17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
27 Tab 5: Understanding and Approach
The Project Manager will also prepare monthly project
status reports, which will be provided with each monthly pay application, to be submitted to the City’s Operations Manager.
The BV Team will work with the City’s current project
management system to post project documents including
plans, schedules, estimates, specifications, and design and construction drawings, etc., for effective management and collaboration.
Program Development/Validation/Gap Analysis
As BV moves along in developing the program, the firm’s programming methodology includes doing a thorough
analysis of existing conditions, reviewing existing
documentation, and interviewing the City’s Operations
Manager and staff to ensure a complete understanding of the agency’s objectives and specify design requirements — all in an effort to identify most, if not all possible “gaps” in information or data. Costs for initial implementation, maintenance, and life-cycle costs will be compiled, which will guide the design and decision-making process for a best-case scenario. The firm’s team will work with various representatives from the City to ensure the Scope of Work and its requirements are fully confirmed.
Services, Tools, and Systems which will be brought to the Project
BV is prepared to provide an unparalleled supply of high quality resources, personnel, and expertise to the City as it relates to the delivery of civil engineering and land development services. The following are descriptions of the resources BV will be utilizing while working on the City’s contract.
e-PLANREVIEW
BV uses a unique web-based interactive review system
to optimize team interaction and efficiency in the review process. This e-PLANREVIEW system is designed to streamline the review process, allowing efficient reviewer, designer, and owner collaboration. Designed to facilitate productive, efficient, well-coordinated documents, the system is an interactive, searchable database which allows the owner, program manager, or any design member to log review
comments, designer responses, owner comments, and
backcheck review comments. The e-PLAN database can export reports to MS Excel format for standardized reporting needs.
The program includes a report function automatically
exporting all review and response comments to a MS Excel file where needed to meet individual client standards. The system provides for categorizing of comments; code, constructability, coordination, and comment disposition status; open, closed, owner review pending, providing efficient recording, tracking, resolution of comments, and outstanding issues.
e-PLANREVIEW can be utilized by all reviewers to document comments. Input is standard web browser based, (MS explorer, Mozilla Firefox) and does not require software download or installation. Comments from multiple reviewers are entered “live” to the system enabling real time management and
progress review.
The system overlays comment tags and markups on PDF
file inputs and generates PDF composite “prints” with tags and comments, along with Excel export of comment logs
and review metadata. Excel exports are easily adapted to the client’s standard templates for uniformity.
Additional features include “handshake” import of Design Team responses, mark up tools, measurement of length and area, and internal overlay of updated drawing versions to easily identify changes to documents. The City’s staff and design teams are invited to utilize the system for comment response or can utilize excel spreadsheet logs for responses.
Scheduling Software
BV will provide planning and scheduling support for all project phases, from development and pre-design through construction closeout. The firm’s staff utilizes Primavera P6, SureTrak, Expedition, Meridian Prolog, Proliance, and Microsoft Project software for the preparation of schedules.
BV’s civil engineers are available to begin work immediately on this contract and will remain in their respective roles for the entire performance period.
Bluebeam Software for Collaboration with NCTD and
Contractors
Bluebeam is BV’s standard Adobe format used by all
employees. The firm utilizes Bluebeam Revu for all staff for efficient creation, edits, and management of PDF documents.
Examples of where BV has used Bluebeam include the firm’s work with CALTRANS for coordination and client reviews, the Division of the State Architect plan checks, and Los Angeles Unified School District constructability reviews.
Improvement of Document Quality, Field
Coordination, and Reduction of Change Orders
Project Controls
BV recognizes the importance of conducting infrastructure improvements projects within a controlled schedule budget as well as ensuring a high quality product to meet and exceed the expectations of the City of Hemet. The firm has standard project management, quality assurance, production and cost control procedures already in place for the management and performance of projects of this nature. The assigned project team is prepared to successfully complete the civil engineering and land development services within the time constraints as established.
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
28 Tab 5: Understanding and Approach
Cost Estimating and Cost Control
BV’s approach to managing and controlling project cost is founded in the identification and resolution of cost impacts early in the process when the firm has the most ability to influence the outcome. Potential costs are immediately
identified and analyzed during review of assessment findings.
We will then propose any corrections in which we will
track, address, and resolve on a continual basis. BV retains staff specializing in developing project schedules and cost estimating to provide exceptional project management.
Analysis and Identification of Cost Alternatives
The BV team has extensive experience in estimating and
managing costs during field assessment/evaluation through active analysis and identification of design elements and construction alternatives to effectively realize compliance with the targeted project budget. At each phase of the
process, the project is estimated and the project scope is compared. Differences are highlighted and resolved to provide alternatives which can optimize proposed improvements to align the project with the budget.
Throughout the field assessment phase, the firm will be proactive, establish cost effective parameters, prototypes, cost models, and define appropriate procurement strategies. At the project level, BV evaluates alternative construction materials, sustainable design choices, site opportunities, and phasing at every stage of development.
The firm examines various construction approaches in the use and development of standard elements and prototypes.
BV develops alternative project phasing and workarounds to alleviate schedule impacts due to material shortages, delayed equipment, site conditions, and adjacency issues which might impact a project.
Change Order Management
For a multitude of the City’s projects, a critical component of BV’s work involves change order management. Change
orders occur for numerous reasons including addition or deletion of scope, changes to the project duration, revisions to materials and specifications, drawing and specification errors, differing site conditions, contractual non-compliance as well as many other reasons. While change orders are
inevitable, they can lead to cost and schedule overruns. BV has become a recognized leader in managing change orders and significantly reducing the risk of claims which typically result in costly disputes and litigation. The firm has been successful in resolving complex design, scope, and construction issues from a variety of perspectives—owner, designer, contractor, and others. BV is committed to bringing a fresh perspective and dedicated effort to resolve issues which lead to change orders through a proactive management effort that focuses on thorough and careful analysis of the project. This includes contractual documents, drawings and designs to consistently monitor and track the cost and schedule impacts associated with project changes.
The firm recognizes the vital importance of completing a change order management process, not overlooking even
the smallest of details. Comprehensive and systematic
reviews of plans, specifications, and bid packages afford the best opportunity to identify errors, omissions, conflicts, and ambiguities which can impact the project. The other critical element is to ensure design documents adhere to applicable building codes including accessibility compliance. These can also be identified early in the design phase and corrective measures can be taken immediately rather than when
construction operations are underway.
Schedule Control
BV utilizes common techniques to keep projects streamlined, organized, and on schedule. Periodic review and reporting includes:
• Timeline Forecast – determination of how long a project will take using available information on labor, productivity, etc., including possible deviations/escalations.
• Progress Assessment – measurement of project progress including work estimates, inventories of supplies, and
materials, etc.
• Estimation Software – tracking of planned dates
compared to estimated dates and prediction on if
changes made to the schedule will progress project
ahead or put it behind.
• Progress Monitoring – identification of potential problems which can lead to delays. Systems include use of diaries, reports, meetings, etc. Determination is made as to whether or not delay prevention is cost effective for the project. • Data Collection – continual collection of project data to help identify potential problems. Sources include materials vendors, labor, managers, weather forecasts, etc.
• Schedule Adjustment – utilization of schedule change
control systems which require changes to move through a process with an approval procedure to prevent schedule
changes which could delay the project. Schedules are
made available in electronic and paper format in a graphic representation. Graphic schedules display current project progress and estimated project performance. Graphic
schedules aid the project team in identifying project
slippages while taking the steps necessary to correct them. • Scheduling Software - BV will provide planning
and scheduling support for all project phases from
development and pre-design through construction
closeout. The firm’s staff can utilize Primavera P6, SureTrak, Expedition, Meridian Prolog, Proliance, and Microsoft
Project software for the preparation of schedules.
17.M
TAB 6:
QUALITY ASSURANCE
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
30 Tab 6: Quality Assurance
Quality Control Program
BV’s Quality Assurance/Quality Control (QA/QC) has evolved over the years into a combined system which involves both project leadership and technical excellence. The roles of the Project Manager is to foster enhanced communication, control, and coordination. Communication and project leadership
is continually being refined and based upon the firm’s prior project experience. BV is committed to avoiding rework and utilizing systems which encourage project completion in the first attempt. This requires a commitment to planning and results as well as an enhanced project control of cost, schedule, and scope of work.
Quality control in a project encompasses not only the
completeness of the reports but the programmatic content, work plan, and costs of the work. BV pays special attention to the entire project to ensure all appropriate measures are taken to provide exceptional quality.
Rigorous quality assurance is provided for all projects produced by BV. The assurance is monitored by the firm’s principals and is established by two functions: Standards of Practice and Quality Control. BV’s deliberate application of these functions minimizes the occurrences of surprises or major change orders during construction. The firm’s top management has a total commitment to the project and
will have internally assigned both “QA/QC” officers and “Independent check” officers. These top personnel all have professional licenses in their fields.
Potential Challenges
BV has developed an approach to any City project based on our experience with projects of a similar nature. BV performs initial site visits and planning which identify any issues that may arise on the end of a project. With this approach, BV is able to identify issues early on the site analysis and planning phase of the project, developing viable solutions before these issues can even occur. For example, the challenge in improvement work is obtaining the accurate as-builts of the existing areas. If this information is not available, then comprehensive field verifications are required. In the event that an unforeseen issue occurs, BV quickly addresses this issue, determines its impact to the scope of work, schedule, and budget. We immediately discuss the issue with the client and stakeholders to provide solutions which are reviewed by responsible parties. Our goal with any project is to ensure the client and stakeholders have a clear understanding of the progress of a project at any given point of time.
17.M
TAB 7:
EXCEPTIONS AND/
OR OTHER RELEVANT
INFORMATION
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
32 Tab 7: Exceptions and/or Other Relevant Information Tab 6: Quality Assurance Exceptions
Bureau Veritas North America, Inc. has reviewed City of Hemet’s On-Call Engineering Services RFQ for General Civil Engineering and Land Development Services in its entirety and formally states the firm does not have any exceptions to present to the aforementioned RFQ.
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
33 Tab 7: Exceptions and/or Other Relevant Information Tab 6: Quality Assurance Secondary Discipline: Architecture Services
General Architecture and Engineering Services
BV understands that time and cost sensitive projects will vary in size, construction value, and disciplines. BV’s depth of experience providing these services has enabled our
professionals valuable insight how to effectively manage any project.
Architectural Consulting Services Include:
• Programming
• Architectural Design & Design Management
• Interior Design | Space Planning | FF&E
• Facility Condition Assessments | Building Evaluations | Feasibility Studies
• ADA Accessibility Studies & Compliance
• DOT and CBC Title 24 Compliance Evaluations
• Hardscape and Landscape Evaluations
• Conceptual Design/Design Engineering
• LEED-EB Projects
• Construction Cost Estimating
• Technical Specifications
• Value Engineering Studies
• Life Cycle Cost Benefit Analysis
• Value Engineering
• AutoCAD Design/Drafting, BIM/REVIT
• Imaging and Record Drawing Digitizing
• Constructability | Peer Review
• Plan Check, Permitting & Inspection Services
Architectural Design
BV takes pride in leading project teams in the architectural design of efficient, functional, and cost-effective projects. Our key architectural staff members have broad experience in master planning, programming, feasibility studies, building survey and evaluation, facility condition assessments, design, and construction support services. The team works closely with in-house affiliated companies of multi-disciplined engineers and other design professionals to ensure our clients the utmost in design coordination. From the initial project programming and preliminary design concept to completion of construction, our work reflects innovative approaches to solving even the most complex space and design problems.
BV’s architectural division is supported by our engineering group for both new construction and modernization, upgrades and improvement projects, remodeling and repair of a
wide variety of facilities including building/facility design, hardscape design, ADA compliance upgrade design, space
planning, infrastructure upgrades, mechanical, electrical and plumbing projects, central plants, and seismic upgrades.
Our integrated cross-discipline environment also facilitates uncomplicated lines of communication and a more open
exchange of ideas. Our expertise in all facets of design and construction also allows us to provide effective management and thorough risk analysis from the start to optimize the construction process.
BV’s Design approach includes the following:
Conceptual Design, Stakeholder Outreach: The firm’s Project Manager first prepares a Work Plan/Flow Chart to demonstrate the steps and requirement to complete this assignment. After a site visit with all stakeholders, BV’s Architectural team will prepare conceptual designs/design development drawings
based on the approved Scope of Work and Work Plan. A cost estimate based on overall project volume will be provided.
The as-built condition of the facility including dimensions and space limitations will be verified prior to the completion of the conceptual design drawings as necessary. BV will submit the Conceptual Design package for the City to review including all the necessary steps to comply with the City standards and BV procedures with regards to quality, design sustainability, energy conservation, budget compliance, etc. The firm will also present the Conceptual Design documents to the City’s Management and Stakeholders before preparing the final CD Documents.
Building Information Modeling (BIM)
BV’s use of BIM technology such as Revit and e-Plan
software in large-scale projects allows for streamlined and simultaneous design analysis. As a result, the firm produces strategic decisions which include planning, budget, quality, value engineering, and aesthetics. Integrating BIM technology and e-plan along with the design and construction personnel helps manage the project delivery process with less need for revision. BV also conducts project phasing with Primavera and Microsoft project software. For quality management, the firm implements a Construction Quality Control (CQC) Program to optimize performance, deliver value, and review project plans and supporting documents. Examining the project in BIM allows for the creation of preliminary estimates of time and costs. The goals of the quality management program are to meet the City’s expectation of quality and fulfill standards outlined in the contract. BIM technology allows for the coordination and synthesis of information provided by various disciplines in real time.
17.M
RESUME
EDUCATION
BS, Architecture
REGISTRATIONS/
CERTIFICATIONS
CA Registered Architect, C14957
CA Registered Electrical Engineer,
E15584
TOTAL YEARS WITH FIRM
17+
TOTAL YEARS OF EXPERIENCE
40+
Steven Hooper, AIA, PE
Principal Architect
As both an architect and an electrical engineer, Steven has experience in all aspects of project management. As Senior Project Manager he oversees architectural design, contract administration, construction drawings, and specifications, electrical systems design, permit review coordination with local, state, and federal agencies and construction observation. He is also highly knowledgeable with the preparation and review of contracts, construction probable cost schedule control, construction drawings and specification preparation. He has worked as a constructability and design reviewer in the education, public works, healthcare, military and private sector.
SELECT PROJECT EXPERIENCE
Orange County Community Resources (OCCR), On-Call Architectural/Engineering Services, Orange County, CA, Principal-in-Charge, QA/QCManager OCCR is comprised of four (4) divisions: OC Animal Care, OC Community Services, OC Parks, and OC Public Libraries. BV is under contract to provide the County with On-Call Architectural/ Engineering Services for various capital improvement projects throughout the County. BV’s responsibilities include architectural design and design review; civil and structural engineering design and review; mechanical, electrical, and plumbing design and design review; bidding, construction and construction support services; preparing detailed project schedules; project and construction management; and public outreach.
City of South Gate, Assessment of Citywide Public Owned & Operated Buildings, All Areas within the Public Right of Way, South Gate, CA, Principal-in-Charge, QA/QC Manager.
Provided the City of South Gate with evaluations and the development of program and facility accessibility plans to implement a comprehensive ADA Self Evaluation pursuant to 28 C.F.R. §
35.105 and an ADA Transition Plan pursuant to 28.C.F.R. § 35.150(d) for City buildings, parks, parking lots, streets, intersections, sidewalks, and related public improvements affecting access by persons with disabilities.
County of Los Angeles, LADPW, Master Contract for As-Needed Architectural Design and Design Review Services, Los Angeles County. Principal-in-Charge and QA/QC Manager.
BV is currently retained by LADPW and provides As-Needed Architectural Design and Design Review Services for various projects throughout the County. BV’s scope of services involves the following: Program Development to Program Validation, Feasibility Studies/Project Definition, Conceptual Design, Design-Build Scoping Documents, Project Design-Construction Documents, Specifications, Design Reviews, Cost Estimating, Value Engineering, Constructability Reviews, Building Evaluations, Troubleshooting, Construction Support Services, BIM/CAD/Drafting Work, and General Engineering Services.
City of Pomona ADA Self-Evaluation and Right of Way Transition Plan Pomona, CA. Project Manager.
Provided a comprehensive ADA self-evaluation and right-of-way transition plan for City streets and sidewalks. Performed field investigations within the City right-of-way in order to identify obstacles limiting accessibility, describe methods to improve accessibility and specify a schedule for achieving ADA compliance.
Los Angeles County Department of Public Works Redondo Beach Maintenance Yard Restroom. Project Manager.
Provided architectural and engineering services to improve the men’s and women’s restroom facilities, including: replacement of utility doors, bike path access with ADA compliance, and pavement repairs.
17.M
RESUME
EDUCATION
BS, Architecture
REGISTRATIONS/
CERTIFICATIONS
Registered Architect:
CA, #24750
NV, #8983
TOTAL YEARS WITH FIRM
18+
TOTAL YEARS OF EXPERIENCE
40+
Rhodore Geronaga, RA
Senior Architect
Rhodore brings more than 40 years of architectural design, master planning, programming and construction administration expertise. He has first hand experience with managing public sector projects that require new construction, modernization, relocation, reconstruction and expansion. He oversees daily activities of the architectural department, providing planning and technical design support, assigning manpower for projects, monitoring development of projects, conducting quality assurances reviews, inter-discipline coordination, peer and constructability reviews, and administration of projects through construction. Rhodore’s collaborative nature allows him to take on complex projects, continuously evolving for the unique needs associated with all architectural phases from concept through construction and approval through local, state, and federal agencies.
SELECT PROJECT EXPERIENCE
Orange County Public Works County Operations Center Building B Tenant Improvement, Santa Ana, CA
Principal Architect
BV currently has an on-call architectural and engineering services contract with the Orange County Public Works. BV was tasked with renovating the first, second and third floors of the County Operations Center Building B, located at 1300 S. Grand Avenue in Santa Ana, California.
The occupants of the second floor, OC Vets and others, will move to the newly renovated first floor once it is done. The initial site visit was conducted to understand the basic parameters and requirements of the first floor tenant improvements.
Riverside County Transportation Commission Regional Operations Center/Storage/ Maintenance Facility Build-out, Corona, CA
Principal Architect
Architectural and engineering design and construction management of the storage and maintenance facility build-outs. Implementing a move management plan, BV helped facilitate the movement of customer service, express lanes monitoring, incident management, equipment maintenance, and other back office activities such as equipment and transponder inventory management, account management and license plate image review.
Services included initial conceptual design and layout/interior space planning, preparation of final plans and specification and cost estimates, construction bidding and securing all permits.
Los Angeles County Metropolitan Transportation Authority (Metro), Blue Line Station Refurbishments and Upgrades, Los Angeles, CA
Principal Architect
Design/Build Team of Amoroso-BV was contracted by Metro for the Blue Line project involving architectural and engineering improvements and upgrades of the entire group of 21 Metro Blue Line stations. BV provided full design and ADA accessibility/compliance. Due to the compressed schedule, BV developed three field inspection teams to cover more stations in an abbreviated time frame, utilizing in field tablets to document field assessments which were uploaded directly into an existing database. As a result, BV completed the project three months ahead of Metro’s schedule.
Project Manager and Lead Architect
Los Angeles Community College District East LA City College Los Angeles, CA
Peer reviews of construction documents (drawings and specifications), prepared by other architects and engineers for projects throughout the whole campus. Activities included discipline coordination, staffing and management of professional fees, as well as the review of all designs to ensure compliance with DSA guidelines and requirements. Page 949 of 1362
17.M
RESUME
EDUCATION
BS, Architecture
LICENSES/CERTIFICATIONS
Registered Architect:
CA, #22986
CO, #ARC00407333
NV, #3788
AZ, #71888
IN, #AR12200096
IL, 001.025917
MA, #953460
LA, #9744
IA, #ARC08217
TN, #107226
GA, #RA016048
MO, # 2022022172
NC, #16129
OH, #ARC2118524
TX, #30255
TOTAL YEARS OF EXPERIENCE
25+
Hong Wong, RA
Project Architect
Hong is a licensed architect with over 37 years of extensive experience throughout the Southwestern states, including California, Arizona, Utah and Nevada. His design expertise includes in-depth understanding of new construction, ground up, renovation, tenant improvements, and relocations for a variety of building types. Hong presents a broad range of experience in all aspects of project and construction management, including managing client contacts and project presentations, master planning, programming, space planning, architectural design, facility condition assessments, contracts, construction probable cost estimation, construction drawings, permit review coordination with local and state agencies, construction administration, and construction observation. He presents direct experience leading and managing, as well as performing, plan check and construction plan review services for municipal, transportation, federal, state, educational, and healthcare agencies.
His plan review services include drawings, construction documents, specifications, contractor submittals, schedules, and code analysis.
SELECT PROJECT EXPERIENCE
Project Architect and Plan Reviewer
Bureau Veritas Architectural | Engineering Division (BVAE) 2015 - Present
Performs architectural design and plan review for various projects throughout the United States.
DGS Architectural Retainer Services Statewide, CA. Project Architect.
Providing A&E and supporting services for various state owned facilities. BVAE’s professionals provide conceptual designs, budget packages, ADA accessibility compliance, OSHPD compliance, LEED consulting, field and site investigations, preparation of reports, preliminary plans, working drawings, specifications, studies, construction documents, cost estimates, budgets, bidding support, and construction administration support. Additional services include MEP, civil, and structural design; hazardous materials assessments, survey reports, abatement design plans and specifications, cost estimates, and air monitoring. Certified Accessibility Specialist (CASp) inspectors to evaluate and establish a designated ADA path of travel. Based on the task order assignment, Hong provides architectural design and design review services as the Architectural Lead for this contract.
Los Angeles County Department of Public Works El Monte Community Health Center, Urgent Care & Primary Care Expansion, CA. Project Architect.
Provided QA/QC review and resource management support and full service A&E design for two projects, a new Urgent Care Clinic and the expansion of the Primary Care Facility. The Urgent Care Clinic is 6,000 sq. ft. and the Primary Care expansion is located on the first floor. The project is being plan checked by LADPW Building & Safety, and OSHPD 3 components.
LADPW As-Needed Building Evaluations, Various Projects, Los Angeles, CA. Project Architect. Performed facility condition assessments/building evaluations for LADPW owned and operated buildings. Identify architectural deficiencies and code violations, including building envelopes, roofs, and more.
17.M
RESUME
EDUCATION
Master of Architecture
B.S., Architectural Design
REGISTRATIONS/
CERTIFICATIONS
Registered Architect
CA, #35615
KS, #7764
AL, #9049
PROFESSIONAL AFFILIATIONS
AIA, Los Angeles
38550189
TOTAL YEARS OF EXPERIENCE
18+
Jason Stoikoff
Project Architect
Jason Stoikoff is an architect with over 18+ years of experience within the industry. Jason has held various positions that required managing a team and being able to delegate responsibilities. Within management, Jason has done an exceptional job in being able to create a successful team and create success by hitting goals. Jason’s ability to lead is quite visible within the projects he’s been apart of and through his actions. Jason is an incredibly knowledgeable individual who is easy to work with and is able to manage and complete tasks on time.
SELECT PROJECT EXPERIENCE
Principal, Director of Architecture
Los Angeles
2018 - Present
Lead the Buildings and Places West Region Architecture Team (30+) in the resourcing, pursuit, delivery, and financial performance of multiple projects across varying market sectors.
Manage high profile, large scale, multidisciplinary projects.
Develop and cultivate productive relationships with clients and consultants Improve and mentor healthy operational procedures and project performance focusing on core project management principals
Design Management / Studio Operations
Los Angeles
2015 - 2018
Managed the delivery and teams for multidisciplinary projects. Operations Leader for 50+ Studio, managing resourcing and financial performance Client Relationship Leader for LA Workplace.
Senior Project Manager
2014 - 2015
Managed fast track luxury residential and commercial projects. Maintained close coordination with consultants, trades, and municipalities while serving as owner’s representative through the construction process.
Manager, Product
2010 - 2014
Managed fast track luxury residential and commercial projects. Maintained close coordination with consultants, trades, and municipalities while serving as owner’s representative through the construction process.
17.M
RESUME
EDUCATION
B.S., Architecture
PROFESSIONAL AFFILIATIONS
LEED Accredited Professional
TOTAL YEARS OF EXPERIENCE
28+
Casey Kysoth, LEED AP BD+C
Project Architect
Casey brings over 28 years of practical experience in programming, design, and construction management of municipal, State, Federal, educational, institutional, and commercial projects.
He works closely with the design team to ensure the required program implementation is fully executed within the design scheme. He has performed multiple facility condition assessments for public agencies and has worked on multiple projects ranging from modernizations to new construction to upgrades and improvements involving ADA and CBC Title 24 compliance.
SELECT PROJECT EXPERIENCE
Orange County Public Works On-Call Architectural and Engineering Master Contract Job Captain/Architect
BV is providing all phases of architectural (interior, full building, space planning, swing moves) and engineering (civil, structural, mechanical, electrical, plumbing and more), drawings, specifications, costs estimates, building facility condition assessments (FCAs), commissioning, as well as manage subconsultant providing such services as landscape architects, data consultants, security consultants, controls engineers, geotechnical, hazardous materials assessments, etc.
Orange County Sheriff’s Dept. On-Call Architectural and Engineering Master Contract Job Captain/Architect
BV is providing architectural, mechanical, electrical, plumbing, civil and structural design for tenant improvements for various facilities, kitchen remodels for jail facilities, design for ballistic store front county vestible areas, parking lot improvements, restroom remodels, ADA upgrades, retrofit shooting range facility and other buildings and facilities.
City of Azusa, FCA City-Wide Owned and Operated Buildings & Infrastructure, CA. Project Architect
Performing FCAs of City buildings, building systems, and supporting infrastructure to establish baseline data, estimates of short and long-term (20 years) maintenance program and schedule, alliances of long-term budget implications and financing operations, and development of ongoing monitoring program and database.
Metro Union Station Gateway Building, Engineering Management Services Contract, Inspection, Facility Condition Assessment, and A/E Design Services Job Captain/Architect
Mr. Kysoth provided coordination and QA/ QC oversight of a large-scale facility condition assessment (FCA) for entire Metro’s Union Station Gateway (USG) building, Union Station, and parking structure. BV is providing A&E services to Metro’s Union Station Gateway (USG) building, a 628,000 square foot, 27 story high rise office tower with four level subterranean parking structure, Metro station, and all surrounding structures. Work includes tenant improvements, renovations, expansions to offices, architectural and interior design, structural engineering and seismic analysis, civil engineering, MEP engineering, as well as code compliance.
17.M
RESUME
EDUCATION
BA, Sociology
LICENSES/CERTIFICATIONS
Certified Access Specialist | CA
#CASp-905
ICC Certified: Accessibility
Inspector/Plans Examiner
TOTAL YEARS OF EXPERIENCE
11+
Jennifer Etten, CASp
Accessibility Plan Reviewer/CASp
SELECT PROJECT EXPERIENCE
FCA and CASp Study (Judicial Courts of California | San Diego, CA QA/QC Manger - BV was awarded a contract with Vanir for the JCC to complete a comprehensive long-range strategic asset management plan for a portion of the JCC’s portfolio of buildings.
The statewide portfolio reviewed as part of this study comprised over 22 million gross square feet (GSF) of facilities, contained within 213 buildings. The JCC required a comprehensive building evaluation including architectural, structural, mechanical, electrical, plumbing and code compliance (including accessibility) evaluations. The scope included corrective recommendations, budget estimates for the corrective work, and an estimated schedule for the completion of all recommended corrective work at the JCC-owned facilities.
ADA Assessment and Transition Plan (Rancho Cucamonga, CA) QA/QC Manager - Ms. Etten provided QA/QC for the Self Evaluation and Transition plan incorporating revisions to verify compliance with the Department of Justice requirements as outlined in the Code of Federal Regulations. Project evaluation included the assessment of City facilities, parks, and right-of-way. Programs, policies, and procedures assessment includes City services, activities, employment practices, and communications addressed by ADA regulations.
