Cities Index.
Vendor · Energy

Syserco Energy Solutions

Contract actions with Syserco Energy Solutions in California city council documents since 2022 — also written as SYSERCO; SYSERCO ENERGY SOLUTIONS; SYSERCO ENERGY SOLUTIONS (SES); SYSERCO ENERGY SOLUTIONS, INC.; SYSERCO Energy Services Solutions (SES); SYSERCO Energy Solutions (SES); SYSERCO, Inc.; Syserco; Syserco Energy Solutions (SES); Syserco Energy Solutions (Ses); Syserco Energy Solutions (Syserco); Syserco Energy Solutions Inc..

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
38actions
22cities
$61,391,296approved (recorded vote)
$12,044,760proposed, no vote in the index
2022-06-07first action in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

By city

CityActionsFirstLatestApproved $
Morgan Hill42022-06-152026-09-16$8,888,150
Daly City32024-06-242026-09-14$3,748,950
Dos Palos32023-01-172026-09-22$146,075
Mountain View32022-06-282024-06-25$7,158,160
Willits32024-12-112026-01-14$3,150,893
Commerce22023-12-122026-07-14$1,796,450
Emeryville22022-06-072024-12-10—
Fort Bragg22023-07-102024-07-22$7,564,511
Norwalk22023-11-072026-01-20$18,200,000
Santa Clara22026-09-222026-09-22$331,928
Campbell12022-12-062022-12-06—
Cupertino12025-02-042025-02-04$4,339,881
Fremont12026-04-212026-04-21$108,857
Gilroy12022-10-032022-10-03$3,685,718
Hayward12025-04-012025-04-01$2,196,973
Irwindale12026-04-222026-04-22—
Los Altos Hills12023-02-162023-02-16$24,750
Mill Valley12026-01-202026-01-20—
Newark12023-04-132023-04-13—
Petaluma12022-11-072022-11-07—
Pico Rivera12026-09-082026-09-08$50,000
Sebastopol12023-01-172023-01-17—

