Cities Index.
CCA money · Single-city CCAs

Cities that run their own CCA

Nine California cities buy power for their residents themselves, most through the California Choice Energy Authority (CalChoice). The city is the bank: it lends start-up money, backs the collateral, and carries the CCA's cash shortfalls; in good years the CCA pays the city back and funds city programmes.

Read from the councils' own documents — check the source. Each figure was copied from a staff report, budget, financial statement or set of minutes, by a person or by a language model whose quote had to be found word for word in the document. Every figure links to the passage it came from; the city's original file is the official record. Updated 2026-10-20.

Apple Valley Choice Energy · Baldwin Park Resident Owned Utility District (BPROUD) · CleanPowerSF · Energy for Palmdale's Independent Choice (EPIC) · King City Community Power · Lancaster Energy · Pico Rivera Innovative Municipal Energy (PRIME) · Pomona Choice Energy · Rancho Mirage Energy Authority · San Jacinto Power · San José Clean Energy · Santa Barbara Clean Energy

Apple Valley Choice Energy — Apple Valley

A Town of Apple Valley enterprise run through CalChoice.

Finances by fiscal year

YearRevenueOperating resultBasisSource
FY2022$22.6 million−$2.3 millionauditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2023-04-11Collateral$147,000
city pays
Town cash of $147,000 backed AVCE's CPUC letter of credit; a surety bond paid by AVCE replaces it.passage · city original
2022-03-08Overhead / staff(946,500.00)
city receives
Mid-year budget cuts the General Fund's budgeted 'Administrative Overhead AVCE' transfer-in from fund 5810 by $946,500.passage · city original

What the documents say about rates

Baldwin Park Resident Owned Utility District (BPROUD) — Baldwin Park

Served Baldwin Park from October 2020 until February 2022, when the city returned its customers to SCE.

Finances by fiscal year

YearChange in net positionNet position / fund balanceBasisSource
FY2021−$177,514—as reportedsource
FY2024—$142,685as reported
Audited 06/30/2024 Fund 450 balance as shown in the FY2025 mid-year budget; the documents do not explain the drop from the projected 305,349.
source

Money between the city and its CCA

DateKindFigureWhat it isSource
2023-05-03Loan / transfer to CCA$1,325,000
to date · city pays · approved / budgeted
Council previously authorized up to $1,325,000 in General Fund transfers to the BPROUD escrow account to cover shortfalls; a new $550,000 raises the total to $1,875,000.passage · city original
2023-03-15Repaid to city$1,825,000
city receives
FY23 mid-year: the General Fund books a one-time $1,825,000 transfer from BPROUD to reimburse prior expenses.passage · city original
2023-03-01Repaid to city$3.5 million
city receives
Status report: $3.5 million moved from the BPROUD lockbox account to the General Fund; about $96,000 was left.passage · city original
2022-08-17Repaid to city$274,229
city receives
Staff project $274,229 net revenue to the General Fund after the wind-down; council authorizes repaying the General Fund and Future Development Fund.passage · city original
2022-04-20Loan / transfer to CCA$1,709,431
city pays
FY22 mid-year: General Fund spending revised up $1,709,431, mainly the transfer to BPROUD, expected to be reimbursed from contract sales.passage · city original
2022-03-16Repaid to city$2.9 million
city receives · estimate / proposal
Liquidating and assigning BPROUD energy supply contracts netted about $2.918M, which would help the City recover general fund loans of $2.638M made to BPROUD.passage · city original
2022-03-16Loan / transfer to CCA$2.6 million
to date · city pays · actual / audited
Baldwin Park's general fund loaned and transferred about $2.638M to the BPROUD CCA from July to November 2021, which the city expects to mostly recover.passage · city original
2022-03-16Repaid to city$2,637,568
city receives
Wind-down accounting includes recovering the $2,637,568 of General Fund loans and transfers made to BPROUD.passage · city original
2022-03-16Loan / transfer to CCA$2.6 million
to date · city pays · actual / audited
City General Fund loans and transfers to cover the BPROUD program's deficit totaled $2.637 million; the city expects to recoup most of it through decertification and reversion to SCE.passage · city original
2022-03-16Loan / transfer to CCA$2.6M
city pays
Background: the city provided a loan and transfers totaling $2.6M to operate BPROUD.passage · city original
2022-03-16Collateral$147,000
city receives
Council recalls the $147,000 letter of credit held by River City Bank for SCE, first ratified Feb 2021 to meet CPUC financial-security rules.passage · city original
2021-09-17Loan / transfer to CCAup to $550,000
city pays
Special meeting: General Fund transfer of up to $550,000 to cover September 2021's deficit and avoid a power-contract default.passage · city original
2021-07-07Loan / transfer to CCAup to $775,000
city pays
Item: loan of up to $775,000 from General Fund Reserve to the BPROUD escrow account; minutes record the motion as 'to table'.passage · city original

CleanPowerSF — San Francisco

Run by the San Francisco Public Utilities Commission.