Project was valued at $290 million and consisted of 53 facilities and 12.5 miles of sidewalk.
ADA Assessment and Transition Plan (Tracy, CA)
QA/QC Manager - Ms. Etten provided project management for the Self Evaluation and Transition plan incorporating revisions to verify compliance with the City requirements as outlined in the Code of Federal Regulations. Project evaluation included ADA site surveys of all City owned building and properties, review of programs and services for policies and procedures, evaluation and remediation recommendations for facilities and the Public Right-of-Way (intersections, sidewalks, curb, ramps, etc.).
ADA Transition Plan, FCA, and Inventory (Napa, CA)
QA/QC Manager - Comprehensive ADA Self- Evaluation and Transition Plan. The assessment included City facilities, parks, and right-of-way. Programs, policies, and procedures assessment includes City services, activities, employment practices, and communications addressed by ADA regulations. BV developed the Transition Plan with estimated costs, and will include the involvement and input of City staff and the public through public workshops.
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
40 Tab 7: Exceptions and/or Other Relevant Information Tab 6: Quality Assurance
ON-CALL ARCHITECTURAL AND ENGINEERING MASTER CONTRACT
CLIENT NAME
Orange County
Public Works
CONTACT NAME: Karen Chieng, PLA | LEED AP, Capital Improvement Programs Manager TELEPHONE: 949.923.3758
EMAIL: [email protected]
DATES OF SERVICES: 2017 -2019
PROJECT SUMMARY
The County issued BV a Master Contract to supplement its own internal staff. As an extension to the County and the lead of the design team, BV is providing all phases of architectural (interior, full building, space planning, swing moves) and engineering (civil, structural, mechanical, electrical, plumbing, and more), drawings, specifications, cost estimates, and building facility condition assessments, commissioning, as well as manage subconsultant providing such services as landscape architects, data consultants, security consultants, controls engineers, geotechnical, hazardous materials assessments, etc. BV professionals perform site investigations which may lead to projects including the following: tenant office improvement; building interior alteration; regional park facility, picnic shelter refurbishment, various improvement; miscellaneous library improvement, entry plaza redesign; building exterior repair, improvement and/or addition; restroom construction and/or restoration; ADA compliance and improvement; various roof systems replacement; exterior door and storefront replacement; existing building MEP system, seismic and geotechnical risk assessments; demolition plan with record drawing.
Aliso and Wood Canyons Wilderness Project
As Prime Consultant and Architect of Record (AOR), BV provided architectural design with full service supporting civil, structural, mechanical, electrical, plumbing engineering, and overall construction management. BV coordinated and managed all other consultants providing such services as landscape architect, utility location, geotechnical, materials testing, inspection, and more.
The three buildings provide offices for the Park Ranger and Non-Profit Groups, Meeting, and Educational Program space. Building #1 – Visitor Center / Ranger Office with Restroom Facilities, Building #2 – Non- Profit Office / Meeting Room, Building #3 – Education / Training. BV provided preliminary design, 30%-65%-95% construction documents, plan check and final bid documents, and utilities for Building #1. The remainder of buildings have not been built and are still under consideration by the County.
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
41 Tab 7: Exceptions and/or Other Relevant Information Tab 6: Quality Assurance
ORANGE COUNTY ZOO, ON-CALL ARCHITECTURAL AND ENGINEERING MASTER CONTRACT
CLIENT NAME
Orange County
Public Works
(OCPW)
CONTACT NAME: Rick De Jong
TELEPHONE: 714.647.4966
EMAIL: [email protected]
DATES OF SERVICES: 2020
PROJECT SUMMARY
The County issued BV a Master Contract to supplement its own internal staff. As an extension to the County and as the lead of the design team, BV is providing all phases of architectural and engineering, drawings, specifications, cost estimates, and building facility condition assessments and commissioning. BV also manages subconsultant providing such services as landscape architecture, data, security, cost estimating, geotechnical and hazardous materials assessments.
As part of the OC Public Works master agreement, BV worked with the OC Public Works to modify the existing Orange County Zoo Master Utility Plan. Per the Contractor’s request and OC Zoo’s/OCPW’s agreement, SCE had changed the design to convert the existing service switchboard “MSA” to a distribution switchboard and to install a new service switchboard and pad on the outside of the soda fountain building, adjacent to SCE’s new transformer pad. The new service switchgear is to back-feed existing switchboard “MSA” and is to provide power feeding for the existing Restroom Building.
This change entailed some additional effort on BV’s part for field investigation, communication, drawings changes, and assistance during construction. BV replaced the previous SCE design with the new SCE design in the construction set of drawings and revised the electrical drawings to incorporate the new changes. Additional structural engineering services were provided.
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
42 Tab 7: Exceptions and/or Other Relevant Information Tab 6: Quality Assurance CARSON SHERIFF’S STATION ARCHITECTURAL DESIGN REMODEL
CLIENT NAME
Los Angeles
County
Department of
Public Works
(LADPW)
CONTACT NAME: Victorio E. Monteil, Capital Projects Manager TELEPHONE: 626.300.3267
EMAIL: [email protected]
DATES OF SERVICES: Ongoing
PROJECT SUMMARY
BV was selected to provide design review services by the Los Angeles County Department of Public Works for the remodel of the existing Carson Sheriff’s Station facility and new second story addition. The existing Carson Sheriff’s Station was a 19,250 square foot, single-story building with a partial basement level that was constructed in 1974.
BV conducted a field investigation of the existing facilities, a review of record drawings, and produced a set of scoping documents, performance specifications, and bubble diagrams with a comprehensive cost estimate. The basis of design and performance specifications include civil and site improvements, sustainability design measures, first and second floor conceptual designs, architectural and engineering systems design considerations, data/telephone/public announcement/communications and security systems, fire alarm and automatic sprinkler systems, and program cost estimating. BV provided a checklist and associated narrative to ensure the building will achieve LEED Silver certification.
17.M
TAB 8:
COST APPROACH
17.M
BUREAU VERITAS 220 Technology Drive, Suite 100 | Irvine, CA 92618 P: 858.863.2000 | www.bvna.com
44 Tab 8: Cost Approach
Fee Schedule
BV’s pricing reflects the firm’s commitment to the success of the City of Hemet’s projects by helping maintain significant quality and cost saving benefits moving forward. BV is dedicated to working with the City to seamlessly adjust required staffing to appropriately accommodate construction activities. This will not only allow BV to provide services of the highest quality during times of increased workload but also help the City save money during times of decreased service demand.
Below is the fee schedule for the provision of Services to the City of Hemet:
Engineering Percentage of Fee, Based on the City’s Collected Fees Initial Sheet: 75%
Each Additional Sheet: 60%
Revisions – Initial Sheet: 60%
Revisions – Each Additional Sheet: 60%
*Percentage includes up to (3) reviews. Additional Review or services to be invoiced hourly.
Hourly Rates for Services
Civil Personnel 2022 Hourly
Billing Rates
Project Manager $165
Sr. Civil Engineer $180
Civil Engineer $165
Associate Engineer III $145
Associate Engineer II $125
Engineering Technician $115
Administrative/Clerical Support $85
• Rates and cost estimates shown above exclude per diem, prevailing wage, and union rates. Should these be applicable, BV will discuss and negotiate fees to account for increased personnel costs. • Emergency Event or Accelerated plan reviews will be an additional 25% of fees shown above. • BV will use an overnight delivery service for next day pick up for delivery of projects and will cover 100% of the Courier cost. • Overtime (OT) will be charged at 1.5 times the standard hourly rate. No overtime will be charged without approval. • Mileage incurred using personal vehicles will be charged at the current IRS rate. • Hourly Rates subject to annual adjustment in accordance with CPI.
17.M
www.bvna.com
17.M
Jack Panichapan, AIA, LEED AP
Principal/CEO
Gillis + Panichapan Architects, Inc.
2900 Bristol Street, Suite G-205
Costa Mesa, 92626
[email protected]
Tel. 714.668.4260
Fax. 714.668.4265
SEPTEMBER 24, 2022
Qualifications for On-Call Architectural
Engineering Services
City of HEMET
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org
TABLE OF CONTENTS
CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
Table of Contents
1. Cover Letter
2. Firm Qualifications
3. Resumes of Team
4. Relevant Experience
5. Understanding and Approach
6. Quality Assurance
7. Exceptions and/or Other Relevant Information
8. Cost Approach
00 01
02 03
12 16
18 19
20
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
1.COVER LETTER
September 24, 2022
CITY OF HEMETRe: NOTICE FOR REQUEST FOR QUALIFICATIONS “ON-CALL” PROFESSIONAL ARCHITECTURAL SERVICES To whom it may concern,
We are pleased to forward to you our statement of qualifications for the On-call Professional Architectural Services for the City of Hemet.
Our work experience involves collaboration with Municipal and Water District agencies on a broad range of projects in complexity, scope of work, and size:
• We specialize in the providing services for new ground-up and rehabilitation of public buildings, police and fire training facilities, Civic Centers, educational facilities, public works facilities, water districts from conceptual design through to project move-in.
• We believe sustainability and life cycle cost efficiencies as a cornerstone of our work. Our goals are to develop the optimum balance of comfort, ease of maintenance, and cost efficiency for your future facility. • Our skills and the experience encompass working with helping the City to visualize their future facility as the design develops. We provide 3-d conceptual models, and clear graphics that communicate a project’s intention from the earliest stages.
We believe our experience, size, flexibility, and range of skills will be ideal to suit the City’s needs. Gillis + Panichapan Architects, Inc. (GPa) is a full-service Architecture, Planning, and Interior Design Firm that has been in practice for well over 30 years. Address: 2900 Bristol Street, Suite G-205, Costa Mesa, CA 92626. We are locally based in Costa Mesa.
Our firm has distinguished itself by providing excellence in architecture, space programming, master planning, and interior design services. We have five (5) full-time employees. Our successful experience with these Agencies leaves us with a great depth of intimate knowledge that we can bring forward specifically to the City of Hemet.
We are pleased to submit our qualifications, and hope to have the opportunity to further demonstrate our enthusiasm, and express our experience in more detail.
Respectfully,
Jack Panichapan, AIA, LEED AP, President, CEO
[email protected]
714-668-4260
2900 Bristol Street, Ste G-205
Costa Mesa, CA 92626
(Contact Person)
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
2.FIRM QUALIFICATIONS
GPa FIRM DESCRIPTION
Gillis + Panichapan Architects, Inc. (GPa) is a full-service Architecture, Planning, and Interior Design Firm that has been in practice for well over 30 years. We are locally based in Costa Mesa. Our firm has distinguished itself by providing excellence in architecture, space programming, master planning, and interior design services. With extensive experience in civic and public works architecture, our knowledge encompasses public facilities ranging from municipal offices, community centers, city maintenance facilities, fire and police facilities, educational facilities, and more.
Our portfolio encompasses a large range and scale of project types in a diversity of public and civic building categories. Beyond ground up building and campus master planning, we carry expertise on renovation and retrofits of existing buildings. We have successfully completed and are currently completing new build as well as renovation for projects throughout California with regions from the ocean to the desert to the mountains, and all in between. Some of our local clients include the University of California, Irvine (UCI), Southern California Edison (SCE), and Cities of Long Beach, Costa Mesa, Santa Ana, Westminster, and Seal Beach.
We believe sustainability is a major cornerstone of our practice. We commit to sustainable practices in every project whether or not a project seeks formal sustainable certification. Every architect here at GPa is LEED accredited and well qualified to guide project towards practical sustainable design solutions or formal LEED certification. We have achieved LEED certification up to the Platinum level in a number of our projects. Considering cost and schedule, we endeavor to maximize sustainable features within the project. Our design philosophy encourages passive building conditioning strategies that are a reflection of local climate, site orientation, and environment. We trust that sustainability is an optimal approach for cost savings, lower long-term maintenance, and minimizes impact on the site, and the environment overall.
While creating a more sustainable built environment, our core values are based on connection to community and by making a difference with enhancing the places people work and visit. As a part of the Fulerton On Call Team, we have the professionals, experience, and expertise for municipal and civic design and planning to exceed your objectives in a timely and cost-effective manner. It would be an honor to work with the City of Fullerton, which exemplifies our commitment to sustainability with a healthy balanced lifestyle seamlessly connected with the outdoors.
CERTIFICATIONS
• Disadvantaged Business Enterprise (DBE), California Unified Certification Program • Small Business Enterprise (SBE), DGS California Department of General Services • Minority Business Entity (MBE), The Supplier Clearinghouse
LICENSED PROFESSIONALS
Jack Panichapan- Principal/CEO
• Professional Architect, CA, 29344
• Professional Architect, IL, 001-018109
• LEED Accredited Professional
Vic Nguyen- Project Architect/Design Director
• Professional Architect, CA, C-30250
• LEED Accredited Professional
Kent Klueter- Project Architect
• Professional Architect, CA, 25189
• LEED Accredited Professional
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
ELECTRICAL/MECHANICAL ENGINEER
Gannett Fleming
Hiten Sheth, P.E.
STRUCTURE ENGINEER
Dale Christian Structural Engineers
Richard Suzuki, P.E., S.E.
LANDSCAPE ARCHITECT
BGB Design Group
Arthur Guy
ARCHITECT
Gillis + Panichapan Architects, Inc
Jack Panichapan, AIA, LEED® AP
Principal In-Charge/Project Director
ARCHITECT
Gillis + Panichapan Architects, Inc
Cynthia Perez
Project Coordinator/Designer
ARCHITECT
Gillis + Panichapan Architects, Inc
Kent Klueter, AIA, LEED® AP
Project Architect
ARCHITECT
Gillis + Panichapan Architects, Inc
Vic Nguyen, AIA, LEED® AP
Project Architect
point of contact
By submitting a proposal, Gillis + Panichapan Architects, Inc. agrees and acknowledges that it will provide for the duration of the project, the full complement of staff required to perform the work, including the specific individuals identified in this proposal. Key personnel shall not be substituted or otherwise changed without the express permission of the City of Hemet.
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Experience:
Years of Experience: 28
Years with GPa: 18
Registration:
Professional Architect, CA,
29344
Professional Architect, IL,
001-018109
LEED Accredited
Professional
CA DSW Volunteer,
#89402 Cal OES- Safety
Assessment Program
Education:
M. Arch, 1997,
Architecture, Iowa State
University
B. Arch, 1996,
Architecture, Iowa State
University
Professional Affiliations:
American Institute of
Architects
National Council of
Architecture Registration
Board
Jack Panichapan, AIA, NCARB, LEED ® AP
CEO/Principal
BIOGRAPHY
Jack Panichapan has over thirty years of experience, ranging from new buildings, renovation, and interior design, to complete city campus master planning. Throughout his career, he has extensive experience in the need’s assessment, site survey and ADA analysis in all types of civic and public facilities, such as municipal, water district, corporate yard, health care facilities, and schools.
RELEVANT EXPERIENCE
San Gabriel Corporate Yard Facility | San Gabriel, CA
Located on a 3.5-acre narrow sloping parcel of land bordering a wash on one side and homes on another, the new Maintenance Facility for the city of San Gabriel had programmatic challenges with vehicular circulation, and noise mitigation that GPa was able to resolve architecturally on a narrow challenging site. The facility maximizes sustainable design features such as window shading strategies, recycled materials, and north-south fenestration orientation.
As the lead design Principal, Jack oversaw the programming development, schematic design on through construction administrative efforts for the new facility.
Water Replenishment District (WRD) ARC Advanced Water Treatment Facility| Pico Rivera, CA
The new 5-acre garden campus of Albert Robles Center (ARC), is a Water Treatment Facility that contains two main buildings among its variety of structures: A 45,000sf water treatment process building, and a 24,000sf Visitors Learning Center topped with a roof garden.
The facility provides delivery of purified recycled water to replenish aquifers creating a sustainable water supply while serving as an immersive learning environment for the community. It provides a tribute to the San Gabriel River’s presence and purpose in the region. The facility achieved LEED Platinum certification.
As the lead design Principal, Jack oversaw the community outreach efforts, schematic design on through construction administrative efforts for the new facility.
Westminster Corporate Yard and Police Training Facility | Westminster, CA The existing facility built in the early 1960s, is overcrowded, inefficient, and no longer sufficient to implement the city’s needs as a maintenance facility. GPa was obtained to update and expand the current facility. The new corporate yard will have a new administration building, canopy, fuel station, and warehouse facilities. The renovation and addition take place within the existing site of the city’s current municipal facility along with an adjacent site the city has obtained for a police training facility with a Firing Range that GPa also designed. One of the challenges of this project was that the facility was required to be operational during the course of renovation.
The new building has many notable sustainable features and reflect the scale of the surrounding residential neighborhood.
As the lead design Principal Jack worked with the city for a phasing plan to relocate staff and keep it operational during phasing plan to relocate staff and keep it operational during the course of construction. The course of construction.
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Jack Panichapan, AIA, NCARB, LEED ® AP
CEO/Principal
ADDITIONAL PROJECT EXPERIENCE
One-Stop Shop (Public Works) Concept Studies| Huntington Beach, CA WRD GRIP- Treatment Facility and Visitors Center| Pico Rivera, CA City Council Chambers Improvements Project |Redondo Beach, CA LADWP Van Nuys Office Building Renovation |Van Nuys, CA LB_MUST Facility |Long Beach, CA |Long Beach, CA
Long Beach Oil and Gas Facility Assessment | Long Beach, CA Police Department/ Indoor Firing Range Tenant Improvement | Costa Mesa, CA UCI Health, 3800 Chapman (4 Phase Building 140k sf Renovation) | Orange County, CA
Southern California Edison – GO-1 Headquarters Renovation (350k sf) |Rosemead, CA
Public Works Facilities and CNG Station | Fullerton, CA Need Assessment, Maintenance and Water District Facility | Escondido, CA Police Department Lobby Concept | Redondo Beach, CA
Manhattan Beach Public Works Renovation| Manhattan Beach, CA Temecula Community Recreation Center Renovation| Temecula, CA Temecula Fire Station 84 Renovation| Temecula, CA
Yorba Linda Water District Headquarters |Temecula, CA OCFA Fire Station Renovations | Orange County, CA
Seal Beach Civic Center Renovations| Seal Beach, CA
Yucca Valley Civic Center Renovations | Yucca Valley, CA Temecula Fire Station 84 Tenant Improvements | Temecula, CA Mojave Water District Headquarters and Operations Center| Apple Valley, CA
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Experience:
Years of Experience: 21
Years with GPa: 11
Registration:
Registered Architect, CA,
C-30250
LEED Accredited
Professional
Education:
B. Arch. 2000
Architecture,
University of Arizona
Professional Affiliations:
American Institute of
Architects
National Council of
Architecture Registration
Board
USGBC Orange County
Vic Nguyen, AIA, LEED ® AP
Design Director/Project Manager
BIOGRAPHY
Vic Nguyen has over twenty years of experience, ranging from development of complex mixed use, civic, and transportation-oriented projects, to highly detailed interiors of residential, retail, health care, and office environments. He has a wealth of experience working with cities and the community directly to attain consensus for project design and development.
RELEVANT EXPERIENCE
Ehlers Community Center | Buena Park, CA
The existing 30,000 square foot facility is composed of a campus of Community Buildings, Senior Citizens’ Center, and Banquet Facilities that is currently a major community gathering place. Built in the 1960s, the facility had a great deal of deterioration including dry rot along with deferred maintenance and was in need of updating. It also had issues of security and homeless accessing private courtyard areas of the facility. Many of the Mid-century modern exposed wood details needed to be repaired and protected.
GPa was selected to provide a strategic design to enhance security while also giving the facility a restoration and architectural update. Details were developed to repair and prevent future dry rot and deterioration.
As the Design Director, Vic lead the development of design schemes and renderings as a part of an interactive process to design the Facility with the City and the Community’s input and collaboration while staying on a restrictive budget.
Orange County Public Works Administrative Office Renovation| Santa Ana, CA The project scope required consolidating 8 distinct County Departments with over 100 employees spread among various floors of a midrise building into a single 14,000sf floor that was continuously occupied during the process. We provided full space planning as well as architectural services. We also developed a phasing plan for the move. During the process, we found many opportunities for shared optimized spaces among the various departments leading to less space requirements than when the Departments were separated. Understanding specific function and layouts required specifically for each department helped to standardize workstations and offer an optimum work layout for everyone while utilizing space much more efficiently and effectively.
Vic was the Design Director and Project Architect in charge of the design, phasing, entitlements, construction documents and construction administration for the project which also included move phasing for the stakeholders.
San Gabriel Corporate Yard Facility | San Gabriel, CA
Located on a 3.5-acre narrow sloping parcel of land bordering a wash on one side and homes on another, the new Maintenance Facility for the city of San Gabriel had programmatic challenges with vehicular circulation, and noise mitigation that GPa was able to resolve architecturally on a narrow challenging site. The facility maximizes sustainable design features such as window shading strategies, recycled materials, and north-south fenestration orientation.
As Design Director, Vic led the overall Master Planning and Design Guideline effort for City entitlements and future development opportunities.
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Vic Nguyen, AIA, LEED ® AP
Design Director/Project Manager
ADDITIONAL PROJECT EXPERIENCE
One-Stop Shop (Public Works) Concept Studies| Huntington Beach, CA City Council Chambers Improvements Project |Redondo Beach, CA Town of Yucca Valley Library Renovation | Town of Yucca Valley, CA UCI Health- 3800 Chapman (4 Phase Building Renovation) | Orange County, CA Need Assessment, Maintenance and Water District Facility | Escondido, CA WRD GRIP- Treatment Facility and Visitors Center| Pico Rivera, CA LB_MUST Facility |Long Beach, CA |Long Beach, CA
Police Department/ Indoor Firing Range Tenant Improvement | Costa Mesa, CA UCI Health, 3800 Chapman (4 Phase Building 140k sf Renovation) | Orange County, CA
Southern California Edison – GO-1 Headquarters Renovation (350k sf) |Rosemead, CA
Public Works Facilities and CNG Station | Fullerton, CA Need Assessment, Maintenance and Water District Facility | Escondido, CA Police Department Lobby Concept | Redondo Beach, CA
Manhattan Beach Public Works Renovation| Manhattan Beach, CA Temecula Community Recreation Center Renovation| Temecula, CA Temecula Fire Station 84 Renovation| Temecula, CA
OCFA Fire Station Renovations | Orange County, CA
Yucca Valley Civic Center Renovations | Yucca Valley, CA Temecula Fire Station 84 Tenant Improvements | Temecula, CA
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Experience:
Years of Experience: 30
Years with GPa: 26
Registration:
Professional Architect, CA,
25189
LEED Accredited
Professional
Education:
B. Arch, 1990,
Architecture, California
Polytechnic State
University, San Luis Obispo
Professional Affiliations:
American Institute of
Architects
National Council of
Architecture Registration
Board
Kent Klueter, AIA, LEED ® AP
Project Architect
Role in the Project:
Mr. Klueter is experienced in project coordination and management including developing working drawings, coordinating with engineering consultants, coordinating production of construction documents and building department, administration of the bidding process, ADA compliance, building code requirement, specification, and construction administration.
Experience with the requirement and tasks:
With 30 years of experiences, and 26 years with GPA, Mr. Klueter has been working with varies types of project, such as municipal, water district, police facility, corporate yard, pump station, maintenance facility, civic facilities and training center (dispatch centers and essential facility).
Relevant Experience:
Mojave Water Agency – Need Assessment, New Agency Headquarters Facility,
Moulton Niguel Water District – Need Assessment on Administration Building, Moulton Niguel, CA
University of California, Irvine, Health – On-Call A/E Services Southern California Edison – On-Call A/E Services
City of Long Beach – On-Call A/E Services
Inland Empire Utilities Agency – On-Call A/E Services Water Replenishment District of Southern California – Administration Needs Assessment and Tenant Improvement, Long Beach, CA
City of Long Beach – Municipal Urban Stormwater Treatment Facility Southern California Edison – GO-1 Tenant Improvement Mojave Water Agency – Need Assessment, Central Operation Facility, Apple Valley, CA
Water Replenishment District of Southern California – Administration Needs Assessment and Tenant Improvement, Long Beach, CA
Water Replenishment District of Southern California – Advanced Water Treatment Facility- GRIP Pico Rivera, CA
Bellflower Somerset Mutual Water Company – Leahy Avenue Water Well Facility
City of Anaheim – Linda Vista Reservoir and Pump Station City of Riverside – Pyrite Canyon Water Treatment Facility
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Richard Suzuki, P.E., S.E.
Structural Engineer
Role in the Project:
Director of Engineering (previously Staff Engineer then Senior Engineer) 199l to present DCSE Associates, Inc. – Structural Engineers
• Responsible for day-to-day supervision and management of 7 engineers, CAD operator
• Responsible for all phases of structural engineering (design analysis, client meetings, submissions, contractor, etc.) for industrial/commercial buildings, civil infrastructure, retail buildings, police and fire stations, office buildings, automobile dealerships.
• Responsible for job scheduling (including assignments to engineers), job site visits, plan checks, quality control, client relationships, etc.).
Experience with the requirement and tasks:
Mr. Suzuki is experienced in all phases of structural engineering and design analysis for different types of structures including mixed-use multi story facility, retail buildings, tilt-up industrial buildings, restaurants, police and fire stations, steel office building and subterranean parking structures. He is involved with the project from the conceptual design all the way though construction by performing site visits during construction as well as the review of various structural submittals.
Relevant Experience:
Municipal Maintenance Yard Complex, City of San Gabriel – (New administration, vehicle repair garage, storage buildings), San Gabriel, CA (in team with Gillis-Panichapan Architects)
Municipal Maintenance Yard Complex, City of Stanton – (New administration, vehicle repair garage, storage buildings), Stanton, CA (in team with Gillis-Panichapan Architects)
Yorba Linda Water District (New administration building, approx.. 20,000 sq. ft.), Yorba Linda, CA (in team with Gillis-Panichapan Architects) Mojave Water Agency – New Agency Headquarters Facility–LEED Gold Palmdale Water District – Master Plan & CMU Wall for facility Water Replenishment District of Southern California – Administration Needs Assessment and Tenant Improvement
South Coast Water District – Operations Center Facility Yorba Linda Water District - New Administration Facility Banning Police Department – Banning, CA
City of Paramount – Tenant Improvement
City of Santa Ana – Santa Ana, California (Multiple projects including Fire Station and Community Center Remodel)
Experience:
Years of Experience: 33
Registration:
2006, Structural
Engineering
Certification,CA, S4971
1992, Registered
Professional Engineer, CA,
CE-49775
Education:
B.S. Civil Engineering,
May, 1987
University of California,
Irvine
M.S. Structural
Engineering, December
2004 Irvine Institute of
Technology
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Hiten Sheth P.E., LEED ® AP
Senior Mechanical Engineer
Role in the Project:
As the Principal/Mechanical Engineer, he is committed to managing projects as MEP leader with hands on design work, in-house quality control and coordination between various trades to ensure accuracy in the delivery of every project personally for every client.
Experience with the requirement and tasks:
Mr. Sheth has more than 10 years of experience of engineering and design for various heating, ventilation and air conditioning systems such as variable air volume system (VAV), constant air volume (DX and Package), chilled water and heating hot water based central plants, variable refrigerant flow system (VRFs), under floor displacement ventilation systems (UFADs) and 100% outside air system for various healthcare and pharmaceutical applications. Mr. Sheth has had large exposure to design of various types of occupancies like office spaces, city halls, auditoriums, hospitals, medical office buildings, laboratories, educational and commercial restaurants.