Actions

DateCityItemActionAmountSize · price · savingsOutcomeSources
2026-09-22Dos PalosConsider approving Syserco Energy Solutions Invoice #22027 for $146,074.90 for the Wastewater Plant Solar
Solar and solar PPAs
Award$146,075Approved
3-1; AYES: Councilmember Pigg, Bravo, and Bautista NOES: Mayor Reed ABSENT:…
packet · city original
2026-09-22Santa ClaraAction to Authorize the City Manager to Issue Purchase Orders and/or Negotiate and Execute an Agreement with Syserco, Inc. for Heating, Ventilation, and Air Con check
Efficiency retrofits and ESPCs
Award$331,928
not to exceed
Approved
6-0 (Absent: Jain)
agenda · minutes · packet · packet · other
2026-09-22Santa ClaraSyserco Service Support Program Agreement check
Other
Award—No vote recordedstaff report · packet · city original
2026-09-16Morgan HillAccept the Citywide Multi-Site Solar System Project
Solar and solar PPAs
Other$7,827,100solar systems at seven City facilitiesNo vote recordedpacket · city original
2026-09-14Daly CityAccept Notice of Completion for the Fire Station 93 Design Build Energy Service Agreement for Solar, HVAC & LED Lighting Project
Efficiency retrofits and ESPCs
Other$576,400Approved
carried by voice vote
minutes · packet · city original
2026-09-08Pico RiveraLetter of Intent to Perform an Investment Grade Audit for an Energy Efficiency Project at City Facilities
Efficiency retrofits and ESPCs
Award$50,000approximately $15.4 million in energy and operational savings over the…Approvedagenda · minutes · packet · packet · packet
2026-07-14CommerceAPROBACIÓN DE UN CONTRATO DE SERVICIOS ENERGÉTICOS CON SYSERCO ENERGY SOLUTIONS, INC. (SES) PARA LA EFICIENCIA ENERGÉTICA DE LAS INSTALACIONES MUNICIPALES Y LA check
Bundles
Award$1,796,450ECM 5.01 building lighting upgrade and controls across seven City stru…
$61,126.00 first-year utility billing savings and $23,268.00 annual O&…
Approvedstaff report · staff report · staff report · staff report · agenda
2026-06-08Daly CityAdopt a resolution awarding a design-build contract to Syserco Energy Solutions, Inc. for HVAC, LED lighting, and other energy-efficiency improvements at War Me check
Efficiency retrofits and ESPCs
Award$2,596,150Approved
carried by unanimous roll call vote
minutes · packet · packet · city original
2026-04-22IrwindalePublic Hearing and Approval of an Energy Services Agreement with Syserco Energy Solutions, Inc. for City Facilities Energy Efficiency Improvements check
Efficiency retrofits and ESPCs
Award$3,075,000new carport solar panels for Police Department and Community/Senior Ce…Continued
unanimously approved
agenda · agenda · minutes · minutes · packet
2026-04-21FremontEnergy Management Services - Approval of a Service Agreement with Syserco Inc., for Support Services and Part Purchases for the City's Energy Management System
Other
Sole-source award$108,857
per year
37 City buildings EMS (Alerton) controllers
20% discount onsite technical support; 60% discount on Alerton product…
Approved
Ayes: Mayor Salwan, Vice Mayor Zhang, Councilmembers: Keng, Campbell,…
staff report · agenda · agenda · minutes · packet
2026-01-20Mill ValleyConsideration of an Energy Services Contract with Syserco Energy Solutions (SES) for LED lighting upgrades at the Community Center, Public Safety Building, and
Efficiency retrofits and ESPCs
Award—Approved
5-0
agenda · minutes · city original
2026-01-20NorwalkENERGY SERVICES CONTRACT – FIRST AMENDMENT
Efficiency retrofits and ESPCs
Renewal / extension—Approvedstaff report · agenda · minutes · packet · packet
2026-01-14WillitsProposed Change Order For The New Sports Park Solar Array For An Amount Of $231,040; To Syserco Energy Solutions (Ses) For The Installation Of Revised Caisson I check
Solar and solar PPAs
Amendment$203,493
not to exceed
20 steel caissons
Projected energy cost savings: cumulative cash flow positive around Ye…
Approved
4/1 with Council Member Stranske dissenting
agenda · agenda · minutes · city original
2025-10-22WillitsProposed Change Order for the New Sports Park Solar Interconnection Site System Upgrades for an Amount of $125,000; To Syserco Energy Solutions (SES) for the In
Solar and solar PPAs
Amendment$125,000
not to exceed
Using a conservative utility escalation rate of 2-percent, the project…Approved
3/1 with Council Member Burton dissenting and Council Member Gonzalez absent
agenda · agenda · minutes · city original
2025-06-18Morgan HillAUTHORIZE A CHANGE ORDER FOR THE ENERGY SERVICES CONTRACT WITH SYSERCO ENERGY SOLUTIONS, INC. TO THE CITYWIDE SOLAR SYSTEMS PROJECT FOR THE REPAIR OF THE CENTEN
