City · Energy
Camarillo
Energy contracts the Camarillo City Council took up since 2022. All Camarillo meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
21actions
12vendors
$2,014,515approved (recorded vote)
$5,765,456proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-10-14 | Bay City Electric Works | Maintenance Contract with Bay City Equipment Industries, Inc. dba Bay City Electric Works (generator and ATS maintenance) Microgrids and backup power | Award | $65,471 not to exceed | six emergency standby generators and six Automatic Transfer Switches | No vote recorded | other · other · city original |
| 2026-07-08 | ABM Electrical & Lighting Solutions | Resolution Approving Final Pay Estimate No. 4 and Accepting Improvements – Standby Power at City Facilities at City Hall (CH-5067) Microgrids and backup power | Amendment | $48,888 | 200-kilowatt generator | No vote recorded | staff report · city original |
| 2026-05-27 | J&H Engineering | Resolution Approving Final Pay Estimate No. 3 and Accepting Improvements – Standby Power at City Facilities at City Hall (CH-5067) Microgrids and backup power | Amendment | $508,117 | 200-kilowatt generator | No vote recorded | staff report · city original |
| 2025-12-10 | Quinn Power Systems | Quinn Power Systems Quote No. AWA15206 - Caterpillar D175 standby diesel generator set (Sourcewell/NJPA pricing) check Microgrids and backup power | Cooperative purchase | $90,610 | 1 Caterpillar Model D175 175 kW stationary diesel standby generator se… | No vote recorded | staff report · city original |
| 2025-12-10 | Quinn Power Systems | Beardsley Pump Station Generator – Ratify Urgency Purchase with Quinn Power Systems check Microgrids and backup power | Cooperative purchase | $87,694 | 1 Caterpillar D100-8 generator | No vote recorded | staff report · staff report · city original |
| 2025-12-10 | Caterpillar | Caterpillar D100-8 100 kW standby diesel generator set quotation (Sourcewell/NJPA pricing), Spring Park Microgrids and backup power | Cooperative purchase | $79,722 | 1 new Caterpillar D100-8 100 kW stationary diesel standby generator se… | No vote recorded | staff report · city original |
| 2025-11-12 | Kennedy Jenks Consultants | CSD Agreement No. 2023-11 with Kennedy/Jenks Consultants, Inc. for generator replacement design at Pump Stations 3 and 5 (agreement excerpt) Microgrids and backup power | Award | — | No vote recorded | packet · city original | |
| 2025-11-12 | High Volt Electric | Wastewater System Generator Replacement at Pump Station 3 and Pump Station 5 (Project No. SS-5120-1) - Award Construction Contract Microgrids and backup power | Award | $968,256 | two stationary standby generators for PS3 and PS5 | No vote recorded | packet · other · city original |
| 2025-11-12 | Ventura County Transportation Commission | Ventura County Transportation Commission Interagency First Amendment to Agreement No. 2024-194 - Senate Bill 125 Bundles | Amendment | $2,538,000 not to exceed | Year 2 includes $438,000 for electric transit vehicles and $1,400,000 … | No vote recorded | staff report · packet · city original |
| 2025-10-07 | ABM Electrical & Lighting Solutions | Award for the Installation of Standby Generator at City Hall – CH-5067 (City) check Microgrids and backup power | Cooperative purchase | $437,253 not to exceed | 200-kilowatt generator at City Hall | Approved Yes: Kildee, Martinez-Bravo, Santangelo, Tennessen, Trembley; No: None | staff report · agenda · packet · other · other |
| 2025-10-07 | J&H Engineering | Award for the Installation of Standby Generator at City Hall – CH-5067 (City) check Microgrids and backup power | Cooperative purchase | $539,361 not to exceed | 200-kilowatt generator at City Hall | Approved Yes: Kildee, Martinez-Bravo, Santangelo, Tennessen, Trembley; No: None | staff report · agenda · packet · other · other |
| 2025-07-09 | Ford Motor | Purchase of 12 new F-150 Ford Lightnings (Action M-TR-1.1, municipal fleet electrification) Fleet vehicles | Purchase order | — | 12 new F-150 Ford Lightnings reduction of over $37,600 annually in fuel and maintenance costs | Approved | other · city original |
| 2025-04-09 | ABM Electrical & Lighting Solutions | Police Facility Interior Lighting Upgrades (CH-5137) - Award of Contract to ABM Electrical and Lighting Solutions, Inc. Efficiency retrofits and ESPCs | Award | $650,243 not to exceed | Approved Yes: Kildee, Martinez-Bravo, Santangelo, Tennessen, Trembley No: None | minutes · other · city original | |
| 2024-12-11 | A-1 Truck and Equipment | Blanket Purchase Orders – Authorize the Purchasing Officer to Increase Blanket Purchase Orders for FY 2024/25 Fleet vehicles | Amendment | $100,000 | 21 new vehicles | No vote recorded | staff report · city original |
| 2024-09-25 | Kennedy Jenks Consultants | Wastewater System Generator Replacement (Project No. SS-5120) – Agreement Amendment for Engineering Design Services Microgrids and backup power | Amendment | $94,195 not to exceed | No vote recorded | staff report · city original | |
| 2024-06-26 | Global Power Group | Emergency Generator Maintenance Agreement - Global Power Group, Inc. check Microgrids and backup power | Award | $45,150 not to exceed | five emergency generators | Approved | staff report · minutes · other · city original |
| 2023-04-26 | Quinn Power Systems | Emergency Generator Maintenance – Agreement Amendment Microgrids and backup power | Amendment | $48,606 | Approved Yes: Kildee, Martinez-Bravo, Santangelo, Tennessen, Trembley. No: None | minutes · city original | |
| 2022-12-14 | Quinn Power Systems | Portable Standby Generator – Purchase Order Microgrids and backup power | Purchase order | $226,360 | 1 portable standby generator | No vote recorded | agenda · minutes · city original |
| 2022-12-14 | ABM Electrical & Lighting Solutions | Award Energy Efficiency Improvements Project at the Camarillo Public Library to ABM Electrical and Lighting Solutions, Inc. Efficiency retrofits and ESPCs | Award | $958,143 not to exceed | No vote recorded | agenda · minutes · city original | |
| 2022-10-26 | Quinn Power Systems | Standby Power – City and CSD Facilities (Project No. CH-5067) Microgrids and backup power | Purchase order | $293,902 | two stationary standby generators | Approved Yes: Craven, Kildee, Mulchay, Santangelo, Trembley No: None | minutes · city original |
| 2022-01-26 | ChargePoint | SCE Charge Ready Program Participation and Purchase of Charging Station Equipment - Authorize City Manager to Execute Charge Ready Program Agreements and Sign Q EV charging | Award | — | Approved Yes: Craven, Kildee, Mulchay, Santangelo, Trembley; No: None | agenda · minutes · city original |