Relevant Experience:
City Of Simi Valley (Prime Consultant): Upgrade of existing HVAC system for city hall and DMV building (Double deck AHU upgrade with title 24 compliance and upgrade of existing air distribution system. Pneumatic to DDC controls). A federally funded project (ARRA Stimulus). DEA - Los Angeles - 40,000 SF TI for existing Federal Facility. 16th Floor Wilshire - Energy Upgrade replacing existing double deck AHUs and CAV system with energy efficient VAV system along with brand new loop air distribution system.
IWBT (Interim West Bus Terminal): Design of waiting area building (50,000 SF) adjacent to Bradley international terminal at LAX. LEED silver project. Fess Parker Waterfront Hotel: 5 star hotel with 200 guest rooms, ball room, spa, commercial kitchen, auditorium, indoor swimming pool, lounges and multipurpose spaces. Approximately 200,000 SF of conditioned space.
Design of various office TIs for Haven Pointe, Rancho Cucamonga. Various large and mid-size TIs for American Career College in Long Beach and Anaheim campuses.
Owner’s representative for American Career College for their Texas and Florida campuses.
USC ophthalmology TI in city of Arcadia.
AHU replacement for USC – McKibben Hall.
Various tenant improvement projects at USC’s Health science campus, Los Angeles, CA.
Experience:
Years of Experience: 12
Registration:
Professional Engineer, CA,
M35789
LEED Accredited
Professional
Education:
M.S. Mechanical
Engineering, University of
Bridgeport (CT), 2006
B.E. Mechanical
Engineering, Sarder Patel
University (India), 2002
Professional Affiliations:
ASHRAE Associate
Member since 2006
3. RESUMES OF TEAM
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Arthur Guy
Landscape Architect
Experience with the requirement and tasks:
Arthur Guy has over 35 years of landscape architecture and planning experience, the past 22 as principal with BGB Design Group (BGB) Mr. Guy directs a comprehensive approach to irrigation design for BGB and serves as the technical liaison pertaining to water management issues which arise during the planning, design and implementation phases of projects. Mr. Guy’s knowledge of horticulture extends from high desert to tropical bioregions, enabling him to effectively design planting and irrigation systems appropriate to individual environmental requirements.
Relevant Experience:
Orange County Sanitation District - Arthur Guy and BGB have provided landscape architectural services for many OCSD projects over the past 20 years. Current and past projects include subconsulting for Brown and Caldwell for the P2-92 Dewatering Facility and P2-90B Brookhurst Screening Project, Carollo Engineers for the P2-66 Headworks Project which included a major Entry Garden Plaza to Plant No. 2, Black and Veatch for the P2-102 Sludge Facility, and contracting as a prime consultant to the District for the P2-90 (Contract A) Supplemental Landscape Screening, and the P2-84 Talbert Marsh Screening Project. Recently completed in 2017, contracting directly with the District, is the P2-96 / J-110 Santa Ana River Landscape Enhancement Project. Currently, as a subconsultant to Carollo Engineers, BGB is providing landscape improvements along Streed Parkway for the P1-105 Headworks Rehabilitation and Expansion project.
Railroad Corridor Pedestrian Beach Trail —City of San Clemente, CA - BGB was the prime consultant for this $15 million multi-phase oceanfront project. The 2.5 mile trail is located at the base of the oceanfront bluffs that run the entire length of the City. Features included bridges, handicap accessible ramps, beach access facilities, native landscaping, signage, public art and pedestrian accent areas. Mr. Guy was the leader for a team of consultants during the planning and design phases of the project.
In addition, he was the primary contact person for all governmental agencies that were involved in processing (including the City of San Clemente, Caltrans, Southern California Regional Rail Authority, California Coastal Commission, USACOE, Fish & Game and SCRWQCB). This project recently received an Award of Excellence by the American Planning Association and a Merit Award from the American Society of Landscape Architects.
Related Projects - Other Public Works projects include; Esplanade Streetscape Improvements / City of Redondo Beach, Kern River Upland and River Edge Restoration / City of Bakersfield, several park projects for the City of Fullerton and Anaheim, and currently on-call consultant for City of Newport Beach
Experience:
Years of Experience: 35
Registration:
Registered Landscape
Architect, California
#2214
Registered Landscape
Architect, Nevada #488
Education:
Bachelor of Science,
Landscape Architecture,
California State
Polytechnic University,
Pomona (cum laude)
1979
Professional Affiliations:
American Society of
Landscape Architects,
Full Member
Irrigation Association, Full
Member
Special Training:
Certified Landscape
Irrigation Auditor #81986
3. RESUMES OF TEAM
17.M
www.gparchitects.org RFQ FOR ON-CALL PROFESSIONAL ARCHITECTURE SERVICES
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES GRIP- Advanced Water Treatment Facility
WRD- Water Replenishment District of Southern California CLIENT REFERENCE:
Charlene King
Associate Engineer
562-275-4252
[email protected]
DESCRIPTION:
WRD is developing an advanced reclaimed water treatment campus ($100 million construction cost) that includes an approximately 45,000sf treatment plant process building and an approx. 24,150sf two story Administration and Visitors Building.
During the course of development, GPa developed the
general architectural aesthetic of the buildings and site landscape concepts and theme through several phases of
public outreach input with the surrounding community. The goal was to have a building and a campus that facilitated a welcome connection to the community.
The Design was developed through stages of Design-Build with an architectural philosophy which is consistent with the theme and character that has been established by WRD
in terms of outdoor connections, views, and transparency.
We worked interactively with WRD in order to ensure that the implementation of the final design aligns with the established budget, needs, and goals for the architecture of new facility.
Throughout the development of the project this can be
implemented with workshops. The facility achieved LEED
Platinum.
CONTRACT VALUE: $875,000 (Architecture only)
CONSTRUCTION BUDGET: $100,000,000
DATES OF SERVICE: 2019
4. RELEVANT EXPERIENCE
17.M
www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES Yucca Valley Branch Library
Town of Yucca Valley
DESCRIPTION:
It has been approximately ten years since a needs
assessment was completed and there have been
potentially organizational and infra-structural changes over the years that require the Town Master Plan Study
to be re-assessed and revised.
GPa had assisted the Town of Yucca Valley to develop
a report to determine a compatible new program
to occupy the infrastructure of the existing mid-20th
century bank facility located at 57271 Twenty-nine
Palms Highway Yucca Valley, CA 92284. Programming
and architectural/ engineering assessments of the
existing building were provided in this report. GPa
provided the Town of Yucca Valley with three separate
schemes: community library, combination hi-desert
museum and California welcome center, and hidesert museum. With three separate programs and conceptual plans developed, it was determined
that the County library program would be the most
optimal fit. A conceptual plan of renovation of the
bank were developed to depict its library use as one of three schemes. Recently, GPa completed performing
the next stages of design services (schematic
design through construction administration) for the
Architectural and Engineering for the renovation of the former Bank Building into the County Library.
CONTRACT VALUE: $331,000
CONSTRUCTION BUDGET: $2,500,000
DATES OF SERVICE: 2020
CLIENT REFERENCE:
Shane R. Stueckle
Deputy Town Manager
760-369-1265 ext. 305
[email protected]
RFQ FOR ON-CALL PROFESSIONAL ARCHITECTURE SERVICES
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES 4. RELEVANT EXPERIENCE
17.M
EHLERS EVENT CENTER
City of Buena Park
DESCRIPTION:
The existing 30,000sf facility is composed of a campus
of Community Buildings, Senior Citizens’ Center, and
Banquet Facilities that is major community gathering
place. Built in the 1960s, the facility had a great
deal of deterioration including dry rot, and deferred
maintenance. It also had issues of security, and
homeless accessing private courtyard areas of the
facility. Many of the original Mid-century exposed wood details were in need of restoration and protection.
GPa provided an assessment of damage, conceptual
design, and cost estimate of the retrofits in a PDR.
We then provided Construction Document through
Construction Administration services.
GPa was assigned to provide a strategic design to
enhance security while also giving the facility a restoration and architectural update. Details were developed to
repair and prevent future dry rot and deterioration. We provided design schemes and renderings as a part of
an interactive process to design it with the City and the Community input and collaboration while staying on a
restrictive budget as noted on our original PDR early in the project development.
CONTRACT VALUE: $230,000
CONSTRUCTION BUDGET: $2,400,000
DATES OF SERVICE: 2018
CLIENT REFERENCE:
Jeff Townsend
Associate Engineer
(714) 562-3680
[email protected]
www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES 4. RELEVANT EXPERIENCE
17.M
Redondo Beach Council Chambers
City of Redondo Beach
CLIENT REFERENCE:
Andrew Winje
Engineering Services Division
(310) 318-0661x2431
[email protected]
DESCRIPTION:
The existing 2,900sf facility is composed of the City council chambers and attached lobby and restroom area. Built in the 1960s, the facility needed a significant amount of work to meet current ADA/accessible requirements by modifying the floor, ramps, stairs, doors, seating, and toilet rooms accessible upgrades. GPa completed the conceptual design stage. This included providing the City of Redondo Beach with a CASp Report, conceptual design, and statement of probable cost for review and approval. The next steps involve taking the established conceptual design scheme into further design development through to Construction Document through
Construction Administration services.
GPa provided a strategic design to meet ADA/accessible
requirements while also giving the facility an overall aesthetic architectural update. We provided design schemes and
renderings as a part of an interactive process to design it with the City input and collaboration while staying on a restrictive budget as noted on our original PDR early in the project development.
With the narrow site, the durability of the walls offers good resistance to the maintenance facility high volume
activities and traffic around on the very narrow site. The facility considers sustainable design features such as native plantings, recycled materials, and north-south fenestration orientation for energy efficiency.
PROJECT SIZE: 2,900sf
CONSTRUCTION BUDGET: $610,000
DATES OF SERVICE: 2019
www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES 4. RELEVANT EXPERIENCE
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
OUR UNIQUE QUALIFICATIONS
With over thirty years of experience working with municipal agencies in the architecture of corporate yards, Water District Facilities, and Fleet Maintenance, our experience covers a wide breadth of needs and perspectives of public works facilities all over the State of California providing us with a great depth of knowledge.
Moreover, our expertise provides fluent and conversant knowledge on Civic and Public Works projects in particular.
Our unique position provides us with the intuition and understanding to relate directly to our clientele and allows us to hone effectively into needed solutions. We can communicate directly with the end user on seeking effective solutions on day-to-day operations. Our direct understanding specialized storage and purchase processing can optimize function, flexibility, and reduce the building footprint resulting in great costs savings for the facility as well as optimal usability.
Our philosophy involves having Jack, the principal, work on the project day to day from project initiation up through move-in day. Because there is no interruption in communication with staff transition, we have a high success rate in completing projects within scope, on time, and on budget.
ARCHITECTURAL SERVICES PROVIDED
For over 30 years, GPA has provided architecture, planning, and interior design services internally. We can offer the following range of services based on each individual project need. • NEEDS ASSESSMENT
• The needs assessment is a fundamental step in discovering the vital issues of the buildings program, scope of work, and current and/or future needs. Completion of the assessment will effectively dictate staff/ building planning and future renovations for many years to come. We have completed needs assessments serving as a foundation to design planning and budget for municipal facilities in a vast range of types, needs, and sizes. • PROGRAMMING & DEVELOPMENT OF ARCHITECTURAL PROGRAMS
• We help the client to review and assess their existing facilities for optimization in planning. Programs may include descriptions of functions, spatial requirements, circulation and adjacencies, special equipment, and furnishings. Program criteria shall consider ADA, egress, fire life safety and other building code requirements, and shall address the flexibility needed to accommodate the issues necessary for functionality by the end users. Work may include assisting the Water Authority in preparing for and presenting information to department heads and the members of the Board of Directors in public meetings related to projects.
• SITE ANALYSIS AND FEASIBILITY STUDIES
• Our site studies regard the community, codes, zoning, ease of circulation, programmatic infrastructure, urban infrastructure and transportation, and are often aligned with maximizing function and space. Our in-depth site analysis regards the community context are often aligned with maximizing passive sustainable strategies for Urban Design and Master Planning. • SPACE PLANNING
• Stemming from our expertise and experience with office and interior planning, we would develop design schemes for workstation and office layouts needed for optimal function of the client within a given space.
• CONCEPTUAL/SCHEMATIC STUDIES
• We work closely with the client developing ideas and the program to ensure that the design from beginning to end as an expression of the client’s needs and budget while having the design enhance connectivity within the surrounding community.
• 3-D MODELING AND RENDERING SERVICES
• We render buildings and spaces to convey to our clients and the surrounding community vivid 3-dimensional characteristics of the proposed design from schematic design to design development.
5.UNDERSTANDING AND APPROACH
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES • SCHEMATIC DESIGN; NEW LAYOUT, EXISTING PLANS, RENOVATION AND RESTORATION PLANS, AND DEMOLITION PLAN.
• We work closely with the City developing ideas and the program to ensure that the design from beginning to end is an expression of the client’s needs and budget while having the design enhance function and safety of the facility while maintaining connectivity within the surrounding community. • COORDINATION OF ENGINEERING SERVICES INCLUDING ELECTRICAL, PLUMBING, AND (HVAC) PLANS • We look at architecture holistically with a seamless coordination of Mechanical, Electrical and Plumbing systems, and can work with additional disciplines as well including Structural Engineering, Landscape Architects and Civil Engineers.
• ENTITLEMENT PROCESSING
• We have experience with CEQA and California Coastal Commission procedures, as well as local city planning and plan check procedures throughout California. In every step of the way we are there to provide community outreach support and facilitate an expedient entitlement. • SITE DEVELOPMENT PLANNING
• Our experience ranges from designing master plans for complex water treatment facilities, campuses for water districts, to smaller urban infill projects and projects that involve challenging topological conditions.
• ADA COMPLIANCE REVIEW PLANNING AND RETROFITS
• Many of our projects have involved older existing buildings with often tight and complex conditions in which we resolve and retrofit for ADA compliance.
• CONSTRUCTION DOCUMENT DEVELOPMENT, SPECIFICATION WRITING • Our office provides precise construction document work, often leading to minimal change orders resulting in projects that have a high likelihood of on time and on budget. We can provide permit submittal drawings and pro-actively respond to plan check comments to ensure permit approvals in a timely manner. We can prepare construction documents sufficient to provide the level of detail necessary to communicate the project intent and constructability to obtain competitive bids through the public agency procurement process.
• COST ESTIMATING SERVICES
• We can provide the client with conceptual cost estimates based on our experience and history with working on a large range and variety of municipal project types. For in-depth cost analysis during design development, we work with an experienced team of cost estimators that can give specific construction costs to help us meet the budget during design. We can include the generation of rough order of magnitude (ROM) as well as detailed cost estimates. Cost Estimates can include evaluation of construction market conditions, the constructability of the project based upon the intent of the design documents
• CONSTRUCTION CONTRACT ADMINISTRATION
• We provide Support services during construction with support to the Water Authority in responding to Contractors’ Requests for Information (RFI), evaluation of shop drawings and material submittals, construction observation reports and review of change orders. Attendance at and participation in design review and onsite construction meetings, documentation and preparation of meeting minutes will be required where appropriate.
• INTERIOR DESIGN, INCLUDING SELECTION AND/OR DESIGN OF FURNITURE, FIXTURES AND EQUIPMENT • GPa can provide design and/or recommend selection of furniture, fixture and equipment. We have extensive experience and expertise in office planning and interior design and can provide these services. We foresee the coordination of workstations, and general equipment and furniture that correlate to interior design.
• SUSTAINABLE DESIGN AND/OR LEED DOCUMENTATION SERVICES • Our standard practice is sustainable design. Our staff is LEED accredited and are experienced with helping the project attain LEED certification when necessary.
5.UNDERSTANDING AND APPROACH
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
DESIGN QUALITY CONTROL
Regardless of whether the drawings pertain to retrofits or ground up new facilities, GPa will work very closely with the City and its stakeholders to define and understand how to meet the City’s objectives. This includes selecting the appropriate team members for the design, using resources effectively, preparing a design schedule with clear and feasible milestones and deadlines, and offering a fair and competitive design budget. GPa proposes the following design quality control approach to achieve these objectives.
Our design quality control processes include:
1) Design Criteria and Programming Validation – GPa, with significant input from the City, will develop clear parameters for what City space needs are and minimum criteria for City’s operational functionality and aesthetic preferences (e.g. space needs, departmental adjacencies, minimum square footages as needed, IT, security, sustainability, broader architecture context or civic design standards, etc). GPa will develop the criteria prior to completion of the Schematic Design documents and track and communicate changes through the design phase. GPa recommends scheduling interactive design workshops with the City early in the Conceptual Design development process to discuss design ideas and operational needs and solicit real-time feedback. Drawings, exhibits, reference designs, and renderings are used optimally and effectively to communicate ideas.
2) Design Reviews with City – GPa will prepare Design Control Documents during the design phase for the City and other relevant stakeholders to review for both conformance to the Design Criteria as well as to promote dialogue and input on the design at critical design milestones. Comments from all stakeholders will be collected in a standardized comment form and review periods will have fixed deadlines to meet the proposed schedule. At a minimum, Design Reviews will take place at Conceptual Design (CD), Schematic Design (SD), 65% Construction Documents and 95% Construction Documents design milestones. 3) Design Review Comment Resolution – GPa will compile all stakeholder comments to the Design Control Documents in a Design Management Log. The log will identify which party initiated each comment and require the same party to agree to close the comment when it has been addressed. Following completion of each Design Review period, GPa will meet with the City and other review stakeholders to page-turn through the comments and ensure that GPa clearly understands the intent of each comment or request.
Where possible, comments will be resolved in real-time during the meeting. The then-current Design Management Log will be submitted with each set of Design Control Documents to track the progress and close-out of design comments. Note that it is common for many comments from the CD and SD Design Reviews to be deferred to a future Design Review as many aspects of the design are detailed and evidenced during the construction documents phase.
4) Internal QA/QC – In between the formal review packages, GPa will perform internal reviews on the design development so as to track and/or correct variances to the Design Criteria and coordinate design output among the various design disciplines. This is accomplished by electronic file sharing, face-to-face coordination meetings, and in-house QC reviews prior to submitting each Design Control Document set.
GPa also has BIM software to effectively highlight items of needed coordination and refinement. 5) Design Deviations – There may be deviations to the Design Criteria that arise throughout the design phase, whether due to comments initiated by the City during the Design Reviews or due to internal design coordination and progression. GPa will track such deviations on the Design Management Log to flag them for review and acceptance by City, and other relevant stakeholders. It is imperative for all parties to provide timely feedback and approval to maintain the design schedule. 6) Submittal Reviews – We would perform shop drawing and other contractor submittal reviews to confirm compliance to the Design Control Documents and Design Criteria during construction.
6. QUALITY ASSURANCE
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
EXCEPTIONS
Gillis+ Panichapan Architects Inc. takes no exceptions to the City’s standard agreement.
COMPANY BACKGROUND
Our work encompasses a large range and scale of project type and project diversity. Beyond entire building and campus design from ground up, we carry expertise on renovation and retrofits of existing buildings. Our portfolio includes projects for the University of California, Irvine, the City of Long Beach, Southern California Edison (SCE) and Orange County Public Works.
Our office is full service and encompasses both Architecture and Interior Design. In each and every project, we are involved in space planning and furniture procurement. We can be involved from early stages of programming all the way to the move in coordination up to opening day. Within the project process even in early stages, we hold interactive workshops showcasing progress to help our clients obtain a clear sense of the direction development of the design at every step.
GPa’S PHILOSOPHY
We have completed a large breadth and variety of projects for Public Agencies all over California, with each one being uniquely different based on the respective needs of the client and regional context. Even though building and project types may be similar, each project is distinctly unique to our Clients. We believe the foundation for the project starts with the goals and visions of our Client.
We guide our clients into making small decisions at a “step by step” basis with number simple strategic questions that can move a project forward rather than overwhelm. Our strategy of collaboration can provide an overall sense of ownership and pride for our clients in the direction and outcome a project. The client’s involvement at every step of the process allows an open door to communication and flexibility while the direction and goals of the overall project are kept under control and the budget kept in check.
Jack Panichapan leads an architecture studio composed of an experienced team of professional architects and interior designers. Jack is directly hands-on, working one on one with the client throughout every stage of the project from the start of the needs assessment stage to move-in day.
BUDGET MANAGEMENT
Our team has worked on a comprehensive range of public works projects throughout California and is accustomed with fluctuations and impacts on costs that influence the construction of Public Works facilities, in particular.
As the project develops, our team can provide and update detailed cost estimates for the project. Knowing the cost estimates early allows us to make necessary adjustments to bring the project under budget with minor concessions. We use in house as well as professional cost estimating services to effectively control the project cost during design. More importantly, all major project decisions are evaluated in terms of cost impact on the project.
We inform our Clients of the cost impact on the project to assist with the decision-making process.
During the course of the project design, we will have scheduled opportunities to present our client with a statement of probable cost based on the current stage as a way to keep budget in check. Each stage of design will be accompanied by a general cost statement to keep the city knowledgeable every step of the way on the general cost of the noted improvements.
7.Exceptions and GPa Information
17.M
ON-CALL PROFESSIONAL ARCHITECTURAL ENGINEERING SERVICES www.gparchitects.org CITY OF HEMET- ON-CALL ARCHITECTURAL SERVICES
8. FEE SCHEDULE
We propose to furnish the services based on the hourly billing rates listed below for the services associated with this project. Often we propose an “hourly not to exceed” contract at the beginning of our process. Below is a schedule of hourly billing rates.
We tailor our scope and subsequent fee proposals to accommodate the scope of work realizing that there is latitude in both parameters to be discussed during the contract negotiation. These rates we propose will be valid for the contract duration.
CONSULTANTS
When additional consultants are needed, we will be the primary point of contact and the team leader. Our contract will include and convey all consultant fees and contracts as a subcategory of our fee and services. Consultant fees will be charged with an additional 15% management and coordination fee.
REIMBURSABLES
In our contract we often have a reimbursable allowance. This reimbursable allowance covers fees beyond general B&W printing fees on standard ledger or tabloid size paper. Government fees, delivery costs (such as United Parcel Service charges), and the costs of special sized prints/ reproductions are not included in our fee. These items are “reimbursable” items and will be shown separately on our invoice with a 10% coordination fee.
MILEAGE
GPa bases our standard mileage rates for the use of a vehicle such as a car, van SUV or pickup will be: 58 cents per mile for business miles based on State of California Employers Association 2022 Mileage Reimbursement Rates Effective January 1, 2022.
SCHEDULE OF HOURLY BILLING RATES
ARCHITECTURE
Principal……………………....……….195
Project Director………..........…………….175
Project Architect…………….........……...150
Job Captain…………..........……………105
CAD Tech……………..........……………….90
Clerical……..………..………………….65
STRUCTURAL
Principal……………………....……….225
Sr. Engineer VP………..........…………….190
Sr. Assoc. Engineer ………….........……...175
Porject Engineer...…..........………………165
Draft Person………….........………………105
MEP
Project Principal.………………....……….270
Project Manager……..........…………….225
Project Engineer....………….........……...180
Engineer……................…..……………150
Designer....………….........………………140
CAD Technician...............…..……………135
Clerical....………….........………………95
LANDSCAPE ARCHITECTURE
Managing Principal.……………...……….170
Principal in Charge…….......…………….140
Project Manager……..........…………….120
Job Captain..……...........…..……………110
Draft Person......................…..……………75
17.M
17.M
City of Hemet
Purchasing Department
SUBJECT: City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Dear City of Hemet Selection Committee:
On behalf of General Technologies and Solutions (GTS), I am pleased to submit our proposal for the City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services.
GTS provides traffic engineering, transportation planning, parking, and technology solutions for public agencies and institutions across Southern California. GTS has supported various projects in Riverside County ranging from traffic engineering designs to studies. We are familiar with the local transportation issues, guidelines, and standards. Our team-members have worked with several cities either directly as staff members or on an on-call basis, and as such we understand the importance of responsiveness while ensuring top-quality deliverables.
For this on-call, we have hand-picked a team of seasoned professionals who bring comprehensive systems engineering and multi-modal transportation planning services to support the City of Hemet for the duration of the project on the potential projects and tasks underlined in the RFP.
I will be your project manager and main point of contact for this project and will manage and coordinate the activities of our proposed team. I have served in similar capacities for various cities most recently for the City of Rancho Palos Verdes, City of Hermosa Beach, City of Commerce, City of Glendora, City of Buena Park, and City of Irvine, among several others. I have managed various projects in Riverside County from Hemet to Moreno Valley, Perris, Lake Elsinore, Coachella, and Cathedral City. I will be supported by the GTS team which includes Chaouki A. Hosn, a seasoned professional and licensed electrical engineer with over 30 years of experience, on street lighting and EV charging infrastructure services.
Our other team members were meticulously selected to ensure responsiveness on every task order. We have added Rock Miller, who brings over 35 years of transportation planning, design, and operations experience. He is a national expert in traffic design and safety who is a voting member of the National Committee on Uniform Traffic Control Devices. Rock has prepared many transportation engineering and planning projects and completed controversial and complex transportation studies, including neighborhood traffic calming projects, complete streets, pedestrian and bicycle studies, and projects with intense public opposition. Rock and GTS are working together on numerous projects.
We have also included Patrick Armijo on our team to provide signal systems engineering expertise building on his many years of experience working with state and local governments. Patrick, who has supported multiple GTS projects, is a professional engineer with 30 years of experience exclusively in traffic signal systems operations, and signal timings.
Our team’s combined experience allows us to work seamlessly as an extension of your staff covering all elements of the identified transportation planning and traffic engineering service areas. The table on the following page summarizes our recent experience pertaining to the various services highlighted in the RFP.
GTS is a registered and licensed Limited Liability Company (S Corporation) in California. If you have any questions regarding our submittal, please feel free to contact me at any time. We appreciate your consideration of the GTS team and look forward to working with the City of Hemet.
Sincerely,
Rawad Hani, PE, TE
1100 Quail Street, Suite 202, Newport Beach, CA 92660
t. 949 988 0832 | [email protected] Page 983 of 1362
17.M
City of Hemet Transportation and Traffic
Engineering Tasks Our Experience in A Nutshell
Engineering and traffic surveys to establish
prima facie speed limits throughout the City
according to the most current California
Vehicle Code and California Manual on
Uniform Traffic Control Devices
GTS has a strong understanding of E&TS. Our recent
experience includes the E&TS study for the City of Colton.
We recognize the importance of following the most current California Vehicle Code and California Manual on Uniform Traffic Control Devices.
Signal and stop warrants analysis for possible
signal or stop sign installations
GTS has carried out warrant analysis for many projects
including the City of Colton, City of Palmdale, City of Glendora, and others.
General traffic engineering associated with
the planning, design, studies and evaluation
of traffic engineering projects
GTS has extensive experience in traffic engineering from planning to design, studies, and evaluation. Our on-call traffic engineering experience includes the City of Rancho Palos Verdes, City of Hermosa Beach, City of Commerce, City of Glendora, City of Buena Park, City of Irvine among others.
General traffic engineering plan checking
services which may include but are not limited
to review of traffic impact analysis reports,
related environmental impact reports, and the
preparation of traffic mitigation conditions
GTS has provided traffic engineering plan checking services for several projects. We have a strong understanding
of CEQA and have prepared traffic studies across all of Southern California. GTS has utilized the Riverside County Model (RIVCOM) on various projects and can support the
City as needed.
Review of general traffic engineering
design, striping plans, signal plans, and
traffic control plans, along with the technical
specifications for striping and traffic signal
plans in accordance with the design policies
and standard plans of the City of Hemet
Departments of Public Works/Engineering
GTS is experienced in traffic engineering design for a wide range of projects. We have supported various clients with striping plans most recently in Riverside County (Perris influence Area), Lake Elsinore, and Cathedral City and we understand the local requirements. GTS has carried out
numerous signal plans, most recently the signal modification of Grand and Bennett in the City of Glendora and a new
signal in the City of La Habra Heights among several others.
Additionally, we often work on traffic control plans.