Finances by fiscal year

YearRevenueChange in net positionNet position / fund balanceBasisSource
FY2022——$84.3 millionauditedsource
FY2023$326.8 million$33.7 million$118.0 millionauditedsource
FY2024$366.6 million$60.5 million$178.1 millionauditedsource
FY2025$429.8 million$68.5 million$246.6 millionauditedsource

Energy for Palmdale's Independent Choice (EPIC) — Palmdale

A City of Palmdale enterprise run through CalChoice.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2021———————as reportedsource
FY2022———————as reportedsource
FY2023$29.4 million—−$50,092−$1.1 million−$1.1 million$5.2 million$1.1 millionaudited
change in net position from the city's documents; due to general fund from the city's documents; transfer to general fund from the city's documents
source
FY2024$67.4 million$57.6 million$8.1 million—$7.0 million$11.0 million$0.00audited
due to general fund from the city's documents; transfer to general fund from the city's documents
source
FY2025$78.0 million$69.9 million−$3.4 million−$3.3 million$3.7 million$11.8 million$0.00auditedsource
FY2025$77.0 million——————as reported
'2025 Actuals' column of the FY2027 draft budget (CONTRACT SERVICES 72,205,157; TRANSFERS OUT 13,761, receiving fund not stated). The FY2024-25 ACFR is not in the corpus.
source

Money between the city and its CCA

DateKindFigureWhat it isSource
2025-05-06Loan / transfer to CCA10,951,344
city pays
At 30 Jun 2024 the Palmdale CCA Fund owed the General Fund $10,951,344 in temporary cash-flow loans.passage · city original
2024-02-21Loan / transfer to CCA5,189,007
city pays
At 30 Jun 2023 the Palmdale CCA Fund owed the General Fund $5,189,007 in temporary cash-flow loans.passage · city original
2024-02-21Transfer to city(1,077,918)
city receives
ACFR moves $1,077,918 from the CCA column to governmental activities, shifting the General Fund's negative CCA balance to the enterprise fund.passage · city original
2023-04-05Collateral$147,000
city pays
City cash of $147,000 at River City Bank has backed EPIC's CPUC letter of credit since 2021; a surety bond replaces it.passage · city original

What the documents say about rates

King City Community Power — King City

A single-city CCA run for King City by a contractor.

Finances by fiscal year

YearRevenueOperating resultChange in net positionNet position / fund balanceTransferred to the general fundBasisSource
FY2022$2.3 million−$157,723−$162,069$15,092$0.00auditedsource
FY2023$4.4 million$19,619−$29,814−$14,722$0.00audited
transfer to general fund from the city's documents
source
FY2024$5.4 million$390,553$309,090$294,368$0.00audited
transfer to general fund from the city's documents
source
FY2025$5.0 million$242,880$132,796$427,164$0.00auditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2024-11-26Transfer to city$170,000
city receives
Res. 2024-5016 transfers $170,000 of earned KCCP headroom to the City for the EV charging lot and other needs.passage · city original
2023-02-28Overhead / staff$30,000 per year
city receives
New Pilot agreement: the City is reimbursed a fixed $30,000 each November for staff costs of running KCCP.passage · city original
2022-06-14Transfer to city$90,000
city receives
The budgeted $90,000 KCCP payment to the City is deleted for FY2022-23 because of the CCA's finances.passage · city original
2022-05-24Transfer to city$30,000 to $90,000
city receives
Staff: KCCP has made annual payments of $30,000 to $90,000 to cover City costs.passage · city original

