SMWD Improvements project is a new roadway construction that includes underground sewer, CMLC, and PVC waterlines, RCP storm drain and structures, dry utilities, concrete curb and sidewalk, street lighting, and asphalt paving. Project Cost: $22 Million.
Orange County Public Works, Gobernadora Creed Bridge, Rancho Mission Viejo, CA Office Engineer. The $22 million Gobernadora Bridge extends 1,340 feet in length ad is 74ft wide. Gobernadora Creek is an active creek and environmentally sensitive area. The super-structure consists of an eight span, cast-inplace post- tensioned concrete box girder bridge containing seven bays founded on two abutments and seven piers.
Responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Caltrans Construction Manual requirements. Prepared daily diaries, monitored prevailing wages, Processed contract change orders and pay estimates. Project Cost: $22 Million.
Rancho Mission Viejo Development, Cow Camp Road / SMWD Pipe Bridge to PA 3 Lift Station, Rancho Mission Viejo, CA
Office Engineer. Responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Orange County Document Control requirements. Processed Contract Change.
Agreements for Professional Services to perform As-Needed Professional C... Page 1761 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 100
Shayna Knowles, EIT
Rancho Mission Viejo Development, Cow Camp Road / SMWD Pipe Bridge to PA 3 Lift Station, Rancho Mission Viejo, CA
Office Engineer. Responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Orange County Document Control requirements. Processed Contract Change Orders and Pay Estimates. The Pipe Bridge is composed of a Zone I Domestic Water Line of 650 HGL, Zone A Recycled Water Line of 626 HGL, and a Sewer Line. The Zone I Domestic Water Line is comprised of 271 linear feet of 4” CML&C Welded Steel Pipe (Class 150) and Fittings with Welded Joints, 56 linear feet of 16” Weathering Steel Casing, and 22 linear feet of Encased Pipe in 2 Sack Sand Cement Slurry Mix. It also contains one 4” Gate Valve with Valve Box, one 2” Combination Air Release and Vacuum Valve Assembly, one 4” Double Ball Flexile Expansion Joint, one 4” CML&C Dished Head End Plug & 2” Tapped DIP End Cap and Temporary Blowoff, and finally four Pipe Slope Anchors. Project Cost: $1 Million.
Santa Margarita Water District, Rienda Zone I & Zone A Interim Water Tanks and Pipeline Facilities, Rancho Mission Viejo, CA
Office Engineer. Responsible for assisting the Resident Engineer in maintaining construction documents, project logs, construction calculations, meeting minutes, processing monthly invoices, project coordination meetings, RFI’s and all other required construction documentation per Orange County Document Control requirements. The project scope contains a 24” Potable Water Transmission Main, Chemical Feed System and Reservoir Mixers, Recycled Water Pipeline, Drainage Improvements, as well as Potable Water Reservoirs and Tank Site Piping. The 24” Portable Water Transmission Main has 3,663 linear feet of 24” PVC C900 Pipe, three 24” butterfly valves & valve boxes, three Fire Hydrant Assemblies, three 4” Air/Vac Assembly and Enclosures, and seven Tracer Wire Access Stations. Additionally, there are 27 DI Push-On Elbow and Thrust Blocks, two DI Push-On Elbow and Vertical Bend Anchors, one Water Quality Sampling Station, and finally one 1-1/2” Water Service. Project Cost: $7.5 Million.