The firm shall also provide customer
support and mediation to citizen comments
and concerns as it relates to traffic and
transportation within the City of Hemet
GTS has provided customer support to citizen comments
and concerns related to traffic and transportation for many projects most recently for the City of Rancho Palos Verdes Transportation and Traffic Engineering On-Call. We typically support the City in working directly with residents, as well as Commission and Council meetings.
Our Experience in A Nutshell
17.M
TABLE OF
CONTENTS
2 5
8 15
21 26
27 Cover Letter
Firm Profile and Background
Resumes of Team
Relevant Experience
Understanding and Approach
Quality Assurance
Cost Approach
17.M
5 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Firm Profile and Background
Firm Profile
General Technologies and Solutions (GTS)
www.gentecsol.com
GTS provides mobility solutions for all road uses: pedestrian, bicycle, transit, auto, and freight modes. We employ state-of-the-art technologies to provide innovation in:
GTS was established in 2017 in Los Angeles, CA with the goal of helping public agencies leverage advanced technology in transportation. We believe in the power of technology to effect meaningful change in our local neighborhoods and communities. Smart cities are the future, offering unlimited opportunities for smart government technology. GTS brings together our understanding of smart technology solutions (what’s on the horizon) with community needs and goals (what’s in demand).
At GTS results matter as much as the way getting there. We support our clients throughout the whole project lifecycle, including communicating mobility initiatives, technology goals, and strategies to stakeholders at all levels.
GTS currently works across Southern California from Los Angeles County to Los Angeles Metro (leading the Strategy development for the Regional Integration for Intelligent Transportation Systems - RIITS and the Local All-Hazard Mitigation Plan) to Caltrans, LADOT, Coachella Valley Association of Governments (CVAG), Riverside County and the cities of Perris, Lake Elsinore, Moreno Valley, Cathedral City, Coachella, San Bernardino, Buena Park, Irvine, Santa Monica, Hermosa Beach, Glendale, and Burbank among others on transportation engineering design and planning tasks ranging from grant applications to smart city solutions, revitalization plans, systems engineering, safety studies, traffic calming, signing and striping, traffic signal design and modification, and data analytics among others.
GTS has served in similar capacities for various cities most recently for the City of Rancho Palos Verdes (supporting on traffic calming, school access, intersection analysis, plan review among others), the City of Hermosa Beach (providing traffic engineering designs and studies), and California State University Dominguez Hills (supporting on campus-wide traffic analysis and parking). Our project manager for this on-call has also served many cities on an on-call basis; Rawad worked with the City of Commerce (delivering on traffic analysis and preparing HSIP and ATP grant applications), City of Glendora (carrying out signal warrant analysis), City of Buena Park (peer reviewing signal synchronization plans), City of Irvine (assisting with adaptive signal control and probe data analysis), and City of West Hollywood (carrying out parking studies) among several others.
Traffic Engineering
Systems Engineering
Multi-modal Planning
Parking
17.M
6 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Staffing
The following is a brief introduction to the key personnel:
Rawad Hani, PE, TE, PTP, PTOE | Role: Project Manager
Rawad is a licensed civil and traffic engineer with over 20 years of experience in traffic engineering and transportation planning. Rawad carried out various projects similar in scope to the project under consideration and understands the importance of communications and timely follow through the success of on-call projects. He will be the main point of contact for this project and will manage day-to-day activities of the project team.
Chaouki A. Hosn, EE | Role: Electrical Engineer
Chaouki is a registered electrical engineer with over 34 years of experience working with the private and public sectors, specializing in high and low voltage design for infrastructure projects. Chaouki will lead on any EV charging and street lighting tasks as needed.
Mehrdad Moshksar, TE | Role: Senior Traffic Engineer
Mehrdad is a registered traffic engineer with over 35 years of experience working in the public sector.
He served with Los Angeles Department of Transportation in conducting and reviewing traffic engineering studies, reviewing traffic engineering designs, and working with City government and neighborhoods to advance mobility and safety.
Rock Miller, PE, TE, PTOE | Role: ATP, Safety & Outreach Rock is a registered civil and traffic engineer with more than 40 years of transportation planning, design, and operations experience. Rock will build on his expertise in active transportation planning with similar projects to advise on the pedestrian, bicycle and safety planning and design aspects and will support in reviewing final plans and public engagement/outreach.
Patrick Armijo, PE, PEng | Role: Signal Operations
Patrick is a professional engineer with 30 years of experience exclusively in traffic signal systems, operations, and signal timings. Patrick will provide signal systems engineering expertise building on his many years of experience working with state and local government.
Kamal Bhayal | Role: Traffic Engineer
Kamal brings over 12 years of experience specializing in transportation planning and municipal traffic engineering projects. He will support the engineering design as well as traffic analysis as part of this project.
Rudy Garcia, EIT | Role: Traffic Analysis
Rudy is an experienced Transportation Engineer with more than 10 years of experience in the design and studies of transportation systems, specializing in traffic impact studies, parking, and feasibility studies. Rudy will support on traffic analysis tasks.
Cassandra Garcia, EIT | Role: Design Engineer
Cassandra will provide traffic engineering and design services ranging from signal designs to signing and striping, traffic control plans, and street lighting.
An organization chart and one-page resume of each of our key team members are included in the following pages.
17.M
7 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Organization Chart
*Licenses: Rawad Hani: 83730 (Civil Engineer - CA); 2817 (Traffic Engineer - CA); PTP; PTOE; RSP1 | Rock Miller: 29493 (Civil Engineer - CA); 1139 (Traffic Engineer - CA); PTOE | Patrick Armijo: 44201 (Civil Engineer - WA) | Chaouki A. Hosn: 14083 (Electrical Engineer - CA) | Mehrdad Moshksar: 2106 (Traffic Engineer - CA) Hemet
17.M
RAWAD HANI PE, TE, PTP, PTOE
PROJECT MANAGER
EDUCATION
PROFILE
REGISTRATIONS
AREAS OF EXPERTISE
AREAS OF EXPERTISE
• BE Civil Engineering,
American University
• MS Civil Engineering,
American University
Rawad is a traffic engineer and transportation planner with over 20 years of experience. He specializes in traffic engineering, parking analysis, demand modeling, and technology applications. Rawad has managed engineering design projects in the US and internationally where he advised public, private, and institutional clients. His recent experience includes assisting local governments across Southern California with transportation plans, traffic studies, parking management strategies, and signal and street lighting designs. His on-call project experience includes the cities of Hermosa Beach, Irvine, Buena Park, Commerce, Santa Monica, and Glendora among others. Rawad understands the importance of striking the right balance between engineering (mobility and safety) and planning (livability and sustainability) considerations. He has worked on contextsensitive design projects and has helped planning and transportation agencies achieve effective solutions.
• City of Lake Elsinore, Traffic Signal Modification Design Central Ave (SR 74) and Ardenwood Way
• Seaton Avenue and Perry Street Riverside County Signing and Striping, Riverside County
• Date Palm and Victoria Street Conceptual Design, Cathedral City, CA • City of Rancho Palos Verdes Transportation and Traffic Engineering OnCall, Rancho Palos Verdes, CA • Hermosa Beach On-Call Traffic Control Plans and Striping, City of Hermosa Beach On-Call
• City of Commerce MixMaster Analysis and Alternatives Design, City of Commerce On-Call
• Foothill Blvd and Oak Tree Dr Warrant Analysis, City of Glendora On-Call • Artesia Blvd and Knott Ave Signal Synchronization Review, City of Buena Park On-Call
• Cty of La Habra Heights Traffic Calming Analysis
• City of Norwalk Rosecrans Ave and San Antonio Dr Traffic Control Plans • City of Commerce ATP and HSIP Grant Applications, Commerce, CA • 20th Street Pedestrian and Bicycle Connection (ATP), City of Santa Monica/Caltrans
• San Bernardino Traffic Signal Upgrade PS&E Services (HSIP), San Bernardino, CA
• Carson Dominguez Channel and Figueroa St/Victoria St Intersection (HSIP), Carson, CA
• La Habra Heights HSIP Grant Applications, La Habra, CA • Buena Park HSIP Grant Application, Buena Park, CA
• Various LRSP Grant Applications, South Pasadena, CA; Buena Park, CA; Hidden Hills, CA
• Notre Dame High School Parking and Traffic Analysis, Los Angeles, CA • CSU Dominguez Hills Parking Needs Assessment and Traffic Analysis, Carson, CA
• Old Pasadena Commercial Vehicle Loading, Pasadena, CA • West Hollywood Parking Studies, City of West Hollywood Parking On-Call • Civil Engineer in CA,
WA, and FL
• Traffic Engineer in CA
• PTOE - Professional
Traffic Operations Engineer
• PTP - Professional
Transportation Planner
• RSP1 - Road Safety
Professional 1
• Traffic Engineering
• Parking Analysis
• Transportation Planning
• Transportation Technology
Applications
17.M
CHAOUKI A. HOSNEE
ELECTRICAL ENGINEER
EDUCATION
PROFILE
EXPERIENCE
REGISTRATIONS
AREAS OF EXPERTISE
• BS Electrical Engineering,
University of Washington,
(Seattle, WA)
Chaouki is a California registered Electrical Engineer, specializing in high and low voltage design for infrastructure projects. His experience includes street lighting design, lighting photometric, communication infrastructure, dry utility services as well as the electrical design for parking lots lighting design. He has designed several electric vehicle charging stations as well as electrical infrastructure designs for commercial, industrial facilities, and residential facilities. Chaouki has over 34 years of experience working with the private and public sectors mostly with the City of Los Angeles Harbor Department and as such he understands first hand the demands placed on the local agency staff. He works collaboratively with utility owners and local agencies to ensure on-going communications and timely delivery of projects.
Chaouki has over 34 years of experience working with the private and public sectors mostly with the City of Los Angeles Harbor Department and as such he understands first-hand the demands placed on the local agency staff. He works collaboratively with utility owners and local agencies to ensure ongoing communications and timely delivery of projects. • Emergency Shelter Parking Lot, Pomona, CA – Design Manager: Light poles layout, conduit and wires, communication, lighting photometric, load calculations, specifications, and cost estimate.
• Santa Monica 20th Street Connection, Santa Monica, CA – Electrical Design Manager: Laying out pedestrian and bicycle lighting along with complete infrastructure design, new SCE services, specifications and cost estimate. Project is in Caltrans right of way and involved working closely with Caltrans.
• Palm Ave Street Lighting Design, Upland, CA – Design Manager: street lighting improvement along Palm Ave between West 9th Street and Alpine Street in compliance with ANSI/IES RFP-8-14 roadway lighting, which includes street light poles layout, conduit and wires, communication, lighting photometric, load calculations, specifications, and cost estimate. • Melrose Complete Street Design, West Hollywood, CA – Design Manager:
(12) EV charging level II stations along streets, which includes power and communication infrastructures, new SCE services and charge point platform for billing. Advising on smart pole designs.
• Lincoln and Arlington Street Lighting and Undergrounding, Torrance, CA – Design Manager: utility pole relocations, undergrounding, new SCE services, load calculations.
• Navy Way Street Lighting, Port of Los Angeles – Design Engineer: lighting and undergrounding design for the 3-mile roadway that included photometric, utility coordination, light poles layout, load calculations, specifications, and cost estimate. LED was later installed.
• Various Dry utility services, SCE rule 20B, parking lot lighting, and complete electrical infrastructure for various development projects across Southern California (Pasadena, Colton, Carlsbad, San Clemente,
Dana Point, Newport Beach, San Diego, Long Beach among others. • Electrical Engineer in CA
• Street Lighting
• Power and Lighting
Layout Design
• EV Charging Stations
Lighting Photometric
• Dry Utility Services
• Design Management
17.M
MEHRDAD MOSHKSARTE
SENIOR TRAFFIC ENGINEER
EDUCATION
PROFILE
REGISTRATIONS
• BBS Civil Engineering,
California State University
Los Angeles
Mehrdad is a registered traffic engineer with over 35 years of experience working in the public sector. He served with Los Angeles Department of Transportation in conducting and reviewing traffic engineering studies, reviewing traffic engineering designs, and working with City government and neighborhoods to advance mobility and safety. He will be assigned to the City for two days per week as needed.
• Registered Professional
Traffic Engineer (TE)
• Institute of Transportation
Engineers (ITE) Member
EXPERIENCE
Transportation Engineer
General Technologies and Solutions (GTS)
• City of Rancho Palos Verdes Transportation and Traffic Engineering On-Call Services
Los Angeles Department of Transportation (LADOT)
• Reviewed and assigned requests received from the Council Offices, other City Departments, other jurisdictions, and general public related to installation or maintenance of various traffic control devices.
• Reviewed and conducted traffic engineering studies for various traffic controls, such as traffic signals, left-turn signals, flashing beacons, stop signs, crosswalks, regulatory and guide signs, parking restrictions, curb zones and pavement markings.
• Prepared traffic control reports for the authorization of new traffic controls such as traffic signals, left-turn signals, flashing beacons, stop signs, crosswalks, regulatory signs, curb zones and parking restrictions.
• Reviewed traffic studies prepared by traffic consultants for new development projects.
• Reviewed site plans, new driveway locations, and identifying the appropriate trip rates and traffic mitigation measures for new development projects. • Reviewed signal design plans, geometric design plans, haul routes and worksite traffic control plans.
• Chaired various traffic committees in the vicinity of Downtown Los Angeles, East Los Angeles, West Los Angeles and South Central Los Angeles. • Represented LADOT at meetings with City Councils, Neighborhood Councils, Planning Commissioners, Community Councils, Business Improvement Districts, Homeowners Associations, other City Departments, and other jurisdiction agencies.
• Supervised the construction of various new ATSAC projects by private contractors and provided technical support to finalize the projects • Performed investigations for in-coming requests received from the Council Offices, residences, businesses and private citizens for various traffic related matters.
• Prepared and reviewed ATSAC signal design, Interconnect and Fiber Optic plans for new and existing ATSAC System.
• Prepared and reviewed ATSAC Interconnect & Fiber Optic Plans. • Performed cost estimates for new ATSAC System Projects. • Conducted field investigations and analyzing data to identify appropriate traffic control devices.
• Attended field meetings with Council Field Deputies and their constituents, and private citizens to discuss traffic related concerns. • Prepared response memos and letters after finalizing the DOT investigation of requests.
• Prepared work orders to install traffic control signs, pavement markings and curb zones.
17.M
ROCK E. MILLERPE, TE
ATP, SAFETY & OUTREACH
EDUCATION
PROFILE
EXPERIENCE
REGISTRATIONS
MEMBERSHIPS
• MS Civil Engineering,
UC Davis
• BS Civil Engineering,
UC Davis
Rock is a registered Civil Engineer and Traffic Engineer in the State of California with more than 35 years of transportation planning, design, and operations experience. He is an expert in the latest capabilities and requirements available and expected from cities and municipal governments.
For more than 25 years, Rock has been a consultant at the senior or principal level in the field of traffic engineering, traffic safety, and circulation design. He also has 10 years of public agency experience serving as City Traffic Engineer for Costa Mesa and staff traffic engineer with the County of Orange.
Rock has completed a wide variety of unique transportation projects,including traffic signals, signing and striping, street lighting, work site traffic control, traffic impact analysis, and the design of street and highway improvements.
He has also prepared many transportation policy plans and completed controversial and complex transportation studies, including neighborhood traffic calming projects, complete streets, pedestrian and bicycle studies, projects anticipating litigation by another public agency, and projects with intense public opposition. Rock is a national expert in the traffic design and safety for walking and urban bicycling infrastructure. He has frequently been an invited speaker to regional and national conferences and committees on many topics, including pedestrian circulation, innovative bikeway design, traffic calming, and transportation policy. Rock served as International President of the 15,000 member Institute of Transportation Engineers (ITE) in 2012. He is a Professional Engineer (Civil) and Professional Engineer (Traffic) in the State of California and a Certified Professional Traffic Operations Engineer by the Institute of Transportation Engineers.
Rock has extensive experience in leading neighborhood traffic management plans. He has led such studies for over ten communities.His role is key as the leader of public outreach efforts for this type of studies, taking advantage of his effective presentation style in public workshops and events. Some of the larger studies of this type are highlighted below and a more extensive resume can be provided upon request:
• Newport Heights Neighborhood Traffic Management Plan, Newport Beach, California (Project Manager)
• Los Alamitos Neighborhood Traffic Plan, Los Alamitos CA (Project Manager)
• Town of Piru Traffic Management Plan, Ventura County, CA (Project Manager)
• Fillmore River Street Traffic Circles, Fillmore, California (Traffic Engineer and Designer)
• Berkeley Street Traffic Calming Project, Santa Monica, CA (Project Director)
• Vista Avenue Bicycle Boulevard, Long Beach, California (Project Manager) • Civil Engineer in CA and HI
• Traffic Engineer in CA
• PTOE - Professional
Traffic Operations Engineer
• Voting Member, National
Committee on Uniform
Traffic Control Devices
• International President,
2012, Institute of
Transportation Engineers
• Member, Association of
Pedestrian and Bicycle
Professionals
• Member, American Society
of Civil Engineers
• Past Section and District
President, Institute of
Transportation Engineers
• Fellow, Institute of
Transportation Engineers
17.M
PATRICK ARMIJOPE, PEng
SIGNAL OPERATIONS EXPERT
EDUCATION
PROFILE
EXPERIENCE
REGISTRATIONS
AFFILIATIONS
Patrick Armijo is a Professional Engineer with about 30 years of experience in the public and private sectors. His experience includes: municipal infrastructure management; supervising traffic signal and railroad signal operations engineering staff and signal maintenance crews; traffic signal timing; traffic signal design; traffic signal construction; ITS operations; TMC operations and design; highway design; bridge and roadway construction; railway crossing signal operations; community lighting; capital Improvement program budgeting; and writing requests for proposals.
• Light Rail Signals Supervisor at Santa Clara Valley Transportation Authority: Plan, schedule, and supervise inspections, maintenance, and repair of signaling, crossing equipment, and rail safety systems. Conduct safety training and monitor crew performance to ensure safe work practices, procedures and compliance with FRA and CPUC regulations.Evaluate traffic signal RR preemption and crossing safety. Advise VTA on intelligent transportation systems and transit system priority.
• Technical Director, Intelligent Transportation Systems at Western Pacific Signal, San Leandro, California: Advanced Traffic Management System client liaison, advanced technical support, training, and proposal director. Projects included adaptive traffic signal operations, transit signal priority, connected vehicle research, railroad crossing signal preemption, and traffic management center design.
• Project Manager at ADVANTEC Consulting Engineers, Irvine, California:
Traffic signal timing, traffic signal synchronization and railroad preemption signal timing: Orange County (OCTA), San Bernardino Association of Governments (SANBAG), Metropolitan Transportation Commission (MTC), Caltrans and City of Glendale.
• Traffic Signals/Railroad Signals Manager at City of Lethbridge, Alberta, Canada: Managed and supervised the traffic signal department for the City of Lethbridge. The staff included a traffic signal operations engineer, five traffic signal/railroad signal electricians. Served as Project Manager on new traffic signal designs and construction projects. Managed traffic signal synchronization projects. Supervised and approved upgrades to traffic signal infrastructure such as signal interconnect, cabinets, controllers, vehicle detection systems, emergency vehicle preemption systems, speed enforcement/red light running camera systems, and Battery Back Up units. • Traffic Signals Operations Engineer at Washington State Department of Transportation: Managed traffic signal operations for over 250 state, county, and municipal traffic signals for 18 years. Developed traffic signal timing and signal coordination plans. Conducted traffic accident analysis and recommended safety mitigation measures. Experience with transit system priority programming and traffic signal railroad preemption timing development.
• Professional Engineer in
WA and Alberta, Canada
• BS Civil Engineering,
California State University,
Sacramento
• Institute of Transportation
Engineers
• International Municipal
Signals Association
17.M
KAMAL BHAYAL MS, MBA
TRAFFIC ENGINEER
EXPERIENCE
Kamal has over 12 years of experience specializing in transportation planning and municipal traffic engineeringprojects. He has been the project engineer for projects in the Cities of Signal Hill, Downey, Seal Beach, Stanton, Norwalk, LongBeach, Cypress, andSan Diego. He has participated in a variety of traffic related research, analyzed traffic signal timing projects and conducted various traffic impact reports utilizing software such as SYCNHRO, HCS, CORSIM, and VISSIM. His project experience includes corridor traffic signal synchronization, traffic management, timing plans, traffic studies, concept alternatives, bikeway projects, intersection improvements, roadway widening, highway ramp improvements, traffic signal design, and AHRP projects.
• On-Call Traffic Engineering Services
Worked on PS&E preparation for street and intersection improvement projects, plan checking, prepared and reviewed various traffic studies including traffic signal warrants, safety analysis, traffic impact study, neighborhood traffic calming studies, and traffic management plans for the City of Signal Hill, City of Downey,City of Norwalk, and City of Stanton.
• Traffic Design
Prepared and reviewed various traffic signal design, interconnect design, signing and striping, and traffic control plans.
• Civil Design
Worked on street widening, drainage design and site grading projects.
CASSANDRA GARCIA EIT
TRAFFIC DESIGN
EXPERIENCE
Cassandra provides traffic engineering and design services ranging from signal designs to signing and striping, traffic control plans, and street lighting. Her recent experience includes the collection of data and creation of design plans for resurfacing projects, bike path projects, and traffic signal upgrade projects.Cassandra strives to improve communities through implementation of safe and effective methods of transportation. • San Bernardino Traffic Signal Upgrades, San Bernardino, CA Created plans for the relocation, replacement and/or upgrade of traffic signal equipment including vehicle heads, pedestrian heads, and pedestrian push buttons for multiple intersections in the San Bernardino region • Traffic Signal Design of Figueroa St and Victoria St / 190th St, Carson, CA Performed a field visit and prepared plans for the installation of poles, curbs, video detection cameras and other traffic signal equipment at an intersection within the City of Carson. • Dominguez Channel Bicycle Design, Carson, CA
Performed a field visit along multiple corridors for the purpose of implementing bike routes and bike lanes to join disconnected portions of the Dominguez Channel Bike Path. Created signing and striping plans for all connecting sections along the channel and paved street roads. • Burbank Resurfacing Program - Signing & Striping Restoration and Loop Replacement Plans, Burbank, CA Worked on creating signing and striping plans as well as loop replacement plans for multiple corridors pending resurfacing within the City of Burbank.
• Eastman Ave/Medford Project, Los Angeles, CA
Performed a field visit and provided notes for two signalized intersections in the City of Los Angeles. Page 994 of 1362
17.M
RUDY GARCIA EIT
TRAFFIC ANALYSIS
EXPERIENCE
Rudy is an experienced Transportation Engineer with over 10 years of experience in the design and studies of transportation systems. His experience includes traffic impact studies, parking, and feasibility studies. He has also prepared various traffic signal design plans, traffic handling and detour plans, conceptual drawings for mitigation and circulation studies. Rudy has working experience with various local and state design and studies guidelines and he worked with the latest versions of AutoCAD, Synchro, and HCS, software. • Glendale Community College District Transportation Impact Analysis, Glendale, CA • California State University Dominguez Hills Parking Needs Assessment, Carson, CA • San Bernardino Traffic Signal Upgrades, San Bernardino, CA • Notre Dame High School Traffic Impact Study, Los Angeles, CA • Buena Park On-Call signal timing peer review of documents for the Artesia Blvd corridor. • Garden Grove Unified School District conceptual signing and striping • City of Commerce: provided support for the HSIP and ATP grant applications. • Pasadena Commercial Vehicle Loading Zone Analysis, Pasadena,CA • Alternatives Parking Assessment and Evaluation for California State University, Fullerton • TRAFFIX Model Update Integrated with Microsoft Access Database, Beverly Hills, CA • Mobility Plan GIS Data Creation, Santa Ana, CA
• Foothill Blvd Master Plan, Claremont, CA
• Various Traffic Impact Studies for mixed use and industrial developments in Orange County
17.M
15 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Relevant Experience
French Valley Marketplace Transportation Assessment, Riverside County (2019) GTS supported the proposed project located at northeast corner of Highway 79/Winchester Road and Thompson Road in the French Valley area of Riverside County. The proposed project includes a commercial development with grocery, pharmacy, retail, fitness center, gas station, and fast-food restaurants totaling approximately 133,000 square feet. The project would be developed in two phases.
The analysis identified several intersections that will not meet the County standards (analysis was prior to July 2020 and as such VMT analysis was optional and LOS analysis was used for determining the significant impacts under CEQA). To mitigate project-related impacts along Highway 79, the project would pay the required Transportation Uniform Mitigation Fee (TUMF). Other local intersection improvements will also be constructed along with mitigation measures to help reduce the overall vehicle trips generated by the proposal including pedestrian walkways, crossings and sidewalks, short- and long-term bicycle parking on-site such as lockers, and encouraging tenants to have a transportation demand management plan for employees, which could include incentives for carpooling or vanpooling or use of alternative modes, flexible work hours, telecommuting etc.
Client: Halferty Development Company, LLC
Reference Information: Cassie Yee | Director of Project Management | [email protected] | 626.405.0956 x1117 City of Rancho Palos Verdes Transportation and Traffic Engineering On-Call (Ongoing) GTS is providing transportation and traffic engineering on-call services to the City of Rancho Palos Verdes. GTS is providing transportation and traffic engineering on-call services to the City of Rancho Palos Verdes. Our services range from studies to designs to responding to citizen requests.
We often assist the City with stop-warrant analysis, speed surveys, signage and pavement marking designs among several other tasks. GTS worked with the City on the traffic signal design review at the intersection of Palos Verdes Drive E & Palos Verdes Drive S. The scope includes presenting recommendations to enhance the aesthetics at said location by presenting features that better blend with the surroundings.
GTS also assisted with the traffic engineering and circulation analysis for several schools in Rancho Palos Verdes (Silver Spur Elementary, Soleado Elementary, Ridgecrest Intermediate, and Vista Grande Elementary).
Our scope of work included working jointly with the City and the schools to confirm the current challenges through site observations of the drop-off and pick-up areas and surrounding streets, analysis of the prevailing conditions and providing recommendations for improvement, and documentation of findings. The results of the analysis will be consolidated in single circulation plan/flyer that can be distributed to families and staff.
Contracting Agency: City of Rancho Palos Verdes
Reference Information: Ramzi Awwad | Public Works Director | [email protected] | 310.544.5275 City of Lake Elsinore, Traffic Signal Modification Design Central Ave (SR 74) and Ardenwood Way (2022) GTS is providing traffic engineering signal upgrade services for the signalized intersection of Central Ave (SR 74) and Ardenwood Way in the City of Lake Elsinore. GTS is carrying out various safety, operational, and accessibility upgrades as part of this design. This project will accommodate the SR74 road widening from 4 to 6 lanes, provide safety improvements for road users and pedestrians, and design ADA-compliant curb ramps.
The design services include coordination with the City and the County (which has shared jurisdiction at the intersection).
Client: Karaki WS
Reference Information: Florentino Mendoza | Project Manager | [email protected] | 714.695.9300 City of Hermosa Beach Transportation Planning and Traffic Engineering On-Call (Ongoing) GTS is providing transportation planning and traffic engineering on-call services to the City of Hermosa Beach.
17.M
16 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services We assisted the City in its COVID-19 relief efforts to support small businesses by providing traffic engineering design services.
GTS produced plans, specifications and estimates (PS&E) for road re-purposing and installing Class II bicycle facilities in the downtown area (Hermosa Ave and Pier Ave) to provide space for walking, biking, and outdoor dining while ensuring social distancing. At the time of this proposal we have provided the design of over seventeen parklets and carried out the traffic engineering feasibility study of closing a right turn slip lane.