What the documents say about rates

Lancaster Energy — Lancaster

The first single-city CCA in SCE territory; Lancaster leads the California Choice Energy Authority.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2015$275,128——————audited
City enterprise fund 490. Revenue and expenses ($1,430,990) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2016$23.4 million——————audited
City enterprise fund 490. Revenue and expenses ($20,238,595) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2017$36.0 million——————audited
City enterprise fund 490. Revenue and expenses ($33,808,624) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2018$37.5 million——————audited
City enterprise fund 490. Revenue and expenses ($34,290,014) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2019$37.1 million——————audited
City enterprise fund 490. Revenue and expenses ($36,835,001) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2020$43.4 million——————audited
City enterprise fund 490. Revenue and expenses ($39,741,272) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2021$43.8 million——————audited
City enterprise fund 490. Revenue and expenses ($47,013,871) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2021$46.6 million$43.7 million−$436,880−$1.3 million$5.1 million—$839,136auditedsource
FY2022$51.7 million——————audited
City enterprise fund 490. Revenue and expenses ($51,194,116) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.
source
FY2022————$5.2 million——audited
The FY2021-22 ACFR is not in the corpus; $5,218,931 is the LCE net position at 30 Jun 2022 as given for the beginning of FY2022-23 in the FY2022-23 ACFR.
source
FY2022———————as reported
Division 9100 LCE expenditures, FY22 actuals, from the FY2023-24 proposed budget.
source
FY2023$68.5 million$59.1 million$1.4 million$3.8 million$9.0 million—$898,095audited
City enterprise fund 490. Revenue and expenses ($67,149,222) from the 10-year table in the statistical section of the FY2024 ACFR; no other figures for this year.; cost of electricity from the city's documents; operating income from the city's documents; change in net position from the city's documents; net position from the city's documents; transfer to general fund from the city's documents
source
FY2024$82.0 million$64.1 million$2.2 million$563,123$9.5 million$12.0 million$2.1 millionaudited
due to general fund from the city's documents; transfer to general fund from the city's documents
source
FY2025$84.3 million$77.2 million−$3.0 million−$3.1 million$6.5 million$11.0 million$940,864auditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2026-02-24Loan / transfer to CCA11,042,696
city pays
At 30 Jun 2025 the LCE enterprise fund owed the General Fund $11,042,696 from temporary deficit cash balances.passage · city original
2026-02-24Transfer to city940,864
city receives
FY2024-25 ACFR: General Fund transfers in from the LCE enterprise fund of $940,864.passage · city original
2025-08-12Collateral$4,103,705.00
city backs · estimate / proposal
Starting September 1, 2025, Lancaster Energy's financial security requirement rises from $147,000 to $4,103,705, to be met by a city-authorized surety bond.passage · city original
2025-08-12Collateral$100,000
a year · city backs · approved / budgeted
Council authorized the City Manager to execute amended surety bond documents for Lancaster Energy's financial security requirement, with annual bond fee not to exceed $100,000.passage · city original
2025-08-12Collateral$41,037.05
a year · city backs · estimate / proposal
Annual surety bond fee for Lancaster Energy's financial security requirement rises to about $41,037.05 from September 1, 2025; paid from Lancaster Energy funds, with city executing the bond.passage · city original
2025-06-10Loan / transfer to CCA12,018,696
city pays
At 30 Jun 2024 the LCE enterprise fund owed the General Fund $12,018,696 from temporary deficit cash balances.passage · city original
2025-06-10Transfer to city2,095,405
city receives
FY2023-24 ACFR: General Fund transfers in from the LCE enterprise fund of $2,095,405.passage · city original
2024-06-11Overhead / staff1,862,829
city receives
Communications & Lancaster TV division charged $1,862,829 to fund 501 (Lancaster Choice Energy), FY2025 budget.passage · city original
2024-06-11Overhead / staff1,219,845
city receives
Communications & Lancaster TV division charged $1,219,845 to fund 501 (Lancaster Choice Energy), FY2024 revised.passage · city original
2024-06-11Overhead / staff147,329
city receives
City Council division charged $147,329 to fund 501 (Lancaster Choice Energy), FY2023 actual.passage · city original
2024-06-11Overhead / staff55,290
city receives
Communications & Lancaster TV division charged $55,290 to fund 501 (Lancaster Choice Energy), FY2023 actual.passage · city original
2024-05-07Loan / transfer to CCA11,991,715
city pays
At 30 Jun 2023 the CalChoice (CCEA) enterprise fund, then reported as a City fund, owed the General Fund $11,991,715.passage · city original
2024-05-07Transfer to city898,095
city receives
FY2022-23 ACFR: LCE transferred $898,095 to the General Fund for administrative and retiree health costs.passage · city original
2023-11-14Overhead / staff$176,000
city receives
Two new City positions, including an Accountant for Lancaster Energy, funded by Lancaster Energy for six months in fund 501.passage · city original
2023-10-10Collateral$2,077,101
city backs · actual / audited
The CCEA cash collateral account, tied to Lancaster Choice Energy, held $2,077,101 at the end of August 2023 in the city's treasurer's report, earning 0.90% interest.passage · city original
2023-04-11Collateral$147,000
city pays
City cash of $147,000 at River City Bank backed Lancaster Energy's CPUC letter of credit; a surety bond paid by LE replaces it.passage · city original
2022-06-28Loan / transfer to CCA2,667,878
city pays
FY2020-21: LCE received $2,667,878 from other City funds and owed the same amount as 'Due to Other Funds' at 30 Jun 2021.passage · city original
2022-06-28Transfer to city839,136
city receives
FY2020-21 ACFR: LCE enterprise fund transferred $839,136 to the General Fund for administrative and retiree health costs.passage · city original
2022-06-28Overhead / staff799,108
city receives
Budget line 'GENERAL FUND OVERHEAD' in the LCE & LPA division, FY2020-21 actual.passage · city original
2022-06-28Overhead / staff640,427
city receives
Budget line 'GENERAL FUND OVERHEAD' in the LCE & LPA division, FY2021-22 estimate.passage · city original