Solar and solar PPAs
Amendment$243,600Replace (2) existing inverters with (1) SMA SHP 125-US-21 inverter, pl…
loss of about $60,000 annually in energy savings costs if not funded
Approved
RESULT: Passed; AYES: Mayor Turner, Mayor Pro Tem Martinez Beltran, Council…
agenda · minutes · packet · packet · packet
2025-04-01HaywardAgreement with Syserco Energy Solutions: Adopt a Resolution Authorizing the City Manager to Execute an Agreement with Syserco Energy Solutions, Inc., for Energy check
Efficiency retrofits and ESPCs
Award$2,196,973
not to exceed
ECMs across 16 City facilities
First year energy savings of approximately $250,000; total energy cost…
Approved
AYES: COUNCIL MEMBERS Andrews, Bonilla Jr., Goldstein, Roche, Syrop, Zermeño;…
staff report · staff report · staff report · staff report · agenda
2025-02-04CupertinoAward of a design-build contract to Syserco Energy Solutions for $4,339,881 and award a project management and construction management agreement to 4Leaf, Inc. check
Solar and solar PPAs
Award$4,339,881
not to exceed
three of the five City of Cupertino facilities (Community Hall, Cupert…
approximately $276,000 annually, and $13 million over a 30-year lifesp…
Approved
Ayes: Moore, Fruen, and Mohan. Noes: Chao and Wang.
staff report · staff report · staff report · staff report · staff report
2024-12-11WillitsDiscussion and Possible Execution of an Energy Services Agreement with Syserco Energy Solutions (SES) for the Completion of a Design and Installation of a Propo check
Solar and solar PPAs
Award$2,822,400
not to exceed
solar PV systems at two City-owned site locations
Using a conservative utility escalation rate of 2-percent, total cost …
Approved
carried unanimously
agenda · agenda · agenda · agenda · agenda
2024-12-10EmeryvilleResolution authorizing City Manager to enter into contract with SYSERCO, Inc. for BMS system replacement and plumbing repairs in Civic Center, Project No.156500 check
Efficiency retrofits and ESPCs
Awardsee source(30) VAVs, (1) AC unit, (1) gas boiler, (6) exhaust fans
Unit price for (1) VAV HW Valve Replacement: $1,650.00
Approvedstaff report · staff report · staff report · staff report · agenda
2024-07-22Fort BraggReceive Report, Conduct Public Hearing, and Consider Adoption of City Council Resolution Approving Contract with Syserco Energy Solutions Inc. for the Purchase
Solar and solar PPAs
Award$7,501,2246 City facilities; Police Station roof replacement included
approximately $12.8M in utility savings over the expected life of the …
Approved
5 - Aye: Mayor Norvell, Vice Mayor Godeke, Councilmember Albin-Smith,…
staff report · staff report · staff report · staff report · staff report
2024-06-26Morgan HillAWARD THE ENERGY SERVICES CONTRACT TO SYSERCO ENERGY SOLUTIONS, INC. FOR DESIGN AND CONSTRUCTION OF SOLAR SYSTEMS AT MULTIPLE CITY FACILITIES IN THE AMOUNT OF $ check
Solar and solar PPAs
Award$7,583,500
not to exceed
solar photovoltaic systems at seven City-owned facilities
estimated net savings of over $18.6 million over 30 years
Approved
AYES: Council Member Spring, Council Member Borgioli, Council Member Martinez…
agenda · minutes · packet · packet · packet
2024-06-25Mountain ViewApprove Budget and Award an Energy Services Contract to Syserco Energy Solutions, Inc. to Install Solar Array Systems on Three Public Facilities: Senior Center, check
Solar and solar PPAs
Award$5,944,803
not to exceed
solar arrays at three City facilities
energy savings of $9.86 million resulting from the project
Approved
7-0
staff report · staff report · staff report · agenda · agenda
2024-06-24Daly CityPublic Hearing for Proposed Turnkey Design-Build Energy Services Agreement with Syserco Energy Solutions, Inc.
Bundles
Award$576,40025.6 kW roof mount solar photovoltaic system
After project completion, the City will receive a tax credit in the am…
Approved
unanimous roll call vote
agenda · minutes · packet · packet · packet
2023-12-19Dos PalosConsider Approving Resolution 2023-17, Making Findings on Energy Savings Pursuant to Government Code Section 4217.12 and Authorizing the Execution of an Energy
Efficiency retrofits and ESPCs
Award—Approved
5-0
agenda · agenda · minutes · city original
2023-12-12CommerceMaking Certain Findings and Adopt Resolutions Approving an Energy Services Contract and Facility Financing Contract for an Energy Efficiency Project Required Un
Efficiency retrofits and ESPCs
Award—$1.2 million saving as stated by vendor representativeContinuedminutes · other · city original