Contracting Agency: City of Hermosa Beach
Reference Information: Douglas Krauss | Project Manager | [email protected] | 310.750.3603 Seaton Avenue and Perry Street Riverside County Signing and Striping, Riverside County (Ongoing) GTS is providing traffic engineering design services along Seaton Avenue in Riverside County. GTS is carrying out various safety and operational upgrades as part of this design. This project will accommodate the Seaton road widening from 2 to 4 lanes and provide safety improvements for road users and pedestrians.
The design services include working with the County.
Client: NLF DP Seaton, LLC
Reference Information: Ben Horning | Director of Development | [email protected] Warrant Analysis – City of Hawthorne On-Call (2022)
GTS supported the City of Hawthorne (as part of the on-call) in carrying out traffic signal warrants studies at three intersections of Freeman Ave & 118th St, 126th St & Birch Ave, and Kornblum Ave & 120th St. The purpose of the analysis was to determine whether a traffic signal should be installed at the currently stop-controlled intersections based on the analysis of the traffic signal warrants contained in the California Manual of Uniform Traffic Control Devices (CA MUTCD). GTS carried site visits, data collection, warrant analysis, and technical documentation.
Contracting Agency: City of Hawthorne
Reference Information: Alan Leung | Director of Public Works | [email protected] | 310.349.2980 Nature’s Medicines Traffic Impact Analysis, Moreno Valley, CA (2019) The purpose of this Traffic Impact Analysis (TIA) is to identify potential traffic-related impacts associated with Nature’s Medicines development located in the City of Moreno Valley. The project proposes two phases with the first phase consisting of a 4,275 sq. ft. dispensary and the second phase consisting of a 5,625 sq. ft. medical office.
This TIA has been prepared consistent with the City’s Traffic Impact Analysis Preparation Guide to evaluate the traffic and circulation impacts of the proposed project. GTS documented the existing traffic conditions and future traffic conditions corresponding to Phase 1 and Phase 2 With and Without project conditions Project conditions and determined the additional circulation system features and system management actions needed to achieve GTS have been an absolute pleasure to work with. They have been extremely responsive, especially during the difficult period of the pandemic. They are a very knowledgeable and capable consulting firm and have proven to be very effective. They came through during a difficult time to assist our city with a very challenging project and has continued to be a tremendous resource and partner in this and other projects. - Douglas Krauss, Project Manager (City of Hermosa Beach)
17.M
17 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services the City’s levels of service requirements with implementation of the proposed project.
Client: Taro LLC
Reference Information: Rajan Patel | Project Manager | [email protected] IC Energy Source Mineral Traffic Impact Study, Imperial County (2021) GTS conducted a peer review of the Traffic Impact Study (TIS) of the project to ensure that the technical report is adequate for supporting the analysis, findings, and conclusions of the Traffic/Transportation section of the environmental document. The TIS was evaluated in accordance with the Imperial County guidelines, as well as industry standards set forth by ITE, AASHTO, Caltrans and other applicable standards.
Client: Chambers Group
Reference Information: Victoria Boyd | Project Manager | [email protected] | 949.261.5414 x7220 City of Moorpark Environmental On-Call, Traffic Impact Studies Peer Review (2020) GTS conducted a peer review of the Traffic Impact Study (TIS) of the project to ensure that the technical report is adequate for supporting the analysis, findings, and conclusions of the Traffic/Transportation section of the environmental document. The TIS was evaluated in accordance with the Imperial County guidelines, as well as industry standards set forth by ITE, AASHTO, Caltrans and other applicable standards.
Client: Chambers Group
Reference Information: Meghan Gibson | Project Manager | [email protected] | 213.623.1859 Date Palm and Victoria Street Conceptual Design, Cathedral City, CA (2021) As part of the conditions of approval for a new gas station at the southeast corner of the Date Palm Drive and Victoria Drive intersection, GTS provided conceptual design support services for the project team. GTS reviewed the proposed site plans, previous traffic impact study report, as-builts, the City’s approval conditions, and other relevant documents. A turning templates (Auto-Turn) analysis of a fuel truck accessing the site was also developed. Based on the initial findings, two concepts were proposed for the project frontage area that included a signal modification and widening of the Victoria Dr. The conceptual plans and costs for the two options were developed and presented along with the pros and cons of each concept.
Client: The Altum Group
Reference Information: Rich Malacoff | Project Manager | [email protected] | 760.346.4750 CVAG ITS Master Plan Peer Review Services (2020)
GTS assisted with a third party review of the CVAG ITS Plan with a focus on the centralized Traffic Management Center, roadway management strategies, and emerging mobility technologies and trends. Our review, which included the concept of operations as well as the systems engineering plan provided valuable feedback on integrating 5G as an enabler of Smart City applications and elaborating on the role of public-private-partnerships as it relates to emerging technologies and trends.
Client: Fehr & Peers
Reference Information: Josh Peterman | Project Manager | [email protected] | 925.357.3368 Encanto Residential Development VMT and Traffic Impact Analysis, City of Coachella (2022) The purpose of this Traffic Impact Analysis (TIA) is to identify potential traffic-related impacts associated with the Encanto Residential development located in the City of Coachella. The project proposes the construction of 119 residential lots including a community park on a 20-acre vacant site.
This TIA is prepared consistent with the City’s Traffic Impact Analysis Preparation Guide to evaluate the traffic and circulation impacts of the proposed project. GTS documented the existing traffic conditions and future traffic conditions With and Without project and determined the additional circulation system features and system management actions needed to achieve the City’s levels of service requirements with implementation of the proposed project. GTS also carried out the VMT analysis using the RIVCOM model.
Client: Integrated Engineering Group
Reference Information: George Ghossain | Principal Engineer | [email protected] | 951.239.1546
17.M
18 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services City of San Bernardino Traffic Signal Upgrade PS&E Services (2021) GTS provided traffic engineering signal upgrade services for 40 of the 224 signalized intersections in the City of San Bernardino where various safety, operational, and accessibility upgrades are required. This HSIP-funded project will replace or install new equipment to the existing traffic signal system which include traffic signal head improvements, pedestrian signal head improvements, and pedestrian pushbutton improvements among others.
Contracting Agency: City of San Bernardino (GTS is a sub to Kimley-Horn) Reference Information: Azzam Jabsheh | City Traffic Engineer | [email protected] | 909.384.7272 Vehicle Miles Traveled (VMT) Analysis for Village Specific Plan, Town of Apple Valley (2021) GTS developed the vehicle miles traveled (VMT) analysis for the proposed Village Specific Plan in the Town of Apple Valley, San Bernardino County, CA. The project encompasses multiple parcels north and south of State Highway 18 between Navajo Rd and Central Rd. The project area is divided into 5 planning areas each consisting of one or more planning Traffic Analysis Zones (TAZs). The project primarily consists of non-residential land uses – retail, office, and industrial and some multifamily residential. The VMT analysis demonstrated that while the vehicle miles traveled per employees only shows a slight significant impact, the project has no significant impact with inclusion of number of customers in the service population estimates which is the widely used and reasonable efficiency metric. GTS also assessed the project OD (origin-destination) VMT per service population in cumulative conditions and noted cost effective mitigation measures from the most recent California Air Pollution Control Officers Association (CAPCOA) manual to offset the VMT impact.
Client: David Evans and Associates, Inc.
Reference Information: James M. Daisa | Project Manager | [email protected] | 909.912.7304Contracting Alpine Street, Vernon Drive and Palm Avenue Street Lighting, Upland, CA (2021) GTS prepared professional engineering design services for construction plans, specifications and estimates as required for removal of existing street lights and replacement with new concrete poles, mast arms and luminaires. The project included voltage drop electrical calculations, conduit fill, proper lighting circuits, conduit routing, breakers, lighting controls and groundings, electrical notes and diagrams on the design plans, and SCE coordination for proposed power services/meter pedestal, in conformance with City of Upland’s requirements.
Client: Kabbara Engineering
Reference Information: Leah Kabbara | Project Manager | [email protected] | 714.744.9400 VMT Analysis of Mariposa Road/Fashion Court Commercial Development, Hesperia, CA (2021) GTS performed the vehicle miles traveled (VMT) analysis for the Mariposa Road / Fashion Court commercial development project located on two sites to the southwest and southeast corners of Mariposa Road and Fashion Court intersection in the City of Hesperia. The project proposes to construct a McDonalds, a drive through restaurants, retail and quality sit-down restaurants. This VMT analysis evaluated the project using the 2016 and 2040 model years obtained from the San Bernardino County Transportation Authority (SBCTA).
Although this project can be screened out for VMT analysis based on its size (less than 50,000 SF) per the City’s Traffic Impact Analysis Guidelines for Vehicle Miles Traveled (VMT), a detailed VMT analysis was carried out to accommodate for the non-local trips given the proximity to the freeway. The analysis demonstrated that while the vehicle miles traveled per employees only shows a significant impact, the project has no significant impact with inclusion of number of customers in the service population estimates which is the widely used and reasonable efficiency metric.
Client: David Evans and Associates, Inc.
Reference Information: James M. Daisa | Project Manager | [email protected] | 909.912.7304 Seneca Villas Residential Development VMT Analysis, Victorville, CA (2021) The Seneca Villas Residential Development Project in the City of Victorville proposes the development of 310- unit multifamily housing in one phase. GTS utilized the City of Victorville VMT Analysis Guidelines to conduct the VMT analysis for the project. The VMT analysis was based on the San Bernardino County Transportation Authority (SBCTA) Transportation Analysis Model known as SBTAM.
The project evaluated the VMT per capita and compared it with the City’s General Plan Buildout VMT per capita
17.M
19 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services to evaluate the project impact for the opening and the horizon years.
Client: David Evans and Associates, Inc.
Reference Information: James M. Daisa | Project Manager | [email protected] | 909.912.7304 Burbank Resurfacing Program - Signing & Striping Restoration and Loop Replacement Plans (2021) GTS supported the City of Burbank with the Phase X resurfacing program (for Zones 9, 10, 11, & 12) which includes over 22 roadway miles. GTS utilized aerial imagery and performed field review prior to the base and design preparation. The striping restoration utilized (when available) as-built and roadway rehabilitation plans and included field reviews for lane widths, locations of speed bumps, fire hydrants, etc. The City is leveraging the roadway resurfacing program to add bike lanes as well as crosswalks at various locations. GTS also prepared the loop restoration for 18 signalized intersections that were impacted by the road rehabilitation.
Contracting Agency: City of Burbank
Reference Information: Omar Moheize | Principal Civil Engineer | [email protected] | 818.238.3943 Rancho Vista Industrial Park VMT Analysis, Palmdale, CA (2021) GTS carried out the vehicle miles traveled (VMT) analysis for the proposed industrial park in the City of Palmdale.
The first phase of this two-phase development consists of approximately 234,660 SF and the second phase is approximately 409,480 SF. GTS used the Los Angeles County Public Works – Transportation Impact Analysis (TIA) Guidelines and conducted a detailed VMT analysis to evaluate the project using the SCAG RTP/SCS Travel Demand Forecast Model. GTS converted the project land use into model socioeconomic categories, modified the socioeconomic data to isolate the project from all other uses within the project zone, and carried out model runs to estimate VMT per employee for baseline and future conditions. The VMT analysis evaluated both phases of the project using the 2020 and 2040 model years obtained from Southern California Association of Governments (SCAG).
Client: Patriots Construction and Development
Reference Information: James M. Daisa | Project Manager | [email protected] | 909.912.7304 Traffic Signal Design of Figueroa St and Victoria St / 190th Street (2021) GTS provided traffic engineering signal upgrade services for the signalized intersection of Figueroa St and Victoria St / 190th St in the City of Carson. GTS carried out various safety, operational, and accessibility upgrades as part of this design. This HSIP-funded project will provide protected left-turn signal phases at all legs of the subject intersection, safety improvements for road users and pedestrians, and ADA-compliant curb ramp design.
The design services included coordination with the City of Los Angeles (which has shared jurisdiction at the intersection) as well as with Caltrans for funding administration purposes.
Contracting Agency: City of Carson
Reference Information: Ryan Kim | Traffic Engineer | [email protected] | 310.952.1700 x1815 Santa Monica 20th Street Connection (2020)
GTS carried out the traffic engineering tasks for this City of Santa Monica project that is closing a key bike and pedestrian network gap and serving as critical linkage between the Michigan Avenue Neighborhood Greenway (MANGo) and Bergamot Expo Station.
The project posed the challenge of designing as closely as possible to Caltrans Highway Design Manual standards with limited space available for improvements. GTS worked closely and tirelessly with Caltrans and the City on developing and testing various alternatives that are acceptable to both agencies. GTS performed the traffic analysis, truck turning analysis, traffic signal design, signing and striping design, and traffic control plans.
GTS also designed the street lighting and emergency blue light phone services over a 4G network. Prior to this project our team members also assisted the City with video detection standardization and the design of the electronic parking guidance for the downtown area.
Contracting Agency: City of Santa Monica
Reference Information: Joseph SanClemente | Principal Transportation Planner | joseph.sanclemente@smgov. net | 310.458.2204
17.M
20 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services City of Carson Dominguez Channel Bicycle Design (2021)
GTS provided traffic engineering design services for both Phase I and Phase II of the City of Carson bicycle design project. GTS services included supporting the conceptual design elements of the project as well as the design development to produce the final plans, specifications, and estimates. GTS carried out the design of signing and striping as well as traffic signal designs and or modifications. The design is per the requirements of the California Manual of Uniform Traffic Design as well as the Highway Design Manual. The design is geared to address safety, operational, and accessibility considerations with a special focus on vulnerable modes of transportation.
Contracting Agency: City of Carson
Reference Information: Ryan Kim | Traffic Engineer | [email protected] | 310.952.1700 x1815 190th Street Traffic Control Plans, City of Redondo Beach (2021) GTS provided professional engineering services to prepare traffic control plans for a new development gas line and water line tie-ins along 190th Street in the City of Redondo Beach.
GTS researched as-built plans and performed a field review and inventory prior to finalizing a base plan for worksite traffic control design. We then prepared two stages of worksite traffic control plans to accommodate the traffic operations during the water and gas tie-in construction. The plans showed necessary existing street improvements, construction area and proposed temporary traffic control devices per City standards and requirements and CA MUTCD.
Client: DSC Engineering
Reference Information: Joe Dietz | Project Manager | [email protected] | 949.305.9070 City of Norwalk Rosecrans Avenue and San Antonio Drive Traffic Control Plans (2022) GTS prepared the traffic control plans for the fiber optic construction works in the southern sidewalk of Rosecrans Ave between Bloomfield Ave and Firestone Blvd. and the median of San Antonio Dr between Olive St and Metro Center Dr. The plans showed the necessary street improvements, construction areas, and proposed temporary traffic control devices per the CA MUTCD requirements. The plan set included the Caltrans Standard TCP Plans, standard City traffic notes, sidewalk closures and signage, parking restrictions, etc. at 1”=40’ scale.
Contracting Agency: City of Norwalk
Reference Information: Raymond Velasco | Principal Engineer | [email protected] | 562.929.5723 City of Colton Engineering and Traffic Survey (Ongoing) GTS is supporting the City of Colton by recommending the establishment and renewal of valid posted speed limits for forty-four (44) street segments on twenty-seven (27) citywide streets within the City. GTS is conducting a comprehensive Engineering and Traffic Survey (E&TS) to determine these results. This E&TS prepared for the City as a record of existing conditions on the selected roadways provides the City with a basis for updating and validating its currently posted speed limits on citywide streets. The GTS study includes an analysis of prevailing speeds, as determined by traffic engineering measurements; an analysis of collision records for the most recent available two-year period; and other highway, traffic, and roadside conditions not readily apparent to the driver.
Contracting Agency: City of Colton
Reference Information: Victor Ortiz | Assistant PW Director/City Engineer | [email protected] | 909.514.4210 Thank you for all your timely and hard work. You have continually gone above and beyond what is expected.
- John Cruikshank, Project Manager
17.M
21 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Understanding and Approach
General Approach
Our general project approach to on-call traffic engineering and studies encompasses three components:
i. Research of Relevant Background Information: this includes items such as previous studies, records of prior approvals or resolutions, conditions of approval that may be relevant to the project under consideration, etc. ii. Application of our Engineering and Planning Knowledge: to discern prospective issues including controversial issues and providing notice to the City staff. Our knowledge is based on the collective experience of our team members coupled with the relevant background information. In delivering our services we build on:
a) Policies and Procedures at the Local, Regional, State, and Federal levels: which include regulations and guidelines impacting the municipal traffic engineering process from the City code to elements like SB 1, SB743, the regional Green House Gas/SCS policies and plans, MUTCD, the Complete Streets guidelines among others.
b) Emerging Trends in Traffic Engineering Practice and Technology: which includes elements such as Vision Zero, concepts of Complete Streets and Active Transportation considerations. Similarly, changes in the MUTCD and the new Highway Safety Manual affect the practice of municipal transportation traffic engineering. iii. Effective and Timely Communication: whereby we expect on-going interaction with City staff during each task order where progress can be monitored. This could include weekly touchpoints to discuss the project and ensure all parties are up to date on project progress. We anticipate that informal check in meetings will occur regularly.
Project Management Approach
GTS provides the capabilities needed to complete high-priority transportation projects or provide solid recommendations to City staff and elected officials on how to address particular transportation issues. We understand that communication, responsiveness, efficiency, and collaboration are critical to our successful partnerships with local municipalities.
Rawad Hani will be City’s main point of contact and will manage the task orders and staff to execute the required tasks adequately and efficiently. His responsibilities include leading the project management, scoping, and coordinating with experts from the GTS team, among others. Upon receiving a task order request, our response proposal will include the following:
• A description of the services to be provided (scope and methodology) • The name and position of each person to be assigned to perform the services • A schedule with the milestones
• The estimated number of hours and cost to complete the services Upon notice to proceed and depending on the specific task order, a kick-off meeting may be required to coordinate the specifics of our project approach and work tasks to ensure we meet the overall goals and objectives. This meeting will be used to establish the goals and objectives for the task order, refine the approach and/or schedule, establish project team communication and stakeholder coordination aspects, discuss data or design requirements, and confirm deliverables and milestones. All project deliverables will be provided to the City in draft format, with time for comments and feedback. Our approach to project delivery emphasizes quality control to ensure that all work products are delivered free of errors. For this engagement, all work products will be reviewed by our quality assurance manager or a key team member prior to submittal to the city. As can be attested to by our references, our project team consistently collaborates to deliver a quality work product in a timely manner. At the end of every task, GTS will conduct a task review process that may include a quick survey to gauge our success from your perspective. We share the feedback among the project team in an effort to constantly improve.
Work Plan
The following sections describe typical task orders carried out as part of on-call contracts illustrating our work plan.
17.M
22 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services
1. Plans, Specifications, and Estimates;
GTS will prepare plans, specifications and estimates (PS&E) to accommodate the construction requirements for traffic signals, signing and striping, traffic control plans and other ITS design tasks.
We typically anticipate producing plans for the following:
• Street Improvement Plans – to accommodate ADA compliant curb ramps and raised median noses • Signing and Striping Design
• Traffic Signal Plan – to propose agreed upon traffic signal improvements and operations based on the developed recommendations
GTS team believes a detailed field review and as-built plan verification will provide a good base plan for a highquality design plan and will result in higher efficiencies (less time and costs). Prior to preparing a base plan for the street improvement and traffic engineering design, GTS will obtain copies of available as-built drawings and other available database/information pertaining to the project from the City and other agencies if needed.
The field review will include identifying design constraints, verifying as-built information, and observing general site conditions. We will document our findings with photos taken as part of our field review. We will review the preliminary utility information and prepare and send notifications to all utility companies known to operate within the project area. Underground and overhead utilities will be identified, and potential conflicts will be noted and resolved during final design.
Typical tasks could include:
1.1 Topographic Land Survey: The design survey will be developed at 1”=20’ scale and will include the following items:
• Sufficient spot elevations and breaklines to accurately develop contours at a 1.0’ interval. • Curbs, right-of-way (and jurisdiction boundary line), flowlines, and gutters. • Paving types.
• Roadway crown elevations and striping.
• Above ground evidence of utilities.
1.2 Street Improvement Plan: GTS will modify the existing curb ramps to comply with ADA guidelines at the intersection. GTS will utilize the topographic land survey to produce the street improvement plan. The street improvements will be limited to ADA curb ramp reconstruction. GTS will perform a detailed ADA evaluation. We will design all proposed curb ramps per the standards agreed upon with the City. The plans will clearly show limits of construction and curb ramp grades and details. The curb ramp details will be prepared at 1”=10’ scale.
1.3 Singing and Striping Design: GTS will incorporate any striping and signage modifications at the project intersection on the corresponding traffic signal plan if it is part of a signal design project or will produce separate signing and striping plans.
Striping and signage services will include items like improving existing bike lane signages, reinstalling faded striping, or other striping or signage that may be required.
1.4 Traffic Signal Plan: Utilizing the traffic signal as-built plans, survey, and field investigation data, GTS will prepare a traffic signal base plan at the intersection. The base plan is the backbone to accurately design proposed improvements. At this stage of the process, a thorough review is performed on the base plan to ensure accuracy prior to design. The base plan will include centerline, right-of-way, relevant existing street improvements, and existing traffic controls. We will prepare the base plan in accordance with City’s format and standards. If the intersection has shared jurisdiction with other cities we will also work with their standards.
GTS has extensive experience in traffic signal design and will utilize that knowledge to identify potential conflicts before the project goes into construction. For example, proposed signal poles will be strategically placed in the optimum location for driver/pedestrian visibility and will adhere to ADA guidelines. We will also evaluate any current deficiencies or sub-standard equipment that should be upgraded to meet current City and City agreed-upon standards.
17.M
23 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services We will provide a detailed traffic signal plan per City agreed-upon format, standards and specifications. The plan will propose approved signal phases, clearly identify all existing, proposed and removed traffic signal equipment to correspond the overall design intent and shown existing and proposed improvements. The traffic signal plan will be 1”=20’ scale unless directed otherwise.
1.5 Utility Verification and Coordination: GTS will request a contact list from the City of utility companies with facilities at the project intersection. We will request utility maps and compile underground and above ground utilities in a separate digital file. This file will be referenced into all relevant design plans and clearly labeled to identify utility type, size, and owner. This will allow us to identify any potential impacts and modify the design as necessary.
We will also send a notification to all utility companies within the project limits at the 70%, and/or final design stage for their review to determine if there are any possible conflicts with the proposed improvements. GTS will work closely with the utility companies and other City departments to resolve conflicts prior to final design.
A communication log will be preserved throughout the project and provided to the City upon request. GTS will provide coordination with electric utility companies if the design includes modification to the service pedestal and/ or point of connection (POC).
1.6 Specifications and Cost Estimates: GTS will prepare the technical specifications using the City’s boilerplate template or Caltrans required template and required format. We will use the City-required standards and specifications.
1.7 Pre-Construction Support: GTS will provide pre-construction support services for this project after plans have been approved by the City and other agency. We will attend pre-bid meeting and answer the questions during the construction bidding process regarding the design and specifications. If there are omissions or conflicts in the design prior to the award to contractor, GTS will provide a plan revision.
1.8 Construction Support: GTS will provide construction support services for this project during construction.
These services include, but are not limited to attending a pre-construction meeting, responding to questions during the construction, reviewing contractor submittals within 72 hours, responding to contractor’s requests for information (RFIs) or Change Request (CR), revising design plans per CR, maintaining a log of all changes to approved plan set, reviewing and making recommendations to Contract Change Order (CCO), and providing progress reports.
1.9 As-Built Plan Preparation: After the completion of project construction, we will request the redline markings prepared by the project inspectors and/or contractors on the signed design plans, for preparation of as-built plans. The as-built plans will be signed and submitted to the City for the completion of the project Sample Recent Relevant Projects:
• City of Carson: Provided HSIP-funded PS&E signal design services at Figueroa St and Victoria St; also provided PS&E services for the Dominguez Channel Bike Path Design working with the City and County • City of Santa Monica: Provided ATP-funded PS&E signal design, signing and striping, and street lighting designs as well as traffic analysis per Caltrans and City guidelines • Los Angeles County TSSP: Myrtle/Peck Ave TSSP (GTS as sub to Michael Baker) and Eastern Ave TSSP (GTS as sub to Kimley-Horn)
2. Review/Prepare Transportation Impact Studies;
We understand that typical task orders could include the review of traffic impact studies produced by others.
GTS will help the City review the Traffic Impact Study (TIS) of proposed development projects to ensure that the technical report is adequate for supporting the analysis, findings, and conclusions of the Traffic/Transportation section of the environmental document. The TIS will be evaluated in accordance with the City’s criteria and standards, as well as industry standards set forth by ITE, HCM, and other applicable standards.
The following scope of work is anticipated to be required for the peer review of the TIS:
• Review the most current project description to fully understand the scope of the proposed project and ensure that it is consistent with the project as analyzed in the applicant’s TIS.
17.M
24 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services • Review the TIS for consistency of the analysis methodology with City and industry-standard requirements, including any measures identified in the report to reduce identified traffic impacts. • Upon review of the TIS, we will discuss the peer review approach and initial findings with the City staff, to ensure that City requirements have been addressed.
• Provide a written summary of the peer review of the TIS in the form of a comments matrix identifying any shortcomings or fatal flaws and outlining findings, including items needing clarification or recommendations to be addressed by the Project Applicants.
• Provide a review of the applicant’s responses to the comments matrix to ensure that comments are addressed We will conduct the review (or analysis) in a timely and thorough manner. After the TIS has been deemed complete and adequate, the City can incorporate the findings and recommendations of the technical report into the environmental document or the City Council staff report recommendations. Any measures outlined in the technical report to reduce traffic impacts will be reviewed for their adequacy and ability to reduce identified impacts to a level of less than significant.
It should be noted that GTS carries out various Transportation Impact Studies and VMT analysis and have the in-house modeling capabilities to assist the City with running VMT analysis and/or verifying other studies and model runs.
Sample Recent Relevant Projects:
• City of Moorpark Environmental On-Call: Conducted review of the Traffic Impact Study (TIS) of the Everett Street Terraces
• Imperial County On-Call: Conducted review of the Traffic Impact Study (TIS) of the Energy Source Industrial Project
3. Review/Prepare Traffic Signal Timing/Coordination Plans; GTS will provide signal timing plan support to the City to address the changing traffic conditions due to COVID so that City staff will have the opportunity to switch to different plans to accommodate a ‘new normal’. We will provide recommendations to City staff on when a certain signal timing plan would be applicable based on our monitoring of traffic conditions using the City’s ATMS applications.
During the timing analysis, GTS will work with the City to consider the timing of adjacent corridors and intersections and the potential to connect adjacent corridors/intersections in coordination or to maintain existing cross coordination that exists. We will work with the City to bench test the timing using available emulators and check all databases for errors, prior to implementation.
Our project manager has peer reviewed various Traffic Signal Synchronization Projects (TSSP) reviewing before and after study reports, the signal timing, optimization, and implementation reports and reviewing the final project reports to ensure they meet City guidelines and objectives.
4. Review/Prepare Traffic Control Plans;
GTS often assists with maintenance of traffic requirements for CIP projects from resurfacing projects to projects involving signal designs, signing and striping, and bicycle facilities design.
We will work with the City to efficiently review and approve plans and maintain schedules. We provide high quality through the plan check cycle, from planning and design to construction completion. Typical projects include:
• New traffic signals or traffic signal modifications
• Power source and cabinet placement
• Required street lighting and integration with traffic control • Conformance with ADA requirements
• Street improvement, rehabilitation, and widening plans
17.M
25 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Sample Recent Relevant Projects:
• City of Hermosa Beach Traffic On-Call: Conducted review (within one to two days) of outdoor dining designs for about 17 parklets
• City of Santa Monica 20th Street Traffic Control Plans (Following Caltrans standards) and invitations to the meetings.