What the documents say about rates

Pico Rivera Innovative Municipal Energy (PRIME) — Pico Rivera

A City of Pico Rivera enterprise run through CalChoice.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2021$14.8 million——−$1.3 million$3.8 million——auditedsource
FY2022$18.0 million——$808,011$4.9 million——auditedsource
FY2023$24.0 million$17.7 million$5.1 million$5.5 million$10.4 million—$0.00audited
Beginning-of-year net position in the FY2024 ACFR (Pico Rivera fund 560).; operating revenue from the city's documents; cost of electricity from the city's documents; operating income from the city's documents; change in net position from the city's documents; transfer to general fund from the city's documents
source
FY2024$28.3 million$20.2 million$6.8 million$7.3 million$17.6 million——auditedsource
FY2024$28.8 million——$7.3 million$17.6 million——audited
Table 9 in the ACFR staff report; MD&A gives operating revenues of $28.15 million and operating expenses of $21.51 million.
source
FY2025$28.4 million$23.2 million$3.6 million$4.3 million$22.0 million$0.00$0.00auditedsource
FY2025$29.1 million——$4.3 million$22.0 million——auditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2023-03-28Collateral$147,000
city pays
City cash of $147,000 at River City Bank backed PRIME's letter of credit since 2020; a surety bond paid by Fund 560 replaces it.passage · city original
2023-03-28Collateral$25,000
a year · city backs · estimate / proposal
City would pay about $25,000 per year, up to $125,000 over five years, for a surety bond meeting PRIME's financial security requirement.passage · city original

What the documents say about rates

Pomona Choice Energy — Pomona

A City of Pomona enterprise run through CalChoice.

Finances by fiscal year

YearRevenueOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2021$10.6 million$578,976$575,565$533,712$183,484$0.00auditedsource
FY2022$34.8 million−$938,783−$954,528−$420,816—$0.00auditedsource
FY2023$48.9 million$8.4 million$8.3 million$7.9 million—$0.00auditedsource
FY2024$57.2 million$8.9 million$9.0 million$16.9 million$0.00$0.00auditedsource
FY2025$61.2 million$5.5 million$6.3 million$23.2 million$0.00$0.00auditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2026-06-15Loan / transfer to CCA$2,195,501
city pays
Water Enterprise Fund advance to PCE outstanding at June 30, 2025.passage · city original
2026-03-16Overhead / staff$418k
city receives · estimate / proposal
Staff requests a $418k mid-year appropriation to Pomona's Energy Choice Fund, correcting an entry omitted from the first-quarter action tied to General Fund administrative services, in FY 2025-26.passage · city original
2025-12-15Repaid to city$7.7 million
city receives
PCE makes its final Water Fund loan payment on December 1, 2025; the three loans totalled $7.7 million.passage · city original
2025-12-15Repaid to city$47,500
city receives
Five-year update: loan payments to the General Fund of $47,500; Water Fund repaid in full.passage · city original
2025-11-17Overhead / staff$418,088
city receives
General Fund books $418,088 of recovered PCE administrative costs and spends it on the City Hall remodel.passage · city original
2024-01-22Loan / transfer to CCA$6,475,682
city pays
Water Enterprise Fund advance to PCE outstanding at June 30, 2023.passage · city original
2022-05-09Loan / transfer to CCA$6.9M
city pays · approved / budgeted
Pomona budgeted $6.9M in the Water Fund in FY 2021-22 for a loan to Pomona Choice Energy, which explains part of the FY 2022-23 Enterprise Funds decrease.passage · city original
2022-01-24Loan / transfer to CCA$735,836
city pays
Water Enterprise Fund advance to PCE outstanding at June 30, 2021.passage · city original
2022-01-24Loan / transfer to CCA$183,484
city pays
PCE owed the General Fund $183,484 (short-term, negative cash) at June 30, 2021.passage · city original
2022-01-10Loan / transfer to CCA$4.5 million
city pays · approved / budgeted
On July 19, 2021, Pomona's council authorized a $4.5 million loan from the Water Fund to Pomona Choice Energy to cover revenue shortfalls.passage · city original
2022-01-10Loan / transfer to CCA$2,400,000
city pays
Res. 2022-09: third Water Fund loan for an energy-cost cash shortfall, 1.25% interest (about $72,500), repaid from year-end surplus.passage · city original
2022-01-10Loan / transfer to CCA$783,428
city pays
Resolution recital: Water Fund reserves loaned to the CCA fund (Mar 2, 2020) to create Pomona Choice Energy.passage · city original
2022-01-10Repaid to city$72,500
over several years · city receives · estimate / proposal
Estimated interest of $72,500 that Pomona Choice Energy Authority Fund would pay the city's Water Fund on the $2.4 million loan, under an estimated payment schedule.passage · city original
2022-01-10Loan / transfer to CCA$47,250
city pays
Resolution recital: General Fund money for the CCA implementation plan (Oct 15, 2018); repaid per the 2025 five-year update.passage · city original