2023-11-07NorwalkPUBLIC HEARING - RESOLUTION NO. 23-68 – SUSTAINABILITY, ENERGY EFFICIENCY AND INFRASTRUCTURE IMPROVEMENT PROJECT
Efficiency retrofits and ESPCs
Award$18,200,000Solar PV arrays at several facilities; LED ballfield lighting; HVAC re…
$39,458,180 total energy savings over useful life of equipment
Approved
AYES: Councilmembers Ayala, Perez, Vice Mayor Rios, and Mayor Valencia; NOES:…
staff report · staff report · agenda · minutes · packet
2023-07-10Fort BraggReceive Report and Consider Adoption of City Council Resolution Approving Letter of Intent (LOI) with Syserco Energy Solutions (SES) for the Facilities Solar Pr
Solar and solar PPAs
Award$63,2876 City-owned sites
$9M - $20M NET Savings over the life of the equipment installed
Approved
Aye: Mayor Norvell, Vice Mayor Godeke, Councilmember Albin-Smith,…
staff report · staff report · staff report · agenda · minutes
2023-04-13NewarkPublic hearing to adopt findings and authorize City Manager to execute an energy services agreement with Syserco Energy Solutions (SES) not to exceed $1,598,265 check
LED streetlights
Awardsee sourceapproximately 2,800 streetlights
first year annual utility savings estimated at $218,757; 15-year net s…
Approved
4 AYES, 1 ABSENT
agenda · packet · packet · city original
2023-02-16Los Altos HillsResolution Approving a Change Order with Syserco for the Construction of a Fence for the Battery Energy Storage System in the Amount of $24,750 check
Battery storage
Amendment$24,750100% of energy savings goes directly to Town of Los Altos HillsApproved
MOTION PASSED 5-0: AYES: Swan, Mok, Schmidt, Tankha, Tyson
agenda · minutes · packet · packet · packet
2023-01-17Dos PalosAuthorize the City Manager to Sign the Letter of Intent with Syserco Energy Solutions for an Investment Grade Audit
Efficiency retrofits and ESPCs
Other—Approved
5-0
agenda · agenda · minutes · city original
2023-01-17SebastopolApproval of change order proposal to facilitate installation of new roof and solar PV at Library, under existing Energy Services Agreement with Syserco check
Solar and solar PPAs
Amendmentsee sourcerooftop solar PV system
1st Year Total Savings $316,354; Net project 5-year cumulative savings…
No vote recordedstaff report · city original
2022-12-06CampbellAccept the Energy Conservation Upgrades and Infrastructure Improvements (Project No. 21-OO) and direct City Engineer to file Notice of Completion
Efficiency retrofits and ESPCs
Other$4,177,660No vote recordedagenda · city original
2022-11-07PetalumaResolution Authorizing Award of Professional Services Agreement for the City-Wide Energy Efficiency Audit to Syserco Energy Solutions, Inc.
Efficiency retrofits and ESPCs
Award—Approved
Carried 6-0
agenda · minutes · packet · city original
2022-10-03GilroyAward a Contract to Syserco Energy Solutions in the amount of $3,685,718 for Energy Conservation Measures Reimbursable under Pacific Gas & Electric's (PG&E) On-
Efficiency retrofits and ESPCs
Award$3,685,718Eleven ECM items
Total energy cost savings of approximately $8.5M over a period of 15 y…
Approved
APPROVE (Items 2 - 4) [UNANIMOUS]; AYES: Blankley, Armendariz, Bracco, Hilton,…
agenda · minutes · packet · city original
2022-09-13Mountain ViewCommunity Center Resiliency Hub Project-Various Actions: Award contract to Syserco Energy Solutions, Inc. for Community Center Resiliency Hub Project, cost not check
Battery storage
Award$1,213,357
not to exceed
528 kWh battery storage (Option A)
$48,400/year average annual savings over 20 years
Approved
7-0 roll call: Abe-Koga, Kamei, Lieber, Matichak, Showalter, Hicks, Ramirez
staff report · staff report · agenda · minutes · other
2022-06-28Mountain ViewHVAC Replacement at Fire Station No. 1 and City Hall/CPA, Projects 20-18 and 20-54—Accept Construction and Associated Administrative Actions
Efficiency retrofits and ESPCs
Amendment$40,000No vote recordedstaff report · city original
2022-06-15Morgan HillAPPROVE CHANGE ORDER FOR $561,050 FOR INCREASED BATTERY STORAGE FOR CENTENNIAL RECREATION CENTER (CRC) BATTERY STORAGE PROJECT
Battery storage
Amendment$1,061,050528 kWh battery storage
approximately $17,000 in savings over 30 years
Approvedpacket · packet · packet · city original
2022-06-07EmeryvilleResolution consenting to installation of a solar project at Emery Center of Community Life with Emery Unified School District
Solar and solar PPAs
Other—CO2 sensors, HVAC assessment and improvement, LED lighting, building e…
$0.25 per kWh solar offset rate
Approvedstaff report · staff report · minutes · city original