5. Prepare Grant Applications;
We will assist the City with identifying and applying for funding to realize the various CIP projects. GTS has assisted various cities in terms of grant applications and grant management. We recently carried out 3 grant applications for the HSIP program for the cities of Buena Park and La Habra Heights to help upgrade signal hardware, construct new signals, and upgrade guardrail. We understand not only the grant writing process but equally important the scoring rubric that is essential to ensure successful grant applications.
Our team has previously supported the City of Commerce on successfully obtaining HSIP and ATP grants.
As part of our project delivery we also support cities with grant management and dealing with the funding agency requirements such as E-76 and others.
Sample Recent Relevant Projects:
• City of La Habra Heights: HSIP applications for guardrail upgrades and new traffic signal • City of Buena Park: HSIP application for signal modifications • LRSP for various cities (South Pasadena, Hidden Hills, Buena Park, etc.)
6. Attend Meetings and Prepare Presentation Materials;
GTS often plans and attends council, commission, and community meetings to solicit input and feedback on projects. The scope of our services ranges from one-on-one briefings to community at-large gatherings. These meetings can take place at various milestones during the life of the project. Meeting topics range from presenting initial findings to soliciting feedback from the community or council/comission.
GTS is prepared to assist with leading the meetings, note taking, and support services which will include coordination of meeting times and locations, hand-outs, sign-in sheets, organization of facility details (venue assumed to be provided by the City), and meeting set-ups. We will also work with the City to provide the notices and invitations to the meetings.
Sample Recent Relevant Projects:
• City of La Habra Heights: GTS presented to the Council and Road Commission on the project progress • City of Torrance Downtown Revitalization: GTS participated the Community Outreach presenting on circulation and Parking Elements
7. Traffic Calming and Revitalization Plans;
GTS provides the experience and expertise to work on various revitalization projects. We are often calledin for our parking experience when it comes to downtown or corridor revitalization projects. We have a keen understanding of parking management strategies and their impact on the economic viability along corridors and in downtown areas. We approach parking not just from a transportation perspective but from economic development and land use frameworks.
At GTS we understand that successful neighborhood traffic calming plans are those “owned” by the community and as such are developed through neighborhood collaboration and often times consensus.
Our goal is to ensure that residents are well-informed about the alternatives and the process. We will assist the City in the response and management of public requests (petitions) for neighborhood traffic calming, the prioritization of study areas, data collection and analysis, attending neighborhood meetings, determination of potential solutions, cost analysis, preparation of construction plans, and refinement of plans and study of effectiveness of traffic calming measures after implementation.
8. Other related services as requested/directed by City;
17.M
26 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services GTS will assist the City on a one-team basis and will serve as an extension to the City’s staff that can be called upon as needed.
In addition to the above listed services, GTS can support the City with the following:
Non-motorized Planning and Design: GTS has a deep understanding of active transportation related policies at the federal, state, and local levels. We adopt the principles of the NACTO Urban Bikeway Design Guide as well as local City and state guidance in the planning and design of bicycle facilities and intersections. Our staff has a keen knowledge and expertise in applying Caltrans Highway Design Manual and California Manual on Uniform Traffic Control Devices to bicycle and pedestrian projects.
Safety Studies: The GTS approach to safety studies is first and foremost to obtain and collect the data necessary to properly analyze the project roadways, identify the issues and suitable countermeasures, develop network-wide assessments and comprehensive road safety program, and assist the City with prioritization of safety improvements based on cost-effectiveness analysis and cost benefit analysis and resource availability and allocation. After receiving the notice to proceed for a safety study we will start obtaining available data, records, and as-builts from the City and other available resources. We will coordinate with the City to determine assessment criteria, field review schedule, and field survey templates prior to performing our field review and inventory work to verify existing sign and traffic control device conditions.
All deliverables and communications with the City will be reviewed by both the project manager and a key team member (who is not otherwise involved in the task. This will be akin to a third-party QA/QC ensuring that not only ensures that deliverables are free of errors but also that we are meeting your needs in terms of our understanding of the project, and are aligned with the City’s budget and schedule.
For design work in particular, our design plans will be field verified and reviewed by senior staff members during the design preparation. A constructability review in the field will be carried out for the final plan prior to City’s approval. Formal quality control checklists and/or plan review comments are employed to control the quality of deliverables.
At the end of every project, GTS conducts a project closure process that includes an online client survey to gauge our success from the client’s perspective. We share the feedback among the project team in an effort to constantly improve.
Quality Assurance & Control Brief
GTS ensures project deliverables are free of errors, easy to understand, and executed in line with client expectations. Our established quality control process builds on our experience to offer precision in delivery of our work. Our quality assurance/quality control plan begins before the task order is assigned, during scoping discussions. At this time, our project manager will work with the City to define the project tasks, establish roles and responsibilities for project team members, identify communication protocols, and identify success criteria for the project. Subsequently, we develop a draft definition of required project tasks, deliverables, budget and schedule. Risk assessment, change management strategies and project communication plans are incorporated into this planning process. Once these tasks have been reviewed, modified and adopted by the project team, GTS will proceed with the project as planned, providing continuous support and regular communication with the City.
WE PLAN THE WORK
AND WORK THE PLAN!
17.M
27 City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services Cost Approach
Our accounting procedures are based on a project-centric point of view: everything begins and ends with projects and tasks. For team members to record time, projects (tasks and subtasks) are created. Time sheets are entered to reflect back on the project.
To assist in billing our clients, as is the standard for our industry, payroll is computed from hours recorded on timesheets. It is the employee’s responsibility to make sure that attendance and hours worked are recorded accurately and saved and submitted on time as required by the accounting department. Employees must record their time worked – as well as details about the work completed – on their timesheets in Core and save the data each day. Employees must finalize and submit their time sheets in Core by close of business every Friday.
Falsifying a timesheet is strictly prohibited. The following chart provides an overview of our accounting process.
Fee Schedule
PROJECT/PROGRAM TITLE: City of Hemet On-Call Engineering Services - Transportation and Traffic Engineering Services
Name: General Technologies and Solutions (GTS)
Rates Effective Beginning: July 1, 2022 Ending: June 30, 2023 Labor Category/Grade
Labor Category/Grade Hourly Fully-Loaded Rate
Principal L7 $230.00 - $280.00
Engineer / Planner / Analyst (L6) $190.00 - $230.00
Engineer / Planner / Analyst (L5) $170.00 - $210.00
Engineer / Planner / Analyst (L4) $150.00 - $190.00
Engineer / Planner / Analyst (L3) $140.00 - $180.00
Engineer / Planner / Analyst (L2) $120.00 - $160.00
Engineer / Planner / Analyst (L1) $110.00 - $140.00
Project Admin / CAD / Graphics (L4) $140.00 - $200.00
Project Admin / CAD / Graphics (L2) $110.00 - $140.00
Intern (L1) $90.00 - $120.00
Yearly escalations are limited to the highest of consumer price index (CPI) or 5%.
Mileage is charged per the maximum allowable IRS rate.
Other expenses (surveys, printing, etc.) will be charged at cost plus 10%.
Billing
• Time &
Expenses (WIP)
• Write-Up/Down
• Billing
Schedules
Invoices
• Client Invoices
• Retainer
Invoices
• Recurring
Invoices
Submit-Approve
• Email Invoices/
Statements
• Print Invoices
Payments
• Collections
• Credit Memos
• Retainer
Payments
Deposits Banking Reconciliation
• Deposits
• Financial
Statements
GTS utilizes BQE Core (previously known as Bill Quick) for project management and accounting. It is a cloudbased solution that offers integrated business accounting, project management, and business intelligence designed specifically for engineering firms.
17.M
Our Commitment to the City of Hemet
We will provide the City with the team most capable of developing innovative solutions based on local needs and, equally important, effectively communicating these solutions. In providing quality service to the City, the GTS team will focus on:
✓ Responsiveness
✓ Clear communications
✓ Meeting established deadlines
✓ Maintaining positive working relationships
✓ Providing creative, yet implementable solutions
17.M
SEPTEMBER 28, 2022
On-Call Engineering Services
PROPOSAL FOR
City of Hemet
Steve Loriso, PE, QSD/QSP
1260 Corona Pointe Court, Suite 305
Corona, CA 92879-5013
Direct 951.475.3619 + Mobile 909.630.2577
[email protected]
Submission Categories
▪ General Civil Engineering and Land Development
▪ Construction Management
▪ Public Works Construction Inspections
Survey Services
▪ Water and Sewer System Design and Assessment Services ▪ Plan Checking Services Within Various Disciplines
17.M
September 28, 2022
Candace Sunds
City of Hemet
Attn: Procurement
445 E. Florida Ave.
Hemet, CA 92543
Re: On-Call Engineering Services
Dear Candace and Other Selection Committee Members,
Prior to the onset of the Covid-19 pandemic, the City of Hemet began experiencing a resurgence in development that was previously subdued for more than a decade. Over the past three years, that resurgence grew into an explosion as the City developed vacant land and workers could be productive working from anywhere, including home in the City of Hemet. From this growth, the City needed to pivot quickly to assist the development community while continuing to protect the existing constituents. The City now needs to maintain and upgrade vital infrastructure, including streets, water, sewer, and drainage.
At the beginning of 2019, the City of Hemet had several years of infrastructure funding available to address the years of deteriorating infrastructure. However, the limited in-house staff resources precluded the City from completing the necessary work. The common denominator to managing the development community and addressing infrastructure needs was the need for a strong engineering team, which is where HR Green Pacific, Inc. (HR Green) continues to assist the City of Hemet in this capacity.
HR Green) has decades of experience providing on-call support services for numerous Southern California agencies for the same specific services you are seeking. We are your best choice to continue delivering the services you are seeking for several key reasons:
▪ These services are what we specialize in and have a proven, positive track record within the City and with other agencies.
▪ Our knowledge of the uniqueness of the Inland Empire is unsurpassed and we are local. ▪ The quality and cost effectiveness of the services as we provide them has been proven.
Over the last three years, HR Green has led the City of Hemet’s engineering department by successfully delivering over $21 million of CIP projects and collaborating with various City departments to process more than 1,000 units of single family residential as well as commercial developments and many additional success.
HR Green’s Partnership Success with the City of Hemet and Differentiators The following is a brief list of accomplishments HR Green has assisted the City of Hemet with since 2019:
▪ Developed the first multi-year Capital Improvement Program (CIP) program since 2016, culminating in a five-year CIP program in 2022. This will allow the City to properly budget for projects throughout the City.
▪ Delivered 82 centerline miles street rehabilitation projects ranging from slurry seal to full reconstruction.
HRGREEN.COM
1260 Corona Pointe Court | Suite 305
Corona, CA 92879
Main 855.900.4742 + Fax 713.965.0044
HR Green® | Building Communities. Improving Lives.
17.M
On-Call Engineering Services
Z City of Hemet
Candace Sunds
September 28, 2022
▪ Provided project management services to deliver projects for Public Works, Fire and City Management, by becoming a trusted partner to deliver projects. ▪ Served as Interim City Engineer, providing sound engineering decisions to facilitate developments and deliver the CIP.
▪ Provided land entitlement and plan check services on behalf of the engineering department for all development projects within the City of Hemet, which streamlined the approval process by utilizing electronic plan checking services.
▪ Provided on-call construction inspection services. Due to staff turnover, HR Green was able to provide scalable staffing to deliver effective, cost-efficient services.
As we have done over the past three years, HR Green will protect the City’s best interests by providing comprehensive, quality, responsive, technically proficient, and timely services in an on-call environment.
You can have confidence that our staff will protect your interests, anticipate your needs, and proactively communicate with you throughout all phases and tasks of the work you assign to us.
The management contact for this engagement is Tim Hartnett, who is authorized to bind the company. The Program Manager will be Steve Loriso, PE, QSD/QSP and the Assistant Program Manager will be Chase Keys, PE. Together, Steve and Chase will continue to be responsible for the day-to-day management of the contract.
We look forward to continuing to assist the City of Hemet with meeting your needs and goals.
Sincerely,
HR GREEN PACIFIC, INC.
Tim Hartnett Steve Loriso, PE, QSD/QSP Chase Keys, PE
Principal-in-Charge/Vice President Program Manager Assistant Program Manager
17.M
2) Firm Profile and Background
17.M
On-Call Engineering Services
Z City of Hemet
For more than a century, HR Green Pacific, Inc. (HR Green) has been dedicated to providing the services our clients need to achieve success. HR Green takes a big-picture, programmatic approach and brings a one-stop consulting solution for your governmental service needs. We are at the forefront of leveraging industry-recognized thought leadership, registered/certified professionals, alternative service delivery options, proven best practices, and cutting-edge technology to save time and money, enhance operational efficiencies, procure funding, and create/implement a road map to future success by delivering long-term sustainability.
NUMBER OF EMPLOYEES
With more than 600 employees, our staff works with local governments like the City of Hemet from across the United States as an extension of their staff, providing a broad range of local government engineering, municipal advisory services, project/program management, construction management, inspection, and public works staff augmentation.
COMPANY HEADQUARTERS AND OFFICES
We are a local company, with our headquarters in Corona. We collaborate across geographies and markets to provide engineering, technical and management solutions from offices in eight states: California, Colorado, Iowa, Illinois, Minnesota, Missouri, South Dakota, and Texas.
NUMBER OF YEARS
HR Green, Inc. was founded in 1913. We have been providing services in California since 2004.
DISCIPLINES
One of America’s longest operating design firms, HR Green is consistently ranked among ENR’s Top 500 Design Firms in the United States. We provide services in General Civil Engineering and Land Development, Construction Management, Public Works Construction Inspections, Water and Sewer System Design and Assessment Services, and Plan Checking.
1913
60+
HR Green has successful partnered with local communities since founding in 1913.
We have 60+ local staff for the City’s immediate
needs and we can draw from a national pool of 600+
professionals as-needed.
Our creative and innovative leaders
develop unique and flexible
approaches for various initiatives to
help the communities they serve.
Construction
100
HR Green is consistently
ranked among ENR’s
Top 100 Construction
Management Firms in the
United States because
we care about delivering
successful projects.
HR Green has continued
to climb the rankings on
Engineering News Record’s
(ENR) annual lists of top
design and construction
firms in the nation, rising
26 spots and coming in at
162.
17.M
On-Call Engineering Services
Z City of Hemet
HR Green’s General Qualifications
HR Green has served 50+ Southern California agencies, including several municipalities in Riverside and San Bernardino Counties. We serve (or have served) the Cities of Hemet, Jurupa Valley, Moreno Valley, Corona, Palm Desert, Victorville, Hesperia, Grand Terrace, Upland, Ontario, Redlands, Rancho Cucamonga, Fort Irwin, Apple Valley, and Chino. We currently maintain 40+ on-call contracts throughout Southern California and bring relevant as-needed experience throughout the region, assign industry thought leadership, and leverage best practice approaches to save agencies time and money while delivering superior quality.
Staff Experience
HR Green has the qualified proposed staff, successful experience, and proven best practices to provide the services and produce the deliverables detailed in your RFP.
Our primary goal for the City of Hemet is to implement a management, staffing and resource plan, assign appropriate administrative services, and create best practices and a service delivery model for the City’s categories: General Civil Engineering and Land Development, Construction Management, Public Works Construction Inspections, Water and Sewer System Design and Assessment Services, and Plan Checking. We will not only align our services to your mission and expectations, but also provide the best value, quality, and operational efficiency by incorporating the latest technology, paperless processes, public outreach (as necessary) and streamlined communication amongst all parties.
Services Offered
HR Green offers the following services to governmental institutions across the country and throughout Southern California:
Recognized as a Great
Place to Work®-
certified company
GIS + Asset Management
Master Planning, Pavement Management, Utility Mapping,
Design Plans, Database Design, Right-of-Way Management, Asset Inventory, Small Unmanned Aerial Mapping (SUAS)
Design + Engineering
Master Planning, Civil Design, Utility Coordination, Pavement Evaluation, Traffic, Transportation Planning, Drainage, Stormwater Compliance, Water + Wastewater, Value
Engineering
Broadband Consulting
Master Planning + Visioning, Smart City, Fiber, Policy Development, Permit Processing, Design Standards Development, ITS,
Grants + Funding, Utility AMR + AMI Planning, Municipalized Street Lighting, GIS Mapping, Community Outreach, Small Cell, 5G, ITS, Studies, Design + Engineering, Procurement, Construction Management Virtual City Hall
Contactless Touchless Counter Services, Remote Plan Check, Remote Construction Management + lnspection, Virtual Engineering Design, Contactless Permitting, Software Implementation Construction Management
Construction Management, Resident Engineering, Contract Administration, Constructability Review, Office Engineering, Inspection, Quality Assurance + Quaüty Control, Claims
Management, Stakeholder Coordination
Land Development Coordination
Entitlement Processing, Project Tracking + Tracking,
Development Review, Project Facilitation, Standards and Procedures Development, Inspections, Development
Incentive Programs
Building + Safety
Building Administration, Plan Check, Inspection,
Permit Processing, Code Enforcement
Program + Project Management
Departmental Oversight, CIP, Change Management,
Organizational + Operational Audits, Solid Waste, Grant Writing + Administration
HRGreen
Electronic Plan Check
Building + Civil Plan Check, Electronic Review + Digital Commenting, Paperless Processing + Tracking, Needs
Assessment, Software Customization + lmplementation,
Change Management
Staff Augmentation
Embedded Staff (FT/PT) - All Departments (Engineering, Public Works, Building + Safety, Code, Community Development,
Construction)
17.M
On-Call Engineering Services
Z City of Hemet
The City of Hemet’s Partnership with HR
Green
Over the past three years, HR Green has been the City of Hemet’s trusted partner, delivering the necessary engineering needed by a growing city. Many HR Green staff have worked alongside of Community Development, Building and Safety, Public Works, Public Safety, Finance and the City Manager’s office. Additionally, key HR Green staff served as the conduit between the City and Caltrans to coordinate improvements directly affecting constituents along SR-74 and SR-79. HR Green has provided the necessary resources over the past three years to assist the City and keep the forward momentum of delivering capital projects and developments.
Finding the Funds
HR Green has been
pleased to contribute our
knowledge of funding
sources combined with
relationships with key
decision makers at the
State and Federal level to
help facilitate funding for
our clients.
HR Green has experienced
personnel that are
adept at both identifying
and securing outside
financial resources
and navigating clients
through the regulatory
and administrative
requirements that
accompany these
funding sources. HR
Green has worked with
the U.S. Department
of Housing and Urban
Development, Federal
Highway Administration,
Economic Development
Administration, and
Environmental Protection
Agency to secure funding
and ensure that projects
maintain compliance with
appropriate regulations.
Overall Management Approach
All proposed personnel must fit your culture, meet or exceed your performance expectations, and be team players. All of our on-site staff members have worked as public agency employees or as on-site extension of city staff, consistently exhibiting these traits and seamlessly blending with City staff. Our staff support will continue to be responsive to your needs, remain dynamic to changing conditions, and match the right mix of staff to the clearly defined assignments. For any assignments we will follow the following approach:
HR Green, as a company and its team members, has decades of experience providing on-call support for the specific services you are seeking for numerous Southern California agencies. HR Green is your best choice to continue delivering the services you are seeking for several key reasons:
1. These services are what we specialize in and have a proven, positive track record within the City and with other agencies.
2. Our knowledge of the uniqueness of the Inland Empire is unsurpassed and we are local.
3. The quality and cost effectiveness of the services as we provide them has been proven.
17.M
On-Call Engineering Services
Z City of Hemet
General Civil Engineering
and Land Development
Chase Keys, PE l
Carolina Fernandez, EIT l
Mike Myers, PE
Brian Jahn, PE
Trent MacDonald
Art Casillas, EIT
Tim Cutsforth
Berlyn Castaneda
Construction Management
Chase Keys, PE l
Jorge Perez, EIT
Jennifer Garcia, PE, QSD/QSP
Robert Luciano, PE, QSD/QSP
Alfredo Del Toro
Rick Torres
Water and Sewer System
Design and Assessment
Chase Keys, PE l
Jennifer Garcia, PE, QSD/QSP
Monica Pangco, EIT
Trent MacDonald
Art Casillas, EIT
Tim Cutsforth
Steve Loriso, PE, QSD/QSP
Program Manager
Tim Hartnett
Principal-in-Charge
HR Green’s Team
Public Works
Construction Inspections
Gary Yeo, CCM l
Chuck Wilson
Robert Luciano, PE, QSD/QSP
Eric Lomeli
Leighton Muckey
Your primary point of contact is Steve Loriso, PE, QSD/QSP, our assigned Program Manager. Steve will be the City’s day-to-day contact and will see that all resources are allocated to your projects as needed, serve as part of our QA/QC team, and will be available for requested meetings with the City. His resume and work experience, along with that of the other key personnel, appear in the following services sections. In addition, HR Green will include subconsultants Dennis Janda Inc., for survey and Terracon Consultants Inc., for geotechnical on an as-needed basis.
Plan Checking Services Within
Various Disciplines
Tina York, PE l
Derek Wieske, PE
Marla Doyle, PE
James Xiong, PE
Miranda Martin
Agenla Saxton, QSD/QSP, CISEC, CESSWI
Kim Evans
Shelby Gonzales
Chase Keys, PE
Assistant Program
Manager
As-Needed
Subconsultants
Dennis Janda, Inc.
Survey
Terracon Consultants, Inc.
Geotechnical
LEGEND
l Key Staff
17.M
On-Call Engineering Services Z City of Hemet Page 5
Services Provided Types of Projects
Agency Served
Permit ProcessingEngineering Plan ReviewMap ReviewLand Development CoordinationBuilding Plan Review / AdministrationCity Engineer and/or City SurveyorProject / Program ManagementAccessibility / ADA DesignAsset Management / Infrastructure AssessmentDesign ManagementPS&E PreparationBid / Construction SupportTechnology Implementation / Electronic ReviewGrant Funding / AdministrationStaff AugmentationConstruction ManagementPublic Works InspectionBroadband Consulting / Policy DevelopmentTraffic EngineeringTraffic Operations / ITSRoadwaysBridges / InterchangesWet UtilitiesDry UtilitiesDrainageBuilding FacilitiesVirtual City / Electronic Plan Check City of Hemet
lllllllllllllllllllllllll
City of Moreno Valley
llllllllllllllllllllll
City of Jurupa Valley
lllllllllllllllllllllllllll
City of Corona
lllllllllll
Elsinore Valley Municipal Water District
lllllllll
Western Municipal Water District
lllllllllll
City of Palm Desert
lllllllllllllllllllllll
City of Rancho Mirage
llllllllll
City of La Quinta
llllllllllllllllllll
CVAG
ll
City of Indio
llllllllll
City of Cathedral City
lllllllllllll
City of Beaumont
llllllllllllllll
Unparalleled Riverside County Area Firm and Personal Experience LEGEND
l Firm Experience
l Personal Experience
17.M
General Civil Engineering and
Land Development
Resumes of Team
Relevant Experience
Understanding and Approach
17.M
On-Call Engineering Services
Z City of Hemet
3) Resumes of Team
Chase Keys, PE
Team Lead
Chase brings comprehensive experience in design project management, CIP Program Management, and construction management experience of municipal public improvement projects. His experience includes a multi-faceted involvement with Engineering and Public Works Department. Types of projects include roads, drainage, water, sewer, traffic, and parking lots. Chase has helped prepare grant applications for federal, state, and regional funding. Moreover, he has assisted in both the office and field on construction projects. He has served as CIP Manager for the Cities of Jurupa Valley and Hemet, and has also served on site at the Cities of Lake Elsinore, Palos Verdes Estates, and Beaumont in delivering a broad array of projects.
SELECTED PROJECT EXPERIENCE
Z CIP Management, City of Hemet
CIP Manager responsible for managing City’s Capital Improvement budget and overseeing the design and construction of all capital projects including grant writing/ administration. Chase is involved with the projects from conception and budgeting through construction management and close out. Manages a wide array of projects for both engineering and public works including the City’s water/sewer system. In this role Chase oversees all of the City’s annual neighborhood pavement rehabilitation projects.
Z CIP Management, City of Jurupa Valley
CIP Manager responsible for managing City’s Capital Improvement budget and overseeing the design and construction of all capital projects including grant writing/ administration. Chase is involved with the projects from conception and budgeting through construction management and close out. Manages wide array of projects from minor traffic signal modifications to multi-million-dollar street improvement projects.
In 2016-2017 Chase managed and designed roughly $8,000,000 of residential street rehabilitation projects through seven project phases. This work included performing a pavement evaluation on every residential street within the 45-square mile City to determine the priority list of projects to be included in the program.
Z Miscellaneous CIP Projects, City of Rancho Cucamonga
Project Manager for preparation of an HSIP Cycle 10 grant application, design of ADA improvements in relation to the pavement rehabilitation on Church Street, design of various traffic signal modifications, and improvements to Hermosa Avenue including widening and addition of on-street back-in angle parking stalls.
Z Miscellaneous CIP Projects, City of Azusa
Project Engineer for the design of various CIP projects including a parking lot analysis and follow-up parking lot design at Azusa Avenue and 5th Street and the design of various pavement rehabilitation projects, including comprehensive re-striping plans.
EXPERIENCE
9 Years
EDUCATION
BS, Civil Engineering
REGISTRATION /
LICENSE
Registered Civil Engineer,
CA #90593
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
On-Call Engineering Services
Z City of Hemet
EXPERIENCE
30+ Years
EDUCATION
BS, Civil Engineering
REGISTRATION /
LICENSE
Registered Civil Engineer,
CA #30702
CERTIFICATIONS
Emergency Response to
Hazardous Materials
Carolina Fernandez, EIT
Team Lead
Carolina brings diverse engineering, public works, grant application, labor compliance, and building and safety support services to public agencies. A member of the American Society of Civil Engineers, Carolina is bi-lingual (Spanish / English). She has served as an office engineer for the Cities of Hemet, Palos Verdes Estates, Beaumont, Lake Elsinore, and Jurupa Valley. In this role, she has been responsible for entitlement projects review, engineering final plan review, city projects management, field construction coordination, counter support, consultant and multi-agency coordination, permit coordination, and special assessment district annexations and formations. She has managed the development review process through Engineering. This has involved performing the review of applications, coordinating with future developers, and drafting the conditions of approval for the Engineering/Public Works Department. She supervised the land development daily activities, such as overall project requirements, required field revisions to approved plans, and conditions of approval and mitigation measures compliance. She is familiar with city processes and is familiar with the local design and code standards. Carolina has coordinated with inspectors for work performed and assessed field modifications. She has also reviewed encroachment permits, approved and released bonds, reviewed survey application reviews, and coordinated with other public agencies present and future City work/projects, including cooperative agreements.
SELECTED PROJECT EXPERIENCE
Z Office Engineer, City of Hemet
Z Public Works/Engineering Support, City of Jurupa Valley Z Public Works/Engineering Support, City of Palos Verdes Estates Mike Myers, PE
Civil Engineer
Mike has more than 30 years of public sector engineering experience. He possesses extensive project and construction management knowledge coupled with strong interpersonal communication skills. Within the last year he has managed the implementation of three pavement management programs, all for communities which had no prior pavement management programs. These agencies include Palos Verdes Estates (70 centerline miles of streets), Jurupa Valley (400 miles of streets) and The Woodlands in Texas (500 centerline miles). Mike has served as a Senior Project/Program Manager handling a broad range of municipal consulting services (federal grant funding, design, CIP management, plan review, assessment engineering, pavement management, and construction management) for 20+ Southern California cities. He has designed a various of road widening, pavement rehabilitation (involving a variety of strategies, such as slurry seal, PCC ADA, and ARHM), site improvement, and wet utility (sewer/water/drainage) projects throughout Southern California.