What the documents say about rates

Rancho Mirage Energy Authority — Rancho Mirage

A City of Rancho Mirage enterprise run through CalChoice.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2018————$759,966——audited
Rancho Mirage enterprise fund. Net position and expenses ($1,334,576) from the statistical section of the FY2023 ACFR; no other figures for this year.
source
FY2019————$2.7 million——audited
Rancho Mirage enterprise fund. Net position and expenses ($16,039,442) from the statistical section of the FY2023 ACFR; no other figures for this year.
source
FY2020————$4.2 million——audited
Rancho Mirage enterprise fund. Net position and expenses ($18,162,800) from the statistical section of the FY2023 ACFR; no other figures for this year.
source
FY2021$17.9 million———$3.0 million——audited
Rancho Mirage enterprise fund. Net position and expenses ($19,099,441) from the statistical section of the FY2023 ACFR; no other figures for this year.; operating revenue from the city's documents
source
FY2022$20.4 million——−$2.0 million$963,566——audited
Rancho Mirage enterprise fund. Net position and expenses ($22,399,936) from the statistical section of the FY2023 ACFR; no other figures for this year.; operating revenue from the city's documents; change in net position from the city's documents
source
FY2023$30.8 million—$7.2 million$7.3 million$8.2 million——auditedsource
FY2023$30.9 million$22.5 million——$8.2 million——as reportedsource
FY2024$39.7 million—$11.2 million$11.5 million$19.7 million$0.00$0.00auditedsource
FY2024$40.0 million$27.4 million——$19.7 million——as reported
'Actual' column of the FY2025-27 budget: beginning $ 8,225,359; 4230 Energy Charges $ 39,756,498. Fund 600 also paid City staff salaries $ 45,109 and benefits $ 18,147.
source
FY2025$35.0 million—−$2.1 million−$1.4 million$18.3 million$0.00$0.00auditedsource
FY2025$35.7 million——−$1.4 million$18.3 million——as reportedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2025-06-05Overhead / staff$ 306,204
city receives
Fund 600 pays City staff salaries (shares of City Manager and finance staff, plus sustainability staff), FY2026-27 budget.passage · city original
2025-06-05Overhead / staff$ 289,712
city receives
Fund 600 pays City staff salaries (shares of City Manager and finance staff, plus sustainability staff), FY2025-26 budget.passage · city original
2025-06-05Overhead / staff$ 269,803
city receives
Fund 600 pays City staff salaries (shares of City Manager and finance staff, plus sustainability staff), FY2024-25 estimate.passage · city original
2025-06-05Overhead / staff$ 115,731
city receives
Fund 600 pays benefits for the City staff it carries, FY2026-27 budget.passage · city original
2025-06-05Overhead / staff$ 109,274
city receives
Fund 600 pays benefits for the City staff it carries, FY2025-26 budget.passage · city original
2025-06-05Overhead / staff$ 108,339
city receives
Fund 600 pays benefits for the City staff it carries, FY2024-25 estimate.passage · city original
2025-06-05Overhead / staff$ 45,109
city receives
Fund 600 pays City staff salaries (shares of City Manager and finance staff, plus sustainability staff), FY2023-24 actual.passage · city original
2025-06-05Overhead / staff$ 18,147
city receives
Fund 600 pays benefits for the City staff it carries, FY2023-24 actual.passage · city original
2023-04-06Collateral$147,000
city pays
City cash of $147,000 backed RMEA's CPUC letter of credit since 2018; a surety bond replaces it and the cash returns to the City.passage · city original