Santa Margarita Water District, CCR 2B Street Improvements, Rancho Mission Viejo, CA Office Engineer responsible for maintaining the project document control system in accordance with Caltrans local procedures and OCTA requirements. Assisted in ensuring all documentation was tracked, logged and properly monitored. Participated and helped prepare Quality Assurance documentation audits, weekly and monthly project progress meetings minutes, QC/QA meetings and coordination meetings with designers and adjacent property owners. The project includes constructing a Domestic Water Line (Zone I) of 650 HGL, a Domestic Water Line (Zone II) of 830 HGL, a Recycled Water Line of 626 HGL, and accommodations for future sewers. The Zone I Domestic Water Line is constructed of 5,092 linear feet of 24” CML&C WSP (Class 150). The Zone II Domestic Water Line is comprised of 4,848 linear feet of 24” CML&C WSP (Class 250). All pipe is connected using Fittings with Welded Joints. Combined for both Domestic Water Lines, there are eighteen 24” Butterfly Valves with Valve Box and Flange Valve Can with DW Lid and Valve Bond, 7 Temporary Dished Head Plug and 4” Blow Off, as well as 7 Electrolysis Test Stations. Each Domestic Water Line has its own Cathodic Protection Rectifier, 10 combined 4” Combination Air Release and Vacuum Valve Assemblies, and 8” Nozzle with Blind Flange. Finally, the Domestic Water Lines share an Interim Pressure Reducing Station. Moving onto the Recycled Water Line. This system has 1 Cathodic Protection Rectifier Location with a Retaining Wall, 5 Electrolysis Test Stations, and 8 Blow Offs.
Rancho Mission Viejo Development, Fire Station 67, Rancho Mission Viejo, CA Project Manager. Fire Station 67 was designed in direct response to the climate crisis and the related and increasing threat of California wildfires Fire Station 67 sits on Cow Camp Road next to Rancho Mission Viejo’s Ranching Operations. Housed within the building are vehicle bays for two fire trucks, six sleeping rooms, a day room, kitchen . dining room, dispatch . workspace, and a captain’s office. Fountainhead provided construction management and inspection services for Fire State 67 for Rancho Mission Viejo Development.
Agreements for Professional Services to perform As-Needed Professional C... Page 1762 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 101
RAMON CARLOS
Office Engineer / Labor Compliance
EDUCATION
Coursework
Mr. Ramon Carlos, Jr. has been a labor compliance officer since 2003 with the public sector as well as private sector. He takes on highly challenging positions and projects, and with his energy, initiative and ability to implement and administer programs, delivers successful assignments that have built his reputation in our industry as one of the best labor compliance officers in the Inland Empire. Ramon utilizes Labor Compliance Software programs.
RELEVANT PROJECT EXPERIENCE
San Bernardino County, Arrowhead Regional Medical Center, Labor & Delivery Remodel, Colton, CA Labor Compliance Analyst responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. Works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.
San Bernardino County Public Works, Board of Chambers, San Bernardino, CA Labor Compliance Analyst is responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Ramon reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. He works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.
San Bernardino County, Fuel Tank Infrastructure, Victorville, CA Labor Compliance Analyst responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. Works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.
City of La Quinta, Complete Streets Project, La Quinta, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The project constructed five new roundabouts in the La Quinta Village where pedestrian, bicycle, golf cart, and automobile traffic coexists. The reduced travel lanes and crosswalks added mid-block provided pedestrians with safer access to Civic Center Park, Old Town La Quinta, and the Benjamin Franklin Elementary School. Improvements are being completed in three stages throughout The Village and Cove areas. Project Cost: $13.5 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1763 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 102
Ramon Carlos
City of Palm Desert, San Pablo Avenue Phase I & II Streetscape Project, Palm Desert, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The San Pablo Avenue Streetscape Project transformed San Pablo Avenue into a key artery in a revitalized city center where walking, biking, and fun is the focus in the City of Palm Desert. Roadway lanes are being reduced to allow room for improved bikeways along San Pablo Avenue, enhanced pedestrian accommodations, new landscaping, beautification of existing community gardens, on-street parking, and a roundabout intersection at San Gorgonio Way.
Project Cost: $17 Million.
City of Corona, I-15/Cajalco Road Interchange Project, Corona, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The project reconstructed the interchange located on Interstate 15 at Cajalco Road in the City of Corona. The proposed improvements increased the capacity of the overcrossing and ramps to reduce congestion and accommodate projected development and growth in the area. As the labor compliance officer, Ramon is responsible for reviewing contractor’s certified payroll records, performing worker interviews, DBE reports and EEO records. Cost: $50 Million.