SELECTED PROJECT EXPERIENCE
Z City Engineering, City of Hemet
Z On-Site Project Management Staff Augmentation, City of Jurupa Valley Z On-Call Engineering, City of Palos Verdes Estates
Z On-Site Project Management Staff Augmentation, City of Moreno Valley
EXPERIENCE
8+ Years
EDUCATION
Bachelor of Science, Civil
Engineering
REGISTRATION
Engineer-in-Training, CA
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
On-Call Engineering Services
Z City of Hemet
Trent MacDonald
Designer
Trent has more than 33 years of CAD design experience for agencies and developers throughout Southern California. He is proficient in AutoCAD and Civil3D. The last 12 years of his experience have been focused in designing municipal capital infrastructure projects, such as street improvements, pavement rehabilitation including the use of ARHM, rough and precise grading, storm drain, sewer, water, erosion control plans and exhibits as well as public facility improvements, planning studies, conceptual designs, libraries, equestrian parks, animal shelters, and parks. In this role he has provided technical and analytical support; created, reviewed and revised construction plans, documents, cost estimates and specifications; produced volume calculations and earthwork, technical reports, Water Quality Management Plans, and Storm Water Pollution Prevention Plans.
SELECTED PROJECT EXPERIENCE
Z Various On-Call Professional Engineering Design Projects, City of Hemet Z Various Street Design Projects, City of Jurupa Valley Z Towne Avenue Complete Streets Project, City of Claremont Z Hermosa Avenue Street Widening, City of Rancho Cucamonga
EXPERIENCE
33 Years
EDUCATION
Autodesk Training Facilities
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
Brian Jahn, PE
Engineer
Brian brings over 36 years of experience and knowledge for planning, design and construction of traffic control devices and neighborhood calming devices. He has overseen and reviewed traffic engineering studies and traffic impact analyses and provided recommendations for safety and operational improvements relative to crash reduction, traffic signal warrants, speed zoning and capacity enhancements. In addition, Brian has managed all school and school-zone related activities, including a 2014 Bond Safe Routes to School program for the City of Fort Worth, TX and a 2019 Bond Safe Routes to School program for the City of Denton, TX.
SELECTED PROJECT EXPERIENCE
Z Traffic Signal Review, City of Jurupa Valley
Z Traffic Signal Modifications, City of Rancho Cucamonga Z Traffic Signal Review, City of Moreno Valley
EXPERIENCE
36 Years
EDUCATION
BS, Civil Engineering
REGISTRATION
Registered Professional
Engineer, TX, #70477
CERTIFICATIONS
Community School Zone
Safety, TEEX
Traffic Signal Operations,
Georgia Institute of
Technology
17.M
On-Call Engineering Services
Z City of Hemet
Tim Cutsforth
Engineer
Tim has an extensive background in design and construction administration. As a Project Manager, he has experience in coordinating and preparing designs, specifications and cost estimates, managing and monitoring construction activities, along with reviewing and composing engineering and legal documents. He serves as Client Service Manager to three Iowa communities, and one county. Tim’s strong knowledge of municipal engineering enables him to work closely with his public clients to achieve their goals and initiatives. Tim has advised, consulted and assisted city councils and other municipality staff to implement improvements within their community. He has successfully and efficiently provided concept planning, design, and construction administration services.
SELECTED PROJECT EXPERIENCE
Z Engineering CIP FY 2022, City of Hemet
Z On Call Engineering, City of Hemet
Z CIP Management, City of Moreno Valley
Z Miscellaneous CIP Projects, City of Rancho Cucamonga
EXPERIENCE
31 Years
EDUCATION
BA, Business
Administration
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
Art Casillas, EIT
Engineer
Art has more than 9 years of professional experience as a construction manager and project engineer. He has been involved with road pavement and rehabilitation projects, traffic signal improvements, street widening, and worked with Caltrans for encroachment permits. He has provided services to various public agencies including the Cities of Walnut, San Gabriel, Covina, and Norco.
SELECTED PROJECT EXPERIENCE
Z Engineering CIP FY 2022, City of Hemet
Z CIP Design Services, City of Jurupa Valley
Z CIP Design Services Area 2, City of Diamond Bar
Z Traffic Signal Improvements at Two Existing Intersections, City of Covina Z Hillside Avenue, 5th to 6th Roadway Widening, City of Norco
EXPERIENCE
9 Years
EDUCATION
BS, Civil Engineering
REGISTRATION
EIT, CA #149135
OSHA 10-hour Safety
Course
17.M
On-Call Engineering Services
Z City of Hemet
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
Berlyn Castaneda
Permit Technician
Berlyn has 10 years of experience with municipal governments, providing complex clerical and technical accounting duties, including accounts receivable, accounts payable, and department specific accounting. She routinely prepares and maintains database records, and generates reports on a regularly and as-needed basis. In addition, Berlyn is experienced with the preparation of monthly, quarterly, and year-end financial, summary and other technical reports in various systems including Accela.
SELECTED PROJECT EXPERIENCE
Z Plan Review and Permit Processing, City of Jurupa Valley Z Plan Review and Permit Processing, City of Palos Verdes Estates Z Accounting Technician, City of Jurupa Valley
EXPERIENCE
10 Years
CERTIFICATIONS
Community Emergency
Response Team
17.M
On-Call Engineering Services
Z City of Hemet
4) Relevant Experience
REFERENCE
Rod Butler
City Manager
City of Jurupa Valley
8930 Limonite Avenue
Jurupa Valley, CA 92509
P: 951.332.6464
E: [email protected]
Project Planning and Engineering
City of Jurupa Valley
HR Green provides full departmental management and on-site civil project staffing, planning, and engineering. We have helped procure federal, state, and regional funding (ATP, HSIP, Safe Route to Schools, SB1, CalRycle, etc.) as well as prepared PS&E for CIP projects and have overseen the design and construction of 150 miles of pavement rehabilitation as well as Complete Streets and Green Streets. Our staff have utilized rubberized asphalt strategies (saving the City construction costs of up to $70,000 and incorporating “Green” recycle methodologies, such as reuse of scrap tires and leveraging local processing facilities, leading to less pollution and truck activity). We created a Pavement Management Report and maintenance program. Recently, our staff completed a Citywide Master Plan for Streets and Trails. Our staff manage and handle the development department, utilizing electronic plan check to provide timely and thorough review.
Over the past few years our engineers and construction staff have coordinated the construction of $60 million of Jurupa Community Services District (JCSD) water and sewer pipelines through residential and arterial roadway right-of-way as well as channel and flood control facilities owned by the Riverside County Flood Control and Water Conservation District. Our staff plan reviewed and coordinated the design a major pipeline along Limonite Avenue, a major arterial involving a tight utility envelope. This involved the preparation of a complex traffic management plan requiring major detours due to the closure of Limonite Avenue for six months. We offered JCSD guidance and support from project inception through project completion.
DATES PERFORMED:
2011-Ongoing
Project Planning and Engineering
City of Pomona
Since 2013, HR Green has maintained various on-call civil engineering, design, plan check, and project management contracts with the City of Pomona. We have provided design engineering of various roadway, alley way, sidewalk, curb and gutter, and ADA compliance projects citywide. This includes Mission Boulevard construction management for the installation of ADA improvements, signal conduit, and minor drainage improvements.
HR Green also provides on-call project management, staff augmentation, and plan review for the Gold Line light rail project, including the extension of the Light Rail Transit line through the City, two bridges at Garey and Town Avenues, and a flyover heavy rail west of Towne Avenue. Comprehensive review services include civil, traffic, railway, environmental and structural engineering, surveying, architecture, landscape, planning, CEQA/NEPA and related proposed work. HR Green has been working with the City of Pomona for the past several years on the planning and development of the Holt Avenue Median Improvements, which is part of a complete streets upgrade for this existing heavily utilized corridor.
REFERENCE
Matt Pilarz
City of Pomona
505 South Garey Avenue,
Pomona, CA 91766
909.602.3652
[email protected]
DATES PERFORMED
2013-Ongoing
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
On-Call Engineering Services
Z City of Hemet
REFERENCE
Ryan Gayler
Project Manager
City of Palm Desert
73-510 Fred Waring Drive Palm
Desert, CA 92260
P: 760.346.0611
D: 760.776.6393
[email protected]
Project Management and On-Call Services
Palm Desert
Palm Desert is a thriving, year-round community (50,000+ population) and a premier resort destination in the Coachella Valley. The City has established a dynamic strategic plan focusing on key initiatives to promote a thriving, safe, and sustainable community that attracts innovative employers by virtue of its diverse, highly qualified workforce and synergistic business, civic, and educational partnerships. With limited in-house engineering staff resources, the City has tactically utilized consultants to deliver a litany of services and projects aligned to their strategic plan, goals, and vision.
Since 2017 HR Green has provided a broad array of consulting services, beginning with serving as Interim Public Works Director to manage the City’s day-to-day departmental operations. This included the planning, design, and construction of CIP and land development projects. Thereafter, in 2021 HR Green was contracted for On-Call Support Services for Development Services and Public Works. To date, our areas of responsibility have generally included, but are not limited to, staff augmentation, program management, project management, and construction management, inspection (road improvements, bike lanes, encroachment permits), strategic planning of the Traffic Division, plan review (building and civil), and development services assessment of their use of TRAKiT in the context of creating a one-stop permit shop.
Our collective efforts have allowed City staff to focus on other initiatives and deliver on a variety of priority projects and programs in a timely and cost-efficient manner.
DATES PERFORMED
2017-Ongoing
Design Engineering and Support
City of Palos Verdes Estates
Since 2015, HR Green has provided full staffing services, including, but not limited to building and safety administration, construction and project management, inspection, building official, plan check, city engineering, public works engineering, transportation planning, traffic engineering, CIP program management, and grant writing/administration.
HR Green provides on-call engineering and design, construction management, and inspection of infrastructure improvements (e.g., pavement striping and marking on various roadways; annual street resurfacing and slurry seal program; and citywide drainage improvements and street repairs). Our staff helps prioritize maintenance activities, catch basin cleaning, and placement of water quality BMPs due to El Nino.
SAMPLE PROJECTS:
Via Coronel and Zurita Sanitary Sewer: HR Green prepared Sewer Improvement Plans for the extension of an 8” vitrified clay pipe (VCP) within Via Coronel and the abandonment and realignment an existing 8” VCP line off Via Zurtia. The realignment was designed with an 8” vitrified clay jacking pipe (VCJP) installed via directional boring located within an easement.
Via Campesina Street Improvements: HR Green prepared Street Improvements and Signing and Striping Plans from Via La Cuesta to Paseo Del Campo. This project included cold milling of existing AC pavement, Asphalt Rubber Hot Mix (ARHM) overlay, construction of 8” AC berm, localized pavement repairs, and localized concrete repairs.
REFERENCE
Laura Guglielmo
City Manager
City of Palos Verde Estates
340 Palos Verdes Dr. West
Palos Verdes Estates, CA
90274
310.378.0383 x2251
[email protected]
Brianna Rindge
Community Development
Director
City of Palos Verde Estates
340 Palos Verdes Dr. West
Palos Verdes Estates, CA
90274
310.378.0383 x2216
[email protected]
DATES PERFORMED
2015-Ongoing
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
On-Call Engineering Services
Z City of Hemet
5) Understanding and Approach
The City of Hemet, a “City of Opportunity,” has experienced significant growth over the past few years. This has created the need to streamline the development entitlement, review, and approval process, while keeping pace with CIP infrastructure improvements to support not only the 4,500 SFR homes currently being entitled, but also replace and upgrade aging and/or substandard infrastructure assets. On June 23, 2021, the City adopted a Strategic Plan that was centered on five (5) key goals: 1) Quality of Life 2) Economic Opportunity 3) Community Engagement 4) Partnership & Collaboration 5) Organizational Effectiveness.
From an “Economic Opportunity” perspective in promoting smart development, the City has prioritized streamlining development review and approval processes and practices. HR Green has supported the City by creating a streamlined electronic plan check process, coordinating closely with the Planning Department during the and meeting early and often with applicants throughout the entitlement and review process.
As a seamless extension of your Engineering Department since 2019, HR Green has coordinated with the Public Works Department to program and facilitate the delivery of diverse Capital Improvement Program (CIP) projects, which have ranged from making structural improvements to city roads, bridges, and concrete walkways to street striping, pavement rehabilitations to improving major street water and sewer pipelines. In fact, HR Green developed the first five-year CIP since 2016, with the latest approved FY 22/23 CIP including over 90 projects with an estimated budget of $71,540,000, involving diverse funding source, such as Measure A, RMRA, Gas Tax, DIF, TUMF, CDBG, ATP, HSIP, Measure U, Riverside County Flood Control & Water Conservation District, City Sanitary Sewer, and City Water. Moreover, our staff regularly provides the City Council and Interim City Manager regular status updates on CIP projects that improve Hemet's infrastructure and aesthetics.
Our staff members are firmly ingrained in Hemet’s
operations and culture, have been instrumental
in implementing efficiencies and improvements,
streamlined development processes, and shepherded a
large volume of CIP projects from concept planning to
construction and ongoing maintenance.
Our approach, tasks necessary for successful
completion, and methods for maintaining cost and
schedule controls can be found on the following pages.
Approach
Project / Program Management
HR Green is a noted industry leader in the provision of project/program management services. Our staff members have served as directors of municipal departments for cities around the country, including Hemet, or as an extension of public agency staff. We will continue to embed engineers at the City to deliver the following services:
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
Multi-year CIP program development CIP management
Asset management plans Grant writing / administration
NPDES compliance Organization/operational assessments
Strategic plans Project management
Master plans Design management
P3 (public-private partnership) facilitation Construction management Alternative service delivery Maintenance management
Solid waste management Public policy development
Document control On-call consulting
17.M
On-Call Engineering Services
Z City of Hemet
As we have successfully done the past three years for
the City of Hemet, HR Green will provide continuity by
assigning the same seasoned project management team,
led by Steve Loriso, PE, QSD/QSP, to facilitate your Capital Improvement Program (CIP) including but not limited to:
▪ Development of project scope
▪ Preparation of design and other necessary RFPs
▪ Selection of design and other necessary consultants
▪ Administration of project design
▪ Engineering support for the preparation of any
environmental and grant funding documentation
▪ Preparation of final bid documents
▪ Administration of bid process and award of contract
▪ Preparation of City Council and Planning Commission
staff reports in support of capital projects
▪ Oversight and mentoring of City engineering staff in
performance of the above tasks
Design Engineering
The proposed HR Green team is well versed in all aspects of design/engineering/surveying and administration,
including, but not limited to project controls (estimating, cost and schedule), planning, quality assurance/quality control (QA/QC), change control and risk management.
Our approach will generally follow the steps set forth
below:
KICK-OFF MEETING & SITE RECONNAISSANCE
▪ Hold a kick-off meeting with City staff to discuss
major features and details of design project.
▪ Identify jurisdictional agency approval and/or permit requirements.
▪ Establish clear lines of communication.
▪ Gather background data available from the City.
▪ Discuss any special requirements, constraints, and/or opportunities available that are in the best interest of the City to expedite the project in a cost-effective and timely manner.
▪ Discuss project completion issues and milestones.
▪ Perform field visit(s) to review and document field
conditions, verify existing topographic data, and
assess specific concerns / constraints and issues.
TASK ORDER NEGOTIATION
▪ Develop, submit, refine, and negotiate task order
proposal with City that includes a detailed scope of
work, identification of subcontract work, deliverables, project milestone schedule, resource requirements,
documentation required from the Caltrans Local
Assistance Procedures Manual (if necessary), and
budget.
RESEARCH AND REVIEW
▪ Upon notice-to-proceed, further research and gather
all available relevant information, data, and reports.
▪ Obtain existing drawings files for topographic and
base mapping, as-built data, survey control data,
hydrology studies, geotechnical studies, right-of-way
maps, and existing utility information from the City.
▪ Research plans not available through City for existing roads, drainage facilities, and utilities.
▪ Contact impacted utility agencies by registered mail to obtain existing plans or updated information.
▪ Hold coordination meetings with utility agencies, as
needed.
▪ Initial Evaluation / Agency Coordination
▪ Identify alternative solutions for key elements of
design task order and evaluate feasibility based
on various factors (e.g., cost-effectiveness,
constructability, utility impacts, safety,
implementation, schedule, ease of operations and
maintenance, sustainability, etc.).
▪ Present findings to City and coordinate with other
impacted agencies.
ENVIRONMENTAL DOCUMENTATION
▪ Evaluate need for CEQA or NEPA documentation
based on funding and specific project requirements.
▪ Develop necessary documentation.
▪ Obtain required permits from regulatory agencies, as
needed, including U.S. Army Corps of Engineers, Air
Quality Management Board, Regional Water Quality
Control Board, California Department of Fish and
Wildlife, Caltrans, etc.
DESIGN DEVELOPMENT
▪ Review existing studies and design documents for
adequacy, value, completeness, assumptions, and
compliance with required standards and criteria.
▪ Complete preliminary design to effectively implement
required infrastructure improvements.
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
On-Call Engineering Services
Z City of Hemet
▪ Review documentation (e.g., existing geotechnical
data and reports, sub-grade compaction records,
traffic studies, and other design and master plan
studies).
CLIENT / AGENCY REVIEW
▪ Present findings and recommendations to City for
review and concurrence.
▪ Coordinate with permitting agencies for plan check
review and comments.
▪ Submit construction plans, specifications and
engineer’s estimate to City at agreed upon milestones
(hardcopy and digital formats conforming to City’s
requirements).
PROJECT FINALIZATION, APPROVALS, AND PERMIT
PROCESSING
▪ Compile input, concerns, and comments from
permitting agencies and present them to City for
resolution and direction to finalize plans.
▪ Support City in obtaining all required approvals and
permits from the permitting agencies.
CONSTRUCTION SUPPORT
▪ Assist City, as needed, in responding to RFIs,
evaluating revision requests, providing construction
staking, performing as-built surveys, and
developing ”as-built” plans.
Land Development Review
“Leveling Up” the Review Process
HR Green has a proven internal plan
review coordination process, GreenTREx,
to make certain that each plan received is
properly processed and returned on time.
Our GreenTREx review process/program
allows us to efficiently complete plan tasks
concurrently. This is a formalized and
integrated process whereby Technician data
input and processing, Review, and Expert
staff manage quality control functions that
are consistently implemented on each and
every project. This allows multiple HR Green
staff members to assist at any phase of the
processing, review, and approval.
Each review is compared to the appropriate
Specific Plan, the final map, and other
improvement plans for the project to
verify conformance and no conflicts. These plans also
go through a thorough investigation for compliance to
conditions of approval, Federal, State, County, and City standards and regulations, Municipal Codes, Ordinances, Resolutions, policies, procedures, checklists, and City approved format/preferences.
At the conclusion of each review, the reviewer digitally stamps the first sheet of the plans or the cover page on reports with the date, reviewer’s initials, and submittal number. The redlines, a comprehensive comment letter,
and checklist are provided to all stakeholders. When
all comments have been addressed, the final set of
deliverables will be stamped as “Recommended for
Approval” and include the date and reviewer’s initials.
All documents are turned around on-time or ahead of
schedule. HR Green’s engineers begin their review as
soon as the plan check is received earnestly seeking to meet or beat your expectations by returning comments
ahead your published turnaround times. By taking
this proactive approach we are able to meet the most
hard-hitting schedules with a near perfect track record.
We have successfully met an aggressive schedule of
5/3/1 business day turnaround on an expedited services
contract. We have met or beaten this schedule better than 98% of the time.
GENERAL CIVIL ENGINEERING AND
LAND DEVELOPMENT
17.M
Construction Management
Resumes of Team
Relevant Experience
Understanding and Approach
17.M
On-Call Engineering Services
Z City of Hemet
3) Resumes of Team
Chase Keys, PE
Team Lead
Chase brings comprehensive experience in design project management, CIP Program Management, and construction management experience of municipal public improvement projects. His experience includes a multi-faceted involvement with Engineering and Public Works Department. Types of projects include roads, drainage, water, sewer, traffic, and parking lots. Chase has helped prepare grant applications for federal, state, and regional funding. Moreover, he has assisted in both the office and field on construction projects. He has served as CIP Manager for the Cities of Jurupa Valley and Hemet, and has also served on site at the Cities of Lake Elsinore, Palos Verdes Estates, and Beaumont in delivering a broad array of projects.
SELECTED PROJECT EXPERIENCE
Z CIP Management, City of Hemet
CIP Manager responsible for managing City’s Capital Improvement budget and overseeing the design and construction of all capital projects including grant writing/ administration. Chase is involved with the projects from conception and budgeting through construction management and close out. Manages a wide array of projects for both engineering and public works including the City’s water/sewer system. In this role Chase oversees all of the City’s annual neighborhood pavement rehabilitation projects.
Z CIP Management, City of Jurupa Valley
CIP Manager responsible for managing City’s Capital Improvement budget and overseeing the design and construction of all capital projects including grant writing/ administration. Chase is involved with the projects from conception and budgeting through construction management and close out. Manages wide array of projects from minor traffic signal modifications to multi-million-dollar street improvement projects.
In 2016-2017 Chase managed and designed roughly $8 million of residential street rehabilitation projects through seven project phases. This work included performing a pavement evaluation on every residential street within the 45 square mile City to determine the priority list of projects to be included in the program.
Z Citywide Pavement Rehabilitation Program, City of Moreno Valley Project Manager responsible for the street improvements of over eighty (80) miles of arterial/collector streets between two projects and ten phases. The projects included the grind and overlay or slurry seal of arterial or collector streets throughout the City. In addition, the project also included new signing and striping of all streets, including the addition of new Class II and Class III bikeways as well as several bicycle boulevards. HR Green had to take into the account the City’s adopted bicycle and pedestrian master plan and existing on-street parking to design the most effective and efficient corridors.
Z Citywide Pavement Rehabilitation Program, City of Jurupa Valley Project engineer responsible for the design of a $9M Citywide neighborhood pavement rehabilitation program spanning seven (7) project phases. Prior to completing PS&E packages, Chase performed “windshield surveys” of all local streets within the City (approximately 190 centerline miles) in order to assign treatment recommendations and prioritize projects. In just 18 months completed the design as well as performed construction management of all 7 projects totaling roughly 40 centerline miles of streets.
EXPERIENCE
9 Years
EDUCATION
BS, Civil Engineering
REGISTRATION /
LICENSE
Registered Civil Engineer,
CA #90593
CONSTRUCTION MANAGEMENT
17.M
On-Call Engineering Services
Z City of Hemet
Jorge Perez, EIT
Construction Administrator
Dedicated project engineer with 5 years of construction experience for public and private sectors performing responsibilities in geotechnical investigations, inspections and testing, construction management and cost estimating. Quality control/quality assurance background for lab testing methods and procedures according to Caltrans standards and ASTM test methods, field inspection duties and collaborating with owners, architects and contractors. His design experience includes roadway improvements, sidewalk rehabilitations, stage construction and drainage projects throughout San Bernardino County and Riverside County. Delivered complete construction plan sets using AutoCAD and Microstation drafting software. Jorge is proficient with AutoCAD/Civil 3D, Microstation/InRoads, Bluebeam, Culvert Master, Hydraulic Toolbox, Procore.
SELECTED PROJECT EXPERIENCE
Z Roadway Construction Management, City of Hemet
Z Engineering Design Services, City of Diamond Bar
Z Citywide Pavement Rehabilitation, City of Jurupa Valley Z Citywide Pavement Rehabilitation, City of Moreno Valley Z Holt Avenue Corridor Improvements, City of Pomona
EXPERIENCE
5 Years
EDUCATION
BS, Civil Engineering
REGISTRATION /
LICENSE
Engineer In Training, CA
#163747
Jennifer Garcia, PE, QSD/QSP
Engineer/Construction Manager
Jennifer has 16 years of broad-based engineering, program/project management, land development coordination, plan review, and construction management experience. She is well versed in preparing a wide variety of civil plans including street improvement, signing and striping, construction phasing, sewer mains, water mains, pavement rehabilitation, erosion control, horizontal control, grading, and drainage plans all in AutoCAD Civil 3D.
She also brings knowledge in preparing specifications, bid documents, cost estimates, and a variety of technical reports, including Water Quality Management Plans (WQMPs) and Storm Water Pollution Prevention Plans (SWPPPs). Jennifer has processed land development projects through entitlement and reviewed final civil engineering plans, erosion control, and grading and drainage plans for the Cities of Pomona and Jurupa Valley.
SELECTED PROJECT EXPERIENCE
Z On-Call Engineering Design, City of Hemet
Z Construction Management, County of Riverside
Z Utility Construction Management, City of Rancho Cucamonga Z Program / Project Management / On-Call Engineering, City of Jurupa Valley Z Street Improvements Design and Land Development Coordination, City of Jurupa Valley
Z CIP Project Design, Various Southern California Cities
EXPERIENCE
16 Years
EDUCATION
BS, Civil Engineering
REGISTRATION
Registered Civil Engineer,
CA #92572
Qualified SWPPP
Developer/Practitioner
(QSD/QSP), CA #27874
CONSTRUCTION MANAGEMENT
17.M
On-Call Engineering Services
Z City of Hemet
Robert Luciano, PE, QSD/QSP
Construction Manager
Robert had a 37-year career with the City of Anaheim involving all facets of construction management and inspection of capital and land development projects. He directed, managed, supervised and coordinated the activities and operations of the Construction Services Division (Inspection, Survey, and Contract/Project Management) within the Department of Public Works. He served as a Public Works Inspector during much of the Anaheim Resort, Platinum Triangle transformation, Anaheim Garden Walk development and Disney’s California Adventureland expansion. As a Project Engineer, he oversaw numerous street improvement projects throughout Anaheim’s downtown communities, such as Center Street Prominade and Anaheim’s Packing House. As the Construction Services Manager, he led the design and construction team for the successful completion of Anaheim Grand Plaza and was an instrumental construction team member for both Anaheim Regional Transportation Intermodal Center (ARTIC) and the Anaheim Convention Center expansion. He also worked on the 200,000 SF Convention Center expansion, building renovations, neighborhood rehabilitation, street improvements, pavement rehabilitation, signal coordination/upgrades, and sewer improvements.
SELECTED PROJECT EXPERIENCE
Z Civic Center EV Charging Stations Construction Management, City of Laguna Hills Z Convention Center Grand Plaza Construction Managerment, City of Anaheim Z Kraemer Blvd BNSF Undercrossing Construction Management, City of Anaheim Z Gene Autry Way Construction Management, City of Anaheim
EXPERIENCE
37 Years
EDUCATION
BS, Civil Engineering
REGISTRATION
Registered Civil Engineer,
CA #70748
Qualified SWPPP
Developer/Practitioner
(QSD/QSP), CA
CONSTRUCTION MANAGEMENT
Alfredo Del Toro
Construction Manager
Alfredo has more than 20 years of experience in the construction of infrastructure projects involving stormwater, street, landscape, irrigation, and traffic improvements.
As a construction inspector, he has worked for numerous public agencies in Southern California, such as the Cities of Montebello, Bell Gardens, South Gate, Brea, Lake Forest, Yorba Linda, Palm Desert, La Quinta, Burbank, Studio City, and the County of Riverside.
His responsibilities entailed all aspects of verifying compliance with public codes, plans, and specifications.
SELECTED PROJECT EXPERIENCE
Z San Pablo Avenue Streetscape Improvements, City of Palm Desert Z La Quinta Complete Streets Project, City of La Quinta Z El Toro and Jeronimo Streetscape, City Lake Forest
Z On-Call Construction Management/Construction Inspection, City of Brea Z On-Call Construction Inspection/Construction Management, Coachella Valley Water District
EXPERIENCE
20 Years
EDUCATION
MS, Civil Engineering
BS, Civil Engineering
SPECIALIZED TRAINING
& CERTIFICATIONS
Caltrans Resident
Engineers Academy
OSHA 30 Certification
17.M
On-Call Engineering Services
Z City of Hemet
Rick Torres
Construction Manager
Rick is an Anaheim resident and has 33 years of experience in Public Works Construction, Inspection, and Construction Inspection Supervision. He has been a full-time employee for the Cities of Irvine, Cypress, Garden Grove, and Bellflower. Rick’s last 7 years of services was Supervising the City of Irvine’s Project Management Inspection Division, which inspected all of the City’s Capital Improvement and Great Park Projects.