What the documents say about rates

San Jacinto Power — San Jacinto

A City of San Jacinto enterprise run through CalChoice.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2018———————as reported
Fund 048 expenditure history in the FY2022-23 budget, column headed Audited (OCR drops the fund number '48' into the row). SJP began serving customers April 2018.
source
FY2019———————as reported
Fund 048 expenditure history in the FY2022-23 budget, column headed Audited (OCR drops the fund number '48' into the row).
source
FY2020———————as reported
Fund 048 expenditure history in the FY2022-23 budget, column headed Audited (OCR drops the fund number '48' into the row).
source
FY2021————$1.3 million——as reportedsource
FY2022$14.9 million$14.9 million−$901,746−$901,746$414,306$2.8 million$0.00auditedsource
FY2023$20.4 million$17.9 million$1.6 million$1.6 million$2.1 million$2.6 million$0.00audited
operating revenue from the city's documents; cost of electricity from the city's documents; operating income from the city's documents; change in net position from the city's documents; due to general fund from the city's documents; transfer to general fund from the city's documents
source
FY2024$26.1 million$20.8 million$4.3 million$4.2 million$6.2 million$1.6 million$0.00audited
due to general fund from the city's documents; transfer to general fund from the city's documents
source
FY2025$26.2 million$22.5 million$2.7 million$2.6 million$8.9 million$0.00$0.00auditedsource

Money between the city and its CCA

DateKindFigureWhat it isSource
2026-05-05Overhead / staff96,945
city receives
FY2024-25 ACFR: the Power Fund paid 'Overhead allocations' of $96,945 to the City.passage · city original
2025-03-18Loan / transfer to CCA1,617,391
city pays
At June 30, 2024 the Power Fund owed the General Fund $1,617,391 as a temporary loan.passage · city original
2025-03-18Repaid to city(975,942)
city receives
FY2023-24: the Power Fund paid $975,942 (net) to other City funds, reducing the General Fund loan.passage · city original
2025-03-18Overhead / staff111,043
city receives
FY2023-24 ACFR: the Power Fund paid 'Overhead allocations' of $111,043 to the City.passage · city original
2024-05-21Loan / transfer to CCA2,593,333
city pays
At June 30, 2023 the Power Fund owed the General Fund $2,593,333 as a temporary loan.passage · city original
2024-05-21Repaid to city(248,772)
city receives
FY2022-23: the Power Fund paid $248,772 (net) to other City funds, reducing the General Fund loan.passage · city original
2024-05-21Overhead / staff119,294
city receives
FY2022-23 ACFR: the Power Fund paid 'Overhead allocations' of $119,294 to the City.passage · city original
2023-03-21Loan / transfer to CCA2,842,105
city pays
At June 30, 2022 the Power Fund had no cash and owed the General Fund $2,842,105 as a temporary loan.passage · city original
2023-03-21Collateral$147,000
city pays
City cash of $147,000 collateralised SJP's CPUC letter of credit; a surety bond replaces it and the cash returns to the City.passage · city original
2023-03-21Overhead / staff108,120
city receives
FY2021-22 ACFR: the Power Fund paid 'Overhead allocations' of $108,120 to the City.passage · city original

What the documents say about rates

San José Clean Energy — San Jose

A department of the City of San José.

Finances by fiscal year

YearRevenuePower costOperating resultChange in net positionNet position / fund balanceRate stabilization fundBasisSource
FY2022$351.1 million—$19.8 million—$48.3 million—auditedsource
FY2023$515.5 million—$129.1 million$127.7 million$176.1 million—audited
Source table in $000, converted to dollars. Comparatives also in the FY2024 statements.
source
FY2024$492.3 million$389.2 million$78.7 million$83.8 million$259.9 million$50.0 millionauditedsource
FY2025$467.5 million$427.7 million$9.2 million$22.9 million$282.4 million$106.0 millionauditedsource
FY2026————$294.3 million—unaudited
Unaudited quarterly statement: net position at 30 Sep 2025.
source