City of Indio, I-10 / Jefferson Street Interchange Project, Indio, CA Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8-foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures. The project also included the installation of a water main on Foothill. Throughout the construction duration, one-way traffic was maintained on Foothill Boulevard, continuous access to the businesses and residents was also maintained. Project Cost: $45 Million.
City of San Dimas, Foothill Boulevard Bridge Widening, San Dimas, CA Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8-foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures. The project also included the installation of a water main on Foothill. Throughout the construction duration, one-way traffic was maintained on Foothill Boulevard, continuous access to the businesses and residents was also maintained. Project Cost: $2.3 Million.
Agreements for Professional Services to perform As-Needed Professional C... Page 1764 of 2161
PROPOSAL TO CITY OF INDIO
On-Call Professional Services for Construction Management and Inspection RFQ No. CM 2024
P a g e | 103
CLAUDIA MEJIA
Public Relations / Community Outreach
EDUCATION
BA, Marketing, California
State University, Long
Beach
Claudia Mejia has more than 16 years of experience in developing and implementing community outreach services for construction management projects, with expertise in public relations, marketing, event planning, and graphics design.
Claudia has managed the logistics and execution of several outreach programs and public events for major transit projects in Southern California, as projects advance through planning, final design, pre-construction, and construction phases. She is an expert in providing proactive community outreach services and communicating program details to stakeholders, residents, and businesses as well as addressing questions and concerns.
As a public relations consultant for construction management projects, Claudia has liaised with leading corporate clients and agencies in the Los Angeles, Orange County, San Diego, and Inland Empire areas to develop and execute public relations and community outreach campaigns, marketing operations, business development, customer relations, event planning and execution, and graphic design services for projects. Claudia speaks and writes fluently in English and Spanish and has experience in translation and interpretation services.
RELEVANT PROJECT EXPERIENCE
City of San Diego, Ted Williams Parkway Pedestrian Bridge Project, San Diego, CA Community Outreach Representative. The project included constructing a pedestrian bridge over Ted Williams Parkway, a six-lane arterial road at Shoal Creek Drive in Carmel Mountain Ranch, for pedestrians and bicyclists.
The bridge replaced the at-grade crossings on Ted Williams Parkway. The new bridge provides an alternative for the community to safely cross Ted Williams Parkway at Shoal Creek Drive and access the elementary school as well as reduce school-related vehicle congestion. Important stakeholders reside alongside or near the project such as local businesses, residential complexes and streets, local schools and recreational facilities. During construction, it was essential to keep these entities and the general public informed on a continuous basis regarding construction schedules/activities, access restrictions and options, and signed detour routes through collateral material development; project website content maintenance and up keep; public notifications in the form of construction notices and electronic email blasts; database development; community inquiry assistance; outreach to City entities, emergency services, utility companies, school and City transportation services, elected officials and residents; and project presentations to stakeholders and community groups. Project Cost: $2.5 Million.
Orange County Transportation Authority (OCTA), I-5 Central County Improvement Project, Orange, CA Public Outreach Project Manager and Community Liaison. Claudia developed a public awareness and community outreach campaign for the final design and construction phases of the I-5 Central Improvement Project, a three-mile segment of I-5 between State Route 55 and State Route 57. This $42 million project for the Orange County Transportation Agency (OCTA), in partnership with Caltrans, traversed the diverse communities of Santa Ana, Orange, and Tustin, California. The communications and outreach plan included proactively, efficiently, and effectively communicating construction activities that may have impacted commute and daily operations for local and regional stakeholders, such as businesses; residents / HOAs / complexes; retail malls; vacation destinations such as the Santa Ana Zoo, Disneyland, Honda Center, Discovery Cube, and the Angels Stadium; medical facilities and hospitals; and trucking companies. Project Cost: $42 Million.