SELECTED PROJECT EXPERIENCE
Z City of Irvine Senior Construction Inspector, City of Irvine Z Jeffrey Road Grade Separation, City of Irvine
Z Supervisor City of Irvine’s Project Management Inspection Division, City of Irvine
EXPERIENCE
33 Years
SPECIALIZED TRAINING
& CERTIFICATIONS
Public Works Inspection,
Rancho Santiago College
Supervisor Academy, UCI/
COI
CONSTRUCTION MANAGEMENT
17.M
On-Call Engineering Services
Z City of Hemet
4) Relevant Experience
REFERENCE
Rod Butler
City Manager
City of Jurupa Valley
8930 Limonite Avenue
Jurupa Valley, CA 92509
951.332.6464
[email protected]
Construction Management and Support
City of Jurupa Valley
Upon Jurupa Valley incorporation, City operations needed to hit the ground running and provide for a seamless transition from County-provided services to City-responsible services. Given our established working relationships with County/regional stakeholders and depth of locally-accessible, available staff, HR Green has been able to handle all their City Administration, Engineering, Public Works, Building & Safety, and Development needs. Over the past 10 years we have helped the City Manager and City Council identify, prioritize, and address their goals/challenges, and also develop a roadmap for continuing and sustained success.
Since City incorporation in 2011, HR Green has provided full-service consulting services to manage Public Works, Engineering, Building Safety and Economic Development operations. Our engineering, construction management, and inspection staff have undertaken an aggressive CIP campaign to provide citywide infrastructure improvements, including an annual $9 million CIP program comprised of road widening, Complete Streets, Active Transportation Program, Safe Routes to School, drainage, SB1 funded pavement rehabilitation, and infrastructure improvements.
DATES PERFORMED:
2011-Ongoing
Construction Management and Project Management
City of Placentia
Since 2012, HR Green has provided as-needed civil engineering, CIP project/program management, construction management, and plan review services. This has included overseeing $6.5 million in street rehabilitation improvements citywide through gas tax funding; managing the planning, design, and construction as well as owner representative, value engineering and plan check of the award-winning, $500 million OC Bridges Program; providing extensive value engineering and design engineering input to save time and money, mitigate impacts, enhance infrastructure improvements. HR Green collaborated with OCTA, OC Flood, multiple cities, utilities, and water agencies to facilitate permits and improvements.
Sample Projects
Richfield Road Widening/Drainage Improvement: Value
engineering and plan review for the design of Richfield Road improvements that included drainage improvements into the County’s Atwood Channel, extending box culvert under Richfield Road, realigning storm drains.
Placentia Avenue Undercrossing/Grade Separation: A roadway within the project area, Industrial Way, had poor pavement conditions. HR Green helped negotiate for OCTA to require the contractor to reconstruct the road at a cost of approximately $50,000 due to adverse impacts of construction. HR Green negotiated with the contractor to incorporate sound attenuation elements and allow for night time construction adjacent to apartments. This mitigated community complaints and reduced the detour schedule by several months.
REFERENCE
Romeo David
Associate Engineer
City of Rancho Cucamonga
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
909.774.4070
[email protected]
DATES PERFORMED:
2012-Ongoing
CONSTRUCTION MANAGEMENT
17.M
On-Call Engineering Services
Z City of Hemet
5) Understanding and Approach CONSTRUCTION MANAGEMENT
The duties of the construction manager are to provide
oversight over the entire project directly for the City of Hemet, working with the engineer/architect and general
contractor to deliver the project on time, at or under
budget, and to the owner’s expected standard of quality.
They are responsible for monitoring construction sites
to ensure that government regulations and Occupational
Safety and Health Administration (OSHA) laws are
followed. Regardless of the delivery system used (designbuild, at-risk, etc.), our Construction Managers (CM) act as an advisor to the City, charged with assuring projects progress smoothly and achieve the City's objectives.
Preconstruction Phase
The preconstruction phase sets the stage for the
experience and outcome of the project. Our CM/RE will
develop a detailed project initiation document that will be the basis for describing the City's objectives and the means for successful delivery. The CM will collaborate
with the project team to transition the project design into the construction phase of the project.
Constructability Review and Value Engineering
We believe it essential to verify scope and constructability before the project is bid. Our preconstruction phase of the project includes performing a detailed review of the contract documents and field conditions. The activities included in our review process are:
▪ Perform constructability review, review plans, and
technical specifications for completeness and
constructability.
▪ Review the engineer’s estimate for accuracy.
▪ Provide value engineering reviews.
▪ Identify design/construction alternatives that may
be employed to reduce project duration and costs,
and minimize conflicts between the proposed
improvements and existing site improvements and
utilities.
APPROACH
HR Green’s Construction Managers will be responsible
for constructability reviews. We developed an internal
24-point constructability review checklist that allows us to identify potential issues in the project early. Following this consistent process allows our team to develop and
recommend cost-effective solutions prior to the issues
causing costly delays. The review also includes field visits to identify potential utility and/or ROW conflicts and to identify project stakeholder impacts. We will identify and recommend corrections of plan errors and omissions,
recommend innovative alternatives, offer potential material substitutions, identify utility conflicts, identify traffic control conflicts, etc. Our team will prepare a summary of the review and present it to the City and Design
Consultant during milestone stages and/or prior to the
start of construction. This established process had led to our success in maintaining project schedules and budgets on contracts managed by HR Green.
Budget and Schedule Management
Another essential preconstruction activity is planning
for schedule and budget management which includes
preparing a master project budget and schedule and
monitoring and review progress, budget, and schedule.
APPROACH
Like every municipality, the City of Hemet desires to
be good stewards of residents’ tax dollars. The best
way we can help to control spending is to effectively
manage project schedules and budgets. HR Green has
the capability to assist the City in the development,
management, and execution of the delivery of your
capital projects. Our team will prepare a master project budget and schedule and will monitor and review design
consultants’ and contractors progress, budget, and
schedule.
We have the experience using enterprise-based planning
and scheduling that integrates budget cost, actual cost and schedule as well as resources for your management
all your capital projects as an organization using Primavera P6. HR Green will take ownership of the project from the start and consistently review project schedules and cost estimates.
Bidding Assistance
RELATED SCOPE OF WORK
▪ Prepare bidding documents.
▪ Assist in bidding of projects.
▪ Assist in prequalification of bidders.
▪ Provide response to bidders during bidding period.
▪ Provide bid analysis.
▪ Conduct reference checks on the low bidder.
▪ Conduct state license and insurance checks on low
bidder.
17.M
On-Call Engineering Services
Z City of Hemet
CONSTRUCTION MANAGEMENT
▪ Make recommendation for the successful bidder.
▪ Prepare contract for the successful bidder.
▪ Review contract required documents from the
successful bidder.
APPROACH
Once the project has been approved by the City and
ready to bid, HR Green will coordinate a pre-bid meeting, respond to questions, prepare addenda, evaluate bidders, and recommend award.
We will prepare the contract and meet with the contractor to review it, answering any question about requirements.
Following that meeting, we will deliver the contract to the City for formal execution.
Construction Phase
Stakeholder Coordination
RELATED SCOPE OF WORK
▪ Coordination with local residents, businesses,
emergency services, etc.
APPROACH
As representatives of the City, HR Green will support
efforts to keep the community informed of construction
activities throughout the project. We will review upcoming contractor work activities for potential impacts to residents and/or businesses and coordinate with the stakeholders to maintain parking and property access during construction.
HR Green will address project stakeholders’ concerns
while keeping the City informed of any issues. On past
projects, we have used a variety of tactics for public
outreach that can be scaled to meet the needs of a
project, the needs of the City, and the needs of the
community. Such strategies have included website and/
or social media updates, door hangers, public meetings, door-to-door outreach, and more.
Utility Coordination
RELATED SCOPE OF WORK
▪ Coordinate and facilitate coordination with utility
companies and contractor.
APPROACH
HR Green has significant experience addressing utility
challenges and coordinating construction activities in
utility-congested areas. Early coordination with the
utility companies and verification that the relocation
clears the proposed improvements will help to minimize
the probability of costly delays to the project during
construction. Our entire Construction Management team
will be focused on finding innovative ways to work around potential conflicts and keep the project on schedule.
Before construction, we will perform a utility engineering investigation to develop a matrix to track the status of the known utility conflicts, the status of their relocation efforts, utility contact information, permits needed/
received for the relocation, anticipated start dates/
completion dates of the relocation, all temporary or
permanent easements and/or ROW are secured, etc. The
matrix will be the foundation of how the known utility are tracked.
As unknown utilities are encountered, they will be
document immediately using contract plan drawings and
photos, an investigation into who the unknown utility
owner is will commence, and the utility matrix will be
updated and prioritized so all the utilities are addressed according to their impact on the critical path.
HR Green routinely hosts weekly utility coordination
meetings on our projects. These meetings are attended
by client representatives, the prime contractor, utility company representatives, and the construction
management leadership. The meetings provide an
opportunity for the project team to collaborate and have an in-depth understanding of potential impacts to the project schedule and/or project budget. This level of coordination allows for all project stakeholders to more efficiently plan and effectively implement the progress of the contract
work.
Keeping the lines of communication open among all the
project stakeholders has been the key to successful
relocation of multiple facilities on past projects managed by HR Green.
Traffic Control
RELATED SCOPE OF WORK
▪ Monitor daily the traffic control devices for compliance with the contract documents.
▪ Evaluate the proposed plan for improved efficiencies.
APPROACH
HR Green staff is trained in traffic control inspection and has a keen understanding of CA MUTCD requirements.
HR Green will continuously evaluate the effectiveness of the planned maintenance of traffic and make immediate
improvement recommendations to the City Traffic
17.M
On-Call Engineering Services
Z City of Hemet
CONSTRUCTION MANAGEMENT
Engineer, if warranted. HR Green will take immediate
ownership of the project, which will provide safe and
expedited travel through the work zone while also
providing worker safety. HR Green will constantly search for innovative methods to expedite construction activities and evaluate planned maintenance of traffic stages in an effort to reduce the impacts to the traveling public and search for cost savings to the City.
We will review the installation of traffic control devices of each construction stage or detour and then monitor
the traffic control daily to verify compliance with the requirements of the contract documents. We immediately
notify the contractor of any discrepancies between the
traffic control setup and the approved plan.
Environmental
RELATED SCOPE OF WORK
▪ Complete understanding of County, State, and Federal
water pollution control regulations related to runoff
from and/or de-watering of construction sites.
▪ Monitor, evaluate, and report contractor’s
environmental compliance including preparing the
Stormwater Multiple Application and Report Tracking
System (SMARTS) reports; update and upload them
into the online database.
APPROACH
HR Green is an industry leader in environmental protection and advocates strict procedures throughout the project to minimize surrounding area impacts. The HR Green team
has always taken an aggressive preemptive approach
to managing erosion control. HR Green will observe the
contractor’s work area for compliance with the contract documents and notify the contractor if the erosion control measures are not in accordance with the SWPPP. Our staff will verify the contractor has implemented the corrective actions. HR Green has QSD/QSP certified staff with
experience in entering and monitoring SWPPPs within the State Multiple Application Reporting and Tracking System (SMARTS).
Schedule / Budget Control
RELATED SCOPE OF WORK
▪ Thorough knowledge of critical path scheduling,
including an ability to evaluate schedules submitted by contractors and to evaluate and anticipate downstream
impacts to those schedules during construction.
▪ Review contractor’s monthly payment request and
make recommendation for payment.
APPROACH
HR Green firmly believes that Critical Path Method
(CPM) schedule methodology should be employed when
managing or maintaining any project schedule. The
critical path is imperative to identifying the tasks which are driving milestones and completion dates. Managing
these milestones enables the schedule to be a tool for
crucial decision making and communication. By updating
the original schedule, changes in needs for personnel,
coordination and finances can be proactively managed.
Our Project Manager, Gary Yeo, is a scheduling specialist who has extensive experience in evaluating project
schedules, notices of potential time impacts, and time
impact analyses utilizing software, such as Primavera P6.
Gary will work with the contractor to verify the baseline progress schedule complies with the requirements of
the contract. The baseline schedule will then be used to monitor the contractor’s weekly progress. Gary will also review the monthly schedule updates for accuracy and
monitor the status of the project throughout the duration of the contract.
HR Green understands the importance of cost
management. Gary will monitor and control costs to stay within the available budget. Utilizing the cost reporting and bid information, the HR Green team records the bid
quantities and progress payment information, monitors
expenditures, estimates the cost to complete the project, and reports potential cost impacts to the City. The cost reporting includes the cost of potential change orders and potential issues we anticipate to occur that may have cost impacts.
In addition, Gary will continually track the construction management budget and staff projections to verify the
appropriate staffing levels are in place for the contractors work effort and the project can be completed within the assigned budget.
Survey and Material Testing
RELATED SCOPE OF WORK
▪ Coordinate the surveying, materials testing, and
inspection needs of the project.
▪ May provide construction inspection, surveying,
hydrant flow testing, and materials testing services.
▪ Monitor the inspection, surveying, and materials
testing budget.
▪ Perform a pre-construction survey.
17.M
On-Call Engineering Services
Z City of Hemet
CONSTRUCTION MANAGEMENT
APPROACH
HR Green has teaming partners to support survey and
material testing as needed. Dennis Janda, Inc. (survey) and Terracon Consulting, Inc. (geotchnical) will perform these services. In addition, HR Green has a team of
inspectors, proposed in our proposal for Inspection
Services, who can provide additional support as needed
for construction inspection activities.
Responsiveness
RELATED SCOPE OF WORK
▪ Review, respond and facilitate response to Request for Information (RFI).
▪ Review and facilitate submittals and shop drawings.
▪ Review, negotiate and make recommendations for
change orders.
APPROACH
HR Green takes pride in being responsive to our clients, contractors, and project stakeholders to keep projects
moving forward efficiently. Our expectation is that our construction managers will process RFI’s within two days, shop drawing reviews within seven days, and submittals
within five days.
As part of our overall financial control during the
construction process our team will implement a change
order control system. Once it is agreed there is a merited change in contract cost or time, our staff will develop an independent cost estimate. We will develop a scope of
work describing the change. A time impact analysis will be performed to establish any schedule impacts. A request
for quotation of the change order will be issued tothe
contractor. Upon receipt of the quote from the contractor, HR Green will review it for completeness.
Once the changes are agreed upon, an official change
order with be developed and recommended to the City for approval.
Project Records
RELATED SCOPE OF WORK
▪ Provide and maintain logs for RFIs, change orders,
submittals, Request for Quotations, Correction
Notices, Stop Work Notices, and related construction
documents.
▪ Review contractor certified payroll for accuracy.
▪ Provide videotape and photographic documentation of
project site prior to and during construction, including video inspection of utilities.
▪ Prepare weekly construction progress report to the
City.
▪ Monitor, evaluate, and report contractor’s labor
compliance.
▪ Project record audits.
APPROACH
HR Green recognizes the importance of maintaining
detailed and accurate project records. Accurate
documentation throughout a project leads to an
efficient project closeout. At HR Green, project closeout is managed from the onset of the project. Projectspecific strategies for final quantities are developed at project startup, including the development of tracking
spreadsheets for final quantity status, identification and documentation of specific requirements for each pay item, and identification of warranty and final documentation
needs for each item. Our Team excels in providing
exceptional project records for our clients and protecting their investments during audits. Our clients know our
documentation will pass audits and they will receive their full federal funding reimbursement without delay.
The foundation of this process is daily tracking and
documenting of all project activities, which includes
keeping a daily diary with all contractor activities,
weather, site conditions, and any notable contract-related correspondence.
All bid item quantities are also tracked daily, documented with plan sheets highlighting the pay item, calculations, and photos attached a daily inspection report. We will
index all the daily inspection reports and upload them to a web-based server to always allow our team access to
the documents. Our team will highlight completed work
on record drawings for progress updates and create a
material documentation deficiency list with each pay
estimate to be sent to the contractor.
HR Green will maintain all records on the project in
compliance with City, State, and Federal record keeping procedures, including DWR, diaries, shop drawings and
submittals, RFI drawings and sketches of measure items, sets of plans, record set plans, material on hand forms, and general correspondence.
HR Green uses the latest technology to be more efficient in documenting contract quantities as well as communicating
17.M
On-Call Engineering Services
Z City of Hemet
with the project team. Our staff can perform all daily
work reports electronically, utilizing tablets in the field and uploading daily reports to a web-based network.
HR Green also utilizes Bluebeam software packages to
document record drawings, provide field change drawings to the contractor, and to collaborate within the project on a real-time basis.
We make sure the contractor signs off on quantities as the project progresses to mitigate any issues with quantities at closeout. Both the contractor and the assigned project/ construction manager will sign the final quantity sign-off sheet to document both parties’ agreement to the final
quantity of an item. We will incorporate final quantity discussion into our weekly progress meetings with a table of current final quantity status in the agenda and hold a closeout meeting with the contractor to resolve any
quantity discrepancies. We strive to deliver project records and the final pay estimate within six weeks of project
completion.
Safety
RELATED SCOPE OF WORK
▪ Review contractor’s safety program.
APPROACH
HR Green is committed to safety. While job site safety
is the contractor’s responsibility, HR Green utilizes
a proactive approach of maintaining effective safety
standards to guard against injuries and illnesses occurring on the job. Our team will actively monitor the daily
construction activities and notify the contractor and the City of any deficiencies or imminent hazards or situations observed. We will follow up with the contractor to
determine if corrective measures have been taken.
Our construction managers will also participate in the
contractor’s weekly tailgate meetings. Maintaining
communication with the project team and including
“safety” during the weekly project meeting is also part of our approach to reaching a goal of zero accidents and injuries on your project. Our team will review the site with the contractor frequently to help identify any potential or unsafe conditions and confirm the deficiencies are
corrected immediately.
Closeout Phase
RELATED SCOPE OF WORK
▪ Prepare project punch-list.
▪ Issue correction notices for deficiencies found,
monitor and enforce all corrective action as
necessary.
▪ Obtain all record (As-Built) drawings, contract
required documents, lien releases, and written
warrantees.
▪ Coordinate collecting all documents needed for
Project closure including guarantees, warranties, O&M
manuals, affidavits, released bonds and waivers, etc.
▪ Document potential contractor claims and respond
to contractor potential claim correspondence citing
specific contract documents, codes, etc.
▪ Prepare analysis of potential claims and make
recommendations regarding their settlement.
▪ Negotiate with contractor and assist the City to
facilitate claim resolution.
APPROACH
HR Green keeps the final punch list in mind throughout the life of the project. Our project team is trained to identify punch list items while the major work activities take place, creating a cleaner project throughout construction and
minimizing additional time after substantial completion.
Our staff will document these items on a living document throughout construction that will be available to all
stakeholders during the final inspection.
At the end of the project, the HR Green Team will
prepare and submit a Notice of Completion, all laboratory and plant testing reports, manufacturer’s certificates, inspection reports, and photographs of various phases of construction. HR Green will also prepare and submit final “as-built” plans. Finally, HR Green will meet with the City’s project manager to review the closeout documents and
identify any lessons learned.
CONSTRUCTION MANAGEMENT
17.M
Public Works Construction
Inspections
Resumes of Team
Relevant Experience
Understanding and Approach
17.M
On-Call Engineering Services
Z City of Hemet
3) Resumes of Team
Gary Yeo, CCM
Team Lead - Public Works Construction Inspections
Gary has 30+ years of experience in planning and construction of infrastructure and facilities for public agencies. He has managed CIP programs up to $600 million and projects up to $3.4 billion, including $900+ million in road and utility projects, and served in various roles, such as Program and Construction Manager and Senior Project Controls Manager to LA Metro, cities, transportation agencies, school districts, ports, and airports. As a thought leader in Project Controls, he is proficient with numerous software systems, such as Primavera Software: P3, P5, P6, Expedition; HCSS Heavy Bid, Xactimate, and PlanSwift estimating software; Skire Unified and Prolog project management software; and Microsoft Office: Word, PowerPoint, Excel, Project, and Access.
SELECTED PROJECT EXPERIENCE
Z CIP Project / Construction Management, Various Southern California Cities and Counties
Director of Program Management / Construction Manager coordinating a team of 25+ program and construction managers, professional engineers, and inspectors on 110+ public projects for 30+ public agencies. This has included $80+ million in miscellaneous CIP projects for numerous Orange and Los Angeles County cities.
Worked with boards and city councils, public works departments and city engineers to translate policy direction and realized the vision. Managed planners, architects, engineers, contractors, move management, and procurement to successfully complete projects on time, within budget, and claim free.
Z 2019 Annual Slurry Seal Project, City of Laguna Hills Construction Manager for curb and gutter repair, installation of ADA ramps at various locations, cold planning and resurfacing of streets and slurry seal where applicable.
Z Civic Center EV Charing Stations, City of Laguna Hills Construction management and inspection for the installation of two (2) ChargePoint CT4000 dual-port Level II electric vehicle (EV) charging stations with dedicated dual-circuits per charging station and infrastructure to serve four (4) EV parking spaces for public use at Laguna Hills’ Civic Center.
Z Palos Verdes Drive West, City of Palos Verdes Estates Construction Manager and inspection for the $643,067 45-working day Palos Verdes Drive West rehabilitation project. The project includes 204,000 SF of cold milling existing AC pavement, Asphalt Rubber Hot Mix (ARHM) overlay, localized pavement repairs, localized concrete repairs, update existing curb ramps to ADA standards, pavement marking and striping, and all other items not mentioned but indicated in the Plans and Specifications.
EXPERIENCE
30+ Years
EDUCATION
MS, Project Management
BS, Construction
Management
REGISTRATION /
LICENSE
Construction Management
Association of America
American Association of
Professional Estimators
Project Management
Institute (PMI)
AACE (Formerly the
Association for the
Advancement of Cost
Engineering)
American Public Works
Association
PUBLIC WORKS CONSTRUCTION
INSPECTIONS
17.M
On-Call Engineering Services
Z City of Hemet
Charles Wilson
Construction Inspector
Chuck has 24 years of professional experience in construction inspection for public agencies in Southern California. He has been involved in projects including major corridors and interchanges, street improvements, traffic signals, flood control and storm drain, water/sewer improvements, open space and recreation, and public building improvements.
SELECTED PROJECT EXPERIENCE
Z Clay Street Grade Separation – Jurupa Community Services District, City of Riverside
Z Pyrite Creek Trunk Sewer Phase 1 – Jurupa Community Services District, City of Riverside
Z Highway 111 Reconstruction (Washington Street to Jefferson Street), Cities of Indio and La Quinta
Z Monroe Street Traffic Signal Interconnect Project and Traffic Signal Modifications, City of Indio
EXPERIENCE
24 Years
SPECIALIZED TRAINING
& CERTIFICATIONS
Certified Landscape
Irrigation Auditor, 57152
Caltrans Water Pollution
Control Manager
Confined Spaces
Trenching and Excavation
First Aid & CPR
PUBLIC WORKS CONSTRUCTION
INSPECTIONS
Robert Luciano, PE, QSD/QSP
Construction Inspector
Robert had a 37-year career with the City of Anaheim involving all facets of construction management and inspection of capital and land development projects. He directed, managed, supervised and coordinated the activities and operations of the Construction Services Division (Inspection, Survey, and Contract/Project Management) within the Department of Public Works. He served as a Public Works Inspector during much of the Anaheim Resort, Platinum Triangle transformation, Anaheim Garden Walk development and Disney’s California Adventureland expansion. As a Project Engineer, he oversaw numerous street improvement projects throughout Anaheim’s downtown communities, such as Center Street Prominade and Anaheim’s Packing House. As the Construction Services Manager, he led the design and construction team for the successful completion of Anaheim Grand Plaza and was an instrumental construction team member for both Anaheim Regional Transportation Intermodal Center (ARTIC) and the Anaheim Convention Center expansion. He also worked on the 200,000 SF Convention Center expansion, building renovations, neighborhood rehabilitation, street improvements, pavement rehabilitation, signal coordination / upgrades, and sewer improvements.
SELECTED PROJECT EXPERIENCE
Z Land Development Projects, City of Jurupa Valley
Z On-Call Construction Engineering / Inspection, City of Diamond Bar Z Kraemer Boulevard Undercrossing, Burlington Northern Santa Fe Railroad, City of Anaheim
EXPERIENCE
37 Years
EDUCATION
BS, Civil Engineering
REGISTRATION
Registered Civil Engineer,
CA #70748
Qualified SWPPP
Developer/Practitioner
(QSD/QSP), CA
17.M
On-Call Engineering Services
Z City of Hemet
Eric Lomeli
Construction Inspector
Eric has 22 years of public works and public utilities experience associated with both construction and maintenance. For the City of Corona he inspected dry utilities projects citywide and is proficient using the City’s iTRAKiT system. Since 2016 he has worked for the City of Jurupa Valley as a Construction Inspector on dozens of encroachment permits and housing tracts that involve inspection/observation of dry utility projects. He also worked for the City of Buena Park, maintaining city streets, sidewalks, parkways and streetscape. He worked for the City of Riverside for six years maintaining and installing
EXPERIENCE
22 Years
CERTIFICATIONS
CVWD Landscape
Certification Program
AQMD Coachella Valley
Fugitive Dust Control
(PM10)
SAR Construction Site
Inspections
ATSSA Traffic Control
Technician
SMR Municipal Facilities &
Activities
SMR Construction Site
Inspections
WWR Construction Site
Inspections
Regionwide Industrial
and Commercial Facility
Inspection
Santa Ana Region Water
Quality Management
Whitewater River Water
Quality Management Plan
Flagger Trained
NHI Proper Diamond Grinding
Techniques
Safe and Effective Law
Enforcement Personnel in
Work Zones
domestic water distribution mains, hydrants, valves and meters. He installed water mains and upgraded pipelines from 4” to 12”. He ran new systems, installed new hydrants, and chlorinated and flushed lines. He has experience
reconstructing an entire neighborhood, including working directly with residents for project updates and changing inside meters. He is skilled in troubleshooting water-related problems and has experience in traffic control around job sites. Eric removed concrete and asphalt, applied skin
patching and filled potholes. His work included operation of heavy equipment including a backhoe, loader and bobcat.
SELECTED PROJECT EXPERIENCE
Z Various CIP Projects, City of Hemet
Z Land Development Inspections, City of Palm Desert
Z Construction Inspection and Inspection of Dry
Utilities, City of Jurupa Valley
PUBLIC WORKS CONSTRUCTION
INSPECTIONS
Leighton Muckey
Construction Inspector
Leighton has 35+ years of public works inspection experience with experience inspecting both CIP and land development projects. He has provided project manager and inspection for CIP infrastructure improvements and maintenance projects as well as land development (residential and commercial projects), water (Steel, Ductile Iron, and C900), sewer (SDR35), storm drain (RCP), streetlight, traffic signal, street paving, concrete construction, and grading operations. Leighton has also inspected citywide pavement rehabilitation projects involving grind and overlay which involved traffic signals, grading, paving, electrical, lighting, sewer and water line relocation. He has coordinated the efforts of third-party materials testing consultants.
SELECTED PROJECT EXPERIENCE
Z Citywide FY 20/21 Miscellaneous Street Repairs, City of Palos Verdes Estates Z Citywide Pavement Rehabilitation CIP NO. 101-L and Ridge Route Drive Pavement Resurfacing CIP NO. 188, City of Laguna Hills
Z Citywide Pavement Rehabilitation Phase 1, City of Jurupa Valley Z Various CIP and Land Development Projects, City of Corona
EXPERIENCE
35 Years
CERTIFICATIONS
Maintenance of Traffic
for Technicians and HMA
Paving Field Inspection
Certification, National
Highway Institute
Various Construction and
Stormwater Compliance