Money between the city and its CCA

DateKindFigureWhat it isSource
2026-06-02Overhead / staff24%
city pays · estimate / proposal
Proposed collection fee for delinquent San José Clean Energy closed-account charges would range from 24% up to 30%, paid to Collection Bureau of America, a collection contractor.passage · city original
2025-12-09Collateral$625,000,000
city backs · actual / audited
Total authorized amount across the city's variable rate credit programs, including a $175 million San José Clean Energy letter of credit; $87.8 million outstanding as of June 30, 2025.passage · city original
2025-12-09Collateral$375 million
city backs · actual / audited
As of June 30, 2025, San José's SOFR-based borrowing exposure totals $375 million, including a $175 million revolving credit facility for SJCE and $200 million for the wastewater facility.passage · city original
2025-12-09Collateral$1,953,614
city backs · actual / audited
As of June 30, 2025, $1,953,614 was outstanding on a $175 million JP Morgan letter of credit facility backing San José Clean Energy power provider contracts, expiring 2/17/2028.»passage · city original
2025-12-02Collateral$25 million
city backs · actual / audited
In April 2025 the City cut the JPMorgan standby letter of credit facility (two years or less) securing SJCE power purchase obligations from $100 million to $25 million.passage · city original
2024-02-07Loan / transfer to CCA$90m
city pays · actual / audited
The City extended $90 million of credit to San José Clean Energy in 2021, which was followed by a $47 million loss; later earnings paid off almost all debt.passage · city original
2023-06-20Collateral$175 million
city backs · approved / budgeted
On August 31, 2021 the City authorized raising the commercial paper program cap from $125 million to $175 million, with letter of credit support; part funds San José Clean Energy costs.passage · city original
2023-06-14Loan / advance$75,000,000
city backs · estimate / proposal
Council proposes reducing the Financing Authority's lease revenue commercial paper authorization for San José Clean Energy power purchases and operating costs to a maximum of $75 million.passage · city original
2022-12-13Collateral$35,000,000
city backs · actual / audited
In November 2018 San José entered a Barclays credit agreement supporting San José Clean Energy, including a $35 million standby letter of credit facility, later amended to $65 million.passage · city original
2022-12-13Collateral$10 million
to date · city backs · actual / audited
San José Clean Energy has used about $10 million of the city's Barclays standby letter of credit facility (up to $65 million) for collateral, as of December 2022.passage · city original
2022-12-06Collateral$615 million
city backs · actual / audited
As of June 30, 2022, San Jose has about $615 million in letters of credit securing commercial paper programs and credit facilities, including one for San José Clean Energy.passage · city original
2022-12-06Collateral$250 million
city backs · estimate / proposal
City sought up to $250 million in revolving credit and standby letter of credit facilities supporting San José Clean Energy operations; JPMorgan Chase recommended, contract negotiations pending as of November 2022.passage · city original
2022-12-06Loan / advance$66.95 million
city backs · actual / audited
As of June 30, 2022, $66.95 million of City financing authority taxable commercial paper notes were outstanding, issued partly to finance San José Clean Energy costs and operations.passage · city original
2022-12-06Collateral$65.0 million
city backs · actual / audited
As of June 30, 2022, the City's standby letter of credit facility for San José Clean Energy had a $65 million sublimit, with $27.644 million committed and $37.356 million remaining.passage · city original
2022-12-06Collateral$50,000,000
city backs · approved / budgeted
City Council authorized in 2018 a Barclays revolving credit agreement up to $50 million, borrowed by the City to finance San José Clean Energy start-up costs, power purchases and letters of credit.passage · city original
2022-12-06Collateral$37.4 million
city backs · actual / audited
As of June 30, 2022, about $37.356 million remained available under the standby letter of credit facility the City backs for SJCE collateral calls; the marked figure is truncated ($3 7,356 thousand).passage · city original
2022-12-06Collateral$20,000,000
city backs · actual / audited
Under its credit agreement with the Bank, the City must keep $20 million in the SJCE Operating Reserve Account at all times since June 24, 2021, and has complied.passage · city original
2022-06-16Loan / transfer to CCA$15.0 million
city pays · approved / budgeted
City Council allocated $15.0 million of Commercial Paper note authorization in 2020-2021 to cover San José Clean Energy's projected cash flow shortage.passage · city original
2022-03-29Loan / transfer to CCA$100 million
to date · city pays · approved / budgeted
A June 2021 amendment to the Barclays credit agreement lets San José lend commercial paper proceeds to SJCE up to $100 million, raised from $10 million.passage · city original
2022-03-29Loan / advance$95 million
city backs · approved / budgeted
City Council and Authority approved up to $95 million in lease revenue commercial paper notes in June 2021 to finance SJCE power purchases and operating costs; $60 million issued by Feb 2022.passage · city original
2022-03-29Collateral$80,000
city backs · approved / budgeted
Barclays credit agreement with the City caps combined revolving loans and standby letters of credit for San José Community Energy at $80 million outstanding at any time, secured by SJCE revenues.passage · city original
2022-03-29Loan / transfer to CCA$ 60.0 million
to date · city pays · actual / audited
As of Feb 28, 2022, $60.0 million of City-backed lease revenue commercial paper was issued to fund SJCE power purchases and operating costs, to be repaid from SJCE revenues.passage · city original
2022-03-29Collateral$30,000,000
city backs · approved / budgeted
Barclays committed up to $30 million in revolving loans to the City to finance SJCE start-up and power purchase costs, secured by SJCE revenues; facility expired November 2021.passage · city original
2022-03-08Collateral25%
city backs · estimate / proposal
Under the CC Power long-duration storage contracts, each participating CCA, including SJCE, would absorb up to 25% extra share of costs if other CCAs default.passage · city original

Santa Barbara Clean Energy — Santa Barbara

A City of Santa Barbara enterprise run through CalChoice; its default is 100% renewable.

Finances by fiscal year

YearRevenueOperating resultChange in net positionNet position / fund balanceOwed to the city's general fundTransferred to the general fundBasisSource
FY2022————$2.1 million—auditedsource
FY2022$16.3 million—$763,421———as reported
FY2022 actuals in the FY2023 year-end report table ('Add / (Use) Reserves' $763,421 shown as change). First year of service (residential from October 2021).
source
FY2023$43.4 million$5.8 million$5.9 million$4.3 million$2.1 million—audited
Beginning-of-year net position in the FY2024 ACFR; FY2023 service charges given only as "$43.0M".; operating revenue from the city's documents; operating income from the city's documents; due to general fund from the city's documents; change in net position from the city's documents
source
FY2024$54.1 million$20.7 million$21.0 million$25.2 million$2.1 million—audited
due to general fund from the city's documents
source
FY2024$51.3 million—$21.3 million———as reportedsource
FY2025$46.9 million−$9.4 million−$8.5 million$16.8 million$0.00$0.00auditedsource
FY2025$45.2 million—−$11.1 million———as reportedsource
FY2026$43.8 million—$2.2 million———as reported
FY2026 year-end report ('operating gain of $2.2 Million'; 'Add/(Use) Reserves' $2,231,866 shown as change).
source

Money between the city and its CCA

DateKindFigureWhat it isSource
2025-05-13Overhead / staff$432,206
city receives
Sustainability & Resilience office lease ($432,206 gross) is split among Creeks, Solid Waste and SBCE funds; SBCE share not stated.passage · city original
2025-03-18Loan / transfer to CCA$2,131,691
city pays
ACFR: General Fund startup advance to SBCE was $2,131,691 at June 30, 2024 (still growing).passage · city original
2025-02-25Overhead / staff$4,566
city receives
Position reclassification costing $4,566 in FY2025: half grant-funded, the rest funded by SBCE.passage · city original
2024-07-02Overhead / staff$320k
city receives
CAP staffing table: two Energy & Climate Specialists, $320k in FY26, funded by SBCE and grants.passage · city original
2024-07-02Overhead / staff$200k
city receives
CAP staffing table: SBCE Programs Manager position, $200k in FY25, funded by SBCE.passage · city original
2024-07-02Overhead / staff$160k
city receives
CAP staffing table: Grant Writer position, $160k in FY25, funded by SBCE.passage · city original
2024-04-16Loan / transfer to CCA$2,096,996
city pays
ACFR: General Fund advance to SBCE was $2,096,996 at June 30, 2023 (larger than a year earlier).passage · city original
2023-04-11Collateral$25,000.00
city backs · approved / budgeted
Council approved a surety bond up to $25,000 to meet the financial security requirement for the city's Santa Barbara Clean Energy CCA program, April 2023.passage · city original
2023-03-14Loan / transfer to CCA$2,062,957
city pays
ACFR: General Fund advance to SBCE was $2,062,957 at June 30, 2022, at 1.65%, repayable over five years from FY2023.passage · city original
2023-03-14Loan / transfer to CCA$1.55 million
city pays
FY22 General Fund budget amendment advanced $1.55 million to the Clean Energy fund for startup costs.passage · city original
2023-03-14Loan / advance1.65%
a year · city receives · actual / audited
The General Fund advanced $2,062,957 to the Clean Energy Enterprise Fund for Santa Barbara Clean Energy start-up costs, carrying 1.65% interest, repayable annually over five years starting FY2023.passage · city original
2022-09-27Loan / transfer to CCA$542,161
city pays
Staff request an additional $542,161 loan at FY2022 year-end; whether it was disbursed is not stated.passage · city original
2022-06-08Overhead / staff$ 80,729
city receives
FY2023 budget moves the Energy Analyst II position from the General Fund to the Clean Energy Fund.passage · city original
2022-03-08Repaid to city$500,000
city receives
Finance Committee refuses to forgive a $500,000 loan payment due to the General Fund; a one-year deferral to be considered.passage · city original
2020-11-17Loan / transfer to CCA$2 million
city pays
Council approves a $2 million General Fund loan (from the SCE Thomas Fire settlement) to SBCE; minutes reproduced in the March 2022 packet.passage · city original
2020-11-17Collateral$147,000Same action: $147,000 from the SBCE fund deposited in the City's River City Bank escrow account as financial security.passage · city original

What the documents